Pipe cleaning method for gas field serial pipeline
By designing a pipe cleaning ball made of water-soluble resin material, combining an intercepting device and a mobile serving device, the crushing characteristics of the pipe cleaning ball are controlled, and the problem of cleaning the main pipe and branch pipe of the gas field is solved, achieving a safe and efficient pipe cleaning effect .
Patent Information
- Application Number
- CN202310666281.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-06
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2043-06-06
AI Technical Summary
The prior art is difficult to efficiently clean the gas production main pipe and gas production branch pipe at the same time, resulting in an increase in the risk of liquid accumulation and freezing in the low-lying areas in the pipeline, and the debris of the water-soluble cleaning balls are not completely dissolved, which may block the drainage pipeline.
Design a pipe cleaner ball, made of water-soluble resin material, combined with an interceptor device and a mobile serving device, to ensure that the pipe cleaner ball can be dissolved or broken when encountering water or collision , thoroughly clean the pipeline.
It has achieved the simultaneous cleaning of the main pipe and the branch pipe of the gas production pipe, avoiding the debris of the pipe cleaning ball entering the gas collection station, reducing the risk of freezing and overpressure of the pipeline, and ensuring the safety and effectiveness of the pipe cleaning operation.
Smart Images

Figure CN119076542A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of gas field gathering and transportation pipeline cleaning methods, and in particular relates to a gas field serial pipeline cleaning method. Background Art
[0002] Gas field production pipelines adopt the well-to-well serial connection mode. The gas production pipelines from different gas well sites are connected to the gas production trunk pipe and then transported to the gas gathering station for processing. The pipelines between the well site and the gas production trunk pipe are gas production branch pipes. Gas field cleaning operations are an important means to remove pipeline liquid accumulation, reduce pipeline corrosion, and improve pipeline transportation efficiency.
[0003] The pipe cleaning technology mainly uses leather cup pipe cleaning devices or rubber pipe cleaning balls to clean the gas main pipes through the pipe cleaning ball launching and collecting devices installed at the beginning and end of the pipeline. As for the gas branch pipes, the above-mentioned technology cannot be used for pipe cleaning, resulting in long-term liquid accumulation in the low-lying areas of the pipeline, which increases the operating pressure of the pipeline and the risk of freezing and blockage in winter, affecting the winter supply of the gas field.
[0004] Based on the fact that the gas production branch pipe cannot be cleaned, the existing technology has proposed a water-soluble cleaning ball, which has achieved a certain cleaning effect by taking advantage of its water-soluble property. However, there are still some fragments that enter the separator in the station and are not completely dissolved to block the drainage pipe; the unreasonable design of the cleaning ball crushing pressure difference causes the pipeline to be over-pressurized after being blocked. Summary of the invention
[0005] The invention aims to provide a method for cleaning gas field serially connected pipelines, which has the characteristics of simultaneously cleaning the gas production main pipe and the gas production branch pipe, and the fragments of the cleaning ball can be fully dissolved.
[0006] The technical solution of the present invention is a method for cleaning a gas field serially connected pipeline, which is specifically implemented according to the following steps:
[0007] Step 1: Design and manufacture a pig ball according to the maximum allowable operating pressure of the gas branch pipe, and design and install an interception device in the terminal pipeline of the gas branch pipe;
[0008] Step 2: Connect the pipe cleaning ball to a mobile ball launching device at the starting point of the gas branch pipe or open the straight pipe section of the well site to launch the pipe cleaning ball, thereby obtaining the launched pipe cleaning ball;
[0009] Step 3: The intercepting device collides with the sent cleaning ball. If the ball is broken by collision, the sent cleaning ball will directly dissolve to complete the cleaning. If the ball is not broken by collision, the sent cleaning ball will be blocked, compressed, deformed and dissolved to complete the cleaning.
