Monitoring method, monitoring device and equipment for abnormal well condition of single well and medium

The method and device use analysis control charts to automatically identify abnormal well conditions in single wells, addressing the lack of objective methods in the oil and gas industry, ensuring accurate and timely detection for improved well management.

CN119062309APending Publication Date: 2024-12-03RICHFIT INFORMATION TECH +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202310651086.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The oil and gas industry lacks effective methods for automatically identifying abnormal well conditions in single wells, relying heavily on subjective human judgment and manual meter reading, which is uncertain and prone to errors due to inherent random fluctuations.

Method used

A method and device for monitoring abnormal well conditions using analysis control charts that convert data into control charts during non-calibration periods, enabling real-time automatic identification by calculating and plotting key parameters, including mean value, range, and standard deviation, to detect anomalies and inform calibration cycles.

Benefits of technology

Enables accurate and automatic detection of abnormal well conditions, providing a basis for well calibration and decision-making by reducing subjectivity and enhancing operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062309A_ABST
    Figure CN119062309A_ABST
Patent Text Reader

Abstract

The invention provides a single well abnormal well condition monitoring method and device, equipment and a medium. The method comprises the steps that a plurality of first state parameter sets of a single well in a calibration time period are obtained; calculating statistics among the first state parameter groups by using the plurality of first state parameters in each first state parameter group, and drawing a control chart for analysis based on the statistics of each first state parameter group; acquiring a plurality of second state parameter groups in a non-calibration time period adjacent to the calibration time period, and drawing in the control chart for analysis by using the plurality of second state parameter groups to obtain the control chart for control; and abnormal well condition monitoring is carried out on the single well based on each second measurement point in the control chart for control and the control limit. According to the method and the device, the control chart for analysis is converted into the control chart for control in the non-calibration time period, so that the abnormal well condition of the single well is monitored in real time and automatically identified, and a basis is provided for the calibration period and the production decision of the well.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of real-time online monitoring of crude oil multiphase flow parameters during single well production, storage and transportation in the oil and gas industry, and specifically to a monitoring method, monitoring device, equipment and medium for abnormal well conditions of a single well. Background Art

[0002] As an important strategic resource supporting the national economy and people's livelihood, the exploration, mining, transportation and processing of oil and natural gas all involve the real-time online monitoring of measurement parameters. Therefore, it is of great significance to be able to accurately and automatically identify abnormal working conditions. At present, the oil and gas industry mostly uses manual meter reading and recording methods for single well measurement parameters, and the identification of abnormal working conditions mostly relies on the judgment of production decision-makers, which is highly subjective and uncertain.

[0003] Any process in the production and measurement process will have inherent random fluctuations, which is normal and cannot be completely eliminated. However, the fluctuation of measurement parameters may also come from abnormal reasons, and these abnormal conditions must be avoided in the production process. Conventional control charts are a statistical tool used to determine whether the measurement process is in a normal state. They were originally used in the statistical control of the production process, and recently they are also often used in the statistical control of the measurement process. However, there are currently few applications specifically for the automatic identification of abnormal well conditions in a single well. Summary of the invention

[0004] In view of this, the purpose of the present application is to provide a monitoring method, monitoring device, equipment and medium for abnormal well conditions in a single well, automatically design and produce analysis control charts for key parameters based on the various state parameters collected, and convert the analysis control charts into control charts during non-calibration time periods, so as to monitor and automatically identify abnormal well conditions in a single well in real time, thereby providing a basis for the calibration cycle and production decisions of the well.

[0005] In a first aspect, an embodiment of the present application provides a method for monitoring abnormal well conditions of a single well, the monitoring method comprising:

[0006] Acquire multiple first state parameter groups of a single well within a calibration time period; wherein the calibration time period includes multiple calibration sub-time periods, each calibration sub-time period corresponds to a first state parameter group, and each first state parameter group includes multiple first state parameters of the single well within the corresponding calibration sub-time period;

[0007] Calculating statistics between the first state parameter groups using a plurality of first state parameters in each first state parameter group, and drawing an analysis control chart based on the statistics of each first state parameter group; wherein the analysis control chart includes a first measurement point of each first state measurement group within the calibration time period, and control limits, wherein the control limits include a center line, an upper control limit, and a lower control limit;

[0008] Acquire multiple second state parameter groups in a non-calibrated time period adjacent to the calibrated time period, and use the multiple second state parameter groups to draw in the analysis control chart to obtain a control chart for control; wherein the length of the non-calibrated time period is the same as the length of the calibrated time period, the non-calibrated time period includes multiple non-calibrated sub-time periods, each non-calibrated sub-time period corresponds to a second state parameter group, each second state parameter group includes multiple second state parameters of the single well in the corresponding non-calibrated sub-time period, and the control chart for control includes the second measurement point of each second state measurement group in the non-calibrated time period, and the control limit;

[0009] The abnormal well condition of the single well is monitored based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit.

[0010] Further, the analysis control chart includes a mean value analysis control chart and a range analysis control chart; the calculation of the statistics between the first state parameter groups using the multiple first state parameters in each first state parameter group, and the drawing of the analysis control chart based on the statistics of each first state parameter group, includes:

[0011] For each first state parameter group, using a plurality of first state parameters in the first state parameter group, calculate a subgroup average value and a subgroup range corresponding to the first state parameter group;

[0012] The total average value between the first state parameter groups is calculated using the subgroup average value corresponding to each first state parameter group, and the average range between the first state parameter groups is calculated using the subgroup range corresponding to each first state parameter group;

[0013] Determining a metering value using the number of first state parameters in each first state parameter group;

[0014] Draw a range center line in the initial range analysis control chart based on the average range, and draw an upper range control limit and a lower range control limit in the initial range analysis control chart based on the measured value and the average range;

[0015] For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the subgroup range corresponding to the first state parameter group and the average range, the first range measurement point corresponding to the first state parameter group is plotted in the control chart for initial range analysis;

[0016] Using a solid line to connect any two adjacent first range measurement points in the initial range analysis control chart to obtain the range analysis control chart;

[0017] Draw a mean value center line in the initial mean value analysis control chart based on the total mean value, and draw a mean value upper control limit and a mean value lower control limit in the initial mean value analysis control chart based on the measured values, the total mean value and the average range;

[0018] For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group average value corresponding to the first state parameter group and the total average value, a first average value measurement point corresponding to the first state parameter group is plotted in the initial average value analysis control chart;

[0019] In the initial mean value analysis control chart, any two adjacent first mean value measurement points are connected using a solid line to obtain the mean value analysis control chart.

[0020] Further, the analysis control chart includes a mean value analysis control chart and a standard deviation analysis control chart; the calculation of the statistics between the first state parameter groups using the multiple first state parameters in each first state parameter group, and the drawing of the analysis control chart based on the statistics of each first state parameter group, includes:

[0021] For each first state parameter group, using a plurality of first state parameters in the first state parameter group, calculate a subgroup mean value and a subgroup standard deviation corresponding to the first state parameter group;

[0022] The total average value between the first state parameter groups is calculated using the subgroup average value corresponding to each first state parameter group, and the average standard deviation between the first state parameter groups is calculated using the subgroup range corresponding to each first state parameter group;

[0023] Determining a metering value using the number of first state parameters in each first state parameter group;

[0024] Draw a standard deviation center line in the initial standard deviation analysis control chart based on the average standard deviation, and draw a standard deviation upper control limit and a standard deviation lower control limit in the initial standard deviation analysis control chart based on the measured value and the average standard deviation;

[0025] For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group standard deviation corresponding to the first state parameter group and the average standard deviation, a first standard deviation measurement point corresponding to the first state parameter group is plotted in the control chart for initial standard deviation analysis;

[0026] Using a solid line to connect any two adjacent first standard deviation measurement points in the initial standard deviation analysis control chart to obtain the standard deviation analysis control chart;

[0027] Draw a mean value center line in the initial mean value analysis control chart based on the total mean value, and draw a mean value upper control limit and a mean value lower control limit in the initial mean value analysis control chart based on the measured values, the total mean value and the average standard deviation;

[0028] For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group average value corresponding to the first state parameter group and the total average value, a first average value measurement point corresponding to the first state parameter group is plotted in the initial average value analysis control chart;

[0029] In the initial mean value analysis control chart, any two adjacent first mean value measurement points are connected using a solid line to obtain the mean value analysis control chart.

[0030] Furthermore, after drawing the control chart for analysis, the monitoring method further comprises:

[0031] Dividing the analysis control chart into a plurality of control ranges using the control limits in the analysis control chart;

[0032] Using a preset abnormality judgment rule, in the analysis control chart, an abnormality judgment is performed on the situation where the plurality of first measurement points fall within the plurality of control ranges, and it is judged whether there is a first abnormal measurement point among the plurality of first measurement points;

[0033] If so, the first state parameter group corresponding to the first abnormal measurement point is eliminated, and the process returns to the step of calculating the statistics between the first state parameter groups using the multiple first state parameters in each first state parameter group, and drawing a control chart for analysis based on the statistics of each first state parameter group, until there is no first abnormal measurement point among the multiple first measurement points.

