Building engineering data information intelligent management method and system

By analyzing the viewing frequency and conversion probability of construction project data, determining the priority of data processing, efficient conversion and storage of construction project data is achieved, computing power loss caused by inconsistent data format and content is solved, and data processing efficiency is improved.

CN119066115AInactive Publication Date: 2024-12-03CHINA CONSTR TAIJI URBAN CONSTR GRP CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411555557.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-04
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In construction projects, due to different requirements for construction project data by different parties, the data format and content are inconsistent, resulting in frequent data conversion and increased computing power loss. Especially in large-scale projects with long construction periods, how to be efficient Pre-selecting to convert data becomes an important issue.

Method used

By obtaining the viewing frequency of building project data, calculating the call impact of each group of source data, and determining the priority of data format and content conversion based on the probability analysis of format and content conversion, realizing the pre-conversion and storage of data, reducing the priority of data Computational power consumption caused by short-term and high-frequency data conversion.

Benefits of technology

It effectively reduces the computing power loss caused by data conversion, improves the processing efficiency of construction engineering data, reduces the short-term and high-frequency data conversion requirements, and optimizes the data management process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119066115A_ABST
    Figure CN119066115A_ABST
Patent Text Reader

Abstract

The invention provides a building engineering data information intelligent management method and system, and belongs to the technical field of building engineering data intelligent management. The building engineering data information intelligent management method comprises the following steps: obtaining building project data; calculating calling influence degree data of each group of source data according to the data viewing frequency; the calling influence degree data is positively correlated to the data viewing frequency; determining a format conversion probability and a content conversion probability of any data viewer for each group of source data in any construction stage according to the building project data; analyzing processing priority data of each group of source data according to the calling influence degree data, the format conversion probability and the content conversion probability; by adopting the method, the preprocessing of the conversion data is realized, and the calculation power loss of data conversion is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of intelligent management of construction project data, and in particular to an intelligent management method and system for construction project data information. Background Art

[0002] In a construction project, the construction period is divided into different construction stages, and each construction stage will generate different construction project data. There are multiple participants in the provision and viewing of construction project data, such as construction teams, management personnel, etc. At different construction stages, some are data providers who provide data, and some are data viewers who need to view data. Due to the different needs of different participants for construction project data at different stages, the data standards of the data provided or viewed by any party are not unified, whether in data format or data content. When the construction project is large and the construction period is long, a large amount of data will need to be viewed frequently at any stage, which will increase the computing power loss of data format conversion. Therefore, it is necessary to convert some data in advance, so how to choose the pre-converted data is very important. Summary of the invention

[0003] The present application provides a method and system for intelligent management of construction project data information, which can determine the conversion priority of construction project data, thereby helping to reduce the computing power loss caused by data conversion.

[0004] In a first aspect, the present application provides a method for intelligent management of construction engineering data information. The method comprises:

[0005] Acquire construction project data; the construction project data includes the data viewing frequency of each set of source data by any data viewer at any construction stage; the source data is data provided by any data provider at any construction stage;

[0006] Calculate the call impact data of each group of source data according to the data viewing frequency; the call impact data is positively correlated with the data viewing frequency;

[0007] Determine the format conversion probability and content conversion probability of each set of source data for any data viewer at any construction stage according to the construction project data; the format conversion probability is the probability that the data viewed by the data viewer is format conversion data; the format conversion data is data for which format conversion is performed on the source data; the content conversion probability is the probability that the data viewed by the data viewer is content conversion data; the content conversion data is data for which content processing is performed on the source data;

[0008] The processing priority data of each group of source data is analyzed according to the call impact data, the format conversion probability and the content conversion probability.

[0009] Further, the analyzing the processing priority data of each group of source data according to the call impact data, the format conversion probability and the content conversion probability includes:

[0010] Calculate format influence data according to the format conversion probability, and calculate content influence data according to the content conversion probability;

[0011] The calculation method of the processing priority data includes:

[0012]

[0013] In the formula, the processing priority data is, the call influence data is, the format influence data is, and the content influence data are respectively the first preset weight, the second preset weight, and the third preset weight.

[0014] Further, .

