Method and device for determining real-time air conditioner load for air conditioner user

CN119067249APending Publication Date: 2024-12-03国网河北省电力有限公司营销服务中心 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411039001.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The prior art is inadequate in calculating the air conditioner load of air conditioners, especially inability to effectively utilize factors such as ambient temperature, resulting in limited calculation accuracy.

Method used

By obtaining the historical load data and environmental data of air conditioners, training the non-air conditioner load calculation model, using the LightGBM regression model to determine the real-time reference load, and correcting the preliminary real-time air conditioner load to improve the calculation accuracy.

Benefits of technology

It improves the accuracy of air conditioning load calculation, helps to plan power resources in advance, ensures the stability and reliability of power supply, and is suitable for air conditioners of different types and regions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067249A_ABST
    Figure CN119067249A_ABST
Patent Text Reader

Abstract

The invention is suitable for the technical field of network measurement, and provides a method and device for determining the real-time air conditioner load of an air conditioner user, and the method comprises the steps: obtaining historical load data and historical environment data of the air conditioner user; based on the historical load data and the historical environment data of the air conditioner user, labels of the air conditioner user using the air conditioner and labels of the air conditioner user not using the air conditioner at different dates are obtained; based on the historical load data and the historical environment data corresponding to the labels of the non-used air conditioners, a preset non-air-conditioner load calculation model is trained, and a trained non-air-conditioner load calculation model is obtained; based on the trained non-air-conditioner load calculation model, the real-time reference load of the air conditioner user is determined; and based on the real-time reference load of the air conditioner user, a predicted value of the real-time air conditioner load of the air conditioner user is determined. According to the method, influence factors such as environmental data and the like with relatively high correlation with the air conditioner load can be effectively utilized, and meanwhile, the calculation precision is improved.
Need to check novelty before this filing date? Find Prior Art