[0010] The present invention is also characterized in that step 1 is specifically implemented according to the following steps:
[0011] Step 1.1: The crushing pressure difference ΔPs of the cleaning ball should not be greater than the maximum allowable operating pressure of the branch pipe and the design pressure P 2max The difference between the operating pressure P1 of the main pipe during cleaning can avoid pipeline overpressure. The pressure difference ΔPs of the cleaning ball breaking is
[0012] ΔP s ≤P 2max -P1 (1)
[0013] Among them, ΔPs is the crushing pressure difference of the cleaning ball, P 2max is the maximum operating pressure of the branch pipe, and P1 is the operating pressure of the main pipe during pigging;
[0014] Step 1.2, use a microcomputer-controlled static stiffness fatigue testing machine to conduct indoor tests, and obtain a curve model of the relationship between the crushing pressure difference and the wall thickness of the cleaning ball after the interception device is stuck in the pipeline;
[0015] Step 1.3, query and design the wall thickness of the pipe cleaning ball according to the relationship curve model between the crushing pressure difference and the wall thickness after the pipe cleaning ball is blocked by the interception device in the pipeline;
[0016] Step 1.4, according to the wall thickness of the cleaning ball, a water-soluble resin material that can dissolve in water and break when it is hit or blocked is used to make the cleaning ball;
[0017] Step 1.5: Design and install an interception device in the terminal pipeline of the gas production branch pipe.
[0018] Step 1.2 is implemented as follows:
[0019] Step 1.2.1, the testing machine gradually applies force to the cleaning ball above the interception device in the simulated pipeline, and the microcomputer obtains the pressure curve of the testing machine;
[0020] Step 1.2.2, according to the pressure curve of the testing machine, the inflection point pressure is obtained as the crushing pressure of the pipe cleaning ball; the inflection point pressure divided by the cross-sectional area of the pipeline is the crushing pressure difference of the pipe cleaning ball;
[0021] Step 1.2.3, simulating the relationship curve between the wall thickness of the pipe cleaning ball and the crushing pressure difference of the pipe cleaning ball through the crushing test of the pipe cleaning ball with different wall thicknesses;
[0022] Step 1.2.4, according to step 1.1, the set pig ball crushing pressure difference is calculated to obtain a simulated wall thickness and crushing pressure difference relationship curve model.
[0023] Step 2 is implemented as follows:
[0024] Step 2.1, close the wellhead and control valve, and release the pressure through the pressure gauge of the wellhead and flow meter;
[0025] Step 2.2: Remove the straight pipe section between the control valves and connect the temporary mobile ball throwing device between the valves to perform the ball throwing operation; or directly throw the ball into the straight pipe section to resume the wellhead process ball throwing.
[0026] The interception device in step 1 is a plurality of metal bars or metal meshes perpendicular to the pipeline.
[0027] The pass-through size of the metal bar or metal mesh shall not be larger than the pass-through size of the sewage pipe of the separator in the station.
[0028] The beneficial effects of the present invention are:
[0029] 1. The present invention uses a water-soluble resin material that is soluble in water and can be broken when it encounters collision or blockage to make a cleaning ball, which can clean the gas main pipe and the gas branch pipe at the same time;
[0030] 2. The present invention utilizes the characteristics of water-soluble pigging balls that can dissolve in water and break when blocked, combined with the temporary ball-issuing process at the starting well site and the application of metal bars or metal mesh at the end of the branch pipe, to achieve pigging operations without collecting the balls in the branch pipe, and to avoid the pigging ball fragments from not being completely dissolved and entering the gas gathering station to affect the system in the station;
[0031] 3. The present invention achieves the crushing pressure difference of the cleaning ball within the allowable range by reasonably designing the wall thickness of the cleaning ball, thereby avoiding the risk of overpressure in the branch pipe caused by the blockage of the cleaning ball. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a flow chart of the method for cleaning the gas field serially connected pipelines of the present invention;
[0033] Figure 2 It is a schematic diagram of the pipe network in the method for cleaning the gas field serially connected pipelines of the present invention;
[0034] Figure 3 It is a schematic diagram of the structure of the metal stopper in the pipe cleaning method of the present invention;
[0035] Figure 4 It is a schematic diagram of the structure of the metal mesh in the pipe cleaning method of the present invention;