[0015] Further, the calculating of the call impact data of each group of source data according to the data viewing frequency includes:

[0016] Assume that there are n data viewers in any construction stage, then the data viewing frequency of the i-th data viewer is ;

[0017]

[0018] In the formula, the influence data is called, the first preset correction coefficient is the first preset conversion coefficient, and the preset frequency weight corresponding to the data viewing frequency of the th data viewer is.

[0019] Further, .

[0020] In a second aspect, the present application provides an intelligent management system for construction engineering data information, the system comprising:

[0021] An acquisition module is used to acquire construction project data; the construction project data includes the data viewing frequency of each set of source data by any data viewer at any construction stage; the source data is data provided by any data provider at any construction stage;

[0022] A calculation module, used for calculating the call impact data of each group of source data according to the data viewing frequency; the call impact data is positively correlated with the data viewing frequency;

[0023] A determination module is used to determine the probability of format conversion and content conversion of each set of source data by any data viewer at any construction stage according to the construction project data; the format conversion probability is the probability that the data viewed by the data viewer is format-converted data; the format-converted data is data for which format conversion is performed on the source data; the content conversion probability is the probability that the data viewed by the data viewer is content-converted data; the content-converted data is data for which content processing is performed on the source data;

[0024] The analysis module is used to analyze the processing priority data of each group of source data according to the call impact data, the format conversion probability and the content conversion probability.

[0025] Furthermore, the analysis module is further configured to analyze the processing priority data of each group of source data according to the call impact data, the format conversion probability and the content conversion probability, including:

[0026] Calculate format influence data according to the format conversion probability, and calculate content influence data according to the content conversion probability;

[0027] The calculation method of the processing priority data includes:

[0028]

[0029] In the formula, To process priority data, To call the impact data, is the format impact data, Content impact data; , , They are respectively the first preset weight, the second preset weight and the third preset weight.

[0030] Furthermore, the analysis module is further configured to: .

[0031] Furthermore, the calculation module is further configured to calculate the call impact data of each group of source data according to the data viewing frequency, including:

[0032] Assume that there are n data viewers in any construction stage, then the data viewing frequency of the i-th data viewer is ;

[0033]

[0034] In the formula, To call the impact data, is the first preset correction coefficient, is the first preset conversion coefficient; is the preset frequency weight corresponding to the data viewing frequency of the i-th data viewer.

[0035] Furthermore, the calculation module is further configured to: .

[0036] It should be understood that the contents described in the Summary of the Invention are not intended to limit the key or important features of the embodiments of the present application, nor are they intended to limit the scope of the present application. Other features of the present application will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The above and other features, advantages and aspects of the embodiments of the present application will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. In the accompanying drawings, the same or similar reference numerals represent the same or similar elements, wherein:

[0038] Figure 1 A flowchart of a method for intelligent management of construction engineering data information in an embodiment of the present application is shown;

[0039] Figure 2 A block diagram of an intelligent management system for construction engineering data information in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0040] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0041] In addition, the term "and / or" in this article is only a description of the association relationship between the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0042] The present application provides a method and system for intelligent management of construction engineering data information, which can.

[0043] In a first aspect, the present application provides a method for intelligent management of construction engineering data information. Figure 1 The specific steps included in the method are as follows.

[0044] Step S110: Acquire construction project data; the construction project data includes the data viewing frequency of each set of source data by any data viewer at any construction stage; the source data is data provided by any data provider at any construction stage.

[0045] It can be understood that in the embodiment of the present application, a construction project includes multiple construction projects, each of which will generate a large amount of construction project data in each construction stage, and in a construction project, there are multiple participants, such as the construction party, the management party, etc.; the standards and contents of the construction project data produced by each participant are not unified, and in the actual construction stage, the parties need to coordinate each other's construction project data, the construction party's project progress data needs to be synchronized to the management party, the procurement strategy data formulated by the management party needs to be synchronized to the financial party, and the construction party's project progress data does not need to be synchronized to the financial party; it can be seen that there are situations where data synchronization is required between at least two different participants; and due to the different participants Different parties have different needs for construction project data, resulting in different data formats and data contents required by each participant. In the process of synchronizing data, it is necessary to convert the data format, and even increase or decrease the data content, and then convert the format. When faced with a large amount of construction project data generated by a huge project, this data conversion mode will lead to high-frequency calls to view a large number of files in a short period of time. In this case, a large amount of computing power is needed to convert the data format in time, which leads to additional consumption of computing power. Therefore, in order to reduce the loss of computing power, it is necessary to pre-analyze and convert the construction project data, so as to reduce the possibility of the above-mentioned situation, thereby reducing the loss of computing power.

