Successive starting method based on vibration sudden rising unit and shaft seal auxiliary device

Through the successful start method of the vibration rush unit and the shaft seal auxiliary device, the unit's multiple start-stop and steam leakage problems were solved, and the unit's safe grid connection and automatic detection functions were realized, which improved economic and safety benefits and reduced maintenance risks.

CN119062411APending Publication Date: 2024-12-03HUANENG POWER INT ENERGY DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410965447.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The unit starts and stops multiple times not only consume a lot of manpower and material resources, but also easily reduces the service life of the components. The abnormal vibration is mainly caused by the collision and grinding between the high and medium pressure rotor and the bottom of the steam seal, which affects the safe grid-connected operation of the unit.

Method used

The successful start method of the unit based on vibration surge is adopted, including pre-start preparation, parameter control before grid connection and load parameter control after grid connection to ensure the unit pre-warming, flushing and cylinder expansion uniformity, and is detected through the shaft seal auxiliary device. Steam leakage and realize automatic alarm and exhaust steam.

Benefits of technology

Through the full process control parameters, we ensure that the unit is safely connected to the grid at one time, save manpower and material resources, avoid multiple starts caused by vibration problems, automatically detect steam leakage and provide double alarm prompts, reduce maintenance risks and improve maintenance efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062411A_ABST
    Figure CN119062411A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of unit starting, in particular to a unit successful starting method based on vibration sudden rising and a shaft seal auxiliary device, and the method comprises the following steps: pre-preparation: ensuring the uniformity of cylinder expansion and the operation safety of steam turbine equipment after unit preheating, kick-down and grid connection; performing parameter control before grid connection; and adding load parameter control after grid connection. The method has the advantages that all parameters are controlled in the whole process, one-time safe grid connection success of the unit is guaranteed, economic benefits and safety benefits are increased, the phenomenon that the unit is started for multiple times due to vibration is avoided, and manpower and material resources are saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of unit starting, in particular to a method for successfully starting a unit based on vibration sudden rise and a shaft seal auxiliary device. Background Art

[0002] Starting and stopping the unit many times not only consumes a lot of manpower and material resources, but also easily reduces the service life of various components, which is not conducive to the current era of energy conservation and consumption reduction under the dual carbon goals. The cause of abnormal vibration can be basically determined as the friction between the high and medium pressure rotors and the bottom of the steam seal after the rush or grid-connected operation. Taking a 350MW unit as an example, after a detailed analysis of the parameters of the previous startup process, it was found that when the expansion of the large machine cylinder reaches a certain value, the vibration of the large machine may increase significantly. During the startup process of the unit, abnormal climbing of the bearing vibration is prone to occur, which poses a great challenge to the safe grid-connected operation of the unit.

[0003] In practical applications, the shaft seal of a steam turbine usually requires connecting pipes, which are used for various purposes, such as heat exchange medium to ensure cooling or heating of the shaft seal. However, during use, due to loose pipe connections, aging and damage of seals, corrosion or wear of pipes, steam leakage may occur at the pipe connections, which in turn has a negative impact on the normal operation of the steam turbine. Summary of the invention

[0004] In view of the above problems or problems existing in the prior art, the present invention is proposed.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for successfully starting a unit based on vibration sudden rise, which includes preparation before starting: for ensuring the uniformity of cylinder expansion after unit preheating, rushing, and grid connection and the safe operation of steam turbine equipment;

[0006] Carry out parameter control before grid connection; and load parameter control after grid connection.

