Overlying strata separation layer grouting device and method

By designing a rock-covered off-stratum grouting device, the flexible ratio of the multi-tube body structure and the slurry inlet are used to solve the problems of drilling fluid loss and signal transmission, and the efficient stability of drilling and grouting is achieved.

CN119021633APending Publication Date: 2024-11-26CHINA COAL SCI & ENG ECOLOGICAL ENVIRONMENT TECH CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411118876.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

During the rock-covered destrata grouting process, drilling fluid is prone to leakage, resulting in directional drilling equipment being unable to transmit signals normally, affecting the directional and grouting efficiency of drilling holes, especially in large fault structures, which are serious loss of recurrence.

Method used

A rock-covered off-layer grouting device is designed, including a first pipe body, a second pipe body and a third pipe body. Different ratios of slurry are pumped into different slurry through different slurry inlets to achieve flexible adjustment and separation of slurry. Ensure that the grouting device can continue to work normally when one inlet fails, and seal it in time when the drilling fluid is leaking.

Benefits of technology

It effectively improves drilling efficiency and grouting quality, ensures signal transmission and slurry sealing during drilling, reduces the occurrence of leakage, and improves the stability and efficiency of the overall project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021633A_ABST
    Figure CN119021633A_ABST
Patent Text Reader

Abstract

The invention discloses an overlying strata separation layer grouting device which comprises a first pipe body, a second pipe body and a third pipe body, the first pipe body is provided with a first slurry inlet and a first slurry outlet, slurry is suitable for entering the first pipe body through the first slurry inlet and being discharged through the first slurry outlet, the second pipe body is provided with a second slurry inlet and a second slurry outlet, and the third pipe body is suitable for being discharged through the second slurry outlet. Slurry is suitable for entering the second pipe body through the second slurry inlet and being discharged through the second slurry outlet, at least part of the first pipe body extends into the second pipe body, the first slurry outlet is located in the second pipe body, one end of the third pipe body is communicated with the first slurry outlet, and the other end of the third pipe body extends out of the second slurry outlet. The overlying strata separation layer grouting device has the advantages of being flexible in adjustment and high in grouting efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of overburden rock separation layer grouting, and in particular to an overburden rock separation layer grouting device and method. Background Art

[0002] Overburden delamination refers to the existence of horizontal or vertical rock cracks, interlayers, joints and other discontinuous surfaces in the rock mass. These discrete surfaces will pose a threat to the stability of engineering construction or underground projects. Therefore, it is necessary to inject grouting inside the cracks, interlayers, etc. to fill and solidify the cracks and discrete surfaces in the rock mass to enhance the stability and bearing capacity of the rock mass.

[0003] When grouting the overburden separation layer, drilling is first performed. In related technologies, directional drilling is often used for drilling. During the implementation of directional drilling, the drilling fluid in the borehole needs to circulate back and forth to achieve signal transmission. However, during the implementation, the drilling fluid is easily lost due to the influence of advanced mining or adjacent goaf areas. Especially when drilling into a larger fault structure, there may even be a phenomenon of loss of return, making it difficult for the drilling fluid to circulate normally, and the directional drilling equipment cannot transmit signals, affecting the direction of the drilling. Summary of the invention

[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent. To this end, an embodiment of the present invention provides an overburden separation grouting device and method.

[0005] The overburden separation grouting device of the embodiment of the present invention comprises:

[0006] A first tube body, wherein the first tube body has a first slurry inlet and a first slurry outlet, and the slurry is suitable for entering the first tube body through the first slurry inlet and being discharged through the first slurry outlet;

[0007] a second tube body, the second tube body having a second slurry inlet and a second slurry outlet, the slurry is suitable for entering the second tube body through the second slurry inlet and being discharged through the second slurry outlet, at least part of the first tube body extends into the second tube body, and the first slurry outlet is located in the second tube body;

[0008] A third tube body, one end of which is connected to the first slurry outlet, and the other end of which extends out of the second slurry outlet.

[0009] In the overburden delamination grouting device of the embodiment of the present invention, the slurry entering the first tube body through the first slurry inlet enters the third tube body through the first slurry outlet and flows out through the third tube body, and the slurry entering the second tube body through the second slurry inlet is located between the inner wall surface of the second tube body and the outer wall surface of the first tube body, and flows out through the second slurry outlet. Thus, the slurry in the first tube body and the second tube body is separated, so that slurries of different proportions and types can be pumped into the first slurry inlet and the second slurry inlet respectively, so that the grouting device can be flexibly adjusted to improve the grouting efficiency; when one of the slurry inlets cannot grout normally, the other slurry inlet can ensure the normal progress of the grouting work; when drilling fluid leakage occurs during the drilling process, the borehole can be sealed in time to improve the drilling efficiency.

[0010] In some embodiments, the first pipe body has a reserved joint, the first slurry outlet is formed on the reserved joint, the reserved joint extends into the second pipe body, and the reserved joint is connected to one end of the third pipe body.

[0011] In some embodiments, the first tube body and the second tube body are integrally formed.

[0012] The overburden separation grouting device also includes a first isolation plate, which is arranged between the first pipe body and the second pipe body and surrounds the outer circumference of the reserved joint to separate the first pipe body from the second pipe body.

[0013] In some embodiments, the overburden separation grouting device further comprises:

[0014] a second isolation plate, the second isolation plate being arranged between the first tube body and the second tube body, the second isolation plate having a through hole, the reserved joint extending into the second tube body through the through hole and connected to the third tube body;

[0015] A connecting piece, the connecting piece is arranged on the second isolation plate, the reserved joint is connected to the second isolation plate through the connecting piece and passes through the through hole;

[0016] A sealing member, the sealing member is disposed between the second isolation plate and the connecting member and is arranged around the outer circumference of the reserved joint;

[0017] A reinforcement member, one end of which is connected to the second isolation plate, and the other end of which is connected to the outer peripheral surface of the first tube body.

