By calculating the backpressure parameters, determining the pressure impact between multiple interdependent Internet application systems, adjusting data flow and function calls, the problem that the existing technology cannot effectively monitor the pressure impact between multiple application nodes is improved, and the system Stability and reliability.

CN119071302APending Publication Date: 2024-12-03SF TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310628858.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Existing stress testing and monitoring solutions cannot effectively reflect the pressure impact between multiple interdependent Internet application systems, resulting in low system stability and reliability.

Method used

By obtaining the response time data of upstream and downstream application nodes, calculating the backpressure parameters, determining the impact of the reverse pressure, and adjusting the data flow and function calls based on this situation, and handling exceptions in a timely manner.

Benefits of technology

Real-time pressure monitoring of multiple application nodes is realized, and bottlenecks or abnormalities are quickly positioned, the stability and reliability of the Internet application system is improved, and avalanche is prevented.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119071302A_ABST
    Figure CN119071302A_ABST
Patent Text Reader

Abstract

The invention is suitable for the technical field of computers, and provides a pressure monitoring method and device and a readable storage medium, the method comprises the following steps: respectively obtaining performance data of a first application node and performance data of a second application node, the first application node being an upstream application node of the second application node, and the performance data comprising a response duration; according to the response duration of the first application node and the response duration of the second application node, a back pressure parameter of the second application node is determined, and the back pressure parameter is used for representing the current data processing capability of the second application node; and determining the reverse pressure influence condition of the second application node on the first application node according to the reverse pressure parameter. Therefore, the pressure of a plurality of application nodes in the Internet application system can be monitored at the same time, the abnormal application node can be quickly positioned, the abnormality of the application node can be solved, and the stability and reliability of the Internet application system can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of computer technology, and in particular, relates to a pressure monitoring method, device and readable storage medium. Background Art

[0002] With the rapid development of enterprises, user requests and data are increasing, and the performance requirements for Internet application systems are also getting higher and higher. Therefore, it is necessary to stress test and monitor the Internet application system to obtain the pressure-bearing capacity of the Internet application system and ensure that the Internet application system can still run safely and stably when users send a large number of requests.

[0003] At present, in the relevant stress testing and monitoring scheme, the performance data of each Internet application in the Internet application system is monitored. The performance data of each Internet application in the Internet application system is counted and analyzed to obtain the analysis results of each Internet application. Thus, according to the analysis results of each Internet application, the internal stress situation of each Internet application is determined.

[0004] However, since the Internet application system includes multiple interdependent Internet applications, the stress conditions of multiple interdependent Internet applications will affect each other in a complete call link. The above stress testing and monitoring solutions can only determine the stress conditions within a single Internet application, and cannot reflect the stress impact between multiple interdependent Internet applications, resulting in low stability and reliability of the Internet application system. Summary of the invention

[0005] The embodiments of the present application provide a pressure monitoring method, device and readable storage medium, which can monitor the pressure conditions of multiple interdependent Internet applications in an Internet application system in real time and handle exceptions in a timely manner, thereby improving the reliability and stability of the Internet application system.

[0006] In a first aspect, an embodiment of the present application provides a pressure monitoring method, the method comprising:

[0007] Acquire performance data of a first application node and performance data of a second application node respectively, the first application node is an upstream application node of the second application node, and the performance data includes response time;

[0008] Determine a back pressure parameter of the second application node according to the response time of the first application node and the response time of the second application node, where the back pressure parameter is used to indicate the current data processing capability of the second application node;

[0009] According to the back pressure parameter, the back pressure influence of the second application node on the first application node is determined.

[0010] In a possible implementation, determining a back pressure parameter of the second application node according to a response duration of the first application node and a response duration of the second application node includes:

[0011] Determine a first variation according to a response duration of the second application node in a first cycle and a response duration of the second application node in a second cycle, the first cycle being a cycle before the second cycle;

[0012] When the first variation is greater than the first preset value, determining the second variation according to the response time of the first application node in the first cycle and the response time of the first application node in the second cycle;

[0013] A back pressure parameter of the second application node is determined according to the second change amount and a preset integration rule.

[0014] In one possible implementation, the preset integration rules include: a first preset integration rule and a second preset integration rule; wherein the first preset integration rule means: when the second change amount is equal to the second preset value, the value of the back pressure parameter increases by the first preset score; the second preset integration rule means: when the second change amount is greater than the second preset value, the value of the back pressure parameter increases by the second preset score.

[0015] In a possible implementation, determining, according to the back pressure parameter, the back pressure influence of the second application node on the first application node includes:

[0016] If the value of the back pressure parameter is within the first threshold range, it is determined that the back pressure impact of the second application node on the first application node is normal;

[0017] If the value of the back pressure parameter is within the second threshold range, it is determined that the back pressure impact of the second application node on the first application node is a first type of abnormal situation;

[0018] If the value of the back pressure parameter is within the third threshold range, it is determined that the back pressure impact of the second application node on the first application node is a second type of abnormal situation.

[0019] In a possible implementation, the method further includes: when the reverse pressure impact condition of the second application node is normal, sending a first warning signal to the user;

[0020] When the reverse pressure impact situation of the second application node is a first type of abnormal situation, sending a second warning signal to the user;

[0021] When the pressure situation of the second application node is reversed by the pressure impact situation of the second type of abnormal situation, a third warning signal is sent to the user, so that a warning can be issued in time, abnormal situations can be handled in time, and the normal operation of the Internet application system can be ensured.

[0022] In a possible implementation, the method further includes: adjusting the data flow processed by the second application node based on the back pressure parameter of the second application node, so as to reduce the back pressure of the second application node on the first application node.