[0046] It should be noted that in the embodiment of the present application, for the construction project data, what is obtained is real-time data under construction; for any construction stage, the number of times any data viewer views the data from the beginning of the construction stage to the current node is divided by the length of this period to obtain the corresponding data viewing frequency; as time goes by, the number of times and the length of time will change accordingly, and the data viewing frequency will also change accordingly. In order to ensure the stability of data calculation, the data viewing frequency can be calculated once according to a predetermined period, which can be the usage period of the method of this solution, or it can be a pre-set preset period.

[0047] It is understandable that the source data is provided by the data provider, so the format and content of the source data must be the data format and data standard formulated by the composite data provider; when the data viewer wants to call the source data for viewing, the data format and data standard used by the data viewer itself may be different from the data format and data standard of the source data, or they may be the same. In different cases, the data format needs to be converted.

[0048] It can be understood that in the embodiment of the present application, any record of any participant viewing and calling source data will be recorded in the cloud; when actually calling the data, there is a situation that participant A sends a data call application to participant B, and participant B agrees to the data call application and sends the source data of the application to participant A; the above situation is an example to illustrate that the data viewing record will be recorded and the record can be viewed.

[0049] It can be understood that, specifically, the data format viewed by participant A can be an EXCEL table, and the source data provided by participant B can be a WORD document; in this case, it is necessary to convert the data format, and data sorting may be required after the format conversion; it should be noted that in this solution, only this example is used to illustrate the data that needs to be processed, indicating that the process requires additional computing power, and the data processing in the specific process is not limited here.

[0050] It can be understood that in the embodiment of the present application, when the default data provider provides source data, it is presented in the form of a group of data, that is, the data provider provides a group of source data at a time.

[0051] Step S120: Calculate the call impact data of each group of source data according to the data viewing frequency; the call impact data is positively correlated with the data viewing frequency.

[0052] In the embodiment of the present application, the calling influence data of each set of source data is calculated according to the data viewing frequency. Specifically, assuming that there are n data viewing parties in any construction stage, the data viewing frequency of the i-th data viewing party is ;

[0053]

[0054] In the formula, To call the impact data, is the first preset correction coefficient, is the first preset conversion coefficient; is the preset frequency weight corresponding to the data viewing frequency of the i-th data viewer; wherein, .

[0055] Step S130: Determine the format conversion probability and content conversion probability of each group of source data for any data viewer at any construction stage based on the construction project data; the format conversion probability is the probability that the data viewed by the data viewer is format-converted data; the format conversion data is data for which format conversion is performed on the source data; the content conversion probability is the probability that the data viewed by the data viewer is content-converted data; the content conversion data is data for which content processing is performed on the source data.

[0056] It is understandable that, as mentioned in step S110, when the data viewer is viewing the data, there may be a situation where the data format and data content of the source data do not meet the standards of the data viewer. In this case, the data needs to be converted in format and content.

[0057] Specifically, suppose there are n data viewers in any construction stage, then the total number of source data viewed by the i-th data viewer is , the number of source data format conversions in the source data viewed by the i-th data viewer is , the number of source data that undergo content conversion in the source data viewed by the i-th data viewer is ; Therefore, the format conversion probability is calculated as:

[0058]

[0059]

[0060] Where A is the format conversion probability and B is the content conversion probability.

[0061] Step S140: analyzing the processing priority data of each group of source data according to the call impact data, format conversion probability and content conversion probability.

[0062] In an embodiment of the present application, analyzing the processing priority data of each group of source data according to the call impact data, the format conversion probability and the content conversion probability specifically includes calculating the format impact data according to the format conversion probability, and calculating the content impact data according to the content conversion probability;

[0063] The calculation method of the processing priority data includes:

[0064]

[0065] In the formula, To process priority data, To call the impact data, is the format impact data, Content impact data; , , are respectively the first preset weight, the second preset weight and the third preset weight; wherein, .

