Gas supply method of protective gas for continuous casting steel casting and circuit system thereof

By switching the use of nitrogen and argon according to the process section and steel grade characteristics in continuous casting metallurgical equipment, the energy waste and high cost problems caused by a single argon gas supply system are solved, and more efficient gas use and production efficiency are achieved.

CN119076932AActive Publication Date: 2024-12-06BAOSHAN IRON & STEEL CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202310665862.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-06
Publication Date
2024-12-06
Estimated Expiration
2043-06-06

AI Technical Summary

Technical Problem

In existing continuous casting metallurgical equipment, a single argon gas supply system leads to waste of argon during tundra preheating, increasing energy consumption and steel costs, and failing to effectively take into account both process and cost.

Method used

Using a protective gas supply method and its line system, the use of nitrogen and argon is switched according to the process section and steel types, including using nitrogen to blow-cool before baking, and using argon or nitrogen-argon mixture during pouring. Cold and restore nitrogen blow-cooling at the end of pouring is achieved through a gas mixer and a multi-channel piping system.

Benefits of technology

It effectively reduces argon consumption, reduces energy waste and steel costs, and optimizes the blow-cooling effect according to the characteristics of the steel grade, improving production efficiency and equipment life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119076932A_ABST
    Figure CN119076932A_ABST
Patent Text Reader

Abstract

The invention discloses a gas supply method of protective gas for continuous casting steel casting and a circuit system thereof. The gas supply method is used for carrying out protective gas blowing on a stopper rod, an upper nozzle and a mechanism seal in three stages of a baking process section before pouring, a pouring process section and the end of pouring, and specifically comprises the following steps: when the stopper rod, the upper nozzle and the mechanism seal are in the baking process section before pouring, carrying out nitrogen blowing cooling on the stopper rod, the upper nozzle and the mechanism seal; in the pouring process section, argon is used for blowing and cooling a stopper rod, an upper nozzle and a mechanism seal; and after the pouring is finished, nitrogen is used for blowing and cooling the stopper rod, the upper nozzle and the mechanism seal. Wherein the line system is arranged for realizing the gas supply scheme. According to the gas supply method of the protective gas for the continuous casting steel casting and the circuit system of the gas supply method, the process and the cost are both considered, and on the premise that the process is allowed, the cost control is implemented to each process control section.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of continuous casting steel, and in particular relates to a gas supply method and a circuit system of protective gas for continuous casting steel. Background Art

[0002] The entire process of continuous steel casting production is that molten steel is cooled and solidified through the crystallizer to form a shell. With the continuous vibration of the crystallizer and the drive of the main machine straightening device, the molten steel in the solidified shell with a liquid core is continuously crystallized and solidified, and is pulled out of the casting machine after bending and straightening in the secondary cooling zone and solidification. In the continuous casting non-oxidation pouring technology, argon is an indispensable gas. Its main role in continuous casting is to stir the molten steel to balance the temperature of the molten steel, protect the molten steel from secondary oxidation, etc., and at the same time prevent the injection channel and the stopper rod from agglomerating and promote the floating of inclusions in the molten steel in the crystallizer and the secondary cooling zone. Therefore, the argon blowing technology of the stopper rod in the tundish car of the continuous casting machine in many steel plants and the argon blowing technology of the submerged nozzle have been widely used.

[0003] In many existing continuous casting metallurgical equipment in steel plants, the argon gas pipelines equipped on the tundish car are all single argon gas supply systems. In the continuous casting production process, the tundish and the matching stopper rods and submerged nozzles must be baked to about 1200 degrees Celsius before the tundish is put into production to prevent the temperature of the molten steel from being too low and the cold steel from forming, causing abnormal final pouring production accidents. During the baking process, the stopper rod and the submerged nozzle must be blown with gas for cooling to prevent the stopper rod and the air-permeable plug in the submerged nozzle from being blocked due to high-temperature oxidation, affecting the stability of continuous casting production. Existing steel plants are basically equipped with only a single argon control pipeline, resulting in the tundish preheating process. Only expensive argon can be turned on for cooling, which not only wastes energy but also increases the cost per ton of steel. Basically, the argon consumption of each tundish stopper rod is 10L / min, and the upper nozzle is 10L / min. The baking time of each tundish is generally about 2 hours on average. Summary of the invention

[0004] The object of the present invention is to provide an air supply cooling scheme which can take both process and cost into consideration.

[0005] In order to achieve the above technical objectives, the present invention provides a method for supplying protective gas for continuous casting of steel and a circuit system thereof, and the technical scheme thereof is as follows:

[0006] A protective gas supply method for continuous casting steel is used to blow protective gas to the stopper rod, water inlet and mechanism seal in the three stages of baking process before pouring, pouring process and after pouring.

[0007] During the baking process before pouring, nitrogen is used to cool the stopper rod, water inlet and mechanism seal;

[0008] During the pouring process, the stopper rod, water inlet and mechanism seal are cooled by argon gas.

[0009] When pouring is completed, the stopper rod, water inlet and mechanism seal are cooled by nitrogen blowing.

[0010] Further,

[0011] When in the pouring process stage, the stopper rod and the water inlet are cooled by argon gas or nitrogen-argon mixed gas.

