Fault processing method and device of power distribution network, electronic equipment and storage medium
By adding tie lines in the distribution network and utilizing low-voltage automatic transfer switches and automation systems to generate control strategies, the power supply to low-voltage loads in self-healing blind areas was restored, solving the problem of power outages in self-healing blind areas and improving the power supply reliability of the distribution network.
Patent Information
- Application Number
- CN202411336187.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-11-29
AI Technical Summary
In power distribution networks, self-healing blind spots cannot restore power supply to low-voltage loads, and existing technologies struggle to effectively address this issue.
By adding connecting lines between power substations and utilizing low-voltage automatic transfer switches and automated master stations or host computer systems, a target control strategy set is generated to control the transfer switch to replace the faulty switch for power supply, thereby achieving local self-healing low-voltage power restoration.
It enables rapid and efficient power restoration of low-voltage loads, overcomes the difficulty of restoring power in self-healing blind spots, and improves the power supply reliability and self-healing power restoration efficiency of the distribution network.
Smart Images

Figure CN119051016A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of power grid technology, and in particular to a method, device, electronic device and storage medium for handling faults in a distribution network. Background Art
[0002] When a distribution network fails, distribution self-healing technology can be used to transfer power to the distribution network and restore power.
[0003] In a distribution automation master station self-healing solution, medium-voltage self-healing can be performed on the transferable power supply area with a contact point in the rear section of the distribution network line after the fault point. However, for the self-healing line itself, there will always be areas where power supply cannot be restored, and the distribution network line still has blind spots where self-healing transfer cannot be implemented. In the self-healing blind spot, it is impossible to restore the power supply of the low-voltage load in the distribution line fault area through the medium-voltage power restoration method.
[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0005] The embodiments of the present application provide a method, device, electronic device and storage medium for handling faults in a distribution network, so as to at least solve the technical problem that it is difficult to restore power in self-healing blind areas in the distribution network.
[0006] According to one aspect of an embodiment of the present application, a fault handling method for a distribution network is provided, comprising: obtaining a fault signal of a power room; determining fault power room information of a power room where a fault occurs according to the fault signal, wherein there are multiple power rooms, power supply lines of the multiple power rooms are connected in sequence, switches inside different power rooms are connected through interconnection lines, and switches inside each power room are electrically connected to a low-voltage standby automatic re-closing device; based on the fault power room information, controlling the first switches of power rooms other than the power room where the fault occurs to close, wherein the first switch is a switch in each power room on the power supply line for connecting adjacent power rooms; controlling the low-voltage standby automatic re-closing device to detect electrical signal information of each second switch in the power room where the fault occurs, wherein the electrical signal information includes the voltage and current of the second switch; generating a target control strategy set based on the electrical signal information, the target control strategy set being used to control at least one transfer switch to supply power instead of the second switch, wherein at least one transfer switch is provided in each power room.
[0007] Optionally, a target control strategy set is generated based on the electrical signal information, including: determining whether the second switch fails based on the electrical signal information; when it is determined that none of the second switches in the power room where the fault occurs fails, generating a first target strategy control set in the target control strategy set, the first target control strategy set being used to control at least one transfer switch through a first device to replace the second switch in the power room where the fault occurs for power supply, wherein the first device includes a low-voltage standby automatic re-closing device; when it is determined that part of the second switch in the power room where the fault occurs does not fail, generating a second target strategy control set in the target control strategy set, the second target control strategy set being used to control at least one transfer switch through a second device to replace the second switch that does not fail for power supply, wherein the second device includes an automation master station or a host computer system.
[0008] Optionally, when it is determined that none of the second switches in the power room where the fault occurs have failed, a first target strategy control set in the target control strategy set is generated, including: when it is determined that none of the second switches in the power room where the fault occurs have failed, controlling the first transfer switch to supply power instead of the second switch, wherein the first transfer switch is a switch in the faulty power room on the connecting line for connecting adjacent power rooms.
[0009] Optionally, controlling at least one transfer switch by the first device to replace the second switch in the faulty power room for power supply also includes: obtaining the load of the first transfer power room connected to the first transfer switch; judging whether the first transfer power room is overloaded according to the load of the first transfer power room; when it is determined that the first transfer power room is overloaded, determining the second transfer switches inside the multiple power rooms based on the electrical topological connection relationship of the multiple power rooms; and controlling the second transfer switches to replace the overload switch for power supply.
[0010] Optionally, determining the second transfer switch inside multiple power rooms based on the electrical topological connection relationship of the multiple power rooms includes: determining at least one alternative switch inside the multiple power rooms based on the electrical topological connection relationship; and determining the second transfer switch from the at least one alternative switch based on a preset algorithm.
