Construction method of high-rise steel structure

The hanging basket system addresses the inefficiencies and safety concerns of high-altitude steel column alignment by providing a motor-driven mechanism for precise alignment and welding of steel columns in high-rise structures.

CN119062108AInactive Publication Date: 2024-12-03HANGXIAO STEEL STRUCTURE (LANKAO) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411405591.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing construction methods for high-rise steel structures require labor-intensive alignment welding at high altitudes, posing safety risks and inefficiencies due to the need for manual adjustment and hoisting of steel columns.

Method used

A hanging basket system is employed to clamp and maintain the alignment of steel columns during installation, allowing workers to weld and fix steel columns at high altitudes safely and efficiently, utilizing a motor-driven mechanism for precise alignment and movement.

Benefits of technology

Ensures precise horizontal and vertical alignment of steel columns, enabling safe and efficient high-altitude welding and fixation, reducing labor intensity and construction time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062108A_ABST
    Figure CN119062108A_ABST
Patent Text Reader

Abstract

The invention particularly relates to a construction method of a high-rise steel structure, which comprises the following steps: S1, preparation work: steel columns, steel beams, support beams, floor slabs and all matched parts of each layer are placed in batches according to quantity points, quality inspection is carried out, and the steel columns, the steel beams, the support beams, the floor slabs and all the matched parts are placed in batches; checking a positioning axis, elevation and foundation bolts, selecting an installation machine, dividing an installation area, determining the installation sequence of each steel structure and the like; s2, assembling a steel structure, hoisting a base of a first-layer flat concrete filled steel tubular column on a pre-embedded foundation bolt for fixing, pouring concrete after the first-layer steel column is fixed, hoisting a steel beam and a connecting plate on the steel column for bolt fixing through a reinforcing plate, and finally placing a floor on the steel beam for welding and fixing, the hanging basket can clamp two steel columns needing to be in butt joint, it is guaranteed that in the installing and fixing process, the two steel columns are kept on the same horizontal line and are kept in the vertical state, and constructors can work aloft and bear parts and tools with certain weights in the hanging basket.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a construction method of a high-rise steel structure. Background Art

[0002] Steel structure is mainly made of steel, generally made of steel and steel plates through welding, bolting or riveting. It is one of the main types of building structures. Compared with ordinary reinforced concrete structures, steel structures have the advantages of homogeneity, high strength, fast construction speed, good seismic resistance and high recycling rate. At present, in the construction process of high-rise buildings, when two steel columns need to be docked and fixed, construction workers are required to perform alignment welding. This operation is time-consuming and laborious, and the operator may also be injured due to operating errors.

[0003] The Chinese invention patent with the authorization announcement number CN112276463A discloses a high-rise steel structure engineering construction method, the technical solution of which is as follows: during the construction process, a steel structure construction welding device is used to clamp and rotate the steel structure to be welded, the steel structure construction welding device comprises a base, two frames are arranged on the base at intervals, driven rotating plates are rotatably arranged in the two frames, a plurality of clamping assemblies are arranged on the opposite sides of the two driven rotating plates, the plurality of clamping assemblies are distributed in a ring array around the axis of the driven rotating plate, the plurality of clamping assemblies include clamping plates, the plurality of clamping plates can simultaneously move in a direction close to or away from the axis of the driven rotating plate, and a rotating structure for controlling the rotation of the driven rotating plate is arranged on the frame;

[0004] This invention patent is a high-rise steel structure engineering construction method, which can clamp steel structures of different specifications during construction and facilitate welding after clamping. However, this high-rise steel structure engineering construction method still has defects: after ground welding is completed, the two steel structure parts still need to be hoisted and welded together, and it is impossible to operate at high altitudes; the position still needs to be adjusted during high-altitude assembly, and it cannot be directly welded and fixed. Summary of the invention

[0005] In order to solve the problems existing in the prior art, the present invention provides a construction method for high-rise steel structures. A hanging basket is provided to clamp two steel columns that need to be connected, ensuring that during the installation and fixation process, the two steel columns remain on the same horizontal line and maintain a vertical state. The hanging basket can also be used by construction workers to work at high altitudes and carry parts and tools of a certain weight.