[0007] As a preferred solution of the method for successfully starting a vibration-surge unit according to the present invention, the parameter control before grid connection is performed, including:

[0008] Put the circulating water, auxiliary steam, deaerator heating and shaft seal systems into use, and pay attention to the changes in TSI eccentricity;

[0009] Put the shaft sealing system into use, control the rate of temperature and pressure increase, adjust the opening of the pre-start valve for positive warming, monitor the temperature difference between the upper and lower cylinders, and extend the positive warming time until the conditions are met;

[0010] Confirm the eccentricity value, monitor the opening of high bypass and low bypass control valves, control the run-up parameters, ensure good vibration and uniform cylinder expansion, and maintain and appropriately increase the main steam temperature during 3000rpm;

[0011] Through TSI and TDM parameter comparison and analysis, take appropriate measures to adjust and confirm that all parameters are normal before connecting to the grid

[0012] As a preferred solution of the method for successfully starting a vibration-surge unit according to the present invention, the load parameter control after grid connection includes:

[0013] After grid connection, the load increase rate is set to 25MW / min, and the load is slowly increased through valve position control, with a target of 50MW;

[0014] Strictly control the main steam temperature and reheat steam temperature to ensure that the main steam temperature is within the range of 420-430℃ and avoid large fluctuations;

[0015] Keep the 50MW load warm-up for 2 hours, and increase the load appropriately after observing that the temperature of the medium and low pressure connecting pipes reaches the requirements. During this period, control the main steam temperature not to exceed 440℃;

[0016] Increase the load gradually, maintain for 0.5 to 1 hour for each 10MW load increase, monitor the trend of differential expansion and cylinder expansion, control the main steam temperature, and appropriately increase the reheat steam temperature when necessary.

[0017] A shaft seal auxiliary device comprises a connecting pipe, a collecting cover arranged opposite to a connecting portion of the connecting pipe, a detection unit for detecting the connecting portion of the connecting pipe, and a steam exhaust unit arranged on the collecting cover, wherein a steam exhaust port is arranged on the collecting cover;

[0018] The detection unit is arranged through the collection cover.

[0019] As a preferred solution of the shaft seal auxiliary device of the present invention, the detection unit includes a sealing box fixedly connected to the inner wall of the collection cover, a moving component moving horizontally along the sealing box, and a detection alarm component and a prompt component used in conjunction with the moving component;

[0020] One end of the detection alarm component is connected to the outer wall of the collection cover.

[0021] As a preferred solution of the shaft seal auxiliary device of the present invention, the moving assembly includes a moving sealing plate that moves horizontally along the sealing box, a special-shaped rod fixedly connected to the moving sealing plate at one end, an extrusion plate fixedly connected to the other end of the special-shaped rod, and a first spring connecting the extrusion plate and the outer wall of the collection cover;

[0022] The prompt component is axially connected to one end of the special-shaped rod.

[0023] As a preferred solution of the shaft sealing auxiliary device of the present invention, the special-shaped rod includes two fixed rods of equal diameter and a frustum block connecting the two fixed rods, wherein the cross-sectional size of the frustum block gradually decreases from the extrusion plate to the movable sealing plate.

[0024] As a preferred solution of the shaft seal auxiliary device of the present invention, the prompt assembly includes a horizontal rod horizontally arranged in the sealing box, and an L-shaped block axially connected to the horizontal rod, wherein one end of the L-shaped block is axially connected to the special-shaped rod, and the other end of the L-shaped block is provided with an open groove;

[0025] The prompt component also includes a moving rod with one end engaged with the open groove, a conductive column penetrating the other end of the moving rod, and a prompt light arranged on the surface of the collection cover.

[0026] As a preferred solution of the shaft seal auxiliary device of the present invention, the detection alarm component includes a support frame connected to the surface of the collection cover, a telescopic rod fixedly connected to the support frame at one end, a mounting plate fixedly connected to the other end of the telescopic rod, a pressure sensor fixedly connected to the mounting plate, and a second spring connecting the support frame and the mounting plate;

[0027] The second spring is wound around the telescopic rod.

[0028] As a preferred solution of the shaft seal auxiliary device of the present invention, the exhaust unit includes a translation component driven to move by the round table, and an exhaust component driven to move by the translation component, wherein the exhaust component moves horizontally along the exhaust port;

[0029] The translation assembly includes a translation rod driven to move by the truncated cone block, a fixing plate fixedly connected to the translation rod, and a third spring connecting the fixing plate and the inner wall of the collection cover;

[0030] The exhaust plate moves horizontally along the exhaust port;

[0031] The exhaust assembly also includes a parallel plate fixedly connected to the exhaust plate, a magnetic block arranged on the side wall of the parallel plate, and a small magnet arranged on the side wall of the collecting cover;

[0032] The magnetic block and the small magnet are set facing each other.