[0066] Specifically, the calculation method of format impact data is: ; The calculation method of content influence data is: ; In the formula, is the format conversion probability, is the content conversion probability; is the second preset correction coefficient, is the second preset conversion coefficient; is the third preset correction coefficient, is the third preset conversion coefficient.

[0067] After the processing priority data is calculated in the above manner, the source data is pre-formatted in order from large to small according to the processing priority data; the source data of different formats are stored together with the source data in a separate database, which allows all participants to view the data; it can be understood that the processing priority data is compared with the priority threshold, and the source data whose processing priority data is not less than the priority threshold is screened as the source data set; then, according to the data format of each data viewer viewing the source data in the source data set mentioned in the above analysis and calculation process, the source data in the source data set is formatted, and then the source data after the format conversion is stored in the source data set. The data is stored in the database together with the source data that has not been formatted; it can be understood that in this scheme, the above-mentioned processing process of the source data is the application part after obtaining the processing priority data, and part of the source data can also be converted into the content conversion part that can be simply adjusted by templates such as date, or the content part is not converted; by adopting the above-mentioned scheme, the purpose is to screen out the source data for priority data processing, as for the specific data processing method of the source data, it is not limited here; this method realizes the preprocessing of the source data, reduces the computing power consumption of short-term high-frequency concentrated data conversion, and improves the processing efficiency of construction engineering data.

[0068] It can be understood that the method in the present scheme is essentially a machine learning model. In the process of continuously calculating and processing priority data, relevant calculation parameters are continuously trained, such as the first preset weight, the second preset weight, the third preset weight, the preset frequency weight, the first preset correction coefficient, the first preset conversion coefficient, the second preset correction coefficient, the second preset conversion coefficient, the third preset correction coefficient, the third preset conversion coefficient, etc.; by continuously training the calculation parameters, they are made more in line with reality, helping the present model to obtain processing priority data more accurately; thereby better screening the source data, and then helping to better reduce computing power loss during data conversion.

[0069] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the embodiments of the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.

[0070] In the second aspect, the present application provides an intelligent management system for construction engineering data information. Figure 2 As shown, the system includes an acquisition module 210 for acquiring construction project data; the construction project data includes the data viewing frequency of each group of source data by any data viewer at any construction stage; the source data is data provided by any data provider at any construction stage; a calculation module 220 is used to calculate the call influence data of each group of source data according to the data viewing frequency; the call influence data is positively correlated with the data viewing frequency; a determination module 230 is used to determine the format conversion probability and content conversion probability of each group of source data by any data viewer at any construction stage according to the construction project data; the format conversion probability is the probability that the data viewed by the data viewer is format conversion data; the format conversion data is data for format conversion of the source data; the content conversion probability is the probability that the data viewed by the data viewer is content conversion data; the content conversion data is data for content processing of the source data; an analysis module 240 is used to analyze the processing priority data of each group of source data according to the call influence data, the format conversion probability and the content conversion probability.

[0071] Specifically, the analysis module 240 is further configured to analyze the processing priority data of each group of source data according to the call influence data, the format conversion probability and the content conversion probability, including calculating the format influence data according to the format conversion probability, and calculating the content influence data according to the content conversion probability; the calculation method of the processing priority data includes:

[0072]

[0073] In the formula, To process priority data, To call the impact data, is the format impact data, Content impact data; , , are respectively a first preset weight, a second preset weight and a third preset weight; further, .

[0074] Specifically, the calculation module 220 is further configured to calculate the call influence data of each set of source data according to the data viewing frequency, including: assuming that there are n data viewing parties in any construction stage, the data viewing frequency of the i-th data viewing party is ;

[0075]

[0076] In the formula, To call the impact data, is the first preset correction coefficient, is the first preset conversion coefficient; is the preset frequency weight corresponding to the data viewing frequency of the i-th data viewer; further, .

[0077] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the described device can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0078] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other to form a technical solution.