[0034] Further, the control chart includes a mean value control chart and a range control chart; the method of using a plurality of the second state parameter groups to draw in the analysis control chart to obtain the control chart includes:

[0035] The average value center line, the average value upper control limit and the average value lower control limit in the average value analysis control chart are extended respectively, and the abscissa of the average value analysis control chart is extended by using the non-calibrated time period to obtain an initial average value control control chart;

[0036] For each second state parameter group, using a plurality of second state parameters in the second state parameter group, calculate a subgroup average value corresponding to the second state parameter group;

[0037] Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group average value corresponding to the second state parameter group and the total average value, a second average value measurement point corresponding to the second state parameter group is drawn in the control chart for initial average value control;

[0038] In the control chart for initial average value control, any two adjacent second average value measurement points are connected by a dotted line to obtain the control chart for average value control;

[0039] The range center line, the range upper control limit and the range lower control limit in the control chart for range analysis are respectively extended, and the abscissa of the control chart for range analysis is extended by using the non-calibrated time period to obtain an initial range control chart;

[0040] For each second state parameter group, a subgroup range corresponding to the second state parameter group is calculated using a plurality of second state parameters in the second state parameter group;

[0041] Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group range corresponding to the second state parameter group and the average range, a second range measurement point corresponding to the second state parameter group is plotted in the control chart for initial range control;

[0042] In the control chart for initial range control, any two adjacent second range measurement points are connected by a dotted line to obtain the control chart for range control.

[0043] Further, the control chart includes a mean value control chart and a standard deviation control chart; the method of using a plurality of the second state parameter groups to draw in the analysis control chart to obtain the control chart includes:

[0044] The average value center line, the average value upper control limit and the average value lower control limit in the average value analysis control chart are extended respectively, and the abscissa of the average value analysis control chart is extended by using the non-calibrated time period to obtain an initial average value control control chart;

[0045] For each second state parameter group, using a plurality of second state parameters in the second state parameter group, calculate a subgroup average value corresponding to the second state parameter group;

[0046] Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group average value corresponding to the second state parameter group and the total average value, a second average value measurement point corresponding to the second state parameter group is drawn in the control chart for initial average value control;

[0047] In the control chart for initial average value control, any two adjacent second average value measurement points are connected by a dotted line to obtain the control chart for average value control;

[0048] The standard deviation center line, the standard deviation upper control limit and the standard deviation lower control limit in the standard deviation analysis control chart are extended respectively, and the abscissa of the standard deviation analysis control chart is extended by using the non-calibrated time period to obtain an initial standard deviation control chart;

[0049] For each second state parameter group, using a plurality of second state parameters in the second state parameter group, calculate a subgroup standard deviation corresponding to the second state parameter group;

[0050] Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group standard deviation corresponding to the second state parameter group and the average standard deviation, a second standard deviation measurement point corresponding to the second state parameter group is drawn in the control chart for initial standard deviation control;

[0051] In the control chart for initial standard deviation control, any two adjacent second standard deviation measurement points are connected by a dotted line to obtain the control chart for standard deviation control.

[0052] Furthermore, the abnormal well condition monitoring of the single well based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit includes:

[0053] Dividing the analysis control chart into a plurality of control ranges using the control limits in the analysis control chart;

[0054] Using a preset abnormality judgment rule, in the analysis control chart, an abnormality judgment is performed on the situation where a plurality of the second measurement points fall within a plurality of the control ranges, and it is judged whether there is a second abnormal measurement point among the plurality of the second measurement points;

[0055] If so, it is considered that the single well has an abnormal well condition within the non-calibrated time period.

[0056] In a second aspect, an embodiment of the present application further provides a monitoring device for abnormal well conditions of a single well, the monitoring device comprising:

[0057] A data acquisition module, used to acquire multiple first state parameter groups of a single well within a calibration time period; wherein the calibration time period includes multiple calibration sub-time periods, each calibration sub-time period corresponds to a first state parameter group, and each first state parameter group includes multiple first state parameters of the single well within the corresponding calibration sub-time period;

[0058] An analysis control chart generating module is used to calculate the statistics between the first state parameter groups using the multiple first state parameters in each first state parameter group, and to draw an analysis control chart based on the statistics of each first state parameter group; wherein the analysis control chart includes the first measurement point of each first state measurement group within the calibration time period, and control limits, wherein the control limits include a center line, an upper control limit, and a lower control limit;

[0059] A control chart generation module for control, used for obtaining a plurality of second state parameter groups in a non-calibrated time period adjacent to a calibrated time period, and using the plurality of second state parameter groups to draw in the analysis control chart to obtain a control chart for control; wherein the length of the non-calibrated time period is the same as the length of the calibrated time period, the non-calibrated time period includes a plurality of non-calibrated sub-time periods, each non-calibrated sub-time period corresponds to a second state parameter group, each second state parameter group includes a plurality of second state parameters of the single well in the corresponding non-calibrated sub-time period, and the control chart for control includes a second measurement point of each second state measurement group in the non-calibrated time period, and the control limit;

[0060] The abnormal well condition monitoring module is used to monitor the abnormal well condition of the single well based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit.

[0061] In a third aspect, an embodiment of the present application further provides an electronic device, comprising: a processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor and the memory communicate via the bus, and when the machine-readable instructions are executed by the processor, the steps of the method for monitoring abnormal well conditions of a single well as described above are performed.

[0062] In a fourth aspect, an embodiment of the present application further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the method for monitoring abnormal well conditions of a single well as described above are executed.

[0063] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0064] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0065] Figure 1 A flow chart of a method for monitoring abnormal well conditions of a single well provided in an embodiment of the present application;

[0066] FIG2(A) is a schematic diagram of a normal distribution curve provided in an embodiment of the present application;

[0067] FIG2(B) is a schematic diagram of a control diagram provided in an embodiment of the present application;

[0068] Figure 3(A)-Figure 3(H) A schematic diagram of a control chart for analysis with abnormality provided in an embodiment of the present application;

[0069] Figure 4 A schematic diagram of the structure of a monitoring device for abnormal well conditions in a single well provided in an embodiment of the present application;

[0070] Figure 5 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0071] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application usually described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, each other embodiment obtained by those skilled in the art without making creative work belongs to the scope of protection of the present application.

[0072] First, the application scenarios to which this application is applicable are introduced. This application can be applied to the field of real-time online monitoring of crude oil multiphase flow parameters during single well production and storage and transportation in the oil and gas industry.

[0073] As an important strategic resource supporting the national economy and people's livelihood, the exploration, mining, transportation and processing of oil and natural gas all involve the real-time online monitoring of measurement parameters. Therefore, it is of great significance to be able to accurately and automatically identify abnormal working conditions. At present, the oil and gas industry mostly uses manual meter reading and recording methods for single well measurement parameters, and the identification of abnormal working conditions mostly relies on the judgment of production decision-makers, which is highly subjective and uncertain.

[0074] Any process in the production and measurement process will have inherent random fluctuations, which is normal and cannot be completely eliminated. However, the fluctuation of measurement parameters may also come from abnormal reasons, and these abnormal conditions must be avoided in the production process. Conventional control charts are a statistical tool used to determine whether the measurement process is in a normal state. They were originally used in the statistical control of the production process, and recently they are also often used in the statistical control of the measurement process. However, there are currently few applications specifically for the automatic identification of abnormal well conditions in a single well.

[0075] Based on this, an embodiment of the present application provides a method for monitoring abnormal well conditions of a single well, which converts the control chart for analysis into a control chart for control during a non-calibration time period, thereby performing real-time monitoring and automatic identification of abnormal well conditions of a single well, thereby providing a basis for the calibration cycle and production decisions of the well.

[0076] See also Figure 1 , Figure 1 This is a flow chart of a method for monitoring abnormal well conditions in a single well provided in an embodiment of the present application. Figure 1 As shown in , the monitoring method provided in the embodiment of the present application includes:

[0077] S101. Acquire multiple first state parameter groups of a single well within a calibration time period.

[0078] It should be noted that the calibration time period refers to a time period for collecting the state parameters of a single well. The calibration time period includes multiple calibration sub-time periods, each calibration sub-time period corresponds to a first state parameter group, and each first state parameter group includes multiple first state parameters of a single well in the corresponding calibration sub-time period. Here, the state parameter can be the water content output by the oil-gas-water three-phase flowmeter of a single well, which is not specifically limited in this application.

[0079] Before monitoring the abnormal well conditions of a single well, it is necessary to first obtain preliminary data. The preliminary data is the basic sampling data used to establish the control chart for analysis, that is, the single well state parameters mentioned above, and the purpose is to determine whether the existing measurement process or measurement stage is in a statistical control state. For the above step S101, in the specific implementation, multiple first state parameter groups of a single well within the calibration time period are obtained. Under repeatability conditions, the selected verification standard is measured n times independently and repeatedly. When the standard deviation control chart is used, the number of measurements n≥12 is required; when the range control chart is used, the number of measurements shall not be less than 5 times. Under the measurement conditions specified in the verification procedures or technical specifications, the above measurement process is repeated at a certain time interval, and a total of k groups (state parameter groups) are measured. The measurements of two adjacent state parameter groups should be separated by a sufficient time. The number of subgroups k is required to be ≥20. In actual work, it is best to take 25 groups. When the data of individual subgroups are eliminated due to abnormalities that can be found out, more than 20 groups of data can still be maintained. The embodiment of the present application takes the water content output by the oil-gas-water three-phase flowmeter as an example and takes it as the statistical control object of this embodiment, because the change of the water content of some oil wells can reflect the change of oil reservoir reserves. The oil-gas-water three-phase flowmeter outputs a water content measurement result every minute, so 60 groups of measurement data can be obtained per hour, each hour is called a calibration sub-time period, and the measurement data within an hour is called a first state parameter group. Repeat this process within the calibration time period to obtain at least 25 first state parameter groups.