[0023] In a possible implementation, the performance data further includes the current number of responses; and adjusting the data flow processed by the second application node based on the back pressure parameter of the second application node includes:

[0024] If the value of the back pressure parameter is within the fourth threshold range, the current limiting response number of the second application node is determined according to the current response number of the second application node and the back pressure parameter, where the current response number is the number of responses of the first application node actually sending a request to the second application node, and the current limiting response number is used to indicate the number of responses after limiting the first application node sending a request to the second application node;

[0025] According to the number of current limiting responses, current limiting processing is performed on the second application node.

[0026] In a possible implementation, adjusting the data flow processed by the second application node based on the back pressure parameter of the second application node includes:

[0027] If it is determined that the value of the back pressure parameter is within the fifth threshold range, controlling the first application node to stop calling some functions of the second application node;

[0028] If it is determined that the value of the back pressure parameter is within the sixth threshold range, the first application node is controlled to stop calling all functions of the second application node.

[0029] Compared with the existing stress testing and monitoring schemes, the embodiment of the present application can obtain the response time of the first application node and the response time of the second application node by obtaining the performance data of the first application node and the performance data of the second application node. Then, according to the response time of the first application node and the response time of the second application node, the back pressure parameter of the second application node can be determined, the current data processing capability of the second application node can be determined, and the relevant data can be adjusted in advance, so as to timely adjust the current data processing capability of the second application node, so that the operation of the Internet application system is more stable. Furthermore, according to the back pressure parameter, the reverse pressure influence of the second application node on the first application node can be determined, which can reflect the real-time operation status of multiple application nodes in the Internet application system, detect the application nodes with bottlenecks or abnormalities in the data processing capability of the Internet application system, and perform corresponding processing, so that the monitoring of the Internet application system is more timely and comprehensive, and the reliability of the Internet application system can be improved. Thus, it is possible to monitor the pressure of multiple application nodes in the Internet application system at the same time, quickly locate the application nodes with bottlenecks or abnormalities in the data processing capabilities among the multiple application nodes, and when the reverse pressure is large, timely reduce the data flow processed by the second application node, so as to reduce the reverse pressure and prevent the Internet application system from avalanche.

[0030] In a second aspect, an embodiment of the present application provides a pressure monitoring device, the device comprising:

[0031] An acquisition module, used to respectively acquire performance data of a first application node and performance data of a second application node, wherein the first application node is an upstream application node of the second application node, and the performance data includes response time;

[0032] A processing module, used to determine a back pressure parameter of the second application node according to the response time of the first application node and the response time of the second application node, where the back pressure parameter is used to indicate the current data processing capability of the second application node;

[0033] The processing module is further used to determine the reverse pressure influence of the second application node on the first application node according to the reverse pressure parameter.

[0034] In a third aspect, an embodiment of the present application provides an electronic device, the electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the electronic device executes the pressure monitoring method in the first aspect or any possible implementation of the first aspect.

[0035] In a fourth aspect, a readable storage medium is provided, wherein instructions are stored in the readable storage medium. When the instructions are executed on a computer, the computer executes the pressure monitoring method in the first aspect or any possible implementation of the first aspect.

[0036] In a fifth aspect, a computer program product comprising instructions is provided. When the instructions are executed on an electronic device, the electronic device executes the pressure monitoring method in the first aspect or any possible implementation of the first aspect.

[0037] It can be understood that the beneficial effects of the second to fifth aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0039] Figure 1 It is a flow chart of a pressure monitoring method provided in an embodiment of the present application;

[0040] Figure 2 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application;

[0041] Figure 3 It is a flow chart of a pressure monitoring method provided in an embodiment of the present application;

[0042] Figure 4 It is a flow chart of a pressure monitoring method provided in an embodiment of the present application;

[0043] Figure 5 It is a signaling interaction diagram of a pressure monitoring method provided in an embodiment of the present application;

[0044] Figure 6 It is a structural schematic block diagram of a pressure monitoring device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0045] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0046] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0047] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0048] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.

[0049] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0050] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0051] See also Figure 1 , Figure 1 The flowchart of a pressure monitoring method provided by an embodiment of the present application is shown. The pressure monitoring method of the present application is applied to the electronic device 100 or a software module in the electronic device 100.

[0052] The pressure monitoring method can be applied to application scenarios such as the Internet, artificial intelligence (AI) computing, smart logistics, smart cities, smart medical care, smart transportation, smart homes and smart industries, which require monitoring the pressure of multiple application nodes.

[0053] In some embodiments, the electronic device 100 may be a palmtop computer, a laptop computer, a desktop computer, or a server, etc. The embodiment of the present application does not specifically limit the type of the electronic device 100.

[0054] like Figure 2 As shown, the electronic device 100 of the embodiment of the present application may include a processor 101, a memory 102, a communication interface 103 and a bus 104. The processor 101, the memory 102 and the communication interface 103 communicate via the bus 104, or may communicate via other means such as wireless transmission. The memory 102 is used to store instructions, and the processor 101 is used to execute the instructions stored in the memory 102. The memory 102 stores program code, and the processor 101 can call the program code stored in the memory 102 to execute Figure 1 Pressure monitoring method shown.

[0055] It should be understood that in the embodiment of the present application, the processor 101 may be a CPU, and the processor 101 may also be other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field programmable gate arrays (FPGAs) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or any conventional processor, etc.

[0056] The memory 102 may include a read-only memory and a random access memory, and provide instructions and data to the processor 101. The memory 102 may also include a non-volatile random access memory. The memory 102 may be a volatile memory or a non-volatile memory, or may include both volatile and non-volatile memories. Among them, the non-volatile memory may be a read-only memory (ROM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), an electrically erasable programmable read-only memory (EEPROM), or a flash memory. The volatile memory may be a random access memory (RAM), which is used as an external cache. By way of example and not limitation, many forms of RAM are available, such as static RAM (SRAM), dynamic random access memory (DRAM), synchronous dynamic random access memory (SDRAM), double data rate synchronous dynamic random access memory (DDR SDRAM), enhanced synchronous dynamic random access memory (ESDRAM), synchronous link dynamic random access memory (SLDRAM), and direct rambus RAM (DR RAM).