Claims

1. A method for intelligent management of construction engineering data information, characterized in that: include: Obtain construction project data; The construction project data includes the data viewing frequency of each set of source data by any data viewing party at any construction stage; The source data is data provided by any data provider at any construction stage; Calculate the call impact data of each group of source data according to the data viewing frequency; the call impact data is positively correlated with the data viewing frequency; Determine the format conversion probability and content conversion probability of each set of source data for any data viewer at any construction stage according to the construction project data; the format conversion probability is the probability that the data viewed by the data viewer is format conversion data; the format conversion data is data for which format conversion is performed on the source data; the content conversion probability is the probability that the data viewed by the data viewer is content conversion data; the content conversion data is data for which content processing is performed on the source data; The processing priority data of each group of source data is analyzed according to the call impact data, the format conversion probability and the content conversion probability.

2. The intelligent management method of construction engineering data information according to claim 1 is characterized in that: The processing priority data of each group of source data is analyzed according to the call impact data, format conversion probability and content conversion probability, including: Calculate format influence data according to the format conversion probability, and calculate content influence data according to the content conversion probability; The calculation method of the processing priority data includes: ; In the formula, To process priority data, To call the impact data, is the format impact data, Content impact data; , , They are respectively the first preset weight, the second preset weight and the third preset weight.

3. The intelligent management method of construction engineering data information according to claim 2 is characterized in that: 。 4. The intelligent management method of construction engineering data information according to claim 3 is characterized in that: The calculating of the call impact data of each group of source data according to the data viewing frequency includes: Assume that there are n data viewers in any construction stage, then the data viewing frequency of the i-th data viewer is ; ; In the formula, To call the impact data, is the first preset correction coefficient, is the first preset conversion coefficient; is the preset frequency weight corresponding to the data viewing frequency of the i-th data viewer.

5. The intelligent management method of construction engineering data information according to claim 4 is characterized in that: 。 6. An intelligent management system for construction engineering data information, characterized in that: include: An acquisition module (210) is used to acquire construction project data; the construction project data includes the data viewing frequency of each set of source data by any data viewer at any construction stage; the source data is data provided by any data provider at any construction stage; A calculation module (220), configured to calculate call impact data of each group of source data according to the data viewing frequency; the call impact data is positively correlated with the data viewing frequency; A determination module (230) is used to determine, based on the construction project data, a probability of format conversion and a probability of content conversion for each set of source data by any data viewer at any construction stage; the format conversion probability is a probability that the data viewed by the data viewer is format-converted data; the format-converted data is data for which format conversion is performed on the source data; the content conversion probability is a probability that the data viewed by the data viewer is content-converted data; the content-converted data is data for which content processing is performed on the source data; The analysis module (240) is used to analyze the processing priority data of each group of source data according to the call impact data, the format conversion probability and the content conversion probability.

7. The intelligent management system for construction engineering data information according to claim 6 is characterized in that: The analysis module (240) is further configured to analyze the processing priority data of each group of source data according to the call impact data, the format conversion probability and the content conversion probability, including: Calculate format influence data according to the format conversion probability, and calculate content influence data according to the content conversion probability; The calculation method of the processing priority data includes: ; In the formula, To process priority data, To call the impact data, is the format impact data, Content impact data; , , They are respectively the first preset weight, the second preset weight and the third preset weight.

8. The intelligent management system for construction engineering data information according to claim 7 is characterized in that: The analysis module (240) is further configured to: .

9. The intelligent management system for construction engineering data information according to claim 8 is characterized in that: The calculation module (220) is further configured to calculate the call impact data of each group of source data according to the data viewing frequency, including: Assume that there are n data viewers in any construction stage, then the data viewing frequency of the i-th data viewer is ; ; In the formula, To call the impact data, is the first preset correction coefficient, is the first preset conversion coefficient; is the preset frequency weight corresponding to the data viewing frequency of the i-th data viewer.

10. The intelligent management system for construction engineering data information according to claim 9 is characterized in that: The calculation module (220) is further configured to: .

Citation Information

Patent Citations

  • Spatial data integration method and system applied to digital twin cities

    CN115329903A

  • Multi-dimensional data driven document search system

    CN118585609A

  • Multi-level data node storage indexing method and system

    CN118626685A

  • File management device and file management method

    JP2009265910A