Self-adaptive suspension method for new energy heavy-duty truck
By real-time monitoring and adjusting the suspension height of new energy trucks, we ensure the safety of the suspension of the warehouse, solve the problem of insufficient coordination between the front and rear suspension and the suspension of the warehouse, reduce the risk of heavy truck overturning, and achieve transportation safety.
Patent Information
- Application Number
- CN202411308175.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2024-12-03
AI Technical Summary
When driving, the buffer adjustment between the front and rear suspension and the warehouse suspension cannot be effectively coordinated, resulting in poor balance, which increases the risk of heavy truck overturning.
By obtaining cab suspension height data in real time, judging and adjusting front and rear suspension cylinders, we ensure that the warehouse suspension meets the safe suspension data, and issue an alarm when it is not met, realizing the adaptive coordination between front suspension, rear suspension and warehouse suspension. .
It effectively reduces the risk of overturning of heavy-duty trucks, ensures transportation safety, and improves balance stability through adaptive adjustment of front and rear suspension cylinders and cargo warehouse suspension.
Smart Images

Figure CN119058311A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of heavy-duty vehicles, and in particular to an adaptive suspension method for a new energy heavy-duty truck. Background Art
[0002] Freight trucks are generally called trucks, also known as trucks. They are mainly used to transport goods. Sometimes they also refer to cars that can tow other vehicles. They belong to the category of commercial vehicles. Generally, they can be divided into heavy and light types according to the weight of the vehicle. Most trucks use diesel engines as their power source, but some light trucks use gasoline, LPG or natural gas. With the large-scale development of new energy technology in the country, some trucks are also driven by new energy such as electricity.
[0003] As new energy trucks have better acceleration and deceleration performance, the shock and collision resistance requirements for new energy trucks are higher. The cab of new energy trucks generally adopts the structure of the suspension system for shock and collision resistance; the cab suspension system includes a front suspension assembly arranged between the front lower part of the cab and the frame and a rear suspension assembly arranged between the rear lower part of the cab and the frame; it mainly supports, flips and resists roll of the cab, and at the same time attenuates the vibration and impact transmitted to the cab by the uneven road surface during vehicle driving, guides the vertical movement of the cab relative to the ground, limits the roll and deflection movement of the cab, and improves ride comfort.
[0004] The current front suspension assembly and rear suspension assembly are equipped with multiple buffer parts, which are used to perform simple buffering during the vibration of the truck. The front suspension and rear suspension work independently, and the buffering adjustment between the front and rear suspensions cannot be effectively coordinated. The front and rear suspensions cannot perform feedback control with the suspension conditions at the cargo compartment of the truck, which makes it easy for new energy trucks to have a large balance difference when driving, resulting in a high risk of overturning of heavy trucks.
[0005] Therefore, in order to solve the above problems, it is necessary for us to design a reasonable adaptive suspension method for new energy heavy-duty trucks. Summary of the invention
[0006] The purpose of the present invention is to provide an adaptive suspension method for new energy heavy-duty trucks, which effectively coordinates the front suspension, rear suspension and cargo hold suspension, obtains the safe suspension data of the cargo hold suspension through the suspension parameters of the cab, and adaptively adjusts the front and rear suspension cylinders when the cargo hold suspension meets the safe suspension data; issues an alarm when the cargo hold suspension does not meet the safe suspension data, and ensures the transportation safety of heavy-duty trucks.
[0007] In order to achieve the above object, the present invention adopts the following technical solutions:
[0008] A new energy heavy-duty truck adaptive suspension method is applicable to a new energy heavy-duty truck adaptive suspension structure, the structure includes a cab front suspension, a cab rear suspension and a cargo hold suspension, the cab front suspension includes a front suspension upper beam and a front suspension lower beam, a front suspension cylinder and a front suspension height valve are arranged between the front suspension upper beam and the front suspension lower beam; the cab rear suspension includes a rear suspension upper beam and a rear suspension lower beam, a rear suspension cylinder and a rear suspension height valve are arranged between the rear suspension upper beam and the rear suspension lower beam; the cargo hold suspension includes a buffer rod arranged between the cargo hold bucket and the cargo hold chassis, and the number of the buffer rods is at least four;
[0009] The method comprises the following steps:
[0010] S1: When the new energy heavy truck is started, the sensing data of the front overhang height valve and the rear overhang height valve are obtained in real time to obtain the suspension height of the cab in front, behind, left and right directions;
[0011] S2: Determine whether the new energy heavy truck is shut down; if so, end all steps; otherwise, deflate the cylinder when the suspension height is higher than the preset height value, and inflate the cylinder when the suspension height is lower than the preset height value;
[0012] S3: Determine whether the maximum suspension height difference of the cab front, back, left, and right is greater than a predetermined threshold value. If so, obtain the pressure value of the buffer rod of the cargo hold suspension and execute step S4; otherwise, do not execute the operation;
[0013] S4: Determine whether the variance of the pressure at each buffer rod is greater than a safety threshold, if so, issue an alarm, otherwise execute step S5;
[0014] S5: Adaptively adjust the inflation and deflation of the front and rear suspension cylinders based on the suspension height difference.