[0057] The bus 104 may include a power bus, a control bus, a status signal bus, etc. in addition to the data bus. Figure 1 Various buses are labeled as bus 104.

[0058] like Figure 1 As shown, the pressure monitoring method of the present application may include:

[0059] S101. Acquire performance data of a first application node and performance data of a second application node respectively.

[0060] Among them, the first application node is the upstream application node of the second application node, and the second application node is the downstream application node of the first application node. The first application node can be any application node in the Internet application system. The second application node can be any application node that is mutually dependent on the first application node in the Internet application system. In other words, the first application node and the second application node belong to the same call link in the Internet application system and have an upstream and downstream dependency relationship.

[0061] It should be understood that the first application node and the second application node may be arranged in the same electronic device 100, or may be arranged in different electronic devices 100, and the present application does not impose any specific limitation thereto.

[0062] It should be understood that the upstream and downstream relationship between the first application node and the second application node in the embodiment of the present application is only used as an example. In fact, the change in the upstream and downstream relationship between the first application node and the second application node has no effect on the specific implementation process of the embodiment of the present application. In addition, the first application node and the second application node can be any two application nodes with upstream and downstream dependencies in the Internet application system. Regarding the pressure monitoring process of other application nodes with upstream and downstream dependencies in the Internet application system, the processing principles of the technical solution of the first application node and the second application node can be followed.

[0063] In some embodiments, the upstream and downstream relationship between the first application node and the second application node can be obtained through link tracking and other technologies.

[0064] Among them, the performance data is used to reflect the ability of the application node to process data. The performance data may include response time. The response time is used to indicate the time it takes for the downstream application node to respond after receiving a request sent by the upstream application node. The unit of the response time may be milliseconds (ms) or seconds (s), etc., and this application does not impose specific restrictions on it.

[0065] In the case where the first application node sends multiple requests to the second application node, the second application node returns multiple responses to the first application node accordingly, and the response duration of each of the multiple responses may be the same or different.

[0066] That is, when the number of requests is multiple, the number of responses is also multiple. Specifically, the number of responses can be represented by the number of transactions per second (TPS) transmitted by the second application node.

[0067] When the number of responses is multiple, the corresponding response time is multiple. Specifically, the response time can be characterized by the P95 indicator. For example, when the number of responses is 100 and the response time is 100, the response time of the 95th response can be used to characterize the response time of the 100 responses.

[0068] In some embodiments, the electronic device 100 may collect the performance data of the first application node through the collection device. The electronic device 100 may collect the performance data of the second application node through the collection device. Thus, the electronic device 100 may receive the performance data of the first application node and the performance data of the second application node sent by the collection device.

[0069] The collection device is installed in the first application node and the second application node respectively. For example, the collection device may be a skyworking collection tool.

[0070] In another embodiment, the electronic device 100 may also actively obtain the performance data of the first application node and the performance data of the second application node from other storage devices. The performance data of the first application node and the performance data of the second application node are pre-stored or cached in other storage devices. For example, the other storage device may be a message queue (MQ) server, which can be used as a transfer station for the performance data of each application node, thereby reducing the resources required for the collection device to directly report to the electronic device 100, and improving the collection speed of the collection device.

[0071] In summary, the electronic device 100 can obtain the performance data of the first application node and the performance data of the second application node respectively, thereby providing a data basis for subsequent data analysis and processing.

[0072] S102: Determine a back pressure parameter of the second application node according to a response duration of the first application node and a response duration of the second application node.

[0073] The response time of the first application node may be 0 or any integer greater than 0. The response time of the second application node may be 0 or any integer greater than 0.

[0074] For the case where the first application node is the upstream application node of the second application node, when the first application node is the first application node of any call link in the Internet application system, there is no upstream application node for the first application node. In other words, the first application node will not receive the request from the upstream application node, nor will it respond. At this time, the response time of the first application node is 0.

[0075] When the first application node is any application node other than the first application node in any call link, the first application node has an upstream application node, that is, the first application node may receive a request from the upstream application node and may also respond. At this time, the response time of the first application node can be any integer greater than 0.

[0076] For the case where the first application node is the upstream application node of the second application node, if the first application node does not send a request to the second application node, the second application node will not respond, so the response time of the second application node is 0. If the first application node sends a request to the second application node, the second application node may respond, so the response time of the second application node can also be any integer greater than 0.

[0077] If the second application node is the upstream application node of the first application node, the response time of the second application node can refer to the relevant description of the response time of the first application node, and the response time of the first application node can refer to the relevant description of the response time of the second application node, which will not be repeated here.

[0078] The back pressure parameter is used to indicate the current data processing capability of the second application node. Specifically, the back pressure parameter can be characterized by a score. For example, the back pressure parameter is 0-100 points. Thus, the second application node can be processed accordingly by the back pressure parameter to avoid avalanche of the Internet application system.

[0079] After obtaining the performance data of the first application node and the performance data of the second application node, the electronic device 100 can obtain the response time of the first application node and the response time of the second application node. The electronic device 100 can determine the back pressure parameter of the second application node based on the response time of the first application node and the response time of the second application node obtained. Thus, the actual operation of the Internet application system can be reflected through the back pressure parameter. The actual operation of the Internet application system may include normal, congestion, and avalanche.

[0080] S103: Determine, according to the back pressure parameter, the back pressure influence of the second application node on the first application node.

[0081] The reverse pressure impact situation is used to indicate the impact of the pressure situation of the downstream application node on the pressure situation of the upstream application node.