[0018] In some embodiments, the central axis of the first tube body, the central axis of the second tube body and the central axis of the third tube body are collinear, there are multiple first slurry inlets, and the multiple first slurry inlets are arranged at intervals along the extension direction of the first tube body.

[0019] In some embodiments, the overburden separation grouting device further comprises:

[0020] A first valve, wherein the first slurry inlet and the second slurry inlet are both provided with the first valve;

[0021] A pressure gauge, wherein the first slurry inlet and the second slurry inlet are both provided with the pressure gauge;

[0022] A second valve, wherein the second valve is arranged at the pressure gauge.

[0023] In some embodiments, the overburden separation grouting device further includes a flower pipe, which is connected to the other end of the third tube body.

[0024] The overburden separation grouting method of the embodiment of the present invention comprises:

[0025] Drilling holes at predetermined locations to form grouting holes;

[0026] Determine the connection between the grouting hole and the fault fracture zone, and when the grouting hole is connected with the fault fracture zone, perform grouting to seal the grouting hole;

[0027] A grouting device is arranged in the grouting hole, and the grouting device is the grouting device according to any one of claims 1 to 7;

[0028] Water is introduced into the grouting hole through the grouting device to perform a water pressure test;

[0029] Grouting is injected into the grouting hole through the grouting device.

[0030] According to the overburden separation grouting method of the embodiment of the present invention, when drilling fluid leakage occurs during the drilling process, the borehole can be sealed in time to reduce the settlement rate, improve the drilling efficiency, and ensure the quality of the grouting hole.

[0031] In some embodiments, when the grouting hole is blocked:

[0032] Inject slurry into the grouting hole, and after the slurry solidifies, check the blocking condition of the grouting hole;

[0033] Introducing slurry into the first pipe body through the first slurry inlet of the grouting device, observing the detection values ​​of the pressure gauge provided on the first slurry inlet and the pressure gauge provided on the second slurry inlet, and when the detection values ​​of the pressure gauge on the first slurry inlet and the pressure gauge on the second slurry inlet are both zero, increasing the amount of slurry pumped into the grouting hole;

[0034] A preset value is set, and when the difference between the detection value of the pressure gauge on the first grout inlet and the detection value of the pressure gauge on the second grout inlet is less than the preset value, the grouting pressure is controlled and the flow rate of the slurry is adjusted, and when the grouting pressure is less than the pressure of the plane where the bottom surface of the grouting hole is located, water is introduced into the grouting hole;

[0035] The pressure gauge on the first grout inlet has a detection value. When the detection value of the pressure gauge on the second grout inlet is zero, the gap between the first pipe body and the second pipe body is blocked or the gap between the inner wall surface of the grouting hole and the outer wall surface of the grouting device is blocked, and water is pressed into the second pipe body from the second grouting inlet to clean the gap. When the slurry in the grouting hole reaches a preset grouting volume or a preset grouting pressure, water is pressed into the first pipe body and the second pipe body, and then the grouting device is moved to the upper end of the grouting hole.

[0036] In some embodiments, slurry is pumped into the first tube body from a first slurry inlet far away from the second tube body. After the slurry reaches the bottom surface of the grouting hole, an accelerator is pumped into the first tube body from a first slurry inlet near the second tube body. After the slurry is pumped in, water is pressed into the first tube body through the first slurry inlet and into the second tube body through the second slurry inlet. After the water pressure is completed, water is again pressed into the first tube body through the first slurry inlet far away from the second tube body and into the second tube body through the second slurry inlet. When the pressure gauge detects the pressure, the pumping of the accelerator is stopped and the slurry is used for sealing. After the preset total grouting volume is reached, the grouting is stopped. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a schematic diagram of a first embodiment of an overburden separation grouting device according to an embodiment of the present invention.

[0038] Figure 2 It is a schematic diagram of a second embodiment of the overburden separation grouting device according to an embodiment of the present invention.

[0039] Figure 3 Schematic diagram of a flower tube of a grouting device for overburden separation according to an embodiment of the present invention.

[0040] Figure 4 It is a schematic flow chart of a grouting method for overburden separation grouting directional drilling through a fault fracture zone according to an embodiment of the present invention.

[0041] Figure 5 It is a flow chart of the comprehensive technology and method for lowering the grouting pipe for grouting the overburden separation layer according to the embodiment of the present invention.

[0042] Figure 6 It is a flow chart of the overburden rock separation grouting water pressure test technology and method according to an embodiment of the present invention.

[0043] Figure 7 It is a schematic flow chart of a grouting method for typical stages of overburden separation grouting according to an embodiment of the present invention.

[0044] Figure numerals: 1, first tube body; 11, first slurry inlet; 12, first slurry outlet; 13, reserved joint; 2, second tube body; 21, second slurry inlet; 22, second slurry outlet; 3, third tube body; 41, first isolation plate; 42, second isolation plate; 421, perforation; 51, connector; 511, connecting hole; 52, sealing member; 53, reinforcement member; 61, first valve; 62, pressure gauge; 63, second valve; 64, flower tube; 641, spray hole. DETAILED DESCRIPTION

[0045] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0046] like Figure 1-7 As shown, the overburden separation grouting device of the embodiment of the present invention comprises a first pipe body 1, a second pipe body 2 and a third pipe body 3. The first pipe body 1 is provided with a first slurry inlet 11 and a first slurry outlet 12, and the slurry is suitable for entering the first pipe body 1 through the first slurry inlet 11 and being discharged through the first slurry outlet 12. The second pipe body 2 is provided with a second slurry inlet 21 and a second slurry outlet 22, and the slurry is suitable for entering the second pipe body 2 through the second slurry inlet 21 and being discharged through the second slurry outlet 22. At least part of the first pipe body 1 extends into the second pipe body 2, and the first slurry outlet 12 is located in the second pipe body 2. One end of the third pipe body 3 is connected to the first slurry outlet 12, and the other end of the third pipe body 3 extends out of the second slurry outlet 22.