[0015] As a preferred embodiment of the present invention, front suspension cylinders and front suspension height valves are provided on both sides between the front suspension upper beam and the front suspension lower beam, and the two groups of front suspension cylinders and front suspension height valves are symmetrically arranged; rear suspension cylinders and rear suspension height valves are provided on both sides between the rear suspension upper beam and the rear suspension lower beam, and the two groups of rear suspension cylinders and rear suspension height valves are symmetrically arranged;
[0016] When executing step S1, the front suspension heights of the cab are obtained by two symmetrically arranged front suspension height valves and two symmetrically arranged rear suspension height valves.
[0017] The front overhang height valve on the left side of the front suspension, the front overhang height valve on the right side of the front suspension, the rear overhang height valve on the left side of the rear suspension and the rear overhang height valve on the right side of the rear suspension respectively obtain the suspension heights of the left front, right front, left rear and right rear of the cab.
[0018] As a preferred embodiment of the present invention, before executing step S2, a front suspension preset height value and a rear suspension preset height value are generated respectively;
[0019] When executing step S2, when the sensing value of the front suspension height valve is higher than the preset height value of the front suspension, the front suspension cylinder on the same side of the front suspension height valve is driven to deflate; when the sensing value of the front suspension height valve is lower than the preset height value of the front suspension, the front suspension cylinder on the same side of the front suspension height valve is driven to inflate; when the sensing value of the rear suspension height valve is higher than the preset height value of the rear suspension, the rear suspension cylinder on the same side of the rear suspension height valve is driven to deflate; when the sensing value of the rear suspension height valve is lower than the preset height value of the rear suspension, the rear suspension cylinder on the same side of the rear suspension height valve is driven to inflate.
[0020] As a preferred embodiment of the present invention, before executing step S2, a distance L1 between the front suspension cylinder and the front suspension height valve and a distance L2 between the rear suspension cylinder and the rear suspension height valve are obtained;
[0021] The filling and discharging volume P1 of the front suspension cylinder is H1*L1 / a;
[0022] The air filling and discharging volume P2 of the rear suspension cylinder is H2*L2 / b;
[0023] Among them: H1 is the difference between the sensing value of the front suspension height valve and the preset height value of the front suspension; H2 is the difference between the sensing value of the rear suspension height valve and the preset height value of the rear suspension; a is the cargo load coefficient value of the first truck; b is the cargo load coefficient value of the second truck.
[0024] As a preferred embodiment of the present invention, when step S3 is performed, specifically:
[0025] S31: Obtaining a maximum suspension height value and a minimum suspension height value among the suspension heights of the left front, right front, left rear and right rear of the cab;
[0026] S32: Calculate the difference between the maximum suspension height value and the minimum suspension height value as the maximum suspension height difference of the cab front, rear, left and right;
[0027] S33: Determine whether the maximum suspension height difference is greater than a predetermined threshold, if so, execute step S4; otherwise, do not execute the operation.
[0028] As a preferred embodiment of the present invention, a pressure sensor is provided at the end of the buffer rod;
[0029] When executing step S3, the pressure at the ends of the plurality of buffer rods is obtained through the pressure sensor.
[0030] As a preferred embodiment of the present invention, the cargo hold suspension includes a base connected to the cargo hold chassis and a buffer rod for connecting the base and the cargo hold bucket, and there are at least four buffer rods and bases, so that multiple groups of buffer rods and bases are evenly arranged at the cargo hold suspension; the multiple groups of buffer rods and bases are symmetrical front to back and left to right.
[0031] Before executing step S1, the base height of each buffer rod is adjusted so that the pressure at the end of each buffer rod is the same.