[0006] The technical solution of the present invention is as follows:

[0007] A construction method for a high-rise steel structure comprises the following steps:

[0008] S1. Preparation work: count and arrange the steel columns, steel beams, support beams, floor slabs and supporting parts of each floor in batches and conduct quality inspection, check the positioning axis, elevation and anchor bolts, select the installation machinery, divide the installation area and determine the installation sequence of each steel structure;

[0009] S2, steel structure assembly, hoist the base of the first-layer flat steel tube concrete column on the pre-buried anchor bolts for fixing, pour concrete after the first-layer steel column is fixed, and fix the connecting plate on the hoisted steel beam and the steel column with bolts through the reinforcement plate, and finally place the floor slab on the steel beam for welding and fixing;

[0010] S3. When hoisting multiple layers or high-rise buildings, hoist the steel columns of the next layer, starting from the middle position of the previous layer, connect the hanging basket to the steel columns of the previous layer through the tower crane, and insert the steel columns to be installed into the hanging basket by another tower crane so that the two corresponding steel columns above and below are connected, and the construction personnel weld the connecting parts of the two steel columns in the hanging basket and install the fixing parts; when hoisting the steel beams and support beams of the next layer, hoist the hanging basket out and transfer it to the outside of the steel columns, and the construction personnel weld and fix the steel columns, steel beams and support beams together with the reinforcing plates in the hanging basket, and expand in the order of hoisting the steel columns, steel beams and support beams, and so on and so forth and expand to all sides;

[0011] S4. During installation, the system is divided into different areas according to the order of hoisting. Each area corresponds to a crane to ensure that the hoisting work in each area can be carried out simultaneously. After each layer is installed, each connection is first calibrated and fine-tuned, and the high-strength bolts are initially tightened. Then each connection is welded and the high-strength bolts are finally tightened.

[0012] Furthermore, the hanging basket in S3 includes a hollow first hanging basket, a second hanging basket and lifting ears, the second hanging basket is connected below the first hanging basket, the left and right sides of the first hanging basket are movably connected with the lifting ears, the first hanging basket is provided with two movable left and right clamping blocks, and the second hanging basket is provided with a hollow boss in the middle.

[0013] Furthermore, the sliders arranged on both sides of the clamping block are movably connected in the slide grooves on the front and rear sides of the first hanging basket, and the two sliders are simultaneously threadedly connected to two threaded rods rotatably connected to the first hanging basket, and the threaded rods have two sections of threads with opposite rotation directions. The two ends of the spiral rod are fixedly connected to the first pulley, and the connecting shaft connected to the right side of the first pulley penetrates into the inner wall of the side of the first hanging basket. The left and right inner walls of the first hanging basket are provided with a motor located between the two threaded rods, and the output shaft of the motor is provided with a second pulley, and the second pulley is connected to the first pulley of one of the threaded rods through a belt.

[0014] Furthermore, connecting rods are provided at the four corners of the second hanging basket, and racks are fixedly connected to the opposite surfaces of the connecting rods at two longitudinal positions.

[0015] Furthermore, the connecting rod is slidably connected up and down in an inner cavity provided on the left and right side walls of the first hanging basket, and a stopper provided at the bottom end of the inner cavity of the first hanging basket blocks the lower limit position of the limit block fixedly connected to the upper end of the connecting rod.

[0016] Furthermore, the end of the connecting shaft of the first hanging basket is fixedly connected with a gear that matches the rack.

[0017] Furthermore, the lifting ear is in an inverted C shape, and the ends of the left and right sides of the lifting ear are connected to a rolling shaft, and the other end of the rolling shaft is fixed to the first hanging basket and penetrates into the side wall.

[0018] Furthermore, a through hole having the same size as the notch of the boss is provided in the middle of the clamping block, and the notch and the through hole are on the same horizontal line.

[0019] Compared with the prior art, the technical solution provided by the present invention has the following beneficial effects: by setting up a hanging basket, it is possible to clamp the two steel columns that need to be connected, ensuring that during the installation and fixing process, the two steel columns remain on the same horizontal line and maintain a vertical state, and the construction workers can tighten and weld the two steel columns in the hanging basket. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the hanging basket of the present invention;

[0021] Figure 2 is a schematic diagram of the side wall section of the hanging basket;

[0022] Figure 3 It is a top view cross-sectional schematic diagram of the hanging basket;

[0023] In the figure: 1, first hanging basket, 2, second hanging basket, 3, lifting ear, 4, rolling shaft, 5, clamping block, 6, screw rod, 7, first pulley, 8, second pulley, 9, motor, 10, slide groove, 11, connecting rod, 12, boss, 13, connecting shaft, 14, bearing, 15, gear, 16, block, 17, limit block, 18, rack 19, through hole, 20, notch. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] See also Figure 1-3 , a construction method of a high-rise steel structure, comprising the following steps:

[0026] S1. Preparation work: count and arrange the steel columns, steel beams, support beams, floor slabs and supporting parts of each floor in batches and conduct quality inspection, check the positioning axis, elevation and anchor bolts, select the installation machinery, divide the installation area and determine the installation sequence of each steel structure;

[0027] S2, steel structure assembly, hoist the base of the first-layer flat steel tube concrete column on the pre-buried anchor bolts for fixing, pour concrete after the first-layer steel column is fixed, and fix the connecting plate on the hoisted steel beam and the steel column with bolts through the reinforcement plate, and finally place the floor slab on the steel beam for welding and fixing;

[0028] S3. When hoisting multiple layers or high-rise buildings, hoist the steel columns of the next layer, starting from the middle position of the previous layer, connect the hanging basket to the steel columns of the previous layer through the tower crane, and insert the steel columns to be installed into the hanging basket by another tower crane so that the two corresponding steel columns above and below are connected, and the construction personnel weld the connecting parts of the two steel columns in the hanging basket and install the fixing parts; when hoisting the steel beams and support beams of the next layer, hoist the hanging basket out and transfer it to the outside of the steel columns, and the construction personnel weld and fix the steel columns, steel beams and support beams together with the reinforcing plates in the hanging basket, and expand in the order of hoisting the steel columns, steel beams and support beams, and so on and so forth and expand to all sides;

[0029] S4. During installation, the system is divided into different areas according to the order of hoisting. Each area corresponds to a crane to ensure that the hoisting work in each area can be carried out simultaneously. After each layer is installed, each connection is first calibrated and fine-tuned, and the high-strength bolts are initially tightened. Then each connection is welded and the high-strength bolts are finally tightened.

[0030] like Figure 1 As shown, in the present invention, the hanging basket in S3 includes a hollow first hanging basket 1, a second hanging basket 2 and a lifting ear 3, the second hanging basket 2 is connected to the lower part of the first hanging basket 1, the left and right sides of the first hanging basket 1 are movably connected with the lifting ears 3, and the first hanging basket 1 is provided with two movable left and right clamping blocks 5. By setting the clamping blocks 5, it is convenient to fix the steel column of the next level, and a hollow boss 12 is provided in the middle of the second hanging basket 2 to facilitate clamping the steel column of the previous level.

[0031] like Figure 1As shown, in the present invention, the sliders arranged on both sides of the clamping block 5 are movably connected in the slide grooves 10 on the front and rear sides of the first hanging basket 1, and the two sliders 5 are simultaneously threadedly connected to two threaded rods 6 rotatably connected to the first hanging basket 1, and the threaded rod 6 has two sections of threads with opposite rotation directions, and the two ends of the spiral rod 6 are fixedly connected to the first pulley 7, and the connecting shaft 13 connected to the right side of the first pulley 7 penetrates into the inner wall of the side of the first hanging basket 1, and the left and right inner walls of the first hanging basket 1 are provided with a motor 9 located between the two threaded rods 6, and the output shaft of the motor 9 is provided with a second pulley 8, and the second pulley 8 is connected to the first pulley 7 of one of the threaded rods 6 through a belt;

[0032] Specifically, the threaded rod 6 includes two threaded sections with opposite rotation directions located in the middle, and both ends of the threaded rod 6 are smooth connecting shafts 13. The first pulley 7 is key-connected to the connecting shaft 13, and the first pulley 7 is located on the inner side of the first hanging basket 1. The connecting shaft 13 is rotatably connected to the side wall of the first hanging basket 1 through a bearing 14; the threaded sections on the same side of the two threaded rods 6 have opposite rotation directions. The opposite rotation directions mentioned here refer to the situation where the two threaded rods 6 rotate clockwise or counterclockwise at the same time, so as to Figure 3 As shown, when the two threaded rods 6 rotate clockwise or counterclockwise at the same time, the left thread section of the upper threaded rod 6 and the left thread section of the lower threaded rod 6 have opposite rotation directions, and when the upper threaded rod 6 rotates clockwise and the lower threaded rod 6 rotates counterclockwise, the left thread section of the side threaded rod 6 and the left thread section of the lower threaded rod 6 have the same rotation direction; and the connection method of the second pulley 8 and the first pulley 7 connected to the output shafts of the two motors 9 is as follows: Figure 1 As shown, the second pulley 8 of the motor 9 fixed to the left inner wall of the first hanging basket 1 is connected to the first pulley 7 on the threaded rod 6 on the rear side by a belt, and the second pulley 8 of the motor 9 fixed to the right inner wall of the first hanging basket 1 is connected to the first pulley 7 on the threaded rod 6 on the rear front side by a belt; when the two motors 9 are running, they respectively drive the two threaded rods 6 to rotate clockwise or counterclockwise (i.e. rotate in opposite directions), so that it can be achieved that the two clamping blocks 5 threadedly connected to them are driven to approach or move away at the same time by two threaded rods 6 with threads at both ends having different rotation directions.