[0047] Specifically, the central axis of the first tube body 1 , the central axis of the second tube body 2 , and the central axis of the third tube body 3 are collinear.

[0048] In the overburden delamination grouting device of the embodiment of the present invention, the slurry entering the first tube body 1 through the first slurry inlet 11 enters the third tube body 3 through the first slurry outlet 12, and flows out through the third tube body 3. The slurry entering the second tube body 2 through the second slurry inlet 21 is located between the inner wall surface of the second tube body 2 and the outer wall surface of the first tube body 1, and flows out through the second slurry outlet 22. Thus, the slurry in the first tube body 1 and the second tube body 2 is separated, so that different proportions and different types of slurries can be pumped in through the first slurry inlet 11 and the second slurry inlet 21, respectively, so that the grouting device can be flexibly adjusted to improve the grouting efficiency. When one of the slurry inlets cannot grout normally, the other slurry inlets can ensure the normal progress of the grouting work. When the drilling fluid is lost during the drilling process, the borehole can be blocked in time to improve the drilling efficiency.

[0049] In some embodiments, the first tube body 1 has a reserved joint 13 , the first slurry outlet 12 is formed on the reserved joint 13 , the reserved joint 13 extends into the second tube body 2 , and the reserved joint 13 is connected to one end of the third tube body 3 .

[0050] Specifically, the outer circumferential surface of the reserved joint 13 has an external thread, and the inner circumferential surface of one end of the third tube body 3 has an internal thread. The third tube body 3 and the reserved joint 13 are threadedly connected, so that the connection direction of the third tube body 3 and the reserved joint 13 is simple and easy to operate.

[0051] In some embodiments, the first pipe body 1 and the second pipe body 2 are integrally formed to ensure the structural strength of the overburden separation grouting device. The overburden separation grouting device also includes a first isolation plate 41, which is arranged between the first pipe body 1 and the second pipe body 2 and around the outer circumference of the reserved joint 13 to separate the first pipe body 1 and the second pipe body 2.

[0052] Specifically, in this embodiment, the cross-sectional area of ​​the first tube body 1 is the same as that of the second tube body 2, and the cross-sectional area of ​​the reserved joint 13 is smaller than that of the first tube body 1. The outer circumference of the first isolation plate 41 is fixedly connected to the inner circumference of the first tube body 1, and the inner circumference of the first isolation plate 41 is fixedly connected around one end of the reserved joint 13, so that the first tube body 1 and the second tube body 2 are separated by the first isolation plate 41.

[0053] In some embodiments, the first isolation plate 41 is made of thick steel plate, and the overall strength of the first isolation plate 41 and the reserved joint 13 can support the weight of the third tube body 3, and a safety factor of more than 1.5 times is reserved.

[0054] In some embodiments, the first isolation plate 41 is two flanges, and an anti-seepage pad (not shown) is arranged between the two flanges to ensure that the first tube body 1 and the second tube body 2 are isolated. The anti-seepage pad can be a pressure-resistant rubber pad, a graphite winding pad, an aluminum pad, a rubber buffer pad, etc.

[0055] In some embodiments, the overburden separation grouting device further comprises a second isolation plate 42, a connector 51, a seal 52 and a reinforcement 53. In this embodiment, the cross-sectional area of ​​the first pipe body 1 is smaller than the cross-sectional area of ​​the second pipe body 2.

[0056] The second isolation plate 42 is fixed between the first tube body 1 and the second tube body 2. The second isolation plate 42 has a through hole 421. The reserved joint 13 passes through the through hole 421 and extends into the second tube body 2 and is connected to the third tube body 3. The connecting piece 51 is provided on the second isolation plate 42. The reserved joint 13 is connected to the second isolation plate 42 through the connecting piece 51 and passes through the through hole 421. Specifically, the connecting piece 51 is a nut, preferably a high-strength hexagonal nut.

[0057] Specifically, there are two connecting members 51, which are respectively arranged on both sides of the second isolation plate 42 and arranged opposite to each other, one of the connecting members 51 is located on the side of the second isolation plate 42 away from the second tube body 2, and the other connecting member 51 is located in the second tube body 2 and fixedly connected to the second isolation plate 42. The connecting member 51 has a connecting hole 511, and the central axis of the connecting hole 511, the central axis of the through hole 421 and the central axis of the second tube body 2 are collinear. The inner circumferential surface of the connecting hole 511 has an internal thread, and the reserved joint 13 passes through the connecting hole 511, the through hole 421 and the connecting hole 511 in sequence, and is threadedly matched with the connecting hole 511, so that the reserved joint 13 is connected to the second isolation plate 42. Therefore, the connection method of the reserved joint 13 and the second isolation plate 42 is simple and easy to operate.

[0058] In addition, when leakage, seepage or even spraying occurs in the device, the reserved joint 13 is removed from the second isolation plate 42 by loosening the connector 51 located on the side of the second isolation plate 42 away from the second pipe body 2, and a new connector 51 is replaced to ensure the connectivity between the connector 51 and the reserved joint 13. Compared with welding connection, the accident handling time is reduced, ensuring that the handling can be completed in a short time, and ensuring that the grouting device can smoothly grout into the grouting hole.

[0059] The sealing member 52 is disposed between the second isolation plate 42 and the connector 51 and is disposed around the outer circumference of the reserved joint 13 to ensure the sealing of the connection between the reserved joint 13 and the second isolation plate 42, so that the slurry in the second tube body 2 is not easy to overflow. In other embodiments, a groove (not shown) is provided on the side of the connector 51 adjacent to the second isolation plate 42, and the sealing member 52 is disposed in the groove, and the thickness of the sealing member 52 is greater than the depth of the groove to improve the sealing effect of the sealing member 52.