[0033] The beneficial effects of the present invention are as follows: by controlling various parameters throughout the entire process, the one-time safe grid connection success of the unit is ensured, thereby increasing economic and safety benefits, avoiding the phenomenon of multiple starts of the unit due to vibration problems, and saving manpower and material resources. On the other hand, when steam leakage occurs, the movement of the mobile component is automatically triggered to achieve the dual alarm prompt of sound and light. Furthermore, regardless of whether the unit is shut down or not for maintenance, the magnetic attraction between the small magnet and the magnetic block can still ensure a stable steam exhaust effect, thereby reducing the possibility of accidents during maintenance by workers. At the same time, after the steam leakage occurs, the warning light will remain on until the exhaust component is manually closed after maintenance, and the warning light will go out, thereby improving maintenance efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0035] Figure 1 Main reheat steam flow diagram.

[0036] Figure 2 It is a schematic diagram of the overall structure of the successful start-up method of the unit based on vibration sudden rise.

[0037] Figure 3 A partial structure diagram Figure 1 .

[0038] Figure 4 A partial structure diagram Figure 2 .

[0039] Figure 5 This is an enlarged schematic diagram of part A. DETAILED DESCRIPTION

[0040] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.

[0041] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0042] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0043] Example 1

[0044] Reference Figure 1 , is the first embodiment of the present invention, which provides a method for successfully starting a unit based on a vibration sudden rise, specifically,

[0045] Preparation before starting: used to ensure the uniformity of cylinder expansion after unit preheating, start-up, and grid connection, and the safe operation of steam turbine equipment;

[0046] Carry out parameter control before grid connection; and load parameter control after grid connection.

[0047] It should be noted that the pre-startup preparations specifically include the following tasks:

[0048] 1. Before starting the unit, all protections are in normal use, the temperature measurement points of the upper and lower cylinders of the turbine are displayed correctly, and the main steam valve, regulating valve, center valve, and extraction check valve can be closed reliably;

[0049] 2. Before starting the unit, confirm that the quality of the turbine lubricating oil and fire-resistant oil is normal. If the oil quality is unqualified, the unit is prohibited from starting;

[0050] 3. Before starting the unit, maintenance personnel install monitoring instruments on both sides of the front bearing box to monitor the cylinder expansion; add grease to the large machine sliding pin system to ensure that the sliding pin system operates normally during startup.

[0051] Furthermore, the parameters before grid connection are controlled, including:

[0052] Put the circulating water, auxiliary steam, deaerator heating and shaft seal systems into use, and pay attention to the changes in TSI eccentricity;

[0053] Put the shaft sealing system into use, control the rate of temperature and pressure increase, adjust the opening of the pre-start valve for positive warming, monitor the temperature difference between the upper and lower cylinders, and extend the positive warming time until the conditions are met;

[0054] It should be noted that when the unit is started, if the conditions for shaft sealing and vacuuming are met, the shaft sealing system should be put into use as soon as possible to reduce the temperature difference between the upper and lower cylinders of the fifth stage. When the large machine is ready for positive warming, start the large machine warming immediately and extend the warming time as much as possible. After ignition, control the rate of temperature increase and pressure increase. When the main steam pressure reaches 30 bar and the main steam temperature reaches 320°C, you can start warming. The warming rate is adjusted by controlling the opening of the pre-start valve. When the opening of the pre-start valve is less than 80%, the large machine will not trip. When the opening of the pre-start valve reaches 85%, pay attention to monitor the first stage pressure. If the pressure is on, temporarily maintain this opening for positive warming. If the pressure is not on, continue to increase the opening by 0.5%. If the turning trips, restart the warming, and the opening of the pre-start valve is set to the opening before the trip. After the positive warm-up is completed, if the mismatch between the main steam temperature and the outer wall temperature of the high-pressure regulating valve is greater than 139°C, the valve cavity preheating will start until the mismatch between the outer wall temperature of the regulating valve and the main steam temperature is less than 56°C, and then the valve cavity preheating will be ended. Furthermore, the temperature difference between the upper and lower cylinders of the high and medium pressure cylinders should be monitored during the startup process. If the temperature difference between the upper and lower cylinders of any stage of the large machine is greater than 50°C, the positive warm-up time should be extended until the conditions are met.