[0082] After obtaining the back pressure parameter, the electronic device 100 can determine the reverse pressure influence of the second application node on the first application node according to the back pressure parameter. For example, the smaller the value of the back pressure parameter, the smaller the reverse pressure influence of the second application node on the first application node, and the Internet application system can operate normally. On the contrary, the larger the value of the back pressure parameter, the greater the reverse pressure influence of the second application node on the first application node, and the Internet application system cannot operate normally, that is, the Internet application system may be blocked or avalanche.

[0083] It should be understood that when an Internet application system includes multiple call links and each of the multiple call links includes multiple application nodes, the pressure monitoring method of the embodiment of the present application is also applicable.

[0084] The pressure monitoring method of the embodiment of the present application can obtain the response time of the first application node and the response time of the second application node by acquiring the performance data of the first application node and the performance data of the second application node. Then, according to the response time of the first application node and the response time of the second application node, the back pressure parameter of the second application node can be determined, the current data processing capability of the second application node can be determined, and the relevant data can be adjusted in advance, so as to timely adjust the current data processing capability of the second application node, so that the operation of the Internet application system is more stable. Furthermore, according to the back pressure parameter, the reverse pressure influence of the second application node on the first application node can be determined, which can reflect the real-time operation of multiple application nodes in the Internet application system, detect the application nodes with bottlenecks or abnormalities in the ability to process data in the Internet application system, and perform corresponding processing, so that the monitoring of the Internet application system is more timely and comprehensive, and the reliability of the Internet application system can be improved. Thus, it is possible to realize the monitoring of the pressure of multiple application nodes in the Internet application system at the same time, quickly locate the application nodes with bottlenecks or abnormalities in the ability to process data in multiple application nodes, and timely adjust the application nodes with bottlenecks or abnormalities in the ability to process data, so as to ensure the stable operation of the Internet application system and improve the stability and reliability of the Internet application system.

[0085] Based on the above description, a feasible implementation manner in which the electronic device determines the back pressure parameter of the second application node in S102 is illustrated by way of example.

[0086] See also Figure 3 , Figure 3 FIG. 1 is a flow chart of a pressure monitoring method provided in an embodiment of the present application. Figure 3 As shown, the pressure monitoring method of the present application may include:

[0087] S201. Determine a first change amount according to a response time length of a second application node in a first cycle and a response time length of the second application node in a second cycle.

[0088] Wherein, the first cycle is the cycle before the second cycle. The duration of the first cycle is equal to the duration of the second cycle. The duration of the first cycle and the duration of the second cycle can be set by those skilled in the art according to actual conditions, and this application does not specifically limit it. For example, the first cycle is 1s, and the second cycle is also 1s.

[0089] The first change is used to represent the change in the response time of the second application node. Specifically, the first change = the response time of the second application node in the second cycle - the response time of the second application node in the first cycle / the response time of the second application node in the first cycle.

[0090] The electronic device 100 may obtain the response duration of the second application node in the first cycle. Furthermore, the electronic device 100 may obtain the response duration of the second application node in the second cycle. The electronic device 100 may perform corresponding calculations on the response duration of the second application node in the first cycle and the response duration of the second application node in the second cycle to obtain a first variation.

[0091] Considering that the response time of the second application node in the second cycle may be greater than the response time of the second application node in the first cycle, or the response time of the second application node in the second cycle may be equal to the response time of the second application node in the first cycle, or the response time of the second application node in the second cycle may be less than the response time of the second application node in the first cycle. It can be seen that the first change amount may be greater than 0, or the first change amount may be equal to 0, or the first change amount may be less than 0.

[0092] The second application node may have a reverse pressure effect on the first application node only when the first change amount is greater than 0. The second application node will not have a reverse pressure effect on the first application node when the first change amount is less than or equal to 0. Therefore, after obtaining the first change amount, the electronic device 100 needs to judge the first change amount.

[0093] S202: When the first change amount is greater than a first preset value, determine a second change amount according to a response time length of the first application node in the first cycle and a response time length of the first application node in the second cycle.

[0094] The first preset value is used to represent the critical value of the possible reverse pressure effect of the second application node on the first application node. The first preset value may be 0, or the first preset value may be a positive integer greater than 0. Those skilled in the art may set it according to actual conditions, and this application does not impose any specific restrictions on it.

[0095] The second variation is used to represent the variation of the response time of the first application node. Specifically, the second variation = the response time of the first application node in the second cycle - the response time of the first application node in the first cycle / the response time of the first application node in the first cycle.

[0096] The electronic device 100 may compare the first variation with a first preset value pre-stored in the electronic device 100. When the electronic device 100 determines that the first variation is less than or equal to the first preset value, it may determine that the second application node has no reverse pressure effect on the first application node. When the electronic device 100 determines that the first variation is greater than the first preset value, it may determine that the second application node has a reverse pressure effect on the first application node. Specifically, the electronic device 100 may obtain the response duration of the first application node within the first cycle. And, the electronic device 100 may obtain the response duration of the first application node within the second cycle. Thus, the electronic device 100 determines the second variation based on the response duration of the first application node within the first cycle and the response duration of the first application node within the second cycle.

[0097] Considering that the response time of the first application node in the second cycle may be greater than the response time of the first application node in the first cycle, or the response time of the first application node in the second cycle may be equal to the response time of the first application node in the first cycle, or the response time of the first application node in the second cycle may be less than the response time of the first application node in the first cycle. It can be seen that the second change amount may be greater than 0, or the second change amount may be equal to 0, or the second change amount may be less than 0.

[0098] When the second change amount is less than 0, it means that the second application node will not produce a reverse pressure effect on the first application node. When the second change amount is greater than or equal to 0, it means that the second application node may produce a reverse pressure effect on the first application node. Since the larger the second change amount, the greater the reverse pressure effect produced by the second application node on the first application node, after obtaining the second change amount, the electronic device 100 needs to judge the second change amount.

[0099] S203: Determine a back pressure parameter of the second application node according to the second change amount and a preset integration rule.