[0080] The design principle of conventional control charts is based on the central limit theorem: even if the measurement results do not follow the normal distribution, as long as the average of several measurement results is taken, the average value is still close to the normal distribution. The design basis of conventional control charts is to assume that the selected statistical control quantity satisfies the normal distribution, such as Figure 1 As shown. For a normal distribution, the probability that the measurement result is within the interval of μ±3σ near the center of the distribution μ is as high as 99.73%, so this area is taken as the area that needs to be controlled. When the measurement result appears outside the ±3σ area, it can be considered that the measurement process is abnormal, so the ±3σ control limit is sometimes also called the "action limit".

[0081] The area outside the ±2σ area and within the ±3σ area is called the warning area. When the measurement result is within the warning area, the probability of its occurrence is only 2. A = 4.28%. This probability is normal if it occurs occasionally, but it should not occur frequently in this area. At this time, the subsequent development of the control chart should be closely monitored to determine whether there are any abnormalities in the measurement process. Therefore, the ±2σ control limit is sometimes also called the "warning limit".

[0082] Please refer to Figure 2(A) and Figure 2(B), Figure 2(A) is a schematic diagram of a normal distribution curve provided in an embodiment of the present application, and Figure 2(B) is a schematic diagram of a control chart provided in an embodiment of the present application. Rotate the normal distribution curve of Figure 2(A) 90 degrees to obtain a control chart as shown in Figure 2(B). According to the use of conventional control charts, they can be divided into two categories: analysis control charts and control control charts. Specifically, analysis control charts are used to analyze completed measurement processes or measurement stages to evaluate whether the measurement process is stable or under control. For control control charts, for ongoing measurement processes, process control can be performed while measuring to ensure that the measurement process is in a stable and controlled state.

[0083] When establishing a control chart, you should first establish an analytical control chart. After confirming that the measurement process is in a stable and controlled state, extend the time limit of the analytical control chart, so that the analytical control chart is converted into a control control chart.

[0084] S102, using a plurality of first state parameters in each first state parameter group to calculate statistics between the first state parameter groups, and drawing a control chart for analysis based on the statistics of each first state parameter group.

[0085] Here, conventional control charts require that data be extracted at approximately equal intervals during the measurement process. These data are defined as state parameter groups, from which corresponding statistics can be obtained, including the average value. The range R or standard deviation s, etc., are not specifically limited in this application. The analysis control chart includes the first measurement point of each first state measurement group within the calibration time period, and the control limits, where the control limits include the center line, the upper control limit (UCL) and the lower control limit (LCL).

[0086] Regarding the above step S102, in a specific implementation, the statistics between the first state parameter groups are calculated using the multiple first state parameters in each first state parameter group obtained in step S101, and a control chart for analysis is drawn based on the statistics of each first state parameter group.

[0087] Specifically, control charts must be used in pairs. Commonly used control charts in the measurement process are: average value -Range (R) control chart; mean value -Standard Deviation (s) Control Chart. Since the mean The average value is less affected by random factors. Control charts are mainly used to determine whether the measurement process is affected by some uncontrollable system effects. The standard deviation (s) and range (R) are less affected by system effects, so standard deviation (s) control charts and range (R) control charts are mainly used to determine whether the measurement process is affected by uncontrolled random effects.

[0088] This application is averaged -Range (R) control chart and mean value -Standard deviation (s) control chart to monitor the well condition of a single well. First, the average -Range (R) control chart is specifically described. Specifically, the analysis control chart includes a mean value analysis control chart and a range analysis control chart. For the above step S102, the statistics between each first state parameter group are calculated using multiple first state parameters in each first state parameter group, and the analysis control chart is drawn based on the statistics of each first state parameter group, including:

[0089] A: For each first state parameter group, multiple first state parameters in the first state parameter group are used to calculate the subgroup average value and subgroup range corresponding to the first state parameter group.

[0090] B: The total average value between the first state parameter groups is calculated using the subgroup average value corresponding to each first state parameter group, and the average range between the first state parameter groups is calculated using the subgroup range corresponding to each first state parameter group.

[0091] It should be noted that the subgroup average refers to the average of multiple first state parameters. The total average is the average of multiple subgroup averages. The subgroup range refers to the range value between multiple first state parameters. The average range is the average of multiple subgroup ranges.

[0092] For the above steps A-B, in the specific implementation, first for each first state parameter group, the subgroup average value and subgroup range corresponding to the first state parameter group are calculated using the multiple first state parameters in the first state parameter group. Specifically, the subgroup average value and subgroup range are calculated by the following two formulas:

[0093]

[0094] R=X max -X min

[0095] in, represents the subgroup average of the first state parameter group, n represents the number of first state parameters in the first state parameter group, X irepresents the i-th first state parameter in the first state parameter group, R represents the subgroup range of the first state parameter group, X max represents the maximum value among multiple first state parameters, X min Represents the minimum value among multiple first state parameters.

[0096] After the subgroup average value corresponding to each first state parameter group is determined, the average value between multiple subgroup average values ​​is calculated as the total average value. After the subgroup range corresponding to each first state parameter group is determined, the average of multiple subgroup ranges is calculated as the average range.

[0097] C: Determine the measurement value using the number of first state parameters in each first state parameter group.

[0098] Please refer to Table 1 below. Table 1 provides a commonly used quantitative control chart quantitative value formula. The quantitative value can be found in Table 1 below:

[0099] Table 1 Commonly used measurement control chart measurement numerical formula

[0100]

[0101]

[0102] Among them, A 2 , A 3 , B 3 , B 4 , D 3 and D 4 This is the measurement value commonly used when drawing control charts.

[0103] Regarding the above step C, in the specific implementation, the measurement value is determined from the above Table 1 using the number of first state parameters in each first state parameter group.

[0104] D: Based on the average range, a range center line is drawn in the control chart for initial range analysis, and based on the measured values ​​and the average range, an upper control limit of the range and a lower control limit of the range are drawn in the control chart for initial range analysis.

[0105] It should be noted that the control chart for initial range analysis refers to a pre-constructed blank image, wherein the ordinate of the control chart for initial range analysis is the statistical control quantity adopted, i.e., the range, and the abscissa is the time coordinate, i.e., each calibrated sub-time period.

[0106] For the above step D, in the specific implementation, the average range is used as the value corresponding to the range center line, the position corresponding to the average range is determined in the ordinate of the initial range analysis control chart, and the range center line is drawn parallel to the abscissa. Based on the measured value and the average range, the upper control limit value corresponding to the upper control limit of the range and the lower control limit value corresponding to the lower control limit of the range are determined, and the positions corresponding to the upper control limit value and the lower control limit value are determined in the ordinate of the initial range analysis control chart, and the upper control limit and the lower control limit of the range are drawn parallel to the abscissa.

[0107] Please refer to Table 2 below. Table 2 provides a common control limit formula for measurement control charts. The control limit formulas involved in the control charts are shown in Table 2 below:

[0108] Table 2 Commonly used control limit formulas for measurement control charts

[0109]

[0110] After determining the measurement value from Table 1 above, the values ​​corresponding to the range center line, the range upper control limit and the range lower control limit can be determined in Table 2 above.

[0111] E: For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the subgroup range corresponding to the first state parameter group and the average range, the first range measurement point corresponding to the first state parameter group is drawn in the control chart for initial range analysis.

[0112] F: Use a solid line to connect any two adjacent first range measurement points in the initial range analysis control chart to obtain the range analysis control chart.

[0113] For the above steps E-F, in the specific implementation, for each first state parameter group, first determine the horizontal coordinate corresponding to the first state parameter group in the initial range analysis control chart based on the calibration sub-time period corresponding to the first state parameter group, then calculate the difference between the subgroup range corresponding to the first state parameter group and the average range, and determine the vertical coordinate corresponding to the difference in the initial range analysis control chart. According to the determined horizontal coordinate and vertical coordinate, the first range measurement point corresponding to the first state parameter group can be drawn in the initial range analysis control chart. After all the first range measurement points of the first state parameter groups in the initial range analysis control chart are drawn, any two adjacent first range measurement points are connected using a solid line to obtain a range analysis control chart.

[0114] G: Draw a mean value center line in the control chart for initial mean value analysis based on the total mean value, and draw a mean value upper control limit and a mean value lower control limit in the control chart for initial mean value analysis based on the measured values, the total mean value and the average range.

[0115] H: For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group average value corresponding to the first state parameter group and the total average value, the first average value measurement point corresponding to the first state parameter group is drawn in the control chart for initial average value analysis.

[0116] I: In the initial mean value analysis control chart, any two adjacent first mean value measurement points are connected using a solid line to obtain the mean value analysis control chart.