[0036] Figure 5 It is a pressure variation curve diagram of a microcomputer-controlled static stiffness fatigue testing machine in the pipe cleaning method of the present invention. DETAILED DESCRIPTION
[0037] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0038] Example 1
[0039] The cleaning method of the gas field serial pipeline is implemented according to the following steps:
[0040] like Figure 1As shown, step 1, design and manufacture a pig ball according to the maximum allowable operating pressure of the gas branch pipe, and design and install an interception device in the terminal pipeline of the gas branch pipe;
[0041] Step 1.1: The crushing pressure difference ΔPs of the cleaning ball should not be greater than the maximum allowable operating pressure of the branch pipe and the design pressure P 2max The difference between the operating pressure P1 of the main pipe during cleaning can avoid pipeline overpressure. The pressure difference ΔPs of the cleaning ball breaking is
[0042] ΔP s ≤P 2max -P1 (1)
[0043] Among them, ΔPs is the crushing pressure difference of the cleaning ball, P 2max is the maximum operating pressure of the branch pipe, and P1 is the operating pressure of the main pipe during pigging;
[0044] Step 1.2, use a microcomputer-controlled static stiffness fatigue testing machine to conduct indoor tests, and obtain a curve model of the relationship between the crushing pressure difference and the wall thickness of the cleaning ball after the interception device is stuck in the pipeline;
[0045] Step 1.2.1, the testing machine gradually applies force to the cleaning ball above the interception device in the simulated pipeline, and the microcomputer obtains the pressure curve of the testing machine;
[0046] Step 1.2.2, according to the pressure curve of the testing machine, the inflection point pressure is obtained as the crushing pressure of the pipe cleaning ball; the inflection point pressure divided by the cross-sectional area of the pipeline is the crushing pressure difference of the pipe cleaning ball;
[0047] Step 1.2.3, simulating the relationship curve between the wall thickness of the pipe cleaning ball and the crushing pressure difference of the pipe cleaning ball through the crushing test of the pipe cleaning ball with different wall thicknesses;
[0048] Step 1.2.4, according to step 1.1, the set pig ball crushing pressure difference is calculated to obtain a simulated wall thickness and crushing pressure difference relationship curve model.
[0049] like Figure 5 As shown in the figure, step 1.3, according to the relationship curve model between the crushing pressure difference and the wall thickness of the pipe cleaning ball after the pipe cleaning ball is blocked by the interception device in the pipeline, the wall thickness of the pipe cleaning ball is queried and designed; the main pipe operating pressure during pipe cleaning is 2.0MPa, and the maximum allowable operating pressure of the branch pipe (usually the design pressure) is 4.0MPa. According to formula (1), the crushing pressure difference of the pipe cleaning ball during branch pipe cleaning should not be greater than 2.0MPa, and the design crushing pressure difference is 1.5MPa; the corresponding design wall thickness of the pipe cleaning ball is found out through the relationship curve between the wall thickness of the pipe cleaning ball and the crushing pressure difference simulated by the indoor test. The crushing pressure difference of the pipe cleaning ball can be controlled by reasonably designing the wall thickness of the pipe cleaning ball.
[0050] Step 1.4, according to the wall thickness of the cleaning ball, a water-soluble resin material that can dissolve in water and break when it is hit or blocked is used to make the cleaning ball;
[0051] like Figure 3 or Figure 4 As shown, step 1.5, design and install an interception device in the terminal pipeline of the gas production branch pipe. The interception device is a number of metal bars or metal meshes perpendicular to the pipeline; the passing size of the metal bars or metal meshes is not greater than the passing size of the sewage pipe of the separator in the station.
[0052] Step 2: Connect the pipe cleaning ball to a mobile ball launching device at the starting point of the gas branch pipe or open the straight pipe section of the well site to launch the pipe cleaning ball, thereby obtaining the launched pipe cleaning ball;
[0053] Step 2.1, close the wellhead and control valve, and release the pressure through the pressure gauge of the wellhead and flow meter;
[0054] Step 2.2: Remove the straight pipe section between the control valves and connect the temporary mobile ball throwing device between the valves to perform the ball throwing operation; or directly throw the ball into the straight pipe section to resume the wellhead process ball throwing.
[0055] Step 3: The intercepting device collides with the sent cleaning ball. If the ball is broken by collision, the sent cleaning ball will directly dissolve to complete the cleaning. If the ball is not broken by collision, the sent cleaning ball will be blocked, compressed, deformed and dissolved to complete the cleaning.