[0100] The second preset value is used to represent the critical value at which the reverse pressure generated by the second application node on the first application node has a greater impact. The second preset value may be 0, or the second preset value may be a positive integer greater than 0. Those skilled in the art may set it according to actual conditions, and this application does not impose any specific restrictions on it.

[0101] Among them, the preset integration rules may include: a first preset integration rule and a second preset integration rule. Among them, the first preset integration rule means that when the second change amount is equal to the second preset value, the value of the back pressure parameter increases by a first preset score. The first preset score is greater than the minimum value of the back pressure parameter and less than the maximum value of the back pressure parameter. Usually, when the back pressure parameter is 0-100 points, the first preset score can be set to 1 point. That is to say, when the second change amount is equal to the second preset value, the value of the back pressure parameter increases by 2 points.

[0102] The second preset integral rule means that when the second change is greater than the second preset value, the value of the back pressure parameter increases by the second preset score. The second preset score is greater than the minimum value of the back pressure parameter and less than the maximum value of the back pressure parameter. Usually, when the back pressure parameter is 0-100 points, the second preset score can be set to 2 points. That is, when the second change is greater than the second preset value, the value of the back pressure parameter increases by 2 points.

[0103] In some embodiments, the second preset integral rule may also be that when the second change amount is greater than the second preset value, and the second change amount increases by a preset percentage, the value of the back pressure parameter increases by a second preset score. For example, the preset percentage is 1%. Generally, when the back pressure parameter is 0-100 points, the second change amount is greater than the second preset value, and the second change amount increases by 1%, the value of the back pressure parameter increases by 2 points.

[0104] The electronic device 100 may judge the second variation according to a preset integration rule pre-stored in the electronic device 100. The electronic device 100 may determine the preset integration rule that the second variation complies with according to the judgment result. Thus, the electronic device 100 may determine the back pressure parameter of the second application node according to the second variation and the preset integration rule, thereby enabling the electronic device 100 to further determine the reverse pressure influence of the second application node on the first application node according to the back pressure parameter.

[0105] Based on the above description, a feasible implementation manner in which the electronic device determines the reverse pressure influence of the second application node on the first application node in S103 is illustrated by way of example.

[0106] See also Figure 4 , Figure 4 FIG. 1 is a flow chart of a pressure monitoring method provided in an embodiment of the present application. Figure 4 As shown, the pressure monitoring method of the present application may include:

[0107] S301: Determine a threshold range within which a value of a back pressure parameter lies.

[0108] The threshold range is used to indicate the magnitude of the reverse pressure effect of the second application node on the first application node. The threshold range includes at least a first threshold range, a second threshold range and a third threshold range.

[0109] The first threshold range is used to indicate that the reverse pressure generated by the second application node on the first application node has a small impact. The second threshold range is used to indicate that the reverse pressure generated by the second application node on the first application node has a large impact. The third threshold range is used to indicate that the reverse pressure generated by the second application node on the first application node has too large an impact. The maximum value of the first threshold range and the minimum value of the second threshold range may be the same or different. The maximum value of the second threshold range and the minimum value of the third threshold range may be the same or different. For example, when the back pressure parameter is 0-100 points, the first threshold range is 0-30 points, the second threshold range is 30-60 points, and the third threshold range is 60-100 points. For another example, the first threshold range is 0-30 points, the second threshold range is 31-60 points, and the third threshold range is 61-100 points. Those skilled in the art may set the size of each threshold range according to actual conditions, and this application does not impose specific restrictions on it.

[0110] After obtaining the back pressure parameter, the electronic device 100 may determine the threshold range in which the value of the back pressure parameter actually lies according to the threshold range pre-stored in the electronic device 100 .

[0111] S302: If the value of the back pressure parameter is within a first threshold range, it is determined that the back pressure impact of the second application node on the first application node is normal.

[0112] When the electronic device 100 determines that the value of the back pressure parameter is within the first threshold range, the electronic device 100 can determine that the back pressure impact of the second application node on the first application node is normal. At this time, the electronic device 100 can determine that the actual operation of the Internet application system is normal, and there is no need to perform corresponding processing on the second application node.

[0113] In some embodiments, when the reverse pressure impact of the second application node is normal, the electronic device 100 may send a first warning signal to the user. Exemplarily, the first warning signal may be represented by warn in the code. The first warning signal may also be represented by a green indicator light signal. Thus, the electronic device 100 may control the green indicator light to light up through the green indicator light signal, so that the user can more intuitively observe the actual operation of the Internet application system.

[0114] S303: If the value of the back pressure parameter is within the second threshold range, determine that the back pressure impact of the second application node on the first application node is a first type of abnormal situation.

[0115] When the electronic device 100 determines that the value of the back pressure parameter is within the second threshold range, the electronic device 100 may determine that the back pressure impact of the second application node on the first application node is a first type of abnormal situation. At this time, the electronic device 100 may determine that the actual operation of the Internet application system is blocked or about to avalanche, and the second application node needs to be processed accordingly. Thus, the actual operation of the Internet application system after processing can be transformed into normal.

[0116] In some embodiments, when the reverse pressure impact of the second application node is a first type of abnormal situation, the electronic device 100 may send a second warning signal to the user. Exemplarily, the second warning signal may be represented by an error in the code. The second warning signal may also be represented by a yellow indicator light signal. Thus, the electronic device 100 may control the yellow indicator light to light up through the yellow indicator light signal, so that the user can more intuitively observe the actual operation of the Internet application system.

[0117] S304: If the value of the back pressure parameter is within a third threshold range, determine that the back pressure impact of the second application node on the first application node is a second type of abnormal situation.

[0118] There is no temporal sequence between S304, S303 and S302, and S304, S303 and S302 can be executed simultaneously or sequentially.