[0011] Optionally, when it is determined that the second switch part in the faulty power room is not faulty, a first target strategy control set in the target control strategy set is generated, including: when it is determined that the second switch part in the faulty power room is not faulty, determining the third transfer switches inside multiple power rooms based on the electrical topology connection relationship of the multiple power rooms, and controlling the third transfer switch to replace the second switch that is not faulty in the faulty power room to provide power.
[0012] Optionally, determining a third transfer switch inside multiple power rooms based on the electrical topological connection relationship of the multiple power rooms includes: determining at least one alternative switch inside the multiple power rooms based on the electrical topological connection relationship; and determining the third transfer switch from at least one alternative switch based on a preset algorithm.
[0013] Optionally, a fault handling device of a distribution network executes the above method, and the fault handling device of the distribution network includes: an acquisition module, the acquisition module is used to acquire a fault signal; a first determination module, the first determination module is used to determine the faulty power room information of the power room where the fault occurs according to the fault signal, wherein there are multiple power rooms, the power supply lines of the multiple power rooms are connected in sequence, the switches inside different power rooms are connected through a connecting line, and the switches inside each power room are electrically connected to the low-voltage standby automatic transfer device; a first execution module, the first execution module is used to control the closing of the first switch of the power room other than the power room where the fault occurs based on the faulty power room information, wherein the first switch is a switch in each power room on the power supply line for connecting adjacent power rooms; a second execution module, the second execution module is used to control the low-voltage standby automatic transfer device to detect the electrical signal information of each second switch in the power room where the fault occurs, wherein the electrical signal information includes the voltage and current of the second switch; a power supply module, the power supply module is used to generate a target control strategy set based on the electrical signal information, and the target control strategy set is used to control at least one transfer switch to replace the second switch for power supply, wherein at least one transfer switch is provided in each power room.
[0014] According to another aspect of an embodiment of the present application, there is further provided an electronic device, comprising: a memory storing an executable program; and a processor for running the program, wherein the above-mentioned distribution network fault handling method is executed when the program is running.
[0015] According to another aspect of an embodiment of the present application, a computer-readable storage medium is further provided, the computer-readable storage medium including a stored executable program, wherein when the executable program runs, the device where the storage medium is located is controlled to execute the above method.
[0016] In the embodiment of the present application, a low-voltage standby automatic switching device is used to control the opening of the transfer switch in the faulty power room, thereby realizing on-site self-healing and power restoration of the low-voltage end, achieving the purpose of quickly and efficiently realizing on-site self-healing and power restoration, thereby achieving the technical effect of restoring power supply to the low-voltage load in the distribution line fault area, and further solving the technical problem of high difficulty in power restoration in the self-healing blind area in the distribution network. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0018] Figure 1is a flow chart of a method for handling a fault in a distribution network according to an embodiment of the present invention;
[0019] Figure 2 is a schematic diagram of an optional power room connection in a medium and low voltage power distribution line according to an embodiment of the present invention;
[0020] Figure 3 It is a schematic diagram of the connection of a power room after installing a tie line in an optional medium and low voltage distribution line according to an embodiment of the present invention;
[0021] Figure 4 It is a schematic diagram of the connection of a power room after installing a tie line in an optional medium and low voltage distribution line according to an embodiment of the present invention;
[0022] Figure 5 It is a schematic diagram of the connection of a power room after installing a tie line in an optional medium and low voltage distribution line according to an embodiment of the present invention;
[0023] Figure 6 It is a schematic diagram of an optional distribution network fault handling device according to an embodiment of the present application. DETAILED DESCRIPTION
[0024] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0025] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0026] It should be noted that the low-voltage standby automatic switching device is an automatic switching device for low-voltage electrical equipment. It can automatically switch to standby equipment when a fault or abnormal situation occurs in the power system to ensure the normal operation of the power system and the safety of the equipment. The device is usually composed of a controller, a sensor, a relay, etc., and can automatically switch equipment according to preset conditions and logical relationships to improve the reliability and stability of the power system. In the event of a power failure, the low-voltage standby automatic switching device can respond quickly and switch to standby equipment, reducing power outage time and improving power supply reliability.
[0027] According to an embodiment of the present application, an embodiment of a fault handling method for a distribution network is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0028] Figure 1 A method for handling a fault in a distribution network according to an embodiment of the present application is as follows: Figure 1 As shown, the method comprises the following steps:
[0029] According to one aspect of an embodiment of the present application, a method for handling a fault in a distribution network is provided, comprising:
[0030] Step S1, obtaining a fault signal from a power room.