[0060] Specifically, the sealing member 52 may be a rubber pad, a graphite wound pad, an aluminum pad, a rubber buffer pad, or the like.

[0061] One end of the reinforcement member 53 is connected to the second isolation plate 42, and the other end of the reinforcement member 53 is connected to the outer peripheral surface of the first pipe body 1. Specifically, there are multiple reinforcement members 53, and the multiple reinforcement members 53 are arranged at intervals around the circumference of the second isolation plate 42, which improves the connectivity between the first pipe body 1 and the second isolation plate 42, thereby improving the connection between the first pipe body 1 and the second pipe body 2, and ensuring the structural strength of the grouting device.

[0062] In some embodiments, there are multiple first slurry inlets 11, which are arranged at intervals along the extension direction of the first tube body 1. Specifically, there are two first slurry inlets 11, which are arranged at intervals along the length direction of the first tube body 1 to improve grouting efficiency.

[0063] In some embodiments, the overburden separation grouting device further includes a first valve 61, a pressure gauge 62, and a second valve 63. The first slurry inlet 11 and the second slurry inlet 21 are both provided with a first valve 61 to control the opening and closing of the first slurry inlet 11 and the second slurry inlet 21. The first slurry inlet 11 and the second slurry inlet 21 are both provided with a pressure gauge 62 to detect the pressure value of the slurry flowing from the first slurry inlet 11 into the first pipe body 1 and the pressure value of the slurry flowing from the second slurry inlet 21 into the second pipe body 2. The second valve 63 is provided at the pressure gauge 62. When the pressure gauge 62 fails, the second valve 63 is closed and the pressure gauge 62 is replaced without affecting the grouting construction.

[0064] In some embodiments, the overburden separation grouting device further includes a flower tube 64, which is connected to the other end of the third tube body 3. Specifically, one end of the flower tube 64 is connected to the other end of the third tube body 3, the other end of the flower tube 64 is a tip, and the flower tube 64 has a plurality of spray holes 641 arranged at intervals.

[0065] The overburden separation grouting method of the embodiment of the present invention comprises:

[0066] Drill holes at preset locations to form grouting holes.

[0067] Determine the connectivity between the grouting hole and the fault fracture zone. When the grouting hole is connected with the fault fracture zone, seal the grouting hole by grouting.

[0068] A grouting device is arranged in the grouting hole.

[0069] Water is introduced into the grouting hole through the grouting device to carry out a water pressure test.

[0070] Grouting is injected into the grouting hole through the grouting device.

[0071] According to the overburden separation grouting method of the embodiment of the present invention, when drilling fluid leakage occurs during the drilling process, the borehole can be sealed in time to reduce the settlement rate, improve the drilling efficiency, and ensure the quality of the grouting hole.

[0072] Specifically, when the grouting device is set in the grouting hole: when the grouting hole is a vertical grouting hole, the grouting hole is a directional grouting hole, and the grouting device should be lowered under the following three engineering conditions: ① The offset distance of the grouting hole is large, in order to ensure that there is still a slurry passage when the grouting hole is damaged, the slurry can still enter the detached layer holes; ② After analyzing and judging the geological structure factors, if there are many faults, collapse columns, etc. around the grouting hole, consider lowering the grouting device to prevent slurry leakage and bubbling; ③ After the grouting hole is formed, if the working face is more than 10 to 20 meters away from the bottom of the grouting hole, the pressure of the water pressure test after the hole is formed should be referred to. If the pressure of multiple water pressure tests after the hole is formed is small, less than 0.3 times the pressure at the end of grouting, or there is basically no pressure in multiple pressure tests under the water pressure process, in this case, the risk of slurry leakage is reduced.

[0073] The grouting holes are directional grouting holes. Grouting devices may not be used under the following two engineering conditions: ① The grouting holes have a small inclination and a small offset distance, and the formation is not broken during drilling. It is recommended to adopt the method of not inserting the third pipe body 3 for the first grouting; ② The grouting holes are perpendicular to the working face mining direction and the grouting holes are opposite to the working face mining direction. According to the law of overburden destruction, they are relatively less affected by the formation disturbance. This type of grouting holes can be considered not to insert the grouting pipe first in combination with other working conditions.

[0074] The above-mentioned model selection principle of the grouting pipe inserted into the formation is: first, to ensure that the slurry can be directly delivered to the grouting layer; second, the diameter of the grouting pipe should be as large as possible to prevent the grouting hole wall from producing large pieces falling into the grouting hole, causing local blockage. At the same time, it is also necessary to consider that if the hole is blocked, the hole should be swept and washed from the inside of the third pipe body 3, and a reasonable flow section can be guaranteed. In the present invention, the preferred diameter of the grouting pipe is 50% to 85% of the diameter of the bare hole section of the grouting hole, and the selection should be as close to the middle or larger value as possible. Various types of grouting pipe models include Φ73mm, Φ89mm, Φ108mm, Φ127mm, Φ168mm, etc.

[0075] According to the type of grouting pipe, the method for lowering the orifice grouting pipe provided by the present invention is as follows: Figure 5 As shown in the figure, ① if there is leakage in the grouting section of the bare hole during drilling, the leakage section is in the middle and lower section of the bare hole, and the average drilling time for drilling one meter is small, and the orifice pressure of the water pressure test is small; ② the main grouting separation layer is designed to be below the middle of the bare hole section; ③ the formation is greatly affected by mining, has poor stability, and is likely to be swept later. In these three cases, the following methods are used: Figure 1 The grouting device shown in the figure is lowered into the grouting pipe in the following manner: the third pipe body 3 is lowered into the whole hole, and when it is 10m to 15m away from the bottom of the hole, it is hung in the hole, or the third pipe body 3 is lowered into the whole hole, and when it is 5m away from the bottom of the hole, it is hung in the hole, and the third pipe body 3 at the bottom is connected to the flower pipe 64. The technical effect achieved by the above lowering method is that the slurry fills the separation hole from the bottom to the top, ensuring that the slurry is accurately injected into the target layer, and when the grouting is abnormal, the grouting pipe can be pulled up, which is convenient for hole sweeping and TV analysis of the grouting hole situation in the hole.