[0117] It should be noted that the control chart for initial mean value analysis refers to a pre-constructed blank image, wherein the vertical axis of the control chart for initial mean value analysis is the statistical control quantity adopted, that is, the average value, and the horizontal axis is the time coordinate, that is, each calibration sub-time period.

[0118] For the above steps G-I, in the specific implementation, firstly, the total average value is used as the value corresponding to the center line of the average value, and the position corresponding to the total average value is determined in the ordinate of the initial average value analysis control chart, and the center line of the average value is drawn in parallel with the abscissa. Then, based on the measured value, the total average value and the average range, the upper control limit value and the lower control limit value are determined in the above table 2, and the positions corresponding to the upper control limit value and the lower control limit value are determined in the ordinate of the initial average value analysis control chart, and the upper control limit of the average value and the lower control limit of the average value are drawn in parallel with the abscissa. For each first state parameter group, firstly, based on the calibration sub-time period corresponding to the first state parameter group, the abscissa corresponding to the first state parameter group is determined in the initial average value analysis control chart, and then the difference between the subgroup average value corresponding to the first state parameter group and the total average value is calculated, and the ordinate corresponding to the difference is determined in the initial average value analysis control chart. According to the determined abscissa and ordinate, the first average value measurement point corresponding to the first state parameter group can be drawn in the initial average value analysis control chart. After all the first state parameter groups have their first average value measurement points drawn in the initial average value analysis control chart, any two adjacent first average value measurement points are connected by a solid line to obtain the average value analysis control chart.

[0119] Next, the average -- Standard deviation (s) control chart is specifically described. Specifically, the analysis control chart includes a mean value analysis control chart and a standard deviation analysis control chart. For the above step S102, the statistics between each first state parameter group are calculated using multiple first state parameters in each first state parameter group, and the analysis control chart is drawn based on the statistics of each first state parameter group, including:

[0120] a: For each first state parameter group, a plurality of first state parameters in the first state parameter group are used to calculate a subgroup mean value and a subgroup standard deviation corresponding to the first state parameter group.

[0121] b: The total average value between the first state parameter groups is calculated using the subgroup average value corresponding to each first state parameter group, and the average standard deviation between the first state parameter groups is calculated using the subgroup range corresponding to each first state parameter group.

[0122] It should be noted that the subgroup standard deviation refers to the standard deviation value between multiple first state parameters, and the average standard deviation is the average of multiple subgroup standard deviations.

[0123] For the above steps a-b, in the specific implementation, first for each first state parameter group, use the multiple first state parameters in the first state parameter group to calculate the subgroup average value and subgroup standard deviation corresponding to the first state parameter group. Specifically, the calculation method of the subgroup average value is the same as the calculation method of the subgroup average value provided in the above step A, which will not be repeated here. The average standard deviation is calculated by the following formula:

[0124]

[0125] Where s represents the mean standard deviation.

[0126] After the subgroup average value corresponding to each first state parameter group is determined, the average value between multiple subgroup average values ​​is calculated as the total average value. After the subgroup standard deviation corresponding to each first state parameter group is determined, the average of multiple subgroup standard deviations is calculated as the average standard deviation

[0127] c: Determine the measurement value using the number of first state parameters in each first state parameter group.

[0128] d: Based on the average standard deviation, a standard deviation center line is drawn in the control chart for initial standard deviation analysis, and based on the measured value and the average standard deviation, a standard deviation upper control limit and a standard deviation lower control limit are drawn in the control chart for initial standard deviation analysis.

[0129] e: For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group standard deviation corresponding to the first state parameter group and the average standard deviation, draw the first standard deviation measurement point corresponding to the first state parameter group in the control chart for initial standard deviation analysis.

[0130] f: Use a solid line to connect any two adjacent first standard deviation measurement points in the initial standard deviation analysis control chart to obtain the standard deviation analysis control chart.

[0131] g: Draw a mean value center line in the control chart for initial mean value analysis based on the total mean value, and draw a mean value upper control limit and a mean value lower control limit in the control chart for initial mean value analysis based on the measured values, the total mean value and the average standard deviation.

[0132] h: For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group average value corresponding to the first state parameter group and the total average value, the first average value measurement point corresponding to the first state parameter group is drawn in the control chart for initial average value analysis.

[0133] i: In the initial mean value analysis control chart, any two adjacent first mean value measurement points are connected using a solid line to obtain the mean value analysis control chart.

[0134] For the above steps c-i, in the specific implementation, when drawing the control chart for standard deviation analysis, first use the average standard deviation as the value corresponding to the center line of the standard deviation, determine the position corresponding to the average standard deviation in the ordinate of the initial standard deviation analysis control chart, and draw the center line of the standard deviation in parallel with the abscissa. Then determine the upper control limit value and the lower control limit value in the above table 2 based on the measured value and the average standard deviation, determine the position corresponding to the upper control limit value and the lower control limit value in the ordinate of the initial standard deviation analysis control chart, and draw the upper control limit of the standard deviation and the lower control limit of the standard deviation in parallel with the abscissa. For each first state parameter group, first determine the abscissa corresponding to the first state parameter group in the initial standard deviation analysis control chart based on the calibrated sub-time period corresponding to the first state parameter group, then calculate the difference between the subgroup standard deviation corresponding to the first state parameter group and the average standard deviation, and determine the ordinate corresponding to the difference in the initial standard deviation analysis control chart. According to the determined abscissa and ordinate, the first standard deviation measurement point corresponding to the first state parameter group can be drawn in the initial standard deviation analysis control chart. After all the first state parameter groups are plotted at the first standard deviation measurement points in the initial mean value analysis control chart, any two adjacent first standard deviation measurement points are connected by a solid line to obtain a standard deviation analysis control chart. The method for drawing the mean value analysis control chart is the same as the drawing method provided in the above steps A to I, and can achieve the same technical effect, which will not be repeated here.

[0135] As an optional implementation, after drawing the analysis control chart, the monitoring method further includes:

[0136] (1) The analysis control chart is divided into a plurality of control ranges using the control limits in the analysis control chart.

[0137] It should be noted that the control range refers to the range divided according to the center line, upper control limit and lower control limit in the analysis control chart.

[0138] For the above step (1), in the specific implementation, the control limits in the analytical control chart are used to divide the analytical control chart into multiple control ranges. Please refer to 3(A), which is one of the schematic diagrams of an analytical control chart with an abnormality provided in an embodiment of the present application. As shown in Figure 3(A), the range from the upper control limit to the center line is divided into three regions: region A, region B, and region C, and the range from the lower control limit to the center line is divided into three regions: region A, region B, and region C, to obtain multiple control ranges.

[0139] (2) Using a preset abnormality judgment rule, in the analysis control chart, an abnormality judgment is performed when the plurality of first measurement points fall within the plurality of control ranges, and it is judged whether there is a first abnormal measurement point among the plurality of first measurement points.

[0140] (3) If so, the first state parameter group corresponding to the first abnormal measurement point is eliminated, and the process returns to the step of calculating the statistics between the first state parameter groups using the multiple first state parameters in each first state parameter group, and drawing a control chart for analysis based on the statistics of each first state parameter group, until there is no first abnormal measurement point among the multiple first measurement points.

[0141] It should be noted that the abnormality judgment rule refers to a pre-set judgment rule for judging whether there is an abnormal measurement point in the control chart for analysis.

[0142] Specifically, the current ISO 8258:1991 and GB / T 4091-2001 summarize 8 common distribution patterns of measurement process anomalies, so the embodiments provided in this application also provide 8 corresponding anomaly judgment rules:

[0143] The first abnormality judgment rule is that the measurement point appears outside multiple control ranges. As shown in FIG3(A), if there are two measurement points outside multiple control ranges, the two measurement points outside the multiple control ranges are considered to be abnormal measurement points.

[0144] The second abnormality judgment rule is that a consecutive measurement points appear on the same side of the center line. In the actual control process, the value of a here can be added or modified according to the on-site conditions and the required probability size. The phenomenon that measurement points appear consecutively on the same side of the center line of the control chart is called a "chain". The appearance of a chain indicates that the mean of the statistical control quantity distribution is offset to the side where the chain appears. Please refer to 3(B). Figure 3(B) is a second schematic diagram of an analytical control chart with abnormalities provided in an embodiment of the present application. As shown in Figure 3(B), there are 9 consecutive measurement points appearing on the same side of the center line, and these 9 measurement points are considered to be abnormal measurement points.

[0145] The third abnormality judgment rule is that a number of consecutive measurement points show a monotonically increasing or decreasing trend. The state in which the arrangement of measurement points on the control chart shows a monotonically increasing or decreasing state is called a "trend", and the appearance of a trend indicates that the mean of the statistical control quantity increases or decreases over time. Please refer to 3(C), FIG3(C) is a schematic diagram of a control chart for analysis with abnormalities provided in an embodiment of the present application. As shown in FIG3(C), if there are 6 consecutive measurement points showing a monotonically increasing or decreasing trend, these measurement points are considered to be abnormal measurement points.

[0146] The fourth abnormality judgment rule is that a number of consecutive measurement points appear in an alternating arrangement. Please refer to 3(D), which is a schematic diagram of a control chart for analysis with abnormalities provided in an embodiment of the present application. As shown in FIG3(D), if there are 14 consecutive measurement points that appear in an alternating arrangement, these measurement points are considered to be abnormal measurement points.