[0056] After the cleaning ball is launched from the branch pipe starting well site, it moves forward with the airflow to the end of the branch pipe and collides with the metal bar or metal mesh and breaks. If it does not break, it will get stuck, causing the upstream pipeline of the cleaning ball to be pressurized. When the pressure difference between the upstream and downstream of the cleaning ball reaches the designed crushing pressure difference, the cleaning ball will deform and break. Small fragments pass through the metal bar or wire mesh and enter the main pipe and gradually dissolve in water. Large fragments dissolve in water in the branch pipe and become smaller before entering the main pipe to dissolve. This prevents large fragments from entering the main pipe and not dissolving completely, and entering the gas gathering station with the airflow, blocking the small-diameter pipelines such as the separator drainage pipeline and instrument pipeline in the station, affecting the normal operation of the gas gathering station. Finally, the series pipeline is connected without collecting balls, and safe and effective cleaning operations are achieved.
[0057] Example 2
[0058] The cleaning method of the gas field serial pipeline is implemented according to the following steps:
[0059] like Figure 1 As shown, step 1, design and manufacture a pig ball according to the maximum allowable operating pressure of the gas branch pipe, and design and install an interception device in the terminal pipeline of the gas branch pipe;
[0060] Step 1.1: The crushing pressure difference ΔPs of the cleaning ball should not be greater than the maximum allowable operating pressure of the branch pipe and the design pressure P 2max The difference between the operating pressure P1 of the main pipe during cleaning can avoid pipeline overpressure. The pressure difference ΔPs of the cleaning ball breaking is
[0061] ΔP s≤P 2max -P1 (1)
[0062] Among them, ΔPs is the crushing pressure difference of the cleaning ball, P 2max is the maximum operating pressure of the branch pipe, and P1 is the operating pressure of the main pipe during pigging;
[0063] Step 1.2, use a microcomputer-controlled static stiffness fatigue testing machine to conduct indoor tests, and obtain a curve model of the relationship between the crushing pressure difference and the wall thickness of the cleaning ball after the interception device is stuck in the pipeline;
[0064] Step 1.2.1, the testing machine gradually applies force to the cleaning ball above the interception device in the simulated pipeline, and the microcomputer obtains the pressure curve of the testing machine;
[0065] Step 1.2.2, according to the pressure curve of the testing machine, the inflection point pressure is obtained as the crushing pressure of the pipe cleaning ball; the inflection point pressure divided by the cross-sectional area of the pipeline is the crushing pressure difference of the pipe cleaning ball;
[0066] Step 1.2.3, simulating the relationship curve between the wall thickness of the pipe cleaning ball and the crushing pressure difference of the pipe cleaning ball through the crushing test of the pipe cleaning ball with different wall thicknesses;
[0067] Step 1.2.4, according to step 1.1, the set pig ball crushing pressure difference is calculated to obtain a simulated wall thickness and crushing pressure difference relationship curve model.
[0068] like Figure 5 As shown in step 1.3, the design wall thickness of the cleaning ball is queried based on the relationship curve model between the crushing pressure difference and the wall thickness after the cleaning ball is blocked by the interception device in the pipeline; the main pipe operating pressure during cleaning is 3.0MPa, and the maximum allowable operating pressure of the branch pipe (usually the design pressure) is 4.0MPa. According to formula (1), the crushing pressure difference of the cleaning ball during branch cleaning should not be greater than 1.0MPa, and the design crushing pressure difference is 0.8MPa; the corresponding design wall thickness of the cleaning ball is found through the relationship curve between the wall thickness of the cleaning ball and the crushing pressure difference simulated by the indoor test. The crushing pressure difference of the cleaning ball can be controlled by reasonably designing the wall thickness of the cleaning ball.
[0069] Step 1.4, according to the wall thickness of the cleaning ball, a water-soluble resin material that can dissolve in water and break when it is hit or blocked is used to make the cleaning ball;
[0070] like Figure 3 or Figure 4 As shown, step 1.5, design and install an interception device in the terminal pipeline of the gas production branch pipe. The interception device is a number of metal bars or metal meshes perpendicular to the pipeline; the passing size of the metal bars or metal meshes is not greater than the passing size of the sewage pipe of the separator in the station.