[0055] Confirm the eccentricity value, monitor the opening of high bypass and low bypass control valves, control the run-up parameters, ensure good vibration and uniform cylinder expansion, and maintain and appropriately increase the main steam temperature during 3000rpm;

[0056] It should be noted that before the large machine is started, it should be confirmed that the eccentricity value does not exceed 40μm, and the other conditions meet the requirements of the "Pre-Start Check Card". Before the start, pay attention to check that the high bypass valve is fully closed and the low bypass valve is kept at 20% opening. When the large machine is warmed up at 3000rpm for a long time, pay attention to monitoring the exhaust temperature of the high and low pressure cylinders and make appropriate adjustments. The pre-start parameters are controlled at the main steam pressure of 50bar and the main steam temperature of 400℃, and maintained at 3000rpm for 4-5h. After that, the vibration of the large machine can be induced by changing the vacuum, sliding heater, changing the low bypass opening, etc. During the period of maintaining 3000rpm, the main steam temperature should be increased to 450℃, so that the expansion of the large machine cylinder reaches more than 17mm. If the vibration rises during the pre-start period, it should be compared and analyzed through the TSI and TDM parameters, and the indication of the micrometer of the head should be checked. After confirming that the collision and friction occur, measures should be taken to adjust appropriately and closely monitor the vibration rise. If the trip value is reached, it should be handled as a shutdown. During the shutdown process, the idling sound should be listened to and the vibration peak value when passing the critical point should be recorded.

[0057] By comparing and analyzing TSI and TDM parameters, appropriate adjustments can be made and the grid connection can be achieved after confirming that all parameters are normal.

[0058] It should be noted that during the official start-up, after the boiler is ignited, try to avoid opening the high bypass, control the temperature and pressure increase rates, and control the start-up parameters at around 60bar and 400℃. Before starting, confirm that all parameters meet the requirements of the regulations. If all TSI parameters are within the qualified range during the start-up process, the speed increase warm-up time can be skipped. When the machine speed reaches 3000rpm, if all parameters are checked to be normal, the grid-connected operation can be carried out. Before grid connection, confirm again that the temperature difference between the upper and lower cylinders of the high and medium pressure cylinders is ≤50℃, the cylinder expansion reaches more than 18mm, and the difference is around 0. During the start-up process, slowly start the high and low pressure heaters, and manually open the high pressure heater emergency drain valve to prevent the high pressure heater from tripping after grid connection and having an adverse effect on the vibration of the high pressure cylinder.

[0059] Furthermore, the load parameter control after grid connection includes:

[0060] After grid connection, the load increase rate is set to 25MW / min, and the load is slowly increased through valve position control, with a target of 50MW;

[0061] It should be noted that before preparing for grid connection, confirm that the high and low bypass valves are fully closed, the reheater cooling water throttle valve is slightly opened, the oil guns on the front and rear walls of layer A are put into use, and the total coal volume is increased by 4 to 5 tons.

[0062] Strictly control the main steam temperature and reheat steam temperature to ensure that the main steam temperature is within the range of 420-430℃ and avoid large fluctuations;

[0063] Keep the 50MW load warm for 2 hours, and increase the load appropriately after observing that the temperature of the medium and low pressure connecting pipes reaches the requirements. During this period, the main steam temperature should be controlled not to exceed 440℃. When adding load, it is necessary to control the cylinder expansion to not more than 0.12mm per 10 minutes.

[0064] It should be noted that when the unit load is 50MW, check whether the temperature of the medium and low pressure connecting pipes reaches 177℃. If it is lower than this temperature, stay at this load until the temperature of the medium and low pressure connecting pipes reaches 177℃, and keep warm for 1 hour. If the amount of superheater cooling water is small due to low load, the load can be appropriately increased.