[0032] As a preferred embodiment of the present invention, the specifications of each group of buffer rods and bases are the same.
[0033] As a preferred embodiment of the present invention, before executing step S4, a safety threshold is generated according to the cargo capacity of the new energy heavy-duty truck and the maximum suspension height difference of the front, rear, left and right sides of the cab.
[0034] As a preferred embodiment of the present invention, when executing step S5, the front suspension cylinder and the rear suspension cylinder are adaptively charged and deflated according to the difference between the suspension height and the average suspension height.
[0035] The beneficial effects of the adaptive suspension method for a new energy heavy-duty truck of the present invention are:
[0036] The front suspension, rear suspension and cargo hold suspension are effectively coordinated, and the safe suspension data of the cargo hold suspension is obtained through the suspension parameters of the cab. When the cargo hold suspension meets the safe suspension data, the front and rear suspension cylinders are adaptively adjusted; when the cargo hold suspension does not meet the safe suspension data, an alarm is issued to ensure the transportation safety of heavy-loaded trucks. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 A schematic diagram of a flow chart of an adaptive suspension method for a new energy heavy-duty truck according to the present invention;
[0038] Figure 2 It is a three-dimensional structural schematic diagram of a self-feedback adjustment structure of a truck front suspension of the present invention;
[0039] Figure 3 The present invention is a three-dimensional structural schematic diagram of a self-feedback adjustment structure of a truck front suspension. DETAILED DESCRIPTION
[0040] The following are specific embodiments of the present invention, which further describe the technical solutions of the present invention, but the present invention is not limited to these embodiments.
[0041] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that the relative arrangements of modules and structures set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.
[0042] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
[0043] Technologies, methods, and systems known to ordinary technicians in the relevant fields may not be discussed in detail, but where appropriate, the technologies, methods, and systems should be considered part of the authorization specification.
[0044] Embodiment 1: Figures 1 to 3 The figure is only one of the embodiments of the present invention, a new energy heavy-duty truck adaptive suspension method, applicable to a new energy heavy-duty truck adaptive suspension structure, the structure includes a cab front suspension, a cab rear suspension and a cargo hold suspension, the cab front suspension includes a front suspension upper beam 11 and a front suspension lower beam 12, a front suspension cylinder 13 and a front suspension height valve 14 are arranged between the front suspension upper beam 11 and the front suspension lower beam 12; the cab rear suspension includes a rear suspension upper beam 21 and a rear suspension lower beam 22, a rear suspension cylinder 23 and a rear suspension height valve 24 are arranged between the rear suspension upper beam 21 and the rear suspension lower beam 22; the cargo hold suspension includes a buffer rod arranged between the cargo hold bucket and the cargo hold chassis, and the number of the buffer rods is at least four;
[0045] The method comprises the following steps:
[0046] S1: When the new energy heavy truck is started, the sensing data of the front overhang height valve and the rear overhang height valve are obtained in real time to obtain the suspension height of the cab in front, behind, left and right directions;
[0047] A front suspension cylinder 13 and a front suspension height valve 14 are provided on both sides between the front suspension upper beam 11 and the front suspension lower beam 12, and the two groups of front suspension cylinders 13 and front suspension height valves 14 are symmetrically arranged; a rear suspension cylinder 23 and a rear suspension height valve 24 are provided on both sides between the rear suspension upper beam 21 and the rear suspension lower beam 22, and the two groups of rear suspension cylinders 23 and rear suspension height valves 24 are symmetrically arranged;
[0048] When executing step S1, the front suspension heights of the cab are obtained by two symmetrically arranged front suspension height valves 14 and two symmetrically arranged rear suspension height valves 24.
[0049] The front suspension height valve 14 on the left side of the front suspension, the front suspension height valve 14 on the right side of the front suspension, the rear suspension height valve 24 on the left side of the rear suspension and the rear suspension height valve 24 on the right side of the rear suspension respectively obtain the suspension heights of the left front, right front, left rear and right rear of the cab.