[0071] Step 2: Connect the pipe cleaning ball to a mobile ball launching device at the starting point of the gas branch pipe or open the straight pipe section of the well site to launch the pipe cleaning ball, thereby obtaining the launched pipe cleaning ball;
[0072] Step 2.1, close the wellhead and control valve, and release the pressure through the pressure gauge of the wellhead and flow meter;
[0073] Step 2.2: Remove the straight pipe section between the control valves and connect the temporary mobile ball throwing device between the valves to perform the ball throwing operation; or directly throw the ball into the straight pipe section to resume the wellhead process ball throwing.
[0074] Step 3: The intercepting device collides with the sent cleaning ball. If the ball is broken by collision, the sent cleaning ball will directly dissolve to complete the cleaning. If the ball is not broken by collision, the sent cleaning ball will be blocked, compressed, deformed and dissolved to complete the cleaning.
[0075] After the cleaning ball is launched from the branch pipe starting well site, it moves forward with the airflow to the end of the branch pipe and collides with the metal bar or metal mesh and breaks. If it does not break, it will get stuck, causing the upstream pipeline of the cleaning ball to be pressurized. When the pressure difference between the upstream and downstream of the cleaning ball reaches the designed crushing pressure difference, the cleaning ball will deform and break. Small fragments pass through the metal bar or wire mesh and enter the main pipe and gradually dissolve in water. Large fragments dissolve in water in the branch pipe and become smaller before entering the main pipe to dissolve. This prevents large fragments from entering the main pipe and not dissolving completely, and entering the gas gathering station with the airflow, blocking the small-diameter pipelines such as the separator drainage pipeline and instrument pipeline in the station, affecting the normal operation of the gas gathering station. Finally, the series pipeline is connected without collecting balls, and safe and effective cleaning operations are achieved.
[0076] Example 3
[0077] The cleaning method of the gas field serial pipeline is implemented according to the following steps:
[0078] like Figure 1 As shown, step 1, design and manufacture a pig ball according to the maximum allowable operating pressure of the gas branch pipe, and design and install an interception device in the terminal pipeline of the gas branch pipe;
[0079] Step 1.1: The crushing pressure difference ΔPs of the cleaning ball should not be greater than the maximum allowable operating pressure of the branch pipe and the design pressure P 2max The difference between the operating pressure P1 of the main pipe during cleaning can avoid pipeline overpressure. The pressure difference ΔPs of the cleaning ball breaking is
[0080] ΔP s ≤P 2max -P1 (1)
[0081] Among them, ΔPs is the crushing pressure difference of the cleaning ball, P 2max is the maximum operating pressure of the branch pipe, and P1 is the operating pressure of the main pipe during pigging;
[0082] Step 1.2, use a microcomputer-controlled static stiffness fatigue testing machine to conduct indoor tests, and obtain a curve model of the relationship between the crushing pressure difference and the wall thickness of the cleaning ball after the interception device is stuck in the pipeline;
[0083] Step 1.2.1, the testing machine gradually applies force to the cleaning ball above the interception device in the simulated pipeline, and the microcomputer obtains the pressure curve of the testing machine;
[0084] Step 1.2.2, according to the pressure curve of the testing machine, the inflection point pressure is obtained as the crushing pressure of the pipe cleaning ball; the inflection point pressure divided by the cross-sectional area of the pipeline is the crushing pressure difference of the pipe cleaning ball;
[0085] Step 1.2.3, simulating the relationship curve between the wall thickness of the pipe cleaning ball and the crushing pressure difference of the pipe cleaning ball through the crushing test of the pipe cleaning ball with different wall thicknesses;
[0086] Step 1.2.4, according to step 1.1, the set pig ball crushing pressure difference is calculated to obtain a simulated wall thickness and crushing pressure difference relationship curve model.