[0065] Increase the load gradually, maintain each additional 10MW load for 0.5 to 1 hour, monitor the trend of differential expansion and cylinder expansion, control the main steam temperature, and appropriately increase the reheat steam temperature when necessary. The gradual increase in load here is to continue to increase the load by increasing the amount of coal and raising the main steam pressure.

[0066] It should be noted that when the main steam pressure reaches 80bar, the load can be increased by increasing the valve position opening, and the load rate is set at 10MW / min. When the unit load is increased to 80MW, the second grinding group is turned on. If the cylinder expansion has reached the limit value under the current main steam temperature, the main and reheat steam temperatures can be appropriately increased. Each increase of 10℃ should be observed for about 0.5 hours. In the 180MW stable stage, the steam temperature is slowly raised to the rated value according to the differential expansion and cylinder expansion. When the cylinder expansion exceeds 20mm, the steam inlet method can be cut to a partial steam inlet method.

[0067] In summary, the beneficial effect of the method for successfully starting a unit based on a vibration sudden rise of the present invention is to control various parameters through the whole process, ensure the successful one-time safe grid connection of the unit, increase economic benefits and safety benefits, avoid the phenomenon of multiple starts of the unit due to vibration problems, and save manpower and material resources.

[0068] Example 2

[0069] Reference Figure 2 to Figure 5 , which is the second embodiment of the present invention, and provides a specific structure of a shaft seal auxiliary device, which includes a connecting pipe 101, a collecting cover 102 arranged at the connecting part of the connecting pipe 101, a detection unit 200 for detecting the connecting part of the connecting pipe 101, and a steam exhaust unit 300 arranged on the collecting cover 102, wherein the collecting cover 102 is provided with a steam exhaust port 102a;

[0070] The detection unit 200 is disposed through the collection cover 102 .

[0071] It should be noted that the collecting cover 102 is a detachable structure, which is installed at the connection point of the connecting pipe 101 by bolts, so that the staff can easily install and repair it when inspecting the point.

[0072] Further, the detection unit 200 includes a sealing box 201 fixedly connected to the inner wall of the collection cover 102, a moving component 202 that moves horizontally along the sealing box 201, and a detection alarm component 203 and a prompt component 204 used in conjunction with the moving component 202, wherein a sealing ring is provided at the connection between the sealing box 201 and the moving component 202;

[0073] One end of the detection alarm component 203 is connected to the outer wall of the collection cover 102 .

[0074] It should be noted that when steam leakage occurs at the connection of the connecting pipe 101, the moving component 202 will be driven to move horizontally along the sealing box 201. The movement of the moving component 202 triggers the detection alarm component 203 to detect and alarm, and at the same time the prompt component 204 is energized to achieve the prompt effect.

[0075] Further, the moving assembly 202 includes a moving sealing plate 202a that moves horizontally along the sealing box 201, a special-shaped rod 202b fixedly connected to the moving sealing plate 202a at one end, an extrusion plate 202c fixedly connected to the other end of the special-shaped rod 202b, and a first spring 202d connecting the extrusion plate 202c and the outer wall of the collection cover 102;

[0076] The prompting assembly 204 is axially connected to one end of the special-shaped rod 202b.

[0077] It should be noted that when steam leakage occurs at the connection of the connecting pipe 101, the leaked steam will fill the space between the collecting hood 102 and the connecting pipe 101, and the steam will squeeze the moving sealing plate 202a to move along the sealing box 201, and simultaneously drive the special-shaped rod 202b and the squeezing plate 202c to move horizontally, and at this time the first spring 202d is tensioned.

[0078] Furthermore, the special-shaped rod 202b includes two fixed rods 202b-1 of equal diameter, and a frustum block 202b-2 connecting the two fixed rods 202b-1, wherein the cross-sectional size of the frustum block 202b-2 gradually decreases from the extrusion plate 202c to the movable sealing plate 202a.