[0031] Step S2, determining the faulty power room information of the power room where the fault occurs according to the fault signal, wherein there are multiple power rooms, the power supply lines of the multiple power rooms are connected in sequence, the switches inside different power rooms are connected through connecting lines, and the switches inside each power room are electrically connected to the low-voltage standby automatic switching device.
[0032] Step S3, based on the faulty power room information, controlling the first switches of power rooms other than the power room where the fault occurs to be closed, wherein the first switch is a switch in each power room on the power supply line for connecting adjacent power rooms.
[0033] Step S4, controlling the low voltage standby automatic switching device to detect the electrical signal information of each second switch in the power room where the fault occurs, wherein the electrical signal information includes the voltage and current of the second switch.
[0034] Step S5, generating a target control strategy set based on the electrical signal information, wherein the target control strategy set is used to control at least one transfer switch to supply power instead of the second switch, wherein each power room is provided with at least one transfer switch.
[0035] In an optional embodiment, Figure 2 A schematic diagram of an optional power room connection in a medium and low voltage power distribution line according to an embodiment of the present invention is shown in FIG. Figure 2As shown, power room 1, power room 2, power room 3, and power room 4 are located on the same power supply line, power room 1 is connected to substation 1, and power room 4 is connected to substation 2. Switch FB1, switch FB2, switch FB3, switch FB4, switch FB5, switch FB6, switch FB7, and switch LB are switches connecting a power room with an adjacent power room or connecting a power room with an adjacent substation. Switch K11, switch K12, switch K13, and switch K14 are located in power room 1, switch K21, switch K22, switch K23, and switch K24 are located in power room 2, switch K31, switch K32, switch K33, and switch K34 are located in power room 3, and switch K41, switch K42, and switch K43 are located in power room 4.
[0036] If the fault occurs on the medium-voltage busbar in power room 2, the medium-voltage self-healing will separate switches FB5 and FB6 to isolate power room 3 in the fault area, and then close all switches upstream of switch FB5 to restore the loads of power rooms 1 and 2, close the tie switch LB, and restore power to the distribution transformer loads after FB6 in power room 3 and the loads in power room 4. However, since the fault occurs on the medium-voltage busbar in the front section of power room 3, the low-voltage load of power room 3 cannot be restored through the medium-voltage switching operation, and only the medium- and low-voltage power supply in the rear half of power room 3 can be restored. There is still a self-healing blind spot where self-healing and power restoration are impossible.
[0037] In order to solve the problem that the self-healing blind area in the distribution network cannot be self-healed and restored to power, a connection line can be added between different power rooms in the same power supply line, or between different power rooms in different power supply lines. Install an automation device on the first switch to obtain the connection relationship of the medium and low voltage power supply lines and the status of the first switch from the automation master station or the host computer system. And reasonably set the protection trip start time setting value and protection current setting value of the first switch, and selectively activate the start protection alarm function of the first switch or the protection trip function of the first switch. The automation master station or the host computer system cyclically obtains and records the section current of the first switch through the automation device according to the section current scanning cycle.
[0038] When the first switch installed with the automation device senses the fault current, the first switch sensing the fault current cuts off the fault and sends a fault signal, and transmits the fault information and the switch position to the main station or the host computer system through the fault signal. The main station or the host computer system determines the faulty power room among the multiple power rooms based on the fault signal.
[0039] By identifying the faulty power room among multiple power rooms, not only can medium-voltage self-healing and power restoration be performed on the medium-voltage area that can be powered when the distribution network line fails, but also low-voltage self-healing and power restoration blind spots in the distribution network lines that cannot be powered are found. By implementing the distribution network's fault handling method on the self-healing and power restoration blind spots, medium- and low-voltage coordinated fault self-healing in the distribution network can be achieved.
[0040] In an optional embodiment, the second switch can be disconnected remotely or manually, and then the automation device on the transfer switch can be remotely controlled by a low-voltage backup automatic switching device, an automation master station or a host computer system to close the transfer switch according to the automation device, or the transfer switch can be closed manually.
[0041] Optionally, the method further includes: determining whether the transfer switch is closed successfully; if the transfer switch fails to close, selecting another alternative switch from at least one alternative switch as the transfer switch, and performing a closing operation.
[0042] Figure 3 FIG. 1 is a schematic diagram of an optional power room connection after a tie line is installed in a medium and low voltage power distribution line according to an embodiment of the present invention. Figure 3 As shown, tie lines L1, L2, and L3 are added between different power rooms on the same power supply line, wherein tie line L1 is used to connect power room 1 and power room 2, tie line L2 is used to connect power room 2 and power room 3, and tie line L3 is used to connect power room 3 and power room 4. Tie line L4 is added between different power rooms on different power supply lines, and tie line L4 is used to connect power room 4 and power room 5.