[0147] The fifth abnormality judgment rule is that two of the a consecutive measurement points appear in the A zone on the same side of the center line. Please refer to 3(E), which is a fifth schematic diagram of an abnormal analysis control chart provided in an embodiment of the present application. As shown in FIG3(E), if two of the three consecutive measurement points appear in the A zone on the same side of the center line, these measurement points are considered to be abnormal measurement points.

[0148] The sixth abnormality judgment rule is that 4 of the a consecutive measurement points appear in the B area or the A area on the same side of the center line. Please refer to 3(F), which is a sixth schematic diagram of an abnormal analysis control chart provided in an embodiment of the present application. As shown in FIG3(F), if 4 of the 5 consecutive measurement points appear in the B area or the A area on the same side of the center line, these measurement points are considered to be abnormal measurement points.

[0149] The seventh abnormality judgment rule is that a consecutive measurement points appear in area C on both sides of the center line. This situation may be caused by an error in the control chart design that causes the control limit to be too wide. Since the measurement system is statistically controllable at this time, it is only necessary to take the recent 20 measurement points to recalculate the center line and upper and lower limits of the control chart, and the statistical chart will return to normal. Please refer to 3(G), Figure 3(G) is a schematic diagram of a control chart for analysis with abnormalities provided in an embodiment of the present application. As shown in Figure 3(G), if there are 15 consecutive measurement points appearing in area C on both sides of the center line, these measurement points are considered to be abnormal measurement points.

[0150] The eighth abnormal judgment rule is that a consecutive measurement points appear on both sides of the center line and all are not in zone C. This situation may be that the distribution of the measured statistical control quantity is a mixture of two different distributions, and there is an obvious difference between the means of the two distributions. In the measurement process, the two distributions appear alternately, and the situation that this criterion appears will occur. Please refer to 3(H). FIG3(H) is a schematic diagram of an abnormal analysis control chart provided in an embodiment of the present application. As shown in FIG3(H), there are 8 consecutive measurement points that appear on both sides of the center line and are not in zone C. These measurement points are considered to be abnormal measurement points.

[0151] With respect to the above steps (2) to (3), in the specific implementation, a pre-set abnormality judgment rule is used to perform abnormality judgment on the situation where multiple first measurement points fall within multiple control ranges in the analysis control chart, and to judge whether there is a first abnormal measurement point among the multiple first measurement points. If there is no first abnormal measurement point, the control chart for control can be drawn based on the analysis control chart. If there is a first abnormal measurement point, the above step (3) is executed, the first state parameter group corresponding to the first abnormal measurement point is eliminated, and the analysis control chart is redrawn using the remaining first state parameter groups, and the step of calculating the statistics between each first state parameter group using the multiple first state parameters in each first state parameter group and drawing the analysis control chart based on the statistics of each first state parameter group in step S102 is returned to execute, until there is no first abnormal measurement point among the multiple first measurement points. Here, it is not difficult to see from Table 2 above that in calculating the average value The control limits (UCL and LCL) in the control chart should use the average value of the range. or the mean with standard deviation Therefore, the loss of control of the range (R) control chart or the standard deviation (s) control chart will also affect the average value. Therefore, when judging abnormal well conditions, the range (R) control chart or the standard deviation (s) control chart should be analyzed first, and then the average value Control chart analysis.

[0152] The function of a process control system is to issue warning messages when abnormal signals with specific rules appear, and to eliminate these abnormal signals through continuous efforts, so that the process can enter a statistically controllable state. Once the process is running in a statistically controllable state, the performance of the process and its ability to meet specifications can be predicted and evaluated. Process capability depends on the minimum change of the system in a statistically controllable state, which is usually measured by the process capability index PCI, and its formula is as follows:

[0153]

[0154] Among them, UTL is the upper tolerance line; LTL is the lower tolerance line; It is estimated by the average within-group variation, given by or Given. A PCI value less than 1 means that the process does not meet the specification requirements and the process capability is insufficient; PCI = 1 means that the process just meets the specification requirements and the process capability is just enough. In actual work, PCI = 1.33 is usually taken as the minimum acceptable value, because there are always some sampling errors, and it is impossible for a process to be always in a state of statistical control. As an optional implementation method, after obtaining an analytical control chart that meets the requirements, the process capability index PCI is calculated to evaluate the process capability of process control. If PCI <1, it proves that the process capability is insufficient, so management decisions such as improving the process, comprehensive inspection or changing the specifications are needed; if PCI>1, it proves that the process capability is sufficient, so it is necessary to check the alignment of the process center and try to improve the process to ensure PCI>1.33.

[0155] S103, obtaining a plurality of second state parameter groups in a non-calibration time period adjacent to the calibration time period, and using the plurality of second state parameter groups to draw in the analysis control chart to obtain a control chart.

[0156] Here, the length of the uncalibrated time period is the same as the length of the calibrated time period, the uncalibrated time period includes multiple uncalibrated sub-time periods, each uncalibrated sub-time period corresponds to a second state parameter group, and each second state parameter group includes multiple second state parameters of a single well in the corresponding uncalibrated sub-time period. The control chart for control includes the second measurement point of each second state measurement group in the uncalibrated time period, and the control limit.

[0157] With respect to the above step S103, in specific implementation, after the analysis control chart is drawn, a plurality of second state parameter groups in the non-calibration time period adjacent to the calibration time period are obtained, and the plurality of second state parameter groups are used to draw in the analysis control chart to obtain the control chart. Specifically, when drawing the control chart, the time coordinates of the analysis control chart are extended, and another set of measurements are made at every specified time interval, and the line segments connecting the measurement points are successively extended, so as to form a control chart that can be used for daily monitoring of the measurement process.

[0158] First, the average -Range (R) control chart is specifically described. The control chart includes a mean value control chart and a range control chart; the control chart obtained by plotting a plurality of the second state parameter groups in the analysis control chart includes:

[0159] I: Extend the mean value center line, the mean value upper control limit and the mean value lower control limit in the mean value analysis control chart respectively, and use the non-calibrated time period to extend the abscissa of the mean value analysis control chart to obtain an initial mean value control control chart.

[0160] II: For each second state parameter group, a plurality of second state parameters in the second state parameter group are used to calculate a subgroup average value corresponding to the second state parameter group.

[0161] III: Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group average value corresponding to the second state parameter group and the total average value, the second average value measurement point corresponding to the second state parameter group is drawn in the control chart for initial average value control.

[0162] IV: In the control chart for initial average value control, any two adjacent second average value measurement points are connected by a dotted line to obtain the control chart for average value control.

[0163] For the above steps I to IV, in the specific implementation, firstly, the average center line, the average upper control limit and the average lower control limit in the average analysis control chart are respectively extended, and the abscissa of the average analysis control chart is extended by using the non-calibrated time period to obtain the initial average control control chart. Then, for each second state parameter group, the subgroup average corresponding to the second state parameter group is calculated using the multiple second state parameters in the second state parameter group. Here, the calculation method of the subgroup average corresponding to the second state parameter group is the same as the calculation method of the subgroup average provided in the above step A, which will not be repeated here. Then, based on the non-calibrated sub-time period corresponding to the second state parameter group, the abscissa corresponding to the second state parameter group is determined in the initial average control control chart, and then the difference between the subgroup average corresponding to the second state parameter group and the total average corresponding to the average center line is calculated, and the ordinate corresponding to the difference is determined in the initial average control control chart. According to the determined abscissa and ordinate, the second average measurement point corresponding to the second state parameter group can be drawn in the initial average control control chart. After all the second state parameter groups have been plotted at the second average value measurement points in the initial average value control control chart, any two adjacent second average value measurement points are connected by a solid line to obtain the average value control control chart.

[0164] V: Extending the range center line, the upper range control limit and the lower range control limit in the control chart for range analysis respectively, and using the non-calibrated time period to extend the abscissa of the control chart for range analysis to obtain an initial range control chart.

[0165] VI: For each second state parameter group, a subgroup range corresponding to the second state parameter group is calculated using a plurality of second state parameters in the second state parameter group.

[0166] VII: Based on the uncalibrated sub-time period corresponding to the second state parameter group, and the difference between the subgroup range corresponding to the second state parameter group and the average range, the second range measurement point corresponding to the second state parameter group is drawn in the control chart for initial range control.

[0167] VIII: Use a dotted line in the control chart for initial range control to connect any two adjacent second range measurement points to obtain the control chart for range control.

[0168] For the above steps V-step VIII, when specifically implemented, firstly, the range center line, the upper control limit of the range and the lower control limit of the range in the control chart for range analysis are respectively extended, and the abscissa of the control chart for range analysis is extended by using the non-calibrated time period to obtain the control chart for initial range control. Then, for each second state parameter group, the subgroup range corresponding to the second state parameter group is calculated using the multiple second state parameters in the second state parameter group. Here, the calculation method of the subgroup range corresponding to the second state parameter group is the same as the calculation method of the subgroup range provided in the above step A, and will not be repeated here. Then, based on the non-calibrated sub-time period corresponding to the second state parameter group, the abscissa corresponding to the second state parameter group is determined in the control chart for initial range control, and then the difference between the subgroup range corresponding to the second state parameter group and the average range corresponding to the range center line is calculated, and the ordinate corresponding to the difference is determined in the control chart for initial range control. According to the determined abscissa and ordinate, the second range measurement point corresponding to the second state parameter group can be drawn in the control chart for initial range control. After all the second state parameter groups are plotted at the second range measurement points in the initial range control control chart, any two adjacent second range measurement points are connected by a solid line to obtain the range control control chart.