[0079] Further, the prompting assembly 204 includes a horizontal rod 204a horizontally arranged in the sealing box 201, and an L-shaped block 204b axially connected to the horizontal rod 204a, wherein one end of the L-shaped block 204b is axially connected to the special-shaped rod 202b, and the other end of the L-shaped block 204b is provided with an open groove;

[0080] The prompt component 204 further includes a moving rod 204 c having one end engaged with the open slot, a conductive column 204 d penetrating the other end of the moving rod 204 c , and a prompt light 204 e disposed on the surface of the collection cover 102 .

[0081] It should be noted that a disconnected circuit is provided in the sealing box 201, and the circuit is electrically connected to the warning light 204e. When there is no gas leakage, the movable component 202 does not move, and the circuit remains disconnected. When the movable component 202 moves horizontally along the sealing box 201, the L-shaped block 204b is synchronously driven to rotate, and further moves along the open groove on the movable rod 204c, so that the conductive column 204d is connected to the disconnected circuit, and the circuit is closed. At this time, the warning light 204e lights up.

[0082] Further, the detection alarm component 203 includes a support frame 203a connected to the surface of the collection cover 102, a telescopic rod 203b fixedly connected to the support frame 203a at one end, a mounting plate 203c fixedly connected to the other end of the telescopic rod 203b, a pressure sensor 203d fixedly connected to the mounting plate 203c, and a second spring 203e connecting the support frame 203a and the mounting plate 203c, wherein the pressure sensor 203d is electrically connected to the alarm;

[0083] The second spring 203e is wound around the telescopic rod 203b.

[0084] It should be noted that when the moving assembly 202 moves along the sealing box 201, the squeezing plate 202c squeezes the pressure sensor 203d to realize the alarm of the alarm.

[0085] Preferably, the movement of the squeezing plate 202c drives the alarm device to sound and the prompt light 204e to light up, thereby achieving the dual alarm prompting effects of sound and light.

[0086] Furthermore, the exhaust unit 300 includes a translation component 301 driven to move by the truncated table, and an exhaust component 302 driven to move by the translation component 301, wherein the exhaust component 302 moves horizontally along the exhaust port 102a.

[0087] Furthermore, the translation assembly 301 includes a translation rod 301a driven to move by the truncated cone block 202b - 2 , a fixed plate 301b fixedly connected to the translation rod 301a , and a third spring 301c connecting the fixed plate 301b and the inner wall of the collection cover 102 .

[0088] It should be noted that, in the original state, the truncated cone block 202b-2 squeezes the translation rod 301a, and the third spring 301c is compressed. When steam leakage occurs, the special-shaped rod 202b moves horizontally, and the translation rod 301a moves horizontally under the reset action of the third spring 301c.

[0089] Furthermore, the steam exhaust assembly 302 includes a steam exhaust plate 302a fixedly connected to one end of the translation rod 301a, wherein the steam exhaust plate 302a moves horizontally along the steam exhaust port 102a.

[0090] Furthermore, the exhaust assembly 302 further includes a parallel plate 302b fixedly connected to the exhaust plate 302a, a magnetic block 302c disposed on the side wall of the parallel plate 302b, and a small magnet 302d disposed on the side wall of the collection cover 102;

[0091] The magnetic block 302c and the small magnet 302d are arranged opposite to each other.

[0092] It should be noted that when the translation rod 301a moves horizontally, it synchronously drives the exhaust plate 302a and the parallel plate 302b to move horizontally along the exhaust port 102a to achieve the exhaust function. Furthermore, the exhaust function can be kept stable through the magnetic attraction of the small magnet 302d and the magnetic block 302c. The reset force of the spring is smaller than the magnetic attraction force, that is, only when the worker manually resets the exhaust assembly 302 after maintenance, the warning light 204e will be turned off.

[0093] Preferably, a stable exhaust effect is achieved through the magnetic attraction between the small magnet 302d and the magnetic block 302c, further reducing the possibility of accidents during maintenance by workers. On the other hand, it is easy to find the fault point through the warning light 204e, thereby improving maintenance efficiency.