[0119] When the electronic device 100 determines that the value of the back pressure parameter is within the third threshold range, the electronic device 100 may determine that the back pressure impact of the second application node on the first application node is a second type of abnormal situation. At this time, the electronic device 100 may determine that the actual operation of the Internet application system has avalanche, and the second application node needs to be processed accordingly. Thus, the actual operation of the Internet application system after processing can be transformed into normal.

[0120] In some embodiments, when the reverse pressure impact of the pressure situation of the second application node is a second type of abnormal situation, the electronic device 100 may send a third warning signal to the user. Exemplarily, the first warning signal may be represented by a crital in the code. The third warning signal may also be represented by a red indicator light signal. Thus, the electronic device 100 may control the red indicator light to light up through the red indicator light signal, so that the user can more intuitively observe the actual operation of the Internet application system.

[0121] In some embodiments, the electronic device 100 may also display the back pressure parameters of each application node in each call link of the Internet application system through the grafrana open source platform set in the electronic device 100. For example, the electronic device 100 may draw the back pressure parameters of each application node as a back pressure parameter trend graph and then display it. Thus, the user can intuitively observe the actual operation of each application node in the Internet application system.

[0122] Furthermore, the electronic device 100 can also send the first warning signal, the second warning signal and the third warning signal to the user through the warning capability of the grafrana open source platform. In addition, the monitoring scanning duration, i.e., the monitoring cycle, can be pre-set in the grafrana open source platform. If the back pressure parameter exceeds the above threshold range in multiple monitoring cycles, the corresponding warning mechanism is triggered to issue an abnormal warning to the first application node.

[0123] In addition, the electronic device 100 can also send the first warning signal, the second warning signal and the third warning signal to the user through email, text message, phone, WeChat, DingTalk and instant messaging software (IM), so that the user can maintain the Internet application system in time.

[0124] In summary, the electronic device 100 can determine the reverse pressure impact of the second application node on the first application node through the back pressure parameter, so as to provide early warning, allowing the electronic device 100 to perform corresponding processing on the second application node, thereby ensuring the safe and stable operation of the Internet application system.

[0125] In some embodiments, the electronic device 100 can also adjust the data flow processed by the second application node based on the back pressure parameters of the second application node, so that the adjusted data flow processed by the second application node is reduced, thereby reducing the reverse pressure of the adjusted second application node on the first application node, thereby avoiding avalanche of the Internet application system.

[0126] Exemplarily, after executing S301, the electronic device 100 determines that the value of the back pressure parameter is within a fourth threshold range. The fourth threshold range may include a first threshold range and a second threshold range. For example, when the back pressure parameter is 0-100 points, the fourth threshold range is 0-60 points. Alternatively, the fourth threshold range may be set to a range that is different from the first threshold range, the second threshold range, and the third threshold range. For example, when the back pressure parameter is 0-100 points, the fourth threshold range is 0-50 points.

[0127] The electronic device 100 can determine the current limiting response times of the second application node according to the current response times and the back pressure parameter of the second application node. Thus, the electronic device 100 can perform current limiting processing on the second application node according to the current limiting response times. In other words, the electronic device 100 can reduce the current response times of the second application node according to the current limiting response times, thereby reducing the reverse pressure effect of the second application node on the first application node to ensure the normal operation of the Internet application system.

[0128] Among them, the current number of responses is the number of responses that the first application node actually sends to the second application node. The current limiting response number is used to indicate the number of responses after the first application node sends a request to the second application node. Exemplarily, the current limiting response number = the current response number * (1-the percentage of the back pressure parameter). For example, the current response number is 1000 times, the back pressure parameter is 60 points, the percentage of the back pressure parameter is 0.6, and the current limiting response number = 1000*(1-0.6) = 400 times.

[0129] Exemplarily, after executing S301, the electronic device 100 determines that the value of the back pressure parameter is within the fifth threshold range. The fifth threshold range may include the second threshold range and the third threshold range. For example, when the back pressure parameter is 0-100 points, the fifth threshold range is 30-100 points. Alternatively, the fifth threshold range may be set to a range that is different from the first threshold range, the second threshold range, the third threshold range, and the fourth threshold range. For example, when the back pressure parameter is 0-100 points, the fifth threshold range is 70-100 points.

[0130] When it is determined that the value of the back pressure parameter is within the fifth threshold range, the electronic device 100 can control the first application node to stop calling some functions of the second application node, that is, downgrade the second application node so that the second application node can quickly return the response of some functions that can be called to the first application node. This can avoid the Internet application system from being unable to operate normally due to the abnormality of the second application node.

[0131] Exemplarily, after executing S301, the electronic device 100 determines that the value of the back pressure parameter is within the sixth threshold range. The sixth threshold range may include the third threshold range. For example, when the back pressure parameter is 0-100 points, the sixth threshold range is 60-100 points. Alternatively, the sixth threshold range may be set to a range that is different from the first threshold range, the second threshold range, the third threshold range, the fourth threshold range, and the fifth threshold range. For example, when the back pressure parameter is 0-100 points, the sixth threshold range is 90-100 points. In the case of determining that the value of the back pressure parameter is within the sixth threshold range, the electronic device 100 may control the first application node to stop calling all functions of the second application node, that is, to perform a fuse process on the second application node. Thereby, the pressure of the second application node can be prevented from being reversely transmitted to the first application node, and the performance problems such as slow data processing speed of the first application node can be avoided due to the excessive influence of the reverse pressure of the second application node on the first application node, causing an avalanche of the Internet application system.

[0132] It should be understood that when the electronic device 100 determines that the value of the back pressure parameter exceeds the sixth threshold range, the first application node can resume calling the second application node.

[0133] based on Figures 1 to 4 The following description is combined with Figure 5 , an example is given to illustrate the specific implementation process of the pressure monitoring method of the present application.