[0033] like Figure 1 and Figure 2As shown, in the present invention, connecting rods 11 are provided at the four corners of the second hanging basket 2, and the opposite surfaces of the connecting rods 11 at the two longitudinal positions are fixedly connected with racks 18; the end of the connecting shaft 13 of the first hanging basket 1 is fixedly connected with a gear 15 that matches the rack 18; when the two motors 9 run and drive the two threaded rods 6 to rotate towards each other and drive the two clamping blocks to approach or move away from each other at the same time, the gears 15 on the connecting shafts 13 at both ends of the two threaded rods 6 drive the four connecting rods 11 to move upward or downward at the same time, so as to drive the second hanging basket 2 to move up and down, thereby extending the space inside the second hanging basket 2, making it convenient for construction workers to carry out construction; and when the hanging basket is not in use, the second hanging basket 2 maintains a small distance from the first hanging basket 1 to reduce the occupied space.

[0034] like Figure 2 As shown, in the present invention, the connecting rod 11 is slidably connected up and down in the inner cavity set on the left and right side walls of the first hanging basket 1, and a stopper 16 is provided at the bottom end of the inner cavity of the first hanging basket 1 to block the lower limit position of the limit block 17 fixedly connected to the upper end of the connecting rod 11.

[0035] like Figure 1 As shown, in the present invention, the lifting ear 3 is in an inverted C shape, and the ends of the left and right sides of the lifting ear 3 are connected with a rolling shaft 4. The other end of the rolling shaft 4 is fixed to the first hanging basket 1 and penetrates through the side wall. During high-altitude operations, the hanging basket will not swing with the lifting ear 3, thereby maintaining the overall stability of the hanging basket.

[0036] like Figure 1 As shown, in the present invention, a through hole 19 having the same size as the notch 20 of the boss 12 is provided in the middle of the clamping block 5, and the notch 20 and the through hole 19 are on the same horizontal line. Two notches 20 and the through hole 19 of the same size are on the same horizontal line. During hoisting, only two steel columns need to be respectively sleeved on them, which is not only convenient for supporting the two steel columns that need to be fixed, but also does not require people to support and adjust the steel columns, and does not require repeated positioning, thereby increasing the efficiency of construction.

[0037] In the specific implementation of the present invention, a safety lock is provided on the lifting ear 3 of the hanging basket, and a hoist is provided on the first hanging basket 1. The safety lock and the hoist are both existing technologies in the field of the hanging basket 3, so they are not shown in the figure. Those skilled in the art can choose to install appropriate safety locks and hoists according to specific needs.

[0038] Working process of the present invention:

[0039] Preparation: Connect the wire rope on a tower crane to the safety lock and the hoist. In the initial state, the two clamping blocks 5 are separated, the connecting rod 11 is in the inner cavity of the side wall, and the connecting rod 11 of the second hanging basket 2 is located at the top of the inner cavity of the first hanging basket 11. Start the motor 9 of the hanging basket, the spiral rod 6 drives the clamping block 5 to move relative to each other, and the gear 15 in the inner cavity of the side wall drives the rack 18 of the second hanging basket 2 to move downward. The construction personnel enter the inner cavity of the second hanging basket 2 with tools and parts;

[0040] Assembling the steel structure: After the construction personnel enter the hanging basket, the hoist is started, and the hanging basket moves upward to the top of the lower steel column, so that the lower steel column corresponds to the notch 20 of the second hanging basket 2, and then the hoist is started to move the hanging basket downward for a distance until the upper end of the lower steel column extends part of the notch 20, and the other hanging tower lifts the upper steel column and aligns it with the through hole 19 on the clamping block 5, so that the upper steel column descends through the through hole 19 until the end faces of the two steel columns collide. During the construction process, no one needs to touch the steel column at all, and the construction personnel only need to fix the two steel columns;

[0041] Lift the hanging basket and pull it out from the steel column, transfer it to one side of the steel column, fix the steel beams and support beams that need to be bolted above the steel column and in the middle of the side of each area, and install each layer from bottom to top in this way.

[0042] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0043] The basic principles and main features of the present invention and the advantages of the present invention are shown and described above. For those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention; therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is limited by the attached claims rather than the above description. Therefore, it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the present invention, and any figure marks in the claims should not be regarded as limiting the claims involved.