[0043] After adding tie lines L1, L2, L3, L4 and L5, power room 1, power room 2, power room 3, power room 4 and power room 5 are located on the same power supply line, power room 1 is connected to substation 1, power room 4 is connected to substation 2, and power room 5 is connected to substation 3. Switches FB1, FB2, FB3, FB4, FB5, FB6, FB7 and LB are all first switches, and all are equipped with automation devices. Switches K11, K12, K13 and K14 are located in power room 1, switches K21, K22, K23 and K24 are located in power room 2, switches K31, K32, K33 and K34 are located in power room 3, switches K41, K42, K43 and K44 are located in power room 4, and switches K52, K53, K53 and K54 are located in power room 5. Among them, switch K13, switch K14, switch K23, switch K24, switch K33, switch K34, switch K43, switch K44, switch K53 and switch K24 are all equipped with low-voltage standby automatic switching devices.
[0044] If switches FB1, FB2, FB3, FB4, and FB5 sense the fault current, and switches FB6, FB7, and LB do not sense the fault current, switches FB1, FB2, FB3, FB4, and FB5 send fault signals to the master station or the host computer system through the automation device. The master station or the host computer system determines that power room 3 is the faulty power room by analyzing the fault information and the switch position.
[0045] Then the automation master station or host computer system records the cross-sectional current of the first switch into the processing area, separates switches FB5 and FB6, isolates power room 3, and then closes all tripped switches upstream of switch FB5 to restore power supply to power room 1 and power room 2; closes the connecting switch LB to restore power supply to power room 4 downstream of FB6, and completes the self-healing of the medium-voltage fault.
[0046] In an optional embodiment, power room 3 is determined to be a faulty power room, switches FB5 and FB6 are separated to isolate power room 3, and then all tripped switches upstream of switch FB5 are closed to restore power to power rooms 1 and 2; the connecting switch LB is closed to restore power to power room 4 downstream of FB6. After the medium-voltage fault is self-healed, the low-voltage standby automatic transfer device directly controls switches K31 and K32 in the faulty power room to open, and the transfer switches (switch K33 and K34) are closed, so that the power supply to the low-voltage loads in the self-healing blind area can be restored as soon as possible, thereby improving the power restoration efficiency in the self-healing blind area.
[0047] Step S51, determining whether the second switch fails based on the electrical signal information.
[0048] The second switch in the above steps is a switch located inside the faulty power room, which is not directly connected to the adjacent power room or connected to the adjacent power room through a connecting line.
[0049] The faulty switch in the above steps is a switch in the second switch that cannot supply power to the connected power supply area.
[0050] Optionally, when it is determined that none of the second switches in the power room where the fault occurs have failed, a first target strategy control set in the target control strategy set is generated, including: after determining that none of the second switches in the power room where the fault occurs have failed, waiting for a first preset time length T1 and detecting the current voltage of at least one second switch; determining that a second switch among at least one second switch whose current voltage is less than or equal to the preset voltage is a fault.
[0051] The first preset time length T1 in the above steps can be preset according to actual application conditions, and can be 10 minutes or 15 minutes, but is not limited thereto. No limitation is made to the preset time length herein.
[0052] The preset voltage in the above steps is a voltage set according to the specific application situation. When the current voltage in at least one second switch is less than or equal to the preset voltage, the second switch can be regarded as having no voltage. The specific value of the preset voltage can be 0 volts, 0.3 volts, or 0.5 volts, but is not limited to this.
[0053] In an optional embodiment, the current voltage of at least one second switch in the faulty power room is obtained. Figure 3 In the example, when power room 3 is a faulty power room, switches K31, K32, K33, and K34 are all second switches. The current voltage of all switches K31, K32, K33, and K34 can be obtained through a voltage detection device, or only the voltage of low-voltage switch K31 and low-voltage switch K32 can be obtained through a voltage detection device. The faulty switch is determined based on the current voltage of at least one second switch in the faulty power room and whether a fault current flows through the second switch.
[0054] Step S52, when it is determined that none of the second switches in the power room where the fault occurs has failed, generates a first target strategy control set in the target control strategy set, the first target control strategy set being used to control at least one transfer switch through a first device to replace the second switch in the power room where the fault occurs for power supply, wherein the first device includes a low-voltage standby automatic transfer device.
[0055] The transfer switch in the above steps is a switch that can replace the second switch and supply power to the area supplied by the second switch.