[0094] When in use, the present invention includes two use states:

[0095] In the first usage state, there is no steam leakage. Specifically, the movable sealing plate 202a is located at the end of the sealing box 201 close to the connecting pipe 101, the movable component 202 does not move, the first spring 202d is in a normal state, the circuit maintains an open circuit state, the prompt light 204e is off, and the extrusion plate 202c does not contact the pressure sensor 203d, the exhaust component 302 does not perform the exhaust function, and the third spring is compressed, and the sound and light alarm is not triggered.

[0096] In the second use state, steam leakage occurs, which triggers the sound and light alarm and realizes stable steam exhaust. Specifically, when steam leakage occurs at the connection of the connecting pipe 101, the steam squeezes and moves the sealing plate 202a along the sealing box 201, and synchronously drives the special-shaped rod 202b and the squeezing plate 202c to move horizontally. At this time, the first spring 202d is tensioned, and the squeezing plate 202c squeezes the pressure sensor 203d to trigger the alarm. On the other hand, the special-shaped rod 202b moves horizontally, and the translation rod 301 a Under the reset action of the third spring 301c, the exhaust plate 302a and the parallel plate 302b are driven to move horizontally along the exhaust port 102a to achieve the exhaust effect. Further, when the small magnet 302d and the magnet are magnetically attracted, stable exhaust can be achieved. Furthermore, the special-shaped rod 202b moves horizontally, synchronously driving the L-shaped block 204b to rotate, and the moving rod 204c moves along the open groove, so that the conductive column 204d is connected to the disconnected circuit, the circuit is closed, and the warning light 204e lights up.

[0097] In summary, the beneficial effect of the method for successfully starting a unit based on vibration sudden rise of the present invention is that when steam leakage occurs, the moving component 202 is automatically triggered to move, thereby realizing the dual alarm prompting effect of sound and light. Furthermore, regardless of whether the unit is shut down or not for maintenance, the magnetic attraction between the small magnet 302d and the magnetic block 302c can still ensure stable steam exhaust, thereby reducing the possibility of accidents during maintenance by workers. At the same time, after the steam leakage occurs, the warning light 204e will remain on until the exhaust component 302 is manually closed after maintenance, and the warning light 204e will go out, thereby improving the maintenance efficiency.

[0098] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A method for successfully starting a unit based on vibration sudden rise, characterized in that: include, Preparation before starting: used to ensure the uniformity of cylinder expansion after unit preheating, start-up, and grid connection, and the safe operation of steam turbine equipment; Carry out parameter control before grid connection; And load parameter control after grid connection.

2. The method for successfully starting a unit based on a vibration sudden rise as claimed in claim 1, characterized in that: The parameter control before grid connection includes: Put the circulating water, auxiliary steam, deaerator heating and shaft seal systems into use, and pay attention to the changes in TSI eccentricity; Put the shaft sealing system into use, control the rate of temperature and pressure increase, adjust the opening of the pre-start valve for positive warming, monitor the temperature difference between the upper and lower cylinders, and extend the positive warming time until the conditions are met; Confirm the eccentricity value, monitor the opening of high bypass and low bypass control valves, control the run-up parameters, ensure good vibration and uniform cylinder expansion, and maintain and appropriately increase the main steam temperature during 3000rpm; By comparing and analyzing TSI and TDM parameters, appropriate adjustments can be made and the grid connection can be achieved after confirming that all parameters are normal.

3. The method for successfully starting a unit based on a vibration sudden rise according to claim 1 or 2, characterized in that: The post-grid connection load parameter control includes: After grid connection, the load increase rate is set to 25MW / min, and the load is slowly increased through valve position control, with a target of 50MW; Strictly control the main steam temperature and reheat steam temperature to ensure that the main steam temperature is within the range of 420-430℃ and avoid large fluctuations; Keep the 50MW load warm-up for 2 hours, and increase the load appropriately after observing that the temperature of the medium and low pressure connecting pipes reaches the requirements. During this period, control the main steam temperature not to exceed 440℃; Increase the load gradually, maintaining it for 0.5 to 1 hour for every 10MW increase in load, monitor the trend of differential expansion and cylinder expansion, control the main steam temperature, and appropriately increase the reheat steam temperature when necessary.