[0087] like Figure 5 As shown in step 1.3, the design wall thickness of the cleaning ball is queried based on the relationship curve model between the crushing pressure difference and the wall thickness after the cleaning ball is blocked by the interception device in the pipeline; the main pipe operating pressure during cleaning is 1.0 MPa, and the maximum allowable operating pressure of the branch pipe (usually the design pressure) is 4.0 MPa. According to formula (1), the crushing pressure difference of the cleaning ball during branch cleaning should not be greater than 3.0 MPa, and the design crushing pressure difference is 2.5 MPa; the corresponding design wall thickness of the cleaning ball is found through the relationship curve between the wall thickness of the cleaning ball and the crushing pressure difference simulated by the indoor test. The crushing pressure difference of the cleaning ball can be controlled by reasonably designing the wall thickness of the cleaning ball.
[0088] Step 1.4, according to the wall thickness of the cleaning ball, a water-soluble resin material that can dissolve in water and break when it is hit or blocked is used to make the cleaning ball;
[0089] like Figure 3 or Figure 4 As shown, step 1.5, design and install an interception device in the terminal pipeline of the gas production branch pipe. The interception device is a number of metal bars or metal meshes perpendicular to the pipeline; the passing size of the metal bars or metal meshes is not greater than the passing size of the sewage pipe of the separator in the station.
[0090] Step 2: Connect the pipe cleaning ball to a mobile ball launching device at the starting point of the gas branch pipe or open the straight pipe section of the well site to launch the pipe cleaning ball, thereby obtaining the launched pipe cleaning ball;
[0091] Step 2.1, close the wellhead and control valve, and release the pressure through the pressure gauge of the wellhead and flow meter;
[0092] Step 2.2: Remove the straight pipe section between the control valves and connect the temporary mobile ball throwing device between the valves to perform the ball throwing operation; or directly throw the ball into the straight pipe section to resume the wellhead process ball throwing.
[0093] Step 3: The intercepting device collides with the sent cleaning ball. If the ball is broken by collision, the sent cleaning ball will directly dissolve to complete the cleaning. If the ball is not broken by collision, the sent cleaning ball will be blocked, compressed, deformed and dissolved to complete the cleaning.
[0094] After the cleaning ball is launched from the branch pipe starting well site, it moves forward with the airflow to the end of the branch pipe and collides with the metal bar or metal mesh and breaks. If it does not break, it will get stuck, causing the upstream pipeline of the cleaning ball to be pressurized. When the pressure difference between the upstream and downstream of the cleaning ball reaches the designed crushing pressure difference, the cleaning ball will deform and break. Small fragments pass through the metal bar or wire mesh and enter the main pipe and gradually dissolve in water. Large fragments dissolve in water in the branch pipe and become smaller before entering the main pipe to dissolve. This prevents large fragments from entering the main pipe and not dissolving completely, and entering the gas gathering station with the airflow, blocking the small-diameter pipelines such as the separator drainage pipeline and instrument pipeline in the station, affecting the normal operation of the gas gathering station. Finally, the series pipeline is connected without collecting balls, and safe and effective cleaning operations are achieved.
[0095] Example 4
[0096] The cleaning method of the gas field serial pipeline is implemented according to the following steps:
[0097] like Figure 1 As shown, step 1, design and manufacture a pig ball according to the maximum allowable operating pressure of the gas branch pipe, and design and install an interception device in the terminal pipeline of the gas branch pipe;
[0098] Step 1.1: The crushing pressure difference ΔPs of the cleaning ball should not be greater than the maximum allowable operating pressure of the branch pipe and the design pressure P 2max The difference between the operating pressure P1 of the main pipe during cleaning can avoid pipeline overpressure. The pressure difference ΔPs of the cleaning ball breaking is
[0099] ΔP s ≤P 2max -P1 (1)
[0100] Among them, ΔPs is the crushing pressure difference of the cleaning ball, P 2max is the maximum operating pressure of the branch pipe, and P1 is the operating pressure of the main pipe during pigging;
[0101] Step 1.2, use a microcomputer-controlled static stiffness fatigue testing machine to conduct indoor tests, and obtain a curve model of the relationship between the crushing pressure difference and the wall thickness of the cleaning ball after the interception device is stuck in the pipeline;
[0102] Step 1.2.1, the testing machine gradually applies force to the cleaning ball above the interception device in the simulated pipeline, and the microcomputer obtains the pressure curve of the testing machine;
[0103] Step 1.2.2, according to the pressure curve of the testing machine, the inflection point pressure is obtained as the crushing pressure of the pipe cleaning ball; the inflection point pressure divided by the cross-sectional area of the pipeline is the crushing pressure difference of the pipe cleaning ball;
[0104] Step 1.2.3, simulating the relationship curve between the wall thickness of the pipe cleaning ball and the crushing pressure difference of the pipe cleaning ball through the crushing test of the pipe cleaning ball with different wall thicknesses;
[0105] Step 1.2.4, according to step 1.1, the set pig ball crushing pressure difference is calculated to obtain a simulated wall thickness and crushing pressure difference relationship curve model.