[0076] The slurry is fed into the first pipe body 1 from the two first slurry inlets 11, and into the second pipe body 2 from the second slurry inlet 21, and the slurry is directly fed into the entire open hole area, and a slurry injection rate of 100m3 / h can be achieved. The three pressure gauges 62 installed on the grouting device can monitor the pressure conditions of the third pipe body 3 and between the third pipe body 3 and the second pipe body 2, and the three pressure monitoring devices can verify each other, realize accurate pressure monitoring, and help analyze the grouting conditions and the conditions in the hole.

[0077] The grouting device can realize the grouting hole is not blocked by the third pipe body 3 and the grouting hole is not blocked by the second pipe body 2 when unexpected situations occur in various stages of grouting. The grouting pipe can be pulled up when grouting is abnormal, which is convenient for hole sweeping and grouting hole television analysis of the situation in the hole.

[0078] In addition to the situations ①, ②, and ③, use Figure 2 The grouting device shown in the figure has the following method for lowering the grouting pipe: the grouting pipe is lowered into the whole hole to the bottom of the grouting hole, and a certain length of the flower pipe 64 is lowered into the lowest bare hole section. The length of the flower pipe 64 should not be too long according to the total length of the bare hole section and the position of the separation layer. Generally, it is 30% to 80% of the length of the bare hole section, and the value is recommended to be lower than the middle. If the upper layer of the bare hole section is the main grouting layer, the length of the flower pipe 64 takes a larger value. For the lowest flower pipe 64, cut the flower pipe 64 10 to 20 cm below, and fold it into a cone after the cutting is completed, so that the flower pipe 64 can be smoothly lowered.

[0079] Specifically, Figure 6 As shown in the figure, when conducting a water pressure test, it is not advisable to use a large flow rate in the initial stage of the water pressure test. The preferred flow rate is 70L / min to 200L / min. In addition, the water pressure volume is based on the principle of judging whether the grouting conditions are met and whether the borehole is blocked. The total water pressure volume should not be too large. The engineering and technical effects that can be achieved by using a small flow rate are as follows: ① If there is sediment in the grouting pipeline, a small flow of water pressure can ensure that the residual sediment in the pipeline will not block the pipeline under the impact of a large flow rate. ② Before the grouting hole is filled with water and is not pressurized, reduce the scouring of the hole wall by a large flow of water pressure and prevent the hole from collapsing. ③ If there is a blockage in the borehole with a grouting pipe, using a large flow of water pressure at the beginning may cause the blockage to be compacted or pressurized quickly, causing accidents in the grouting hole and hidden safety hazards on the ground.

[0080] In the water pressure test technology and method, the borehole has the conditions for grouting, preferably:

[0081] If the flow rate Q increases gradually from low to high during the water pressure test, when Q increases to 230-390L / min or above, the orifice pressure P of the grouting hole continues to rise slowly, but can be maintained at 0.4-0.6 times the end pressure of grouting for a long time, or although the flow rate is large and P rises quickly, at low flow rates such as 70L / min-250L / min, the pressure rises slowly and can be maintained at 0.4-0.6 times the end pressure of grouting. In these two cases, whether grouting is possible is determined comprehensively in combination with the progress of the working face:

[0082] a. If the working face is less than 15 meters away from the bottom of the grouting hole and there is no special geological structure, or the working face has been pushed through the bottom of the grouting hole, trial grouting can be carried out.

[0083] b. If the working surface is more than 15 meters away from the bottom of the grouting hole, you can wait appropriately to keep the grouting hole unobstructed.

[0084] If the water pressure flow Q increases to above 230-390L / min, the P hole rises too fast, or although the grouting hole mouth pressure rises slowly, the water pressure exceeds the drilling volume by 4-6 times, and the pressure is greater than 0.6 times the grouting end pressure, it is judged that the grouting conditions are not met.

[0085] If the flow rate reaches 300L / min or above during the water pressure process, the P hole can be maintained at 0.6-0.8 times the pressure at the end of grouting, and the pressure rises slowly. At this time, if the working face has been pushed past the bottom of the grouting hole by more than 10-20 meters, it is possible to try to use the pressure in the grouting hole and the water flow to overcome the flow resistance, formation pressure, and tensile strength of the layer under the current pumping conditions to promote the formation of cracks in the rock layer and extend them to the surrounding areas, and penetrate into the upper and lower rock layers of the fracturing layer. This working condition was attempted many times to actively press open the cracks, promote the development of stratification, and meet the grouting conditions.

[0086] The water pressure test flow rate of the embodiment of the present invention is suitable for normal grouting holes with a drilling depth of 100 to 800 m and a final hole diameter of 108 mm, 118 mm, 152 mm, 168 mm, 190 mm, etc. in the current domestic overburden separation grouting field without special oversized or undersized aperture designs.

[0087] Specifically, there are five typical grouting stages when grouting the overburden separation layer, such as Figure 7 As shown, the use of correct and scientific grouting technology and grouting methods in each stage is of great significance to the successful implementation of this delamination grouting project.

[0088] The typical stage 1 is the initial stage of high pressure and low flow rate. The preferred grouting method of the present invention is as follows: when grouting starts in this stage, the following characteristics will generally appear: after the clear water is converted into slurry, the orifice pressure will generally have a slow decline process. If the third pipe body 3 is lowered into the grouting hole, the first pipe body 1 and the second pipe body 2 must be grouted at the same time. If only one pipe body is grouted, the annular space gap between the grouting pipe and the hole wall will be blocked for a long time, and it will be difficult to grout from the gap outside the pipe body. The grouting flow rate of the third pipe body 3 should be controlled at more than 250L / min. If the pressure is unstable, at least the first pipe body 1 and the second pipe body 2 are grouted, and the second pipe body 2 is pressed or grouted at a small flow rate. The slurry ratio can be adjusted step by step from water: fly ash = 3:1 or 4:1 combined with the grouting pressure. The ratio adjustment during this period should not be too fast to ensure that the fly ash diffuses far away, and under the action of pressure, the cracks in the formation gradually develop.