[0134] Assume that the electronic device 100 may include an application server, a data collection server, a monitoring and early warning server, and a governance server. The application server is provided with an Internet application system, and the Internet application system includes application node A, application node B, and application node C. Among them, application node A, application node B, and application node C form a call link, and application node A is the upstream application node of application node B, and application node B is the upstream application node of application node C.

[0135] See also Figure 5 , Figure 5 FIG. 2 shows a schematic diagram of signaling interaction of a pressure monitoring method provided in an embodiment of the present application. Figure 5 As shown, the specific implementation process of the pressure monitoring method of the present application is as follows:

[0136] Step 11: The application server may collect the response time and current response times of application node A, the response time and current response times of application node B, and the response time and current response times of application node C.

[0137] Step 12: The application server may send the response time and current response number of application node A, the response time and current response number of application node B, and the response time and current response number of application node C to the data collection server.

[0138] In addition, the data collection server may also store the response time and current response times of application node A, the response time and current response times of application node B, and the response time and current response times of application node C in the link.

[0139] Step 13: The data collection server may determine the upstream and downstream dependency relationship of each application node in the call link, and obtain that application node A is the upstream application node of application node B, and application node B is the upstream application node of application node C.

[0140] Step 14: The data collection server may determine the back pressure parameter of application node B according to the upstream and downstream dependencies of each application node in the call link and the response time of application node A and the response time of application node B in the link. At the same time, the data collection server may determine the back pressure parameter of application node C according to the upstream and downstream dependencies of each application node in the call link and the response time of application node B and the response time of application node C.

[0141] Step 15: The data acquisition server may send the back pressure parameters of the application node B to the monitoring and early warning server, and send the back pressure parameters of the application node C to the monitoring and early warning server.

[0142] Step 16: The monitoring and warning server may determine the impact of the reverse pressure of the application node A according to the pre-stored warning mechanism and the reverse pressure parameters of the application node B. Also, the monitoring and warning server may determine the impact of the reverse pressure of the application node B according to the warning mechanism and the reverse pressure parameters of the application node C.

[0143] Step 17: When the monitoring and warning server determines that the reverse pressure impact of application node A meets the warning mechanism, it may send a warning signal corresponding to the reverse pressure impact of application node A to the governance server. Alternatively, when the monitoring and warning server determines that the reverse pressure impact of application node B meets the warning mechanism, it may send a warning signal corresponding to the reverse pressure impact of application node B to the governance server.

[0144] Step 18: The governance server may control application node A to stop calling some functions of application node B or control application node A to stop calling all functions of application node B according to the corresponding warning signal. Alternatively, the governance server may control application node B to stop calling some functions of application node C or control application node B to stop calling all functions of application node C according to the corresponding warning signal. This reduces the reverse pressure of application node B on application node A or reduces the reverse pressure of application node C on application node B, avoids avalanche of Internet application system, and ensures stable operation of Internet application system.

[0145] Step 19: The governance server may obtain the current response times of application node A, the current response times of application node B, and the current response times of application node C from the data collection server.

[0146] Since application node A is the first application node in the call link, the current response number of application node A is 0.

[0147] Step 20: The governance server may determine the current limiting response times of application node B according to the current response times of application node B. Furthermore, the governance server may determine the current limiting response times of application node C according to the current response times of application node C. This improves the response speed of the application node and ensures the stable operation of the Internet application system.

[0148] There is no temporal sequence between step 11 to step 18 and step 19 to step 20, and step 11 to step 18 and step 19 to step 20 can be performed simultaneously or sequentially.

[0149] In summary, the pressure monitoring method of the embodiment of the present application can simultaneously complete the pressure monitoring of multiple application nodes in multiple call links in the Internet application system, and can provide early warning. When an abnormality is about to occur in a downstream application node, the downstream application node can be processed accordingly in a timely manner, thereby avoiding the reverse transmission of pressure to the upstream application node, thereby improving the efficiency of determining the abnormal application nodes in the Internet application system and processing the abnormal application nodes.

[0150] See also Figure 6 , Figure 6 FIG. 1 is a schematic block diagram of a pressure monitoring device provided in an embodiment of the present application. Figure 6 As shown, the pressure monitoring device 400 of the present application may include:

[0151] An acquisition module 401 is used to respectively acquire performance data of a first application node and performance data of a second application node, where the first application node is an upstream application node of the second application node, and the performance data includes response time;

[0152] A processing module 402 is used to determine a back pressure parameter of the second application node according to the response time of the first application node and the response time of the second application node, where the back pressure parameter is used to indicate the current data processing capability of the second application node;

[0153] The processing module 402 is further configured to determine the reverse pressure influence of the second application node on the first application node according to the reverse pressure parameter.

[0154] In some embodiments, the processing module 402 is also used to determine a first change amount based on a response time of the second application node within a first period and a response time of the second application node within a second period, where the first period is a period before the second period; when the first change amount is greater than a first preset value, determine a second change amount based on a response time of the first application node within the first period and a response time of the first application node within the second period; determine a back pressure parameter of the second application node based on the second change amount and a preset integration rule.

[0155] In some embodiments, the preset integration rule may include: a first preset integration rule and a second preset integration rule. The first preset integration rule means: when the second change amount is equal to the second preset value, the value of the back pressure parameter increases by the first preset score. The second preset integration rule means: when the second change amount is greater than the second preset value, the value of the back pressure parameter increases by the second preset score.

[0156] In some embodiments, if the value of the back pressure parameter is within the first threshold range, the processing module 402 is also used to determine that the reverse pressure impact of the second application node on the first application node is normal; if the value of the back pressure parameter is within the second threshold range, the processing module 402 is also used to determine that the reverse pressure impact of the second application node on the first application node is a first type of abnormal situation; if the value of the back pressure parameter is within the third threshold range, the processing module 402 is also used to determine that the reverse pressure impact of the second application node on the first application node is a second type of abnormal situation.