[0050] S2: Determine whether the new energy heavy truck is shut down; if so, end all steps; otherwise, deflate the cylinder when the suspension height is higher than the preset height value, and inflate the cylinder when the suspension height is lower than the preset height value;
[0051] S3: Determine whether the maximum suspension height difference of the cab front, back, left, and right is greater than a predetermined threshold value. If so, obtain the pressure value of the buffer rod of the cargo hold suspension and execute step S4; otherwise, do not execute the operation;
[0052] It should be noted that since new energy heavy-duty trucks have the high torque characteristics of new energy vehicles and the large load of heavy-duty trucks, the entire new energy heavy-duty truck is very prone to balance differences. If this balance difference is not adjusted properly, it will lead to a greater risk of overturning. Therefore, it is necessary to monitor the balance of new energy heavy-duty trucks in real time; once the suspension height difference between any two points in the front, back, left and right of the cab is greater than the predetermined threshold, a balance difference has occurred and needs to be adjusted.
[0053] When executing step S3, specifically:
[0054] S31: Obtaining a maximum suspension height value and a minimum suspension height value among the suspension heights of the left front, right front, left rear and right rear of the cab;
[0055] S32: Calculate the difference between the maximum suspension height value and the minimum suspension height value as the maximum suspension height difference of the cab front, rear, left and right;
[0056] S33: Determine whether the maximum suspension height difference is greater than a predetermined threshold, if so, execute step S4; otherwise, do not execute the operation;
[0057] S4: Determine whether the variance of the pressure at each buffer rod is greater than a safety threshold, if so, issue an alarm, otherwise execute step S5;
[0058] When executing step S4, if the variance of the pressure at each buffer rod is greater than the safety threshold, in addition to issuing an alarm, the base at the buffer rod is adjusted according to the pressure at each buffer rod, so that the base at the buffer rod where the pressure is greater than the initial pressure is lowered, and vice versa, the base at the buffer rod where the pressure is less than the initial pressure is raised; until the variance of the pressure at each buffer rod is no greater than the safety threshold;
[0059] The initial pressure is the pressure at the buffer rod before step S1.
[0060] At this time, step S3 is executed again. When the maximum suspension height difference of the cab front, back, left and right is not greater than the predetermined threshold, all bases are adjusted back so that the base height is equal to the initial height before step S1.
[0061] When executing step S4, a safety threshold is generated according to the cargo capacity of the new energy heavy-duty truck and the maximum suspension height difference of the cab in front, behind, left and right directions.
[0062] Here, the focus of step S4 is: once the maximum suspension height difference between the front, rear, left and right sides of the cab is greater than the predetermined threshold, the new energy heavy-duty truck will have a large center of gravity offset. At this time, the maximum allowable offset of the cargo hold can be calculated based on the offset of the cab, which is the safety threshold. If the variance of the pressure at each buffer rod is greater than the safety threshold, it means that there is a major fault in the cargo hold buffer; an alarm needs to be issued to alert the driver and the cloud control center; conversely, if the variance of the pressure at each buffer rod is less than the safety threshold, it means that the cargo hold buffer structure is normal and only requires conventional buffer adjustment.
[0063] S5: Adaptively adjust the inflation and deflation of the front and rear suspension cylinders based on the suspension height difference.
[0064] Embodiment 2: Still as Figures 1 to 3 The figure is only one of the embodiments of the present invention. Based on the first embodiment, in the adaptive suspension method of a new energy heavy-duty truck of the present invention,
[0065] As one of the embodiments of the present invention, before executing step S2, a front suspension preset height value and a rear suspension preset height value are generated respectively;
[0066] When executing step S2, when the sensing value of the front suspension height valve is higher than the preset height value of the front suspension, the front suspension cylinder on the same side of the front suspension height valve is driven to deflate; when the sensing value of the front suspension height valve is lower than the preset height value of the front suspension, the front suspension cylinder on the same side of the front suspension height valve is driven to inflate; when the sensing value of the rear suspension height valve is higher than the preset height value of the rear suspension, the rear suspension cylinder on the same side of the rear suspension height valve is driven to deflate; when the sensing value of the rear suspension height valve is lower than the preset height value of the rear suspension, the rear suspension cylinder on the same side of the rear suspension height valve is driven to inflate.
[0067] As one of the embodiments of the present invention, before executing step S2, a distance L1 between the front suspension cylinder and the front suspension height valve and a distance L2 between the rear suspension cylinder and the rear suspension height valve are obtained;
[0068] The filling and discharging volume P1 of the front suspension cylinder is H1*L1 / a;
[0069] The air filling and discharging volume P2 of the rear suspension cylinder is H2*L2 / b;
[0070] Among them: H1 is the difference between the sensing value of the front suspension height valve and the preset height value of the front suspension; H2 is the difference between the sensing value of the rear suspension height valve and the preset height value of the rear suspension; a is the cargo load coefficient value of the first truck; b is the cargo load coefficient value of the second truck.