[0089] From the initial slurry to the ratio adjusted to water: fly ash = 1.5:1 ~ 1.8:1, it usually lasts for more than 24h ~ 48h. When the ratio is adjusted to water: fly ash = 1.1:1 ~ 1.3:1, the orifice pressure of the grouting hole is still low or has a trend of continuous decrease. When it can be 40% ~ 60% and below of the designed final hole pressure, you can consider increasing the grouting flow rate and transition to the next grouting stage.

[0090] The second typical stage of grouting for overburden separation is the pressure reduction, low pressure and low flow stage. The preferred grouting method of the present invention is: when the low pressure and low flow state lasts for a period of time and there is no pressure fluctuation, the flow rate is adjusted. The flow rate is adjusted in accordance with the capacity of the grouting pump to 70-100L / min, and is adjusted step by step. The grouting slurry ratio at this stage is generally between 1:1 and 1.3:1 for water: fly ash, and it is not advisable to thicken the slurry too early.

[0091] The third typical stage of overburden separation grouting is the high flow and low pressure / negative pressure stage. The preferred grouting method of the present invention is: step-by-step flow rate increase combined with the pore pressure of the grouting hole, and the injection volume of a single hole is controlled at 900-1800L / min. In this stage, large flow and high concentration slurry should be used for continuous grouting. The slurry ratio should be between 1:1 and 1:1.35, and the concentration should be maintained at 65%-85%. If zero pressure or negative pressure occurs during the grouting process, strengthen the analysis to eliminate the abnormal geological conditions that cause slurry leakage. If it is normal, maintain large flow and high concentration grouting to achieve orifice pressure as soon as possible.

[0092] If a temporary pressure drop occurs during the three grouting processes in the above-mentioned typical stage, the grouting method of the present invention is: first, observe the pressure data and analyze the progress of coal mining at the working face. If the temporary pressure drop lasts for less than 6 hours, do not rush to increase the flow rate. Second, if the pressure drop lasts for more than 6 hours, there is no abnormality on the working face and normal mining, and there are no abnormalities on the ground and pipelines, the flow rate and concentration will be increased. Each flow increase should be 1 to 3 times of 70 to 100 L / min as a gradient, and the ratio increase should be 0.1 to 0.2 as a gradient. 0.1 to 0.2 means: if the original ratio is 1:1, the maximum adjustment is 1:1.1 or 1:1.2 during adjustment, and it is not appropriate to adjust the ratio in a large span. Third, analyze the surface settlement rate. If the settlement rate is greater than 1.7 mm / d, the grouting pressure should be continuously increased to ensure the settlement reduction effect.

[0093] Typical stages of overburden separation grouting: four high flow rate pressure boosting stages, such as Figure 6The preferred grouting method of the present invention is: the characteristic of this stage is that the orifice pressure will steadily increase because the holes between the abscission layers have been well filled in the early stage and the abscission layers in the overburden behind the working face are gradually compacted and closed. During the grouting process, the slurry concentration is first reasonably reduced to more than 55%, and the grouting flow rate is kept unchanged. After a period of time, if the grouting pressure continues to rise, the grouting flow rate is reduced again. The flexible adjustment of the above grouting method can achieve the following technical effects: it can achieve a larger injection volume, maintain a higher orifice pressure, and slow down the surface settlement rate.

[0094] Typical stage 5 of overburden separation grouting: low flow and high pressure to the end of grouting. The preferred grouting method of the present invention is: gradually reduce the concentration and flow of the grouting slurry, and finally maintain single pump grouting. Control and maintain the grouting pressure, and do not exceed the design pressure, and maintain slow and long-term pressure grouting. When the slurry flow gradually decays and decreases to 250L / min or below, and the pressure continues to reach the design pressure value, the grouting is terminated.

[0095] In some embodiments, when the grouting hole is blocked:

[0096] Inject mud into the grouting hole. After the mud solidifies, check the sealing condition of the grouting hole.

[0097] Slurry is introduced into the first pipe body 1 through the first slurry inlet 11 of the grouting device, and the detection values ​​of the pressure gauge 62 provided on the first slurry inlet 11 and the pressure gauge 62 provided on the second slurry inlet 21 are observed. When the detection values ​​of the pressure gauge 62 on the first slurry inlet 11 and the pressure gauge 62 on the second slurry inlet 21 are both zero, the amount of slurry pumped into the grouting hole is increased.

[0098] A preset value is set. When the difference between the detection value of the pressure gauge 62 on the first slurry inlet 11 and the detection value of the pressure gauge 62 on the second slurry inlet 21 is less than the preset value, the grouting pressure is controlled and the flow rate of the slurry is adjusted. When the grouting pressure is less than the pressure of the plane where the bottom surface of the grouting hole is located, water is introduced into the grouting hole.

[0099] The pressure gauge 62 on the first slurry inlet 11 has a detection value. When the detection value of the pressure gauge 62 on the second slurry inlet 21 is zero, the gap between the first pipe body 1 and the second pipe body 2 is blocked or the gap between the inner wall surface of the grouting hole and the outer wall surface of the grouting device is blocked, and water is pressed into the second pipe body 2 from the second slurry inlet 21 to clean the gap. When the slurry in the grouting hole reaches a preset grouting volume or a preset grouting pressure, water is pressed into the first pipe body 1 and the second pipe body 2, and then the grouting device is moved to the upper end of the grouting hole.