[0169] Next, the average -Standard deviation (s) control chart is specifically described. The control chart includes a mean value control chart and a standard deviation control chart; the control chart obtained by using a plurality of the second state parameter groups to be plotted in the analysis control chart includes:

[0170] i: Extend the mean value center line, the mean value upper control limit and the mean value lower control limit in the mean value analysis control chart respectively, and use the non-calibrated time period to extend the abscissa of the mean value analysis control chart to obtain an initial mean value control control chart.

[0171] ii: For each second state parameter group, a subgroup average value corresponding to the second state parameter group is calculated using a plurality of second state parameters in the second state parameter group.

[0172] iii: Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group average value corresponding to the second state parameter group and the total average value, the second average value measurement point corresponding to the second state parameter group is drawn in the control chart for initial average value control.

[0173] iv: In the control chart for initial average value control, any two adjacent second average value measurement points are connected by a dotted line to obtain the control chart for average value control.

[0174] Among them, the description of steps i to iv can refer to the description of the above steps I to IV, and can achieve the same technical effect, which will not be repeated here.

[0175] v: Extend the standard deviation center line, the standard deviation upper control limit and the standard deviation lower control limit in the standard deviation analysis control chart respectively, and use the non-calibrated time period to extend the abscissa of the standard deviation analysis control chart to obtain an initial standard deviation control control chart.

[0176] vi: For each second state parameter group, a subgroup standard deviation corresponding to the second state parameter group is calculated using a plurality of second state parameters in the second state parameter group.

[0177] vii: Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group standard deviation corresponding to the second state parameter group and the average standard deviation, the second standard deviation measurement point corresponding to the second state parameter group is drawn in the control chart for initial standard deviation control.

[0178] viii: In the control chart for initial standard deviation control, any two adjacent second standard deviation measurement points are connected using a dotted line to obtain the control chart for standard deviation control.

[0179] For the above steps vi-viii, in the specific implementation, firstly, the standard deviation center line, the upper control limit of the standard deviation and the lower control limit of the standard deviation in the control chart for standard deviation analysis are respectively extended, and the abscissa of the control chart for standard deviation analysis is extended by using the non-calibrated time period to obtain the initial standard deviation control chart. Then, for each second state parameter group, the subgroup standard deviation corresponding to the second state parameter group is calculated using the multiple second state parameters in the second state parameter group. Here, the calculation method of the subgroup standard deviation corresponding to the second state parameter group is the same as the calculation method of the subgroup standard deviation provided in the above step a, which will not be repeated here. Then, based on the non-calibrated sub-time period corresponding to the second state parameter group, the abscissa corresponding to the second state parameter group is determined in the initial standard deviation control chart, and then the difference between the subgroup standard deviation corresponding to the second state parameter group and the average standard deviation corresponding to the standard deviation center line is calculated, and the ordinate corresponding to the difference is determined in the initial standard deviation control chart. According to the determined abscissa and ordinate, the second standard deviation measurement point corresponding to the second state parameter group can be drawn in the initial standard deviation control chart. After all the second state parameter groups are plotted at the second standard deviation measurement points in the initial standard deviation control control chart, any two adjacent second standard deviation measurement points are connected by a solid line to obtain the standard deviation control control chart.

[0180] S104: Monitor the abnormal well condition of the single well based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit.

[0181] Regarding the above step S104, in the specific implementation, after the control diagram for control is determined in the above step S103, the single well is monitored for abnormal well conditions based on the second measurement points and control limits corresponding to each second state measurement group in the control diagram for control, to monitor whether the single well has abnormal well conditions.

[0182] Specifically, with respect to the above step S104, the abnormal well condition monitoring of the single well based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit includes:

[0183] Step 1041, dividing the analysis control chart into a plurality of control ranges using the control limits in the analysis control chart.

[0184] Step 1042, using a preset abnormality judgment rule, in the analysis control chart, perform abnormality judgment on the situation where multiple second measurement points fall within multiple control ranges, and judge whether there is a second abnormal measurement point among the multiple second measurement points.

[0185] Step 1043: If yes, it is considered that the single well has abnormal well conditions within the non-calibrated time period.

[0186] The description of step 1041 to step 1042 can refer to the description of step (1) to step (2) above, and can achieve the same technical effect, which is not described in detail. When it is determined that there is no second abnormal measurement point among the multiple second measurement points, it is considered that there is no abnormal well condition in the single well during the uncalibrated time period. When it is determined that there is a second abnormal measurement point among the multiple second measurement points, the above step 1043 is executed, and it is considered that there is an abnormal well condition in the single well during the uncalibrated time period.

[0187] Compared with the methods in the prior art, the monitoring method for abnormal well conditions in a single well provided in the embodiments of the present application performs statistical analysis on various state parameters, designs and produces corresponding conventional control charts, and performs real-time online judgment on abnormal control charts, and performs alarm operations on abnormal well conditions. The monitoring method provided in the present application can automatically design and produce analysis control charts for various key parameters based on the various state parameters collected, and convert the analysis control charts into control control charts during non-calibration time periods, thereby performing real-time monitoring and automatic identification of abnormal well conditions in a single well, thereby providing a basis for the calibration cycle and production decision-making of the well.

[0188] See also Figure 4 , Figure 4 This is a schematic diagram of the structure of a monitoring device for abnormal well conditions in a single well provided in an embodiment of the present application. Figure 4 As shown in , the monitoring device 400 includes:

[0189] The data acquisition module 401 is used to acquire a plurality of first state parameter groups of a single well within a calibration time period; wherein the calibration time period includes a plurality of calibration sub-time periods, each calibration sub-time period corresponds to a first state parameter group, and each first state parameter group includes a plurality of first state parameters of the single well within the corresponding calibration sub-time period;

[0190] The analysis control chart generating module 402 is used to calculate the statistics between the first state parameter groups using the multiple first state parameters in each first state parameter group, and draw the analysis control chart based on the statistics of each first state parameter group; wherein the analysis control chart includes the first measurement point of each first state measurement group within the calibration time period, and the control limits, wherein the control limits include the center line, the upper control limit and the lower control limit;

[0191] A control chart generation module 403 for control is used to obtain a plurality of second state parameter groups in a non-calibrated time period adjacent to a calibrated time period, and use the plurality of second state parameter groups to draw in the analysis control chart to obtain a control chart for control; wherein the length of the non-calibrated time period is the same as the length of the calibrated time period, the non-calibrated time period includes a plurality of non-calibrated sub-time periods, each non-calibrated sub-time period corresponds to a second state parameter group, each second state parameter group includes a plurality of second state parameters of the single well in the corresponding non-calibrated sub-time period, and the control chart for control includes a second measurement point of each second state measurement group in the non-calibrated time period, and the control limit;

[0192] The abnormal well condition monitoring module 404 is used to monitor the abnormal well condition of the single well based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit.

[0193] Further, the analysis control chart includes a mean value analysis control chart and a range analysis control chart; when the analysis control chart generation module 402 is used to calculate the statistics between each first state parameter group using multiple first state parameters in each first state parameter group and draw the analysis control chart based on the statistics of each first state parameter group, the analysis control chart generation module 402 is also used to:

[0194] For each first state parameter group, using a plurality of first state parameters in the first state parameter group, calculate a subgroup average value and a subgroup range corresponding to the first state parameter group;

[0195] The total average value between the first state parameter groups is calculated using the subgroup average value corresponding to each first state parameter group, and the average range between the first state parameter groups is calculated using the subgroup range corresponding to each first state parameter group;

[0196] Determining a metering value using the number of first state parameters in each first state parameter group;

[0197] Draw a range center line in the initial range analysis control chart based on the average range, and draw an upper range control limit and a lower range control limit in the initial range analysis control chart based on the measured value and the average range;

[0198] For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the subgroup range corresponding to the first state parameter group and the average range, the first range measurement point corresponding to the first state parameter group is plotted in the control chart for initial range analysis;

[0199] Using a solid line to connect any two adjacent first range measurement points in the initial range analysis control chart to obtain the range analysis control chart;

[0200] Draw a mean value center line in the initial mean value analysis control chart based on the total mean value, and draw a mean value upper control limit and a mean value lower control limit in the initial mean value analysis control chart based on the measured values, the total mean value and the average range;

[0201] For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group average value corresponding to the first state parameter group and the total average value, a first average value measurement point corresponding to the first state parameter group is plotted in the initial average value analysis control chart;

[0202] In the initial mean value analysis control chart, any two adjacent first mean value measurement points are connected using a solid line to obtain the mean value analysis control chart.