[0044] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A construction method for a high-rise steel structure, characterized in that: The following steps are involved: S1. Preparation work: count and arrange the steel columns, steel beams, support beams, floor slabs and supporting parts of each floor in batches and conduct quality inspection, check the positioning axis, elevation and anchor bolts, select the installation machinery, divide the installation area and determine the installation sequence of each steel structure; S2, steel structure assembly, hoist the base of the first-layer flat steel tube concrete column on the pre-buried anchor bolts for fixing, pour concrete after the first-layer steel column is fixed, and fix the connecting plate on the hoisted steel beam and the steel column with bolts through the reinforcement plate, and finally place the floor slab on the steel beam for welding and fixing; S3. When hoisting multiple layers or high-rise buildings, hoist the steel columns of the next layer, starting from the middle position of the previous layer, connect the hanging basket to the steel columns of the previous layer through the tower crane, and insert the steel columns to be installed into the hanging basket by another tower crane so that the two corresponding steel columns above and below are connected, and the construction personnel weld the connecting parts of the two steel columns in the hanging basket and install the fixing parts; when hoisting the steel beams and support beams of the next layer, hoist the hanging basket out and transfer it to the outside of the steel columns, and the construction personnel weld and fix the steel columns, steel beams and support beams together with the reinforcing plates in the hanging basket, and expand in the order of hoisting the steel columns, steel beams and support beams, and so on and so forth and expand to all sides; S4. During installation, the system is divided into different areas according to the order of hoisting. Each area corresponds to a crane to ensure that the hoisting work in each area can be carried out simultaneously. After each layer is installed, each connection is first calibrated and fine-tuned, and the high-strength bolts are initially tightened. Then each connection is welded and the high-strength bolts are finally tightened.

2. A construction method for a high-rise steel structure according to claim 1, characterized in that: The hanging basket in S3 comprises a hollow first hanging basket (1), a second hanging basket (2) and a lifting lug (3); the second hanging basket (2) is connected to the lower part of the first hanging basket (1); the left and right sides of the first hanging basket (1) are movably connected to the lifting lug (3); two movable left and right clamping blocks (5) are arranged in the first hanging basket (1); and a hollow boss (12) is arranged in the middle of the second hanging basket (2).

3. A construction method for a high-rise steel structure according to claim 2, characterized in that: The sliders arranged on both sides of the clamping block (5) are movably connected to the slide grooves (10) on the front and rear sides of the first hanging basket (1), and the two sliders (5) are simultaneously threadedly connected to two threaded rods (6) rotatably connected to the first hanging basket (1), and the threaded rod (6) has two sections of threads with opposite rotation directions. The two ends of the spiral rod (6) are fixedly connected to the first pulley (7), and the connecting shaft (13) connected to the right side of the first pulley (7) penetrates into the inner wall of the side of the first hanging basket (1). The left and right inner walls of the first hanging basket (1) are provided with a motor (9) located between the two threaded rods (6), and the output shaft of the motor (9) is provided with a second pulley (8), and the second pulley (8) is connected to the first pulley of one of the threaded rods (6) through a belt.

4. A construction method for a high-rise steel structure according to claim 2, characterized in that: The second hanging basket (2) is provided with connecting rods (11) at the four corners, and racks (18) are fixedly connected to the opposite surfaces of the connecting rods (11) at two longitudinal positions.

5. A construction method for a high-rise steel structure according to claim 4, characterized in that: The connecting rod (11) is slidably connected up and down in an inner cavity provided on the left and right side walls of the first hanging basket (1), and a stopper (16) provided at the bottom end of the inner cavity of the first hanging basket (1) blocks the lower limit position of a limit block (17) fixedly connected to the upper end of the connecting rod (11).

6. A method for constructing a high-rise steel structure according to claim 4, characterized in that: The end of the connecting shaft (13) of the first hanging basket (1) is fixedly connected with a gear (15) which matches the rack (18).

7. A construction method for a high-rise steel structure according to claim 2, characterized in that: The lifting lug (3) is in an inverted C shape, and the ends of the left and right sides of the lifting lug (3) are connected to a rolling shaft (4), and the other end of the rolling shaft (4) is fixed to the first hanging basket (1) and penetrates into the side wall.

8. The construction method of a high-rise steel structure according to claim 3, characterized in that: A through hole (19) having the same size as the notch (20) of the boss (12) is provided in the middle of the clamping block (5), and the notch (20) and the through hole (19) are located on the same horizontal line.