[0100] In some embodiments, slurry is pumped into the first tube body 1 from the first slurry inlet 11 far away from the second tube body 2. After the slurry reaches the bottom surface of the grouting hole, an accelerator is pumped into the first tube body 1 from the first slurry inlet 11 close to the second tube body 2. After the slurry is pumped in, water is pressed into the first tube body 1 through the first slurry inlet 11 and into the second tube body 2 through the second slurry inlet 21. After the water is pressed, water is pressed into the first tube body 1 through the first slurry inlet 11 far away from the second tube body 2 and into the second tube body 2 through the second slurry inlet 21. When the pressure gauge 62 detects the pressure, the pumping of the accelerator is stopped and the slurry is used for sealing. After the preset total grouting volume is reached, the grouting is stopped.

[0101] Specifically, Figure 4 As shown in the figure, when setting the grouting hole, first determine the type of fault and its connectivity with the underground working surface and the ground. If there is a risk of connectivity between the underground working surface or the ground and the fault, the grouting hole needs to be plugged. The plugging method is:

[0102] First, ordinary mud and plugging materials are used for grouting and plugging. The mud viscosity is 22s~32s. The plugging materials are sawdust, slag lignin, walnut shell powder, high molecular polymer, etc. The grouting volume each time is the depth of the grouting hole plus 100m. The interval between two pluggings is more than 4h, and two groutings are completed.

[0103] Secondly, if there is no obvious effect after completing the second grouting, you need to use the grouting method in this step. Figure 1 The grouting device shown is installed, and the third pipe body 3 is installed to the bottom of the grouting hole 3 to 6m and hung at the bottom of the well, the reserved joint 13 is connected to the third pipe body 3, and a composite slurry of pure cement + plugging material is pumped into the first pipe body 1 from the first slurry inlet 11 on both sides above. The plugging material is sawdust, slag lignin, walnut shell powder, high molecular polymer, etc. The specific gravity of the cement slurry is 1.5 to 1.85 g / cm3, and the amount of plugging material added is 1% to 10.5% of the cement mass. The pressure of the grouting hole is observed by the pressure gauge 62.

[0104] If there is no pressure on the pressure gauge 62, the amount of slurry pumped in each time is the volume of the grouting hole depth plus 100m. If it is observed that all three pressure gauges 62 have pressure and the pressure difference is less than 0.2MPa, the grouting pressure should be controlled and the flow rate should be adjusted in time to ensure that the grouting pressure is less than 0.3 to 0.6 times the combined pressure of the overlying stratum or the underlying stratum (from the bottom of the grouting hole to the working surface), whichever is smaller. After reaching the pressure value or the single grouting volume, a small amount of clean water of 1 to 1.5 times the volume of the grouting hole should be pressed in time.

[0105] If it is observed that there is pressure on the two upper pressure gauges 62 but no pressure on the lower pressure gauge 62, it means that the annular gap between the third pipe body 3 and the second pipe body 2 above the bottom of the grouting hole or between the second pipe body 2 and the wall of the grouting hole is blocked. Clean water should be immediately pressed into the annular gap from the second grouting port 21 to clean the annular gap. When the grouting volume or grouting pressure is reached, clean water 1 to 1.5 times the volume of the grouting hole should be pressed into the first grouting port 11 at the same time. After the pressure relief is completed, the third pipe body 3 should be immediately lifted.

[0106] In the above grouting process, after the pressure is detected and the grouting is stopped, no matter how many times the grouting has been done to seal, the grouting should be ended and the third pipe body 3 should be lifted up.

[0107] Finally, the grouting plugging method still has a large amount of leakage after the above plugging, and directional drilling is impossible. It is necessary to first conduct a slurry ratio test, add an accelerator to the slurry of cement + plugging material, and control the initial setting time to 0.5-1h after each slurry is pumped in and the hole is washed and the grouting pipe is lifted. The accelerator is a silicate, aluminate, alkali-free liquid accelerator, etc. According to the ratio test results, the cement slurry is pumped in from the first slurry inlet 11 away from the second pipe body 2. After the cement slurry reaches the bottom of the hole for 1-3 minutes, the accelerator is pumped in from the first slurry inlet 11 adjacent to the second pipe body 2. The accelerator pumping flow rate should be completed 5 minutes before the cement slurry pumping time. After the cement slurry is pumped in, water is immediately pressed through the three slurry inlets at the same time. 20 minutes after the water is pressed, the grouting hole volume V is pressed into the pipe body again from the first slurry inlet 11 and the second slurry inlet 21 away from the second pipe body 2. 孔 1 to 1.5 times the amount of water.

[0108] During the entire grouting process mentioned above, if the pressure gauge 62 monitors the pressure, the pumping of the accelerator is stopped immediately, and pure cement slurry + plugging material is used to continue plugging. After the pressure or the total grouting volume is reached, the grouting is stopped. The grouting pressure is less than 0.3 to 0.6 times the combined pressure of the overlying stratum or the underlying stratum (from the bottom of the hole to the working face), whichever is smaller. A variable frequency mud pump must be used in the grouting process to ensure the accuracy of the pumping amount of the accelerator and slurry.

[0109] In all the above processes, after the pressure is detected and the grouting is stopped, no matter how many times the plugging has been grouted, the grouting should be ended and the third pipe body 3 should be lifted.

[0110] If it is judged that the risk of connection between the underground working face or the ground and the fault is small, then according to the grouting method of this step, only the grouting pressure in the above grouting method is changed to ensure that the grouting pressure is less than the combined pressure value of the overlying stratum or the underlying stratum (from the bottom of the grouting hole to the working face), whichever is smaller.

[0111] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0112] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0113] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0114] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0115] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0116] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.

