Transient process control method for double-active-bridge series resonant converter in intermittent conduction mode

CN119070602AActive Publication Date: 2024-12-03HUAZHONG UNIV OF SCI & TECH

Patent Information

Application Number
CN202411091456.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-12-03
Estimated Expiration
2044-08-09

AI Technical Summary

Technical Problem

Under light load conditions, the dual active bridge series resonant converter is prone to lose soft switching characteristics, resulting in a decrease in the efficiency of the converter and its dynamic performance in transient processes is poor, affecting the reliability and stability of the converter.

Method used

By controlling the duty cycle of the AC side voltage of the primary full-bridge in the intermittent conduction mode of the dual active bridge series resonant converter, the transient process is ended within one to two switching cycles using the FTCM and IFTCM methods, and smoothly Transition to a new stable operation state.

Benefits of technology

It realizes a rapid transition of the transient process, shortens the transient transition time, improves the dynamic adjustment speed and closed-loop control performance of the converter, and ensures the safe operation and dynamic adjustment capabilities of the converter.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070602A_ABST
    Figure CN119070602A_ABST
Patent Text Reader

Abstract

The invention discloses a transient process control method for a double-active-bridge series resonant converter in an interrupted conduction mode, and belongs to the field of direct-current converter control. When a transmission power instruction of the converter is suddenly changed in the kth switching period, the duty ratio of the first half period in the switching period is calculated according to charge quantity change values before and after a transient state, and the duty ratio of the second half period is calculated according to the charge quantity change values before and after the transient state; and the steady-state duty ratio Dk is recovered from the last half switching period, so that the transient process is ended in the half switching period. In order to realize rapid control in a larger transmission power sudden change range, the time of the first half period in the kth switching period is set as a half resonance period, rapid transient control is carried out by using the duty ratio of the second half switching period, and the steady duty ratio Dk is recovered from the (k + 1) th switching period. According to the method, overshoot and bias of a state variable in the sudden change process of a transmission power instruction can be eliminated, stable and rapid transition between two power levels is realized in one or two switching periods, and the dynamic performance of the converter is improved.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Patent Citations

  • DAB-BDC modulation method based on high-frequency alternating-current buck-boost principle

    CN105162333A

  • Transient process control method and system for dual-active-bridge series resonant converter

    CN114285052A

  • Interrupted conduction mode modulation method of double-active-bridge series resonant converter

    CN119070646A

Cited By

  • Non-contact power supply series connection constant current control algorithm based on DC-DC

    CN121172931A