[0056] In an optional embodiment, if Figure 3 As shown, if switches K31 and K32 lose voltage and there is no fault current, the load in the area powered by switch K31 can be transferred through switch K33, and the load in the area powered by switch K32 can be transferred through switch K34. At this time, after the switches K31 and K32 in the faulty power room are controlled to open by the low-voltage standby automatic switching device, the transfer switch (switch K33, switch K34) is closed after waiting for the second preset time T2, and the power supply of the low-voltage load in the self-healing blind area can be restored, overcoming the problem that the medium-voltage switching operation cannot restore the low-voltage load in the faulty power room.
[0057] The second preset time length T1 in the above step can be preset according to the actual application situation, and can be 10 minutes or 15 minutes, but is not limited thereto. No limitation is made to the preset time length herein.
[0058] Step S53, when it is determined that the second switch part in the faulty power room is not faulty, generate a second target strategy control set in the target control strategy set, the second target control strategy set is used to control at least one transfer switch through a second device to replace the faulty second switch for power supply, wherein the second device includes an automation master station or a host computer system.
[0059] In an optional embodiment, if Figure 5 As shown, if switch K31 loses voltage and has no fault current, and switch K32 loses voltage and has fault current, the electrical topology connection relationship is used to search for the distribution transformer connected to it based on the electrical connection relationship, and the low-voltage side bus connected to it is searched from the low-voltage side of the distribution transformer to determine the switches in the multiple power rooms that can replace the faulty switches and use them as the transfer switches. Figure 3 In the example, if switch K32 is a faulty switch, the load in the area powered by switch K31 can be transferred through switch K24. At this time, the load in the area powered by switch K31 can be restored through the transfer switch (switch K24), realizing the power supply restoration of some low-voltage loads in the self-healing blind area, overcoming the problem that the medium-voltage switching operation cannot restore the low-voltage load in the faulty power room.
[0060] Optionally, when it is determined that none of the second switches in the power room where the fault occurs fails, generating a first target strategy control set in the target control strategy set includes:
[0061] Step S521, when it is determined that the second switches in the faulty power room are not faulty, control the first transfer switch to supply power instead of the second switch, wherein the first transfer switch is a switch in the faulty power room on the tie line for connecting the adjacent power room.
[0062] like Figure 3 As shown, if switches K31 and K32 lose voltage and there is no fault current, the load in the area powered by switch K31 can be transferred through switch K33, and the load in the area powered by switch K32 can be transferred through switch K34. At this time, the switches K31 and K32 in the faulty power room are controlled to open by the low-voltage standby automatic switching device, and the transfer switches (switch K33 and switch K34) are closed, so that the power supply of the low-voltage load in the self-healing blind area can be restored, overcoming the problem that the medium-voltage switching operation cannot restore the low-voltage load in the faulty power room.
[0063] Optionally, the method controls at least one transfer switch by the first device to supply power in place of a second switch in a power room where a fault occurs, and further includes:
[0064] Step S522, obtaining the load of the first transfer power supply room connected to the first transfer power supply switch.
[0065] In step S522, the calculation formula for the total low-voltage switch load rate in the first transfer power supply room is: load rate = transfer switch cross-section current / transfer area switch rated current; the calculation formula for the load rate of the transfer distribution transformer is: load rate = transfer distribution transformer apparent power / transfer area switch rated power.
[0066] Among them, after obtaining the load of the first transfer power supply room connected to the first transfer power supply switch, wait for the third preset time length T3, the third preset time length T3 in the above steps can be preset according to the actual application situation, which can be 10 minutes or 15 minutes, but is not limited to this, and the preset time length is not limited here. Specifically, T3>T1, T3>T2.
[0067] In a specific embodiment of the present application, the master station determines that after the low-voltage standby automatic transfer, the alternative switch of switch K31 is switch K33, and the alternative switch of switch K32 is switch K34. Then the load rate of the upstream switch K41 of the alternative switch K33 and the alternative switch K34 is:
[0068] Load rate of K41 = Ik41 / Iek41;
[0069] The load factor of power distribution transformer in power room 4 = Spb41 / Sepb41;
[0070] Among them, Ik41 is the cross-sectional current of the upstream switch K41 of the alternative switch K33 and the alternative switch K34, and Iek41 is the rated current of the upstream switch K41 of the alternative switch K33 and the alternative switch K34.
[0071] Step S523: determining whether the first power transfer room is overloaded according to the load of the first power transfer room.
[0072] When the total low-voltage load rate in the first transfer and supply room or the transfer and supply distribution transformer load rate is ≥100%, it is judged as overload.
[0073] Step S524, when it is determined that the first transfer power room is overloaded, second transfer power switches inside the plurality of power rooms are determined based on the electrical topological connection relationship of the plurality of power rooms.