[0157] In some embodiments, the pressure monitoring device 400 of the present application may also include: an early warning module 403; the early warning module 403 is used to send a first early warning signal to the user when the reverse pressure impact situation of the second application node is a normal situation; send a second early warning signal to the user when the reverse pressure impact situation of the second application node is a first type of abnormal situation; send a third early warning signal to the user when the reverse pressure impact situation of the pressure situation at the second application node is a second type of abnormal situation.

[0158] In some embodiments, the processing module 402 is further configured to adjust the data flow of the second application node based on the back pressure parameter of the second application node.

[0159] In some embodiments, if the value of the back pressure parameter is within the fourth threshold range, the processing module 402 is also used to determine the current limiting response number of the second application node based on the current response number of the second application node and the back pressure parameter, where the current response number is the number of responses of the first application node actually sending a request to the second application node, and the current limiting response number is used to indicate the number of responses after the first application node sends a request to the second application node; the processing module 402 is also used to perform current limiting processing on the second application node based on the current limiting response number.

[0160] In some embodiments, if the value of the back pressure parameter is within the fifth threshold range, the processing module 402 is further configured to control the first application node to stop calling some functions of the second application node.

[0161] In some embodiments, if the value of the back pressure parameter is within a sixth threshold range, the processing module 402 is further configured to control the first application node to stop calling all functions of the second application node.

[0162] An embodiment of the present application further provides a readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.

[0163] The embodiment of the present application also provides a computer program product including instructions, which, when executed on a proxy server, enables the proxy server to execute the steps in the above-mentioned method embodiments.

[0164] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0165] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method embodiment part and will not be repeated here.

[0166] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the above-mentioned device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.

[0167] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0168] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0169] In the embodiments provided in the present application, it should be understood that the disclosed devices / network equipment and methods can be implemented in other ways. For example, the device / network equipment embodiments described above are merely schematic. For example, the division of the above modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0170] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0171] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A pressure monitoring method, characterized in that: The method comprises: respectively acquiring performance data of a first application node and performance data of a second application node, wherein the first application node is an upstream application node of the second application node, and the performance data includes response time; Determine, according to the response duration of the first application node and the response duration of the second application node, a back pressure parameter of the second application node, where the back pressure parameter is used to indicate a current data processing capability of the second application node; According to the back pressure parameter, a back pressure influence of the second application node on the first application node is determined.

2. The method according to claim 1, characterized in that The determining, according to the response duration of the first application node and the response duration of the second application node, a back pressure parameter of the second application node includes: determining a first variation according to a response duration of the second application node in a first cycle and a response duration of the second application node in a second cycle, wherein the first cycle is a cycle before the second cycle; When the first change amount is greater than a first preset value, determining a second change amount according to a response time length of the first application node in a first cycle and a response time length of the first application node in a second cycle; A back pressure parameter of the second application node is determined according to the second change amount and a preset integration rule.

3. The method according to claim 2, characterized in that The preset integration rules include: a first preset integration rule and a second preset integration rule; The first preset integral rule means that when the second change amount is equal to a second preset value, the value of the back pressure parameter is increased by a first preset score; The second preset integration rule means that when the second change amount is greater than a second preset value, the value of the back pressure parameter is increased by a second preset score.

4. The method according to claim 1, characterized in that: The determining, according to the back pressure parameter, the back pressure influence of the second application node on the first application node includes: If the value of the back pressure parameter is within the first threshold range, it is determined that the back pressure impact of the second application node on the first application node is normal; If the value of the back pressure parameter is within a second threshold range, it is determined that the back pressure impact of the second application node on the first application node is a first type of abnormal situation; If the value of the back pressure parameter is within a third threshold range, it is determined that the back pressure impact of the second application node on the first application node is a second type of abnormal situation.

5. The method according to claim 4, characterized in that The method further comprises: When the reverse pressure impact of the second application node is normal, sending a first warning signal to the user; When the reverse pressure impact of the second application node is a first type of abnormal situation, sending a second warning signal to the user; When the reverse pressure impact of the pressure situation of the second application node is a second type of abnormal situation, a third warning signal is sent to the user.

6. The method according to any one of claims 1 to 5, characterized in that: The method further comprises: Based on the back pressure parameter of the second application node, the data flow processed by the second application node is adjusted.

7. The method according to claim 6, characterized in that The performance data also includes the current response number; The adjusting the data flow processed by the second application node based on the back pressure parameter of the second application node includes: If the value of the back pressure parameter is within the fourth threshold range, determining the current limiting response number of the second application node according to the current response number of the second application node and the back pressure parameter, the current response number is the number of responses of the first application node actually sending a request to the second application node, and the current limiting response number is used to indicate the number of responses after limiting the first application node sending a request to the second application node; Perform current limiting processing on the second application node according to the number of current limiting responses.

8. The method according to claim 6, characterized in that The adjusting the data flow processed by the second application node based on the back pressure parameter of the second application node includes: If it is determined that the value of the back pressure parameter is within a fifth threshold range, controlling the first application node to stop calling some functions of the second application node; If it is determined that the value of the back pressure parameter is within a sixth threshold range, the first application node is controlled to stop calling all functions of the second application node.

9. A pressure monitoring device, characterized in that: The device comprises: An acquisition module, configured to respectively acquire performance data of a first application node and performance data of a second application node, wherein the first application node is an upstream application node of the second application node, and the performance data includes a response time; a processing module, configured to determine a back pressure parameter of the second application node according to a response time of the first application node and a response time of the second application node, wherein the back pressure parameter is used to indicate a current data processing capability of the second application node; The processing module is further used to determine the impact of the reverse pressure of the second application node on the first application node according to the reverse pressure parameter.

10. A readable storage medium, characterized in that: The readable storage medium stores a computer executable program or instructions, and the computer executable program or instructions are configured to execute the method according to any one of claims 1 to 8.