[0106] like Figure 5 As shown in step 1.3, the design wall thickness of the cleaning ball is queried based on the relationship curve model between the crushing pressure difference and the wall thickness after the cleaning ball is blocked by the interception device in the pipeline; the main pipe operating pressure during cleaning is 2.5 MPa, and the maximum allowable operating pressure of the branch pipe (usually the design pressure) is 5.0 MPa. According to formula (1), the crushing pressure difference of the cleaning ball during branch pipe cleaning should not be greater than 2.5 MPa, and the design crushing pressure difference is 2.0 MPa; the corresponding design wall thickness of the cleaning ball is found out through the relationship curve between the wall thickness and the crushing pressure difference of the cleaning ball simulated by the indoor test.
[0107] Step 1.4, according to the wall thickness of the cleaning ball, a water-soluble resin material that can dissolve in water and break when it is hit or blocked is used to make the cleaning ball;
[0108] like Figure 3 or Figure 4 As shown, step 1.5, design and install an interception device in the terminal pipeline of the gas production branch pipe. The interception device is a number of metal bars or metal meshes perpendicular to the pipeline; the passing size of the metal bars or metal meshes is not greater than the passing size of the sewage pipe of the separator in the station.
[0109] Step 2: Connect the pipe cleaning ball to a mobile ball launching device at the starting point of the gas branch pipe or open the straight pipe section of the well site to launch the pipe cleaning ball, thereby obtaining the launched pipe cleaning ball;
[0110] Step 2.1, close the wellhead and control valve, and release the pressure through the pressure gauge of the wellhead and flow meter;
[0111] Step 2.2: Remove the straight pipe section between the control valves and connect the temporary mobile ball throwing device between the valves to perform the ball throwing operation; or directly throw the ball into the straight pipe section to resume the wellhead process ball throwing.
[0112] Step 3: The intercepting device collides with the sent cleaning ball. If the ball is broken by collision, the sent cleaning ball will directly dissolve to complete the cleaning. If the ball is not broken by collision, the sent cleaning ball will be blocked, compressed, deformed and dissolved to complete the cleaning.
[0113] After the cleaning ball is launched from the well site at the starting point of the branch pipe, it moves forward with the airflow to the end of the branch pipe and collides with the metal bar or metal mesh and breaks. If it does not break without collision, it will get stuck, causing the upstream pipeline of the cleaning ball to be pressurized. When the pressure difference between the upstream and downstream of the cleaning ball reaches the designed crushing pressure difference, the cleaning ball will deform and break. Small fragments pass through the metal bar or wire mesh and enter the main pipe and gradually dissolve in water. Large fragments dissolve in water in the branch pipe and become smaller before entering the main pipe to dissolve. This application prevents large fragments from entering the main pipe and not dissolving completely, and entering the gas gathering station with the airflow, blocking small-diameter pipelines such as the separator drainage pipeline and instrument pipeline in the station, affecting the normal operation of the gas gathering station. Ultimately, the series pipeline is not collected, and safe and effective cleaning operations are achieved.
Claims
1. A method for cleaning gas field serial pipelines, characterized in that: Follow the steps below to implement it: Step 1: Design and manufacture a pig ball according to the maximum allowable operating pressure of the gas branch pipe, and design and install an interception device in the terminal pipeline of the gas branch pipe; Step 2, the cleaning ball is sent out by connecting the starting point of the gas branch pipe to a mobile ball-sending device or opening the straight pipe section of the well site to obtain the sent cleaning ball; Step 3, the intercepting device collides with the sent cleaning ball. If the ball is broken by collision, the sent cleaning ball will directly dissolve to complete the cleaning; if the ball is not broken by collision, the sent cleaning ball will be blocked and deformed and dissolved after pressure accumulation to complete the cleaning.