[0203] Furthermore, the analysis control chart includes a mean value analysis control chart and a standard deviation analysis control chart; when the analysis control chart generation module 402 is used to calculate the statistics between each first state parameter group using multiple first state parameters in each first state parameter group and draw the analysis control chart based on the statistics of each first state parameter group, the analysis control chart generation module 402 is also used to:

[0204] For each first state parameter group, using a plurality of first state parameters in the first state parameter group, calculate a subgroup mean value and a subgroup standard deviation corresponding to the first state parameter group;

[0205] The total average value between the first state parameter groups is calculated using the subgroup average value corresponding to each first state parameter group, and the average standard deviation between the first state parameter groups is calculated using the subgroup range corresponding to each first state parameter group;

[0206] Determining a metering value using the number of first state parameters in each first state parameter group;

[0207] Draw a standard deviation center line in the initial standard deviation analysis control chart based on the average standard deviation, and draw a standard deviation upper control limit and a standard deviation lower control limit in the initial standard deviation analysis control chart based on the measured value and the average standard deviation;

[0208] For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group standard deviation corresponding to the first state parameter group and the average standard deviation, a first standard deviation measurement point corresponding to the first state parameter group is plotted in the control chart for initial standard deviation analysis;

[0209] Using a solid line to connect any two adjacent first standard deviation measurement points in the initial standard deviation analysis control chart to obtain the standard deviation analysis control chart;

[0210] Draw a mean value center line in the initial mean value analysis control chart based on the total mean value, and draw a mean value upper control limit and a mean value lower control limit in the initial mean value analysis control chart based on the measured values, the total mean value and the average standard deviation;

[0211] For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group average value corresponding to the first state parameter group and the total average value, a first average value measurement point corresponding to the first state parameter group is plotted in the initial average value analysis control chart;

[0212] In the initial mean value analysis control chart, any two adjacent first mean value measurement points are connected using a solid line to obtain the mean value analysis control chart.

[0213] Furthermore, the monitoring device 400 further includes an anomaly detection module. After drawing the control chart for analysis, the anomaly detection module is used to:

[0214] Dividing the analysis control chart into a plurality of control ranges using the control limits in the analysis control chart;

[0215] Using a preset abnormality judgment rule, in the analysis control chart, an abnormality judgment is performed on the situation where the plurality of first measurement points fall within the plurality of control ranges, and it is judged whether there is a first abnormal measurement point among the plurality of first measurement points;

[0216] If so, the first state parameter group corresponding to the first abnormal measurement point is eliminated, and the process returns to the step of calculating the statistics between the first state parameter groups using the multiple first state parameters in each first state parameter group, and drawing a control chart for analysis based on the statistics of each first state parameter group, until there is no first abnormal measurement point among the multiple first measurement points.

[0217] Further, the control chart includes a mean value control chart and a range control chart; when the control chart generation module 403 is used to draw a plurality of the second state parameter groups in the analysis control chart to obtain a control chart, the control chart generation module 403 is also used to:

[0218] The average value center line, the average value upper control limit and the average value lower control limit in the average value analysis control chart are extended respectively, and the abscissa of the average value analysis control chart is extended by using the non-calibrated time period to obtain an initial average value control control chart;

[0219] For each second state parameter group, using a plurality of second state parameters in the second state parameter group, calculate a subgroup average value corresponding to the second state parameter group;

[0220] Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group average value corresponding to the second state parameter group and the total average value, a second average value measurement point corresponding to the second state parameter group is drawn in the control chart for initial average value control;

[0221] In the control chart for initial average value control, any two adjacent second average value measurement points are connected by a dotted line to obtain the control chart for average value control;

[0222] The range center line, the range upper control limit and the range lower control limit in the control chart for range analysis are respectively extended, and the abscissa of the control chart for range analysis is extended by using the non-calibrated time period to obtain an initial range control chart;

[0223] For each second state parameter group, a subgroup range corresponding to the second state parameter group is calculated using a plurality of second state parameters in the second state parameter group;

[0224] Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group range corresponding to the second state parameter group and the average range, a second range measurement point corresponding to the second state parameter group is plotted in the control chart for initial range control;

[0225] In the control chart for initial range control, any two adjacent second range measurement points are connected by a dotted line to obtain the control chart for range control.

[0226] Further, the control chart includes a mean value control chart and a standard deviation control chart; when the control chart generation module 403 is used to draw a plurality of the second state parameter groups in the analysis control chart to obtain a control chart, the control chart generation module 403 is also used to:

[0227] The average value center line, the average value upper control limit and the average value lower control limit in the average value analysis control chart are extended respectively, and the abscissa of the average value analysis control chart is extended by using the non-calibrated time period to obtain an initial average value control control chart;

[0228] For each second state parameter group, using a plurality of second state parameters in the second state parameter group, calculate a subgroup average value corresponding to the second state parameter group;

[0229] Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group average value corresponding to the second state parameter group and the total average value, a second average value measurement point corresponding to the second state parameter group is drawn in the control chart for initial average value control;

[0230] In the control chart for initial average value control, any two adjacent second average value measurement points are connected by a dotted line to obtain the control chart for average value control;

[0231] The standard deviation center line, the standard deviation upper control limit and the standard deviation lower control limit in the standard deviation analysis control chart are extended respectively, and the abscissa of the standard deviation analysis control chart is extended by using the non-calibrated time period to obtain an initial standard deviation control chart;

[0232] For each second state parameter group, using a plurality of second state parameters in the second state parameter group, calculate a subgroup standard deviation corresponding to the second state parameter group;

[0233] Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group standard deviation corresponding to the second state parameter group and the average standard deviation, a second standard deviation measurement point corresponding to the second state parameter group is drawn in the control chart for initial standard deviation control;

[0234] In the control chart for initial standard deviation control, any two adjacent second standard deviation measurement points are connected by a dotted line to obtain the control chart for standard deviation control.

[0235] Further, when the abnormal well condition monitoring module 404 is used to monitor the abnormal well condition of the single well based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit, the abnormal well condition monitoring module 404 is also used to:

[0236] Dividing the analysis control chart into a plurality of control ranges using the control limits in the analysis control chart;

[0237] Using a preset abnormality judgment rule, in the analysis control chart, an abnormality judgment is performed on the situation where a plurality of the second measurement points fall within a plurality of the control ranges, and it is judged whether there is a second abnormal measurement point among the plurality of the second measurement points;

[0238] If so, it is considered that the single well has an abnormal well condition within the non-calibrated time period.

[0239] See also Figure 5 , Figure 5 This is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. Figure 5 As shown in , the electronic device 500 includes a processor 510 , a memory 520 and a bus 530 .

[0240] The memory 520 stores machine-readable instructions executable by the processor 510. When the electronic device 500 is running, the processor 510 communicates with the memory 520 via the bus 530. When the machine-readable instructions are executed by the processor 510, the above-mentioned Figure 1 The steps of the method for monitoring abnormal well conditions of a single well in the method embodiment shown, and the specific implementation method thereof can be referred to the method embodiment, which will not be described in detail here.

[0241] The present application also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the computer program can execute the above-mentioned Figure 1 The steps of the method for monitoring abnormal well conditions of a single well in the method embodiment shown, and the specific implementation method thereof can be referred to the method embodiment, which will not be described in detail here.

[0242] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0243] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of devices or units can be electrical, mechanical or other forms.

[0244] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0245] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0246] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a non-volatile computer-readable storage medium that is executable by a processor. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a disk or an optical disk.

[0247] It should be noted that similar numbers and letters represent similar items in the following figures. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description and are not to be understood as indicating or implying relative importance.

[0248] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present application, which are used to illustrate the technical solutions of the present application, rather than to limit them. The protection scope of the present application is not limited thereto. Although the present application is described in detail with reference to the above-mentioned embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-mentioned embodiments within the technical scope disclosed in the present application, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application, and should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.

Claims

1. A method for monitoring abnormal well conditions in a single well, characterized in that: The monitoring method comprises: Acquire multiple first state parameter groups of a single well within a calibration time period; wherein the calibration time period includes multiple calibration sub-time periods, each calibration sub-time period corresponds to a first state parameter group, and each first state parameter group includes multiple first state parameters of the single well within the corresponding calibration sub-time period; Calculating statistics between the first state parameter groups using the multiple first state parameters in each first state parameter group, and drawing an analytical control chart based on the statistics of each first state parameter group; wherein the analytical control chart includes a first measurement point of each first state measurement group within the calibration time period, and control limits, wherein the control limits include a center line, an upper control limit, and a lower control limit; Acquire multiple second state parameter groups within an uncalibrated time period adjacent to the calibrated time period, and plot the multiple second state parameter groups on the analysis control chart to obtain a control chart; wherein the length of the uncalibrated time period is the same as the length of the calibrated time period, the uncalibrated time period includes multiple uncalibrated sub-time periods, each uncalibrated sub-time period corresponds to a second state parameter group, each second state parameter group includes multiple second state parameters of the single well within the corresponding uncalibrated sub-time period, and the control chart includes a second measurement point of each second state measurement group within the uncalibrated time period, as well as the control limits; The abnormal well condition of the single well is monitored based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit.