4. A shaft seal auxiliary device, characterized in that: include, A connecting pipe (101), a collecting cover (102) arranged opposite to a connection point of the connecting pipe (101), a detection unit (200) for detecting the connection point of the connecting pipe (101), and a steam exhaust unit (300) arranged on the collecting cover (102), wherein the collecting cover (102) is provided with a steam exhaust port (102a); The detection unit (200) is disposed through the collection cover (102).

5. The shaft sealing auxiliary device according to claim 4, characterized in that: The detection unit (200) comprises a sealing box (201) fixedly connected to the inner wall of the collection cover (102), a moving component (202) that moves horizontally along the sealing box (201), and a detection alarm component (203) and a prompt component (204) that cooperate with the moving component (202); One end of the detection alarm component (203) is connected to the outer wall of the collection cover (102).

6. The shaft sealing auxiliary device according to claim 5, characterized in that: The moving assembly (202) comprises a moving sealing plate (202a) that moves horizontally along the sealing box (201), a special-shaped rod (202b) with one end fixedly connected to the moving sealing plate (202a), an extrusion plate (202c) with the other end fixedly connected to the special-shaped rod (202b), and a first spring (202d) that connects the extrusion plate (202c) and the outer wall of the collection cover (102); The prompting assembly (204) is axially connected to one end of the special-shaped rod (202b).

7. The shaft seal auxiliary device according to claim 6, characterized in that: The special-shaped rod (202b) comprises two fixed rods (202b-1) of equal diameter, and a truncated cone block (202b-2) connecting the two fixed rods (202b-1), wherein the cross-sectional size of the truncated cone block (202b-2) gradually decreases from the extrusion plate (202c) to the movable sealing plate (202a).

8. The shaft sealing auxiliary device according to claim 7, characterized in that: The prompt component (204) comprises a horizontal rod (204a) horizontally arranged in the sealing box (201), and an L-shaped block (204b) axially connected to the horizontal rod (204a), wherein one end of the L-shaped block (204b) is axially connected to the special-shaped rod (202b), and the other end of the L-shaped block (204b) is provided with an open groove; The prompt component (204) also includes a moving rod (204c) with one end engaged with the open slot, a conductive column (204d) passing through the other end of the moving rod (204c), and a prompt light (204e) arranged on the surface of the collection cover (102).

9. The shaft sealing auxiliary device according to claim 8, characterized in that: The detection alarm component (203) comprises a support frame (203a) connected to the surface of the collection cover (102), a telescopic rod (203b) one end of which is fixedly connected to the support frame (203a), a mounting plate (203c) fixedly connected to the other end of the telescopic rod (203b), a pressure sensor (203d) fixedly connected to the mounting plate (203c), and a second spring (203e) connecting the support frame (203a) and the mounting plate (203c); The second spring (203e) is wound around the telescopic rod (203b).

10. The shaft sealing auxiliary device according to claim 9, characterized in that: The steam exhaust unit (300) comprises a translation component (301) driven to move by the truncated table, and a steam exhaust component (302) driven to move by the translation component (301), wherein the steam exhaust component (302) moves horizontally along the steam exhaust port (102a); The translation assembly (301) comprises a translation rod (301a) driven to move by the truncated cone block (202b-2), a fixing plate (301b) fixedly connected to the translation rod (301a), and a third spring (301c) connecting the fixing plate (301b) and the inner wall of the collection cover (102). The steam exhaust assembly (302) comprises a steam exhaust plate (302a) fixedly connected to one end of the translation rod (301a), wherein the steam exhaust plate (302a) moves horizontally along the steam exhaust port (102a). The exhaust assembly (302) further comprises a parallel plate (302b) fixedly connected to the exhaust plate (302a), a magnetic block (302c) arranged on the side wall of the parallel plate (302b), and a small magnet (302d) arranged on the side wall of the collection cover (102); The magnetic block (302c) and the small magnet (302d) are arranged opposite to each other.