2. The method for cleaning gas field serial pipelines according to claim 1, characterized in that: Step 1 is implemented according to the following steps: Step 1.1: The crushing pressure difference ΔPs of the cleaning ball should not be greater than the maximum allowable operating pressure of the branch pipe and the design pressure P 2max The difference between the operating pressure P1 of the main pipe during cleaning can avoid pipeline overpressure. The pressure difference ΔPs of the cleaning ball breaking is ΔP s ≤P 2max -P1 (1) Among them, ΔPs is the crushing pressure difference of the cleaning ball, P 2max is the maximum operating pressure of the branch pipe, and P1 is the operating pressure of the main pipe during pigging; Step 1.2, use a microcomputer-controlled static stiffness fatigue testing machine to conduct indoor tests, and obtain a curve model of the relationship between the crushing pressure difference and the wall thickness of the cleaning ball after the interception device is stuck in the pipeline; Step 1.3, query and design the wall thickness of the pipe cleaning ball according to the curve model of the relationship between the crushing pressure difference and the wall thickness after the pipe cleaning ball is blocked by the interception device in the pipeline; Step 1.4, according to the wall thickness of the cleaning ball, a water-soluble resin material that is soluble in water and can be broken when it is hit or blocked is used to make the cleaning ball; Step 1.5: Design and install an interception device in the terminal pipeline of the gas production branch pipe.
3. The method for cleaning gas field serial pipelines according to claim 2, characterized in that: The step 1.2 is specifically implemented according to the following steps: Step 1.2.1, the testing machine gradually applies force to the cleaning ball above the interception device in the simulated pipeline, and the microcomputer obtains the pressure curve of the testing machine; Step 1.2.2, according to the pressure curve of the testing machine, the inflection point pressure is obtained as the crushing pressure of the pipe cleaning ball; the inflection point pressure divided by the cross-sectional area of the pipeline is the crushing pressure difference of the pipe cleaning ball; Step 1.2.3, simulating the relationship curve between the wall thickness of the pipe cleaning ball and the crushing pressure difference of the pipe cleaning ball through the crushing test of the pipe cleaning ball with different wall thicknesses; Step 1.2.4, according to step 1.1, the set pig ball crushing pressure difference is calculated to obtain a simulated wall thickness and crushing pressure difference relationship curve model.
4. The method for cleaning gas field serial pipelines according to claim 2, characterized in that: In step 1.3, the wall thickness of the cleaning ball is proportional to the crushing pressure difference ΔPs of the cleaning ball.
5. The method for cleaning gas field serial pipelines according to claim 1, characterized in that: Step 2 is implemented as follows: Step 2.1, close the wellhead and control valve, and release the pressure through the pressure gauge of the wellhead and flow meter; Step 2.2: Remove the straight pipe section between the control valves and connect the temporary mobile ball throwing device between the valves to perform the ball throwing operation; or directly throw the ball into the straight pipe section to resume the wellhead process ball throwing.
6. The method for cleaning gas field serial pipelines according to claim 1, characterized in that: The interception device in step 1 is a plurality of metal bars or metal meshes perpendicular to the pipeline.
7. The method for cleaning gas field serial pipelines according to claim 6, characterized in that: The pass-through size of the metal bar or metal mesh is not larger than the pass-through size of the sewage discharge pipe of the separator in the station.
Citation Information
Patent Citations
Pipe cleaning device for gas long conveying pipeline
CN110449423A
Spherical soluble pipeline cleaner
CN212633720U
Petroleum pipeline pigging and ball collecting tool
CN213001625U
Novel oil field paraffin removing and dissolving ball
CN214937213U
Pipeline washing pig, pipeline washing method, and pipeline washing device
JP2021090917A
Cited By
Automatic pipe cleaning device adopting green electric energy utilization structure
CN119794014A