[0071] Embodiment 3: Still as Figures 1 to 3 The figure is only one of the embodiments of the present invention. Based on the first embodiment, in the adaptive suspension method of a new energy heavy-duty truck of the present invention,
[0072] The end of the buffer rod is provided with a pressure sensor;
[0073] When executing step S3, the pressure at the ends of the plurality of buffer rods is obtained through the pressure sensor.
[0074] As one of the embodiments of the present invention, the cargo hold suspension includes a base connected to the cargo hold chassis and a buffer rod for connecting the base and the cargo hold bucket, and there are at least four buffer rods and bases, so that multiple groups of buffer rods and bases are evenly arranged at the cargo hold suspension; the multiple groups of buffer rods and bases are symmetrical front to back and left to right.
[0075] Before executing step S1, the base height of each buffer rod is adjusted so that the pressure at the end of each buffer rod is the same.
[0076] As one embodiment of the present invention, the specifications of each set of buffer rods and bases are the same.
[0077] As one of the embodiments of the present invention, before executing step S4, as a preferred embodiment of the present invention, when executing step S5, the front suspension cylinder and the rear suspension cylinder are adaptively charged and deflated according to the difference between the suspension height and the average suspension height.
[0078] The present invention discloses an adaptive suspension method for a new energy heavy-duty truck, which effectively coordinates the front suspension, the rear suspension and the cargo hold suspension, obtains the safe suspension data of the cargo hold suspension through the suspension parameters of the cab, and adaptively adjusts the front and rear suspension cylinders when the cargo hold suspension meets the safe suspension data; and sends out an alarm when the cargo hold suspension does not meet the safe suspension data, thereby ensuring the transportation safety of the heavy-duty truck.
[0079] The present invention discloses an adaptive suspension method for a new energy heavy-duty truck. The left and right sides of the front suspension and the left and right sides of the rear suspension are effectively coordinated to effectively obtain the suspension height values of the front, rear, left and right sides of the cab. When a balance difference occurs in the suspensions of the front, rear, left and right sides of the cab, the cab is effectively adjusted through four groups of suspension cylinders to effectively reduce the risk of overturning of the heavy truck.
[0080] The present invention is not limited to the above specific implementations, and the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made to the above implementations based on the technical essence of the present invention shall be included in the protection scope of the present invention.
Claims
1. A new energy heavy-duty truck adaptive suspension method, Features: The invention is applicable to an adaptive suspension structure of a new energy heavy-duty truck, the structure comprising a cab front suspension, a cab rear suspension and a cargo hold suspension, the cab front suspension comprising a front suspension upper beam (11) and a front suspension lower beam (12), a front suspension cylinder (13) and a front suspension height valve (14) being arranged between the front suspension upper beam (11) and the front suspension lower beam (12); the cab rear suspension comprising a rear suspension upper beam (21) and a rear suspension lower beam (22), a rear suspension cylinder (23) and a rear suspension height valve (24) being arranged between the rear suspension upper beam (21) and the rear suspension lower beam (22); the cargo hold suspension comprising a buffer rod arranged between the cargo hold bucket and the cargo hold chassis, the number of the buffer rods being at least four; The method comprises the following steps: S1: When the new energy heavy truck is started, the sensing data of the front overhang height valve and the rear overhang height valve are obtained in real time to obtain the suspension height of the cab in front, behind, left and right directions; S2: Determine whether the new energy heavy truck is shut down; if so, end all steps; otherwise, deflate the cylinder when the suspension height is higher than the preset height value, and inflate the cylinder when the suspension height is lower than the preset height value; S3: Determine whether the maximum suspension height difference of the cab front, back, left, and right is greater than a predetermined threshold value. If so, obtain the pressure value of the buffer rod of the cargo hold suspension and execute step S4; otherwise, do not execute the operation; S4: Determine whether the variance of the pressure at each buffer rod is greater than a safety threshold, if so, issue an alarm, otherwise execute step S5; S5: Adaptively adjust the inflation and deflation of the front and rear suspension cylinders based on the suspension height difference.