2. The monitoring method according to claim 1, characterized in that: The analysis control chart includes a mean value analysis control chart and a range analysis control chart; the calculation of statistics between the first state parameter groups using multiple first state parameters in each first state parameter group, and drawing the analysis control chart based on the statistics of each first state parameter group, includes: For each first state parameter group, using multiple first state parameters in the first state parameter group, calculate the subgroup average value and subgroup range corresponding to the first state parameter group; The total average value between the first state parameter groups is calculated using the subgroup average value corresponding to each first state parameter group, and the average range between the first state parameter groups is calculated using the subgroup range corresponding to each first state parameter group; Determining a metering value using the number of first state parameters in each first state parameter group; Based on the average range, a range center line is drawn in the control chart for the initial range analysis; based on the measured value and the average range, an upper control limit of the range and a lower control limit of the range are drawn in the control chart for the initial range analysis; For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the subgroup range corresponding to the first state parameter group and the average range, plotting the first range measurement point corresponding to the first state parameter group in the initial range analysis control chart; Connecting any two adjacent first range measurement points in the initial range analysis control chart using a solid line to obtain the range analysis control chart; Drawing a mean value center line in the initial mean value analysis control chart based on the total mean value, and drawing a mean value upper control limit and a mean value lower control limit in the initial mean value analysis control chart based on the measured values, the total mean value, and the average range; For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group average value corresponding to the first state parameter group and the overall average value, plotting a first average value measurement point corresponding to the first state parameter group in the initial average value analysis control chart; In the initial mean value analysis control chart, any two adjacent first mean value measurement points are connected using a solid line to obtain the mean value analysis control chart.

3. The monitoring method according to claim 1, characterized in that The analysis control chart includes a mean value analysis control chart and a standard deviation analysis control chart; the calculation of statistics between the first state parameter groups using multiple first state parameters in each first state parameter group and the drawing of the analysis control chart based on the statistics of each first state parameter group include: For each first state parameter group, using the multiple first state parameters in the first state parameter group, calculate the subgroup mean value and subgroup standard deviation corresponding to the first state parameter group; The total average value between the first state parameter groups is calculated using the subgroup average value corresponding to each first state parameter group, and the average standard deviation between the first state parameter groups is calculated using the subgroup range corresponding to each first state parameter group; Determining a metering value using the number of first state parameters in each first state parameter group; Drawing a standard deviation center line on the control chart for initial standard deviation analysis based on the average standard deviation, and drawing a standard deviation upper control limit and a standard deviation lower control limit on the control chart for initial standard deviation analysis based on the measured values ​​and the average standard deviation; For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group standard deviation corresponding to the first state parameter group and the average standard deviation, plotting a first standard deviation measurement point corresponding to the first state parameter group in the initial standard deviation analysis control chart; Connecting any two adjacent first standard deviation measurement points in the initial standard deviation analysis control chart using a solid line to obtain the standard deviation analysis control chart; Drawing a mean value center line on the control chart for initial mean value analysis based on the total mean value, and drawing a mean value upper control limit and a mean value lower control limit on the control chart for initial mean value analysis based on the measured values, the total mean value, and the average standard deviation; For each first state parameter group, based on the calibration sub-time period corresponding to the first state parameter group and the difference between the sub-group average value corresponding to the first state parameter group and the overall average value, plotting a first average value measurement point corresponding to the first state parameter group in the initial average value analysis control chart; In the initial mean value analysis control chart, any two adjacent first mean value measurement points are connected using a solid line to obtain the mean value analysis control chart.

4. The monitoring method according to claim 1, characterized in that: After drawing the analytical control chart, the monitoring method further comprises: Dividing the analytical control chart into a plurality of control ranges using the control limits in the analytical control chart; Using a preset abnormality judgment rule, performing abnormality judgment on a situation in the analysis control chart where a plurality of the first measurement points fall within a plurality of the control ranges, and judging whether there is a first abnormal measurement point among the plurality of the first measurement points; If so, the first state parameter group corresponding to the first abnormal measurement point is eliminated, and the process returns to the step of calculating the statistics between the first state parameter groups using the multiple first state parameters in each first state parameter group, and drawing an analysis control chart based on the statistics of each first state parameter group, until no first abnormal measurement point exists among the multiple first measurement points.

5. The monitoring method according to claim 2, characterized in that: The control chart includes a mean value control chart and a range control chart; and the plurality of second state parameter groups are plotted on the analysis control chart to obtain the control chart, including: Extending the mean value center line, the mean value upper control limit, and the mean value lower control limit in the mean value analysis control chart respectively, and extending the abscissa of the mean value analysis control chart using the uncalibrated time period to obtain an initial mean value control control chart; For each second state parameter group, using the plurality of second state parameters in the second state parameter group, calculate the subgroup average value corresponding to the second state parameter group; Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group average value corresponding to the second state parameter group and the total average value, plotting a second average value measurement point corresponding to the second state parameter group in the control chart for initial average value control; Connecting any two adjacent second average value measurement points in the initial average value control control chart using a dotted line to obtain the average value control control chart; The range center line, the upper range control limit and the lower range control limit in the range analysis control chart are respectively extended, and the abscissa of the range analysis control chart is extended by using the non-calibrated time period to obtain an initial range control control chart; For each second state parameter group, using multiple second state parameters in the second state parameter group, calculate the subgroup range corresponding to the second state parameter group; Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the subgroup range corresponding to the second state parameter group and the average range, plotting the second range measurement point corresponding to the second state parameter group in the control chart for initial range control; In the control chart for initial range control, any two adjacent second range measurement points are connected by a dotted line to obtain the control chart for range control.

6. The monitoring method according to claim 3, characterized in that: The control chart includes a mean value control chart and a standard deviation control chart; the plurality of second state parameter groups are plotted on the analysis control chart to obtain the control chart, including: Extending the mean value center line, the mean value upper control limit, and the mean value lower control limit in the mean value analysis control chart respectively, and extending the abscissa of the mean value analysis control chart using the uncalibrated time period to obtain an initial mean value control control chart; For each second state parameter group, using the plurality of second state parameters in the second state parameter group, calculate the subgroup average value corresponding to the second state parameter group; Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group average value corresponding to the second state parameter group and the total average value, plotting a second average value measurement point corresponding to the second state parameter group in the control chart for initial average value control; Connecting any two adjacent second average value measurement points in the initial average value control control chart using a dotted line to obtain the average value control control chart; Extending the standard deviation center line, the standard deviation upper control limit, and the standard deviation lower control limit in the standard deviation analysis control chart respectively, and extending the abscissa of the standard deviation analysis control chart using the uncalibrated time period to obtain an initial standard deviation control chart; For each second state parameter group, using a plurality of second state parameters in the second state parameter group, calculate a subgroup standard deviation corresponding to the second state parameter group; Based on the uncalibrated sub-time period corresponding to the second state parameter group and the difference between the sub-group standard deviation corresponding to the second state parameter group and the average standard deviation, plotting a second standard deviation measurement point corresponding to the second state parameter group in the control chart for initial standard deviation control; In the control chart for initial standard deviation control, any two adjacent second standard deviation measurement points are connected by a dotted line to obtain the control chart for standard deviation control.

7. The monitoring method according to claim 1, characterized in that: The abnormal well condition monitoring of the single well based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit includes: Dividing the analytical control chart into a plurality of control ranges using the control limits in the analytical control chart; Using a preset abnormality judgment rule, performing abnormality judgment on a situation in the analysis control chart where a plurality of second measurement points fall within a plurality of control ranges, and judging whether there is a second abnormal measurement point among the plurality of second measurement points; If so, it is considered that the single well has an abnormal well condition within the uncalibrated time period.

8. A monitoring device for abnormal well conditions in a single well, characterized in that: The monitoring device comprises: a data acquisition module, configured to acquire a plurality of first state parameter groups of a single well within a calibration time period; wherein the calibration time period includes a plurality of calibration sub-time periods, each calibration sub-time period corresponds to a first state parameter group, and each first state parameter group includes a plurality of first state parameters of the single well within the corresponding calibration sub-time period; an analysis control chart generating module, configured to calculate statistics between the first state parameter groups using a plurality of first state parameters in each first state parameter group, and to draw an analysis control chart based on the statistics of each first state parameter group; wherein the analysis control chart includes a first measurement point of each first state measurement group within the calibration time period, and control limits, wherein the control limits include a center line, an upper control limit, and a lower control limit; a control chart generation module, configured to obtain a plurality of second state parameter groups within an uncalibrated time period adjacent to a calibrated time period, and plot the plurality of second state parameter groups on the analysis control chart to obtain a control chart; wherein the length of the uncalibrated time period is the same as the length of the calibrated time period, the uncalibrated time period includes a plurality of uncalibrated sub-time periods, each uncalibrated sub-time period corresponds to a second state parameter group, each second state parameter group includes a plurality of second state parameters of the single well within the corresponding uncalibrated sub-time period, and the control chart includes a second measurement point of each second state measurement group within the uncalibrated time period, as well as the control limits; The abnormal well condition monitoring module is used to monitor the abnormal well condition of the single well based on the second measurement point corresponding to each second state measurement group in the control diagram and the control limit.

9. An electronic device, characterized in that: include: A processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor. When the electronic device is running, the processor and the memory communicate through the bus. When the processor is running, the machine-readable instructions execute the steps of the method for monitoring abnormal well conditions of a single well as described in any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the method for monitoring abnormal well conditions of a single well as claimed in any one of claims 1 to 7 are executed.

Citation Information

Cited By

  • Polarization fading point avoiding method based on range control chart and phi-OTDR original data

    CN120880546A