[0074] When the upstream switch K41 of the alternative switch K33 and the alternative switch K34 is overloaded, the second transfer switch K24 inside the power room 2 is determined to reduce the load of the upstream switch K41 of the alternative switch K34.
[0075] Step S525, controlling the second transfer switch to supply power instead of the overload switch.
[0076] Through the above steps, part of the load on the low-voltage side of the low-voltage self-healing distribution room is transferred to another distribution room for power supply.
[0077] Optionally, determining the second transfer switches inside the plurality of power rooms based on the electrical topological connection relationship of the plurality of power rooms includes:
[0078] Determine at least one candidate switch in the plurality of power rooms based on the electrical topology connection relationship;
[0079] The second transfer switch is determined from at least one candidate switch based on a preset algorithm.
[0080] The alternative switches in the above steps are switches within multiple power rooms that can supply power to the area where the faulty switch is powered. They can be determined based on the electrical topology connection relationship, and the second transfer switch is selected from the alternative switches.
[0081] The preset algorithm in the above steps can be preset according to actual application conditions. Again, the preset algorithm is not limited. The preset algorithm can be used to determine the transfer switch from at least one candidate switch.
[0082] In an optional embodiment, the electrical topology connection relationship is analyzed to determine at least one candidate switch in multiple power rooms that can supply power to the area where the faulty switch is powered. Then a preset algorithm is determined. The preset algorithm can be to calculate the load rate of the upstream switch of the candidate switch, and use the candidate switch with the lowest load rate of the upstream switch as the transfer switch. The calculation formula of the load rate is as follows:
[0083] Load rate = (cross-section current of the faulty switch + cross-section current of the upstream switch of the backup switch) / rated current of the upstream switch of the backup switch;
[0084] like Figure 4 As shown, according to the electrical topology connection relationship, the alternative switch of switch K31 is switch K24.
[0085] In addition, the preset algorithm may also give priority to the low-voltage side of the distribution transformer for non-important users for supply transfer, or may give priority to the low-voltage side of the distribution transformer with a large reserve capacity for supply transfer, or may give priority to the low-voltage side of the distribution transformer with a small number of users for supply transfer, or may give priority to the low-voltage side of the distribution transformer with a small number of important users for supply transfer, but is not limited to this.
[0086] Optionally, when it is determined that the second switch part in the power room where the fault occurs is not faulty, generating a first target strategy control set in the target control strategy set includes:
[0087] Step S531, when it is determined that the second switch part in the faulty power room is not faulty, determine the third transfer switches inside multiple power rooms based on the electrical topology connection relationship of the multiple power rooms, and control the third transfer switches to replace the second switch that is not faulty in the faulty power room to supply power.
[0088] In an optional embodiment, if Figure 5 As shown, based on the electrical signal information, determine whether the second switch has a fault, wait for the fourth preset time T4, if switch K31 loses pressure and there is no fault current, and switch K32 loses pressure and there is a fault current, through the electrical topology connection relationship, take the busbar of the power room with no pressure as the root node, search for the distribution transformer connected to it according to the electrical connection relationship, and search for the connected low-voltage side busbar from the low-voltage side of the distribution transformer, determine multiple switches in the power room that can replace the faulty switch, and use them as transfer switches. Figure 3 In the example, if switch K32 is a faulty switch, the load in the area powered by switch K31 can be transferred through switch K24. At this time, the load in the area powered by switch K31 can be restored through the transfer switch (switch K24), realizing the power supply restoration of some low-voltage loads in the self-healing blind area, overcoming the problem that the medium-voltage switching operation cannot restore the low-voltage load in the faulty power room.
[0089] The fourth preset duration T4 in the above step can be preset according to the actual application situation, and can be 10 minutes or 15 minutes, but is not limited thereto. No limitation is made to the preset duration here. Specifically, T4>T3.
[0090] Optionally, determining the third transfer switches inside the plurality of power rooms based on the electrical topological connection relationship of the plurality of power rooms includes:
[0091] Step S532, determining at least one candidate switch in the plurality of power rooms based on the electrical topology connection relationship;
[0092] Step S533: determining a third transfer switch from at least one candidate switch based on a preset algorithm.
[0093] The alternative switches in the above steps are switches within multiple power rooms that can supply power to the area where the faulty switch is powered. They can be determined based on the electrical topology connection relationship, and the second transfer switch is selected from the alternative switches.
[0094] The preset algorithm in the above steps can be preset according to actual application conditions. Again, the preset algorithm is not limited. The preset algorithm can be used to determine the transfer switch from at least one candidate switch.