2. According to claim 1, a new energy heavy-duty truck adaptive suspension method, Features: A front suspension cylinder (13) and a front suspension height valve (14) are provided on both left and right sides between the front suspension upper beam (11) and the front suspension lower beam (12), and the two groups of front suspension cylinders (13) and front suspension height valves (14) are symmetrically arranged; a rear suspension cylinder (23) and a rear suspension height valve (24) are provided on both left and right sides between the rear suspension upper beam (21) and the rear suspension lower beam (22), and the two groups of rear suspension cylinders (23) and rear suspension height valves (24) are symmetrically arranged; when executing step S1, the front and rear, left and right suspension heights of the cab are obtained through the two symmetrically arranged front suspension height valves (14) on the left and right sides of the front suspension and the two symmetrically arranged rear suspension height valves (24) on the left and right sides of the rear suspension; The front overhang height valve (14) on the left side of the front suspension, the front overhang height valve (14) on the right side of the front suspension, the rear overhang height valve (24) on the left side of the rear suspension, and the rear overhang height valve (24) on the right side of the rear suspension respectively obtain the overhang heights of the left front, right front, left rear, and right rear of the cab.
3. A new energy heavy-duty truck adaptive suspension method according to claim 2, Features: Before executing step S2, a front suspension preset height value and a rear suspension preset height value are generated respectively; When executing step S2, when the sensing value of the front suspension height valve is higher than the preset height value of the front suspension, the front suspension cylinder on the same side of the front suspension height valve is driven to deflate; when the sensing value of the front suspension height valve is lower than the preset height value of the front suspension, the front suspension cylinder on the same side of the front suspension height valve is driven to inflate; when the sensing value of the rear suspension height valve is higher than the preset height value of the rear suspension, the rear suspension cylinder on the same side of the rear suspension height valve is driven to deflate; when the sensing value of the rear suspension height valve is lower than the preset height value of the rear suspension, the rear suspension cylinder on the same side of the rear suspension height valve is driven to inflate.
4. The adaptive suspension method for a new energy heavy-duty truck according to claim 3, Features: Before executing step S2, obtaining a distance L1 between the front suspension cylinder and the front suspension height valve and a distance L2 between the rear suspension cylinder and the rear suspension height valve; The filling and discharging volume P1 of the front suspension cylinder is H1*L1 / a; The air filling and discharging volume P2 of the rear suspension cylinder is H2*L2 / b; Among them: H1 is the difference between the sensing value of the front suspension height valve and the preset height value of the front suspension; H2 is the difference between the sensing value of the rear suspension height valve and the preset height value of the rear suspension; a is the cargo load coefficient value of the first truck; b is the cargo load coefficient value of the second truck.
5. The adaptive suspension method for a new energy heavy-duty truck according to claim 2, Features: When executing step S3, specifically: S31: Obtaining a maximum suspension height value and a minimum suspension height value among the suspension heights of the left front, right front, left rear and right rear of the cab; S32: Calculate the difference between the maximum suspension height value and the minimum suspension height value as the maximum suspension height difference of the cab front, rear, left and right; S33: Determine whether the maximum suspension height difference is greater than a predetermined threshold, if so, execute step S4; Otherwise, no action is performed.
6. The adaptive suspension method for a new energy heavy-duty truck according to claim 1, Features: The end of the buffer rod is provided with a pressure sensor; When executing step S3, the pressure at the ends of the plurality of buffer rods is obtained through the pressure sensor.
7. The adaptive suspension method for a new energy heavy-duty truck according to claim 1, Features: The cargo hold suspension includes a base connected to the cargo hold chassis and a buffer rod for connecting the base and the cargo hold bucket, and there are at least four buffer rods and bases, so that multiple groups of buffer rods and bases are evenly arranged at the cargo hold suspension; the multiple groups of buffer rods and bases are symmetrical front to back and left to right. Before executing step S1, the base height of each buffer rod is adjusted so that the pressure at the end of each buffer rod is the same.
8. The adaptive suspension method for a new energy heavy-duty truck according to claim 7, Features: Each set of bumper bars and bases have the same specifications.
9. The adaptive suspension method for a new energy heavy-duty truck according to claim 1, Features: Before executing step S4, a safety threshold is generated according to the cargo capacity of the new energy heavy-duty truck and the maximum suspension height difference of the cab in front, behind, left and right directions.
10. The adaptive suspension method for a new energy heavy-duty truck according to claim 1, Features: When executing step S5, the front suspension cylinder and the rear suspension cylinder are adaptively charged and deflated according to the difference between the suspension height and the average suspension height, and the process returns to step S2.