Claims

1. A grouting device for overburden separation, characterized in that: include: A first tube body (1), the first tube body (1) having a first slurry inlet (11) and a first slurry outlet (12), the slurry being suitable for entering the first tube body (1) through the first slurry inlet (11) and being discharged through the first slurry outlet (12); a second tube body (2), the second tube body (2) having a second slurry inlet (21) and a second slurry outlet (22), the slurry is suitable for entering the second tube body (2) through the second slurry inlet (21) and being discharged through the second slurry outlet (22), at least part of the first tube body (1) extends into the second tube body (2), and the first slurry outlet (12) is located in the second tube body (2); A third tube body (3), one end of the third tube body (3) is connected to the first slurry outlet (12), and the other end of the third tube body (3) extends out of the second slurry outlet (22).

2. The overburden separation grouting device according to claim 1, characterized in that: The first pipe body (1) has a reserved joint (13), the first slurry outlet (12) is formed on the reserved joint (13), the reserved joint (13) extends into the second pipe body (2), and the reserved joint (13) is connected to one end of the third pipe body (3).

3. The overburden separation grouting device according to claim 2, characterized in that: The first tube body (1) and the second tube body (2) are integrally formed, The overburden separation grouting device further comprises a first isolation plate (41), wherein the first isolation plate (41) is arranged between the first pipe body (1) and the second pipe body (2) and is arranged around the outer circumference of the reserved joint (13) to separate the first pipe body (1) from the second pipe body (2).

4. The overburden separation grouting device according to claim 2, characterized in that: Also includes: a second isolation plate (42), the second isolation plate (42) being arranged between the first tube body (1) and the second tube body (2), the second isolation plate (42) having a through hole (421), the reserved joint (13) passing through the through hole (421) and extending into the second tube body (2) and connected to the third tube body (3); A connecting piece (51), wherein the connecting piece (51) is arranged on the second isolation plate (42), and the reserved joint (13) is connected to the second isolation plate (42) through the connecting piece (51) and passes through the through hole (421); A sealing member (52), the sealing member (52) being arranged between the second isolation plate (42) and the connecting member (51) and surrounding the outer peripheral surface of the reserved joint (13); A reinforcing member (53), one end of the reinforcing member (53) being connected to the second isolation plate (42), and the other end of the reinforcing member (53) being connected to the outer peripheral surface of the first tube body (1).

5. The overburden separation grouting device according to any one of claims 1 to 4, characterized in that: The central axis of the first tube body (1), the central axis of the second tube body (2) and the central axis of the third tube body (3) are collinear, and there are a plurality of first slurry inlets (11), which are arranged at intervals along the extension direction of the first tube body (1).

6. The overburden separation grouting device according to any one of claims 1 to 4, characterized in that: Also includes: A first valve (61), wherein the first slurry inlet (11) and the second slurry inlet (21) are both provided with the first valve (61); A pressure gauge (62), wherein the first slurry inlet (11) and the second slurry inlet (21) are both provided with the pressure gauge (62); A second valve (63), wherein the second valve (63) is arranged at the pressure gauge (62).

7. The overburden separation grouting device according to any one of claims 1 to 4, characterized in that: It also includes a flower tube (64), wherein the flower tube (64) is connected to the other end of the third tube body (3).

8. A method for grouting overburden separation layer, characterized in that: include: Drilling holes at predetermined locations to form grouting holes; Determine the connection between the grouting hole and the fault fracture zone, and when the grouting hole is connected with the fault fracture zone, grout the grouting hole to seal it; A grouting device is arranged in the grouting hole, and the grouting device is the grouting device according to any one of claims 1 to 7; Water is introduced into the grouting hole through the grouting device to perform a water pressure test; Grouting is injected into the grouting hole through the grouting device.

9. The overburden separation grouting method according to claim 8, characterized in that: When the grouting hole is blocked: Inject slurry into the grouting hole, and after the slurry solidifies, check the blocking condition of the grouting hole; Slurry is introduced into the first pipe body (1) through the first slurry inlet (11) of the grouting device, and the detection values ​​of the pressure gauge (62) provided on the first slurry inlet (11) and the pressure gauge (62) provided on the second slurry inlet (21) are observed. When the detection values ​​of the pressure gauge (62) on the first slurry inlet (11) and the pressure gauge (62) on the second slurry inlet (21) are both zero, the amount of slurry pumped into the grouting hole is increased; A preset value is set, and when the difference between the detection value of the pressure gauge (62) on the first grout inlet (11) and the detection value of the pressure gauge (62) on the second grout inlet (21) is less than the preset value, the grouting pressure is controlled and the flow rate of the slurry is adjusted, and when the grouting pressure is less than the pressure of the plane where the bottom surface of the grouting hole is located, water is introduced into the grouting hole; The pressure gauge (62) on the first grout inlet (11) has a detection value. When the detection value of the pressure gauge (62) on the second grout inlet (21) is zero, the gap between the first pipe body (1) and the second pipe body (2) is blocked or the gap between the inner wall surface of the grouting hole and the outer wall surface of the grouting device is blocked, water is pressed into the second pipe body (2) from the second grout inlet (21) to clean the gap. When the slurry in the grouting hole reaches a preset grouting volume or a preset grouting pressure, water is pressed into the first pipe body (1) and the second pipe body (2), and then the grouting device is moved to the upper end of the grouting hole.

10. The overburden separation grouting method according to claim 9, characterized in that: Slurry is pumped into the first pipe body (1) from a first slurry inlet (11) far from the second pipe body (2). After the slurry reaches the bottom surface of the grouting hole, an accelerating setting agent is pumped into the first pipe body (1) from a first slurry inlet (11) close to the second pipe body (2). After the slurry is pumped in, water is pressed into the first pipe body (1) through the first slurry inlet (11) and into the second pipe body (2) through the second slurry inlet (21). After the water pressure is completed, water is again pressed into the first pipe body (1) through the first slurry inlet (11) far from the second pipe body (2) and into the second pipe body (2) through the second slurry inlet (21). When the pressure gauge (62) detects pressure, the pumping of the accelerating setting agent is stopped and the slurry is used for plugging. After the preset total grouting volume is reached, the grouting is stopped.