[0095] In an optional embodiment, the electrical topology connection relationship is analyzed to determine at least one candidate switch in multiple power rooms that can supply power to the area where the faulty switch is powered. Then a preset algorithm is determined. The preset algorithm can be to calculate the load rate of the upstream switch of the candidate switch, and use the candidate switch with the lowest load rate of the upstream switch as the transfer switch. The calculation formula of the load rate is as follows:
[0096] Load rate = (cross-section current of the faulty switch + cross-section current of the upstream switch of the backup switch) / rated current of the upstream switch of the backup switch;
[0097] like Figure 4 As shown, according to the electrical topology connection relationship, the alternative switch of switch K31 is switch K24. In addition, the preset algorithm may also give priority to the low-voltage side of the distribution transformer for non-important users for supply transfer, or give priority to the low-voltage side of the distribution transformer with a large reserve capacity for supply transfer, or give priority to the low-voltage side of the distribution transformer with a small number of users for supply transfer, or give priority to the low-voltage side of the distribution transformer with a small number of important users for supply transfer, but is not limited to this.
[0098] According to another aspect of the embodiment of the present application, a fault handling device for a distribution network is also provided, Figure 6 As shown, the fault handling device of the distribution network executes the method in the above embodiment, and the fault handling device of the distribution network includes an acquisition module, a first determination module, a first execution module, a second execution module and a power supply module, wherein the acquisition module is used to acquire a fault signal; the first determination module is used to determine the faulty power room information of the power room where the fault occurs according to the fault signal, wherein there are multiple power rooms, the power supply lines of the multiple power rooms are connected in sequence, the switches inside different power rooms are connected through a connecting line, and the switches inside each power room are electrically connected to the low-voltage standby automatic transfer device; the first execution module is used to control the first switch of the power room other than the power room where the fault occurs to close based on the faulty power room information, wherein the first switch is a switch in each power room on the power supply line for connecting adjacent power rooms; the second execution module is used to control the low-voltage standby automatic transfer device to detect the electrical signal information of each second switch in the power room where the fault occurs, wherein the electrical signal information includes the voltage and current of the second switch; the power supply module is used to generate a target control strategy set based on the electrical signal information, and the target control strategy set is used to control at least one transfer switch to replace the second switch for power supply, wherein at least one transfer switch is provided in each power room.
[0099] According to another aspect of an embodiment of the present application, an electronic device is further provided, including: a memory storing an executable program; and a processor for running the program, wherein the fault handling method for the distribution network in the above embodiment is executed when the program is running.
[0100] According to another aspect of an embodiment of the present application, a computer-readable storage medium is further provided. The computer-readable storage medium includes a stored executable program, wherein when the executable program is running, the device where the storage medium is located is controlled to execute the method in the above embodiment.
[0101] In another embodiment of the present application, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, the steps of the method described in each embodiment of the present application are implemented.
[0102] In another embodiment of the present application, a computer program product is provided, including a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method described in each embodiment of the present application are implemented.
[0103] In the above embodiments of the present application, the following technical effects are achieved:
[0104] 1. For the problem of self-healing blind spots in the distribution network where self-healing cannot restore power, the main station and local automation equipment and standby automatic switching devices cooperate with each other to restore power to the low-voltage load in the fault area of the distribution line, thereby improving the reliability of power supply in the distribution network. In addition, this technical solution is highly available. In most cases, it can be completely independent of the backup self-healing action of the main station. The low-voltage self-healing and power restoration can be completed by using the local standby automatic switching devices. The main station is only used for load optimization and backup optimization, which is conducive to the rapid coverage and promotion of low-voltage self-healing. It solves the problem that self-healing can only be performed on medium-voltage non-fault areas in the past, and the power supply load downstream of the heavy-voltage fault area cannot be restored.
[0105] 2. This technical solution can be completely implemented by computer without manual intervention, and the self-healing and power restoration speed is very fast, which greatly reduces the power outage time caused by distribution network faults and maximizes the power supply reliability of distribution lines.
[0106] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.
[0107] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.
[0108] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0109] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0110] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0111] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, in essence, or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk and other media that can store program codes.
[0112] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A method for handling a fault in a distribution network, characterized in that: include: Get the fault signal from the power room; Determine the faulty power room information of the power room where the fault occurs according to the fault signal, wherein there are multiple power rooms, the power supply lines of the multiple power rooms are connected in sequence, the switches inside different power rooms are connected through a connecting line, and the switches inside each power room are electrically connected to a low-voltage standby automatic switching device; Based on the faulty power room information, controlling the first switches of the power rooms other than the power room where the fault occurs to be closed, wherein the first switches are switches in each power room on the power supply line for connecting adjacent power rooms; Controlling the low-voltage standby automatic switching device to detect the electrical signal information of each second switch in the power room where a fault occurs, wherein the electrical signal information includes the voltage and current of the second switch; A target control strategy set is generated based on the electrical signal information, and the target control strategy set is used to control at least one transfer switch to supply power instead of the second switch, wherein each of the power rooms is provided with at least one transfer switch.
2. The method according to claim 1, characterized in that Generating the target control strategy set based on the electrical signal information includes: determining whether the second switch fails based on the electrical signal information; In the case where it is determined that none of the second switches in the power room where the fault occurs has failed, a first target strategy control set in the target control strategy set is generated, wherein the first target control strategy set is used to control at least one transfer switch through a first device to replace the second switch in the power room where the fault occurs to supply power, wherein the first device includes the low-voltage standby automatic transfer device; When it is determined that the second switch part in the faulty power room is not faulty, a second target strategy control set in the target control strategy set is generated, and the second target control strategy set is used to control at least one transfer switch through a second device to supply power instead of the second switch that is not faulty, wherein the second device includes an automation master station or a host computer system.
3. The method according to claim 2, characterized in that When it is determined that none of the second switches in the power room where the fault occurs fails, generating a first target strategy control set in the target control strategy set, including: When it is determined that the second switch is not faulty, the first transfer switch is controlled to supply power instead of the second switch, wherein the first transfer switch is a switch in the faulty power room on the tie line for connecting the adjacent power room.
4. The method according to claim 2 or 3, characterized in that: Controlling at least one transfer switch by the first device to supply power in place of the second switch in the power room that fails, further comprising: Obtaining a load of a first power transfer room connected to the first power transfer switch; Determining whether the first power transfer room is overloaded according to the load of the first power transfer room; In the event that the first power supply room is determined to be overloaded, Determining the second transfer switches inside the multiple power rooms based on the electrical topological connection relationship of the multiple power rooms; The second transfer switch is controlled to supply power instead of the overload switch.
5. The method according to claim 4, characterized in that Determining the second transfer switches inside the multiple power rooms based on the electrical topological connection relationship of the multiple power rooms includes: Based on the electrical topology connection relationship, determining at least one alternative switch inside the plurality of power rooms; The second transfer switch is determined from the at least one candidate switch based on a preset algorithm.
6. The method according to claim 2, characterized in that In the case where it is determined that the second switch part in the power room where the fault occurs is not faulty, generating a first target strategy control set in the target control strategy set, including: When it is determined that the second switch part in the faulty power room is not faulty, the third transfer switch inside the multiple power rooms is determined based on the electrical topological connection relationship of the multiple power rooms, and the third transfer switch is controlled to supply power instead of the second switch that is not faulty in the faulty power room.
7. The method according to claim 6, characterized in that Determining the third transfer switches inside the multiple power rooms based on the electrical topological connection relationship of the multiple power rooms includes: Based on the electrical topology connection relationship, determining at least one alternative switch inside the plurality of power rooms; The third transfer switch is determined from the at least one candidate switch based on a preset algorithm.
8. A fault handling device for a distribution network, characterized in that: The distribution network fault processing device performs the method according to any one of claims 1 to 7, and the distribution network fault processing device comprises: An acquisition module, wherein the acquisition module is used to acquire a fault signal; A first determination module, the first determination module is used to determine the faulty power room information of the power room where the fault occurs according to the fault signal, wherein there are multiple power rooms, the power supply lines of the multiple power rooms are connected in sequence, the switches inside different power rooms are connected through a connecting line, and the switches inside each of the power rooms are electrically connected to a low-voltage standby automatic switching device; A first execution module, the first execution module is used to control the closing of the first switch of the power room other than the power room where the fault occurs based on the fault power room information, wherein the first switch is a switch in each power room on the power supply line for connecting adjacent power rooms; A second execution module, the second execution module is used to control the low-voltage standby automatic switching device to detect the electrical signal information of each second switch in the power room where a fault occurs, wherein the electrical signal information includes the voltage and current of the second switch; A power supply module, the power supply module is used to generate a target control strategy set based on the electrical signal information, the target control strategy set is used to control at least one transfer switch to replace the second switch for power supply, wherein each of the power rooms is provided with at least one transfer switch.
9. An electronic device, characterized in that: include: A memory storing an executable program; A processor is used to run the program, wherein the program, when running, executes the fault handling method for the distribution network described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored executable program, wherein when the executable program is run, the device where the storage medium is located is controlled to execute the method according to any one of claims 1 to 7.