[0012] Further,

[0013] The gas supply method specifically comprises the following steps:

[0014] S1: When the PLC detects that the tundish car has reached the preheating position, it sends a baking start signal to the regenerative baking device. At the same time, the baking start signal is used as a trigger signal to trigger the nitrogen pipeline leading to the stopper rod, the water inlet and the mechanism seal to form a passage;

[0015] S2: When the PLC receives the baking end signal, it triggers the pipelines leading to the stopper rod, the water inlet and the mechanism seal to enter the nitrogen-argon switching mode; at the same time, it reads the corresponding relationship between the current steel grade and nitrogen in the process computer; when it is read that the current steel grade has strict requirements on nitrogen, it enters step S3, otherwise it enters step S4;

[0016] S3: When the PLC detects that the tundish car moves to the pouring position, it triggers the argon pipeline leading to the stopper rod, the water inlet and the mechanism seal to form a passage; until the pouring is completed, enter step S5;

[0017] S4: When the PLC detects that the tundish car moves to the pouring position, the nitrogen pipeline and the argon pipeline leading to the stopper rod and the water inlet are triggered to form passages respectively, and the stopper rod and the water inlet are cooled in the form of mixed gas; the argon pipeline leading to the mechanism seal is triggered to form a passage; until the pouring is completed, enter step S5;

[0018] S5: The PLC-controlled nitrogen passage is the passage leading to the stopper rod, the water inlet and the mechanism sealing pipeline.

[0019] Further,

[0020] Gas mixers are respectively arranged at the front end of the stopper rod air inlet and the front end of the water inlet. The stopper rod and the water inlet are cooled by blowing mixed gas in step S4, which is achieved by arranging argon pipelines and nitrogen pipelines leading to the respective gas mixers.

[0021] Further,

[0022] In step S4, the concentration ratio of the nitrogen-argon mixed gas flowing to the stopper rod and the upper water inlet is determined according to the current steel grade.

[0023] Further,

[0024] The argon gas leading to the stopper rod is low-pressure argon gas, and the argon gas leading to the water inlet and the mechanism seal is high-pressure argon gas.

[0025] A gas supply line system for protective gas for continuous casting of steel.

[0026] Three parallel nitrogen pipelines are respectively arranged between the nitrogen supply source and the stopper rod, the water inlet, and the mechanism seal;

[0027] The first parallel nitrogen pipeline is arranged between the gas supply source and the stopper rod gas inlet.

[0028] The second parallel nitrogen pipeline is set between the gas supply source and the upper water inlet.

[0029] A third parallel nitrogen pipeline is provided between the gas supply source and the mechanism sealing gas inlet;

[0030] at the same time,

[0031] Three argon pipelines are respectively arranged between the argon gas supply source and the stopper rod, the water inlet, and the mechanism seal;

[0032] A low-pressure argon gas pipeline is set between the argon gas supply source and the stopper rod gas inlet.

[0033] A first high-pressure argon pipeline is arranged between the argon gas supply source and the upper water inlet;

[0034] A second high-pressure argon pipeline is arranged between the argon gas supply source and the mechanism sealing gas inlet.

[0035] Further,

[0036] A first gas mixer is arranged at the front end of the stopper rod gas inlet, and a nitrogen pipeline and an argon pipeline leading to the stopper rod gas inlet are introduced through the first gas mixer;

[0037] A second gas mixer is arranged at the front end of the air inlet of the upper water inlet, and the nitrogen pipeline and the argon pipeline leading to the air inlet of the upper water inlet are introduced through the second gas mixer.

[0038] Further,

[0039] The first high-pressure argon gas pipeline and the second high-pressure argon gas pipeline are arranged in parallel;

[0040] The low-pressure argon gas pipeline and the parallel pipeline consisting of the first high-pressure argon gas pipeline and the second high-pressure argon gas pipeline are independently arranged;

[0041] or

[0042] The first high-pressure argon gas pipeline is arranged in parallel with the second high-pressure argon gas pipeline and then arranged in parallel with the low-pressure argon gas pipeline.

[0043] Further,

[0044] A mechanism-sealed nitrogen-argon gas switching solenoid valve is arranged at the front end of the mechanism-sealed air inlet, and a nitrogen pipeline and an argon pipeline leading to the mechanism-sealed air inlet are led to the mechanism-sealed air inlet via the mechanism-sealed nitrogen-argon gas switching solenoid valve.

[0045] Further,

[0046] A main flow control setting and a bypass branch flow control setting are respectively formed on the first parallel nitrogen pipeline, the second parallel nitrogen pipeline, the low-pressure argon pipeline, the first high-pressure argon pipeline, and the pipeline between the mechanism-sealed air inlet and the mechanism-sealed nitrogen-argon switching solenoid valve.

[0047] The present invention discloses a protective gas supply method and circuit system for continuous casting of steel, which changes the conventional argon gas cooling of the tundish. Different cooling control methods are adopted for the stopper rod, water inlet and mechanism seal in different process sections, and the cost and process are taken into consideration in each process control section, which significantly improves the cost reduction and consumption reduction. Meanwhile, on this basis, the cooling of nitrogen and argon is combined with the specific steel grade, and a setting is established in which the cooling control can be performed according to the steel grade in the casting stage. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Figure 1 A schematic diagram of the steps of a method for supplying protective gas for continuous casting of cast steel according to the present invention;

[0049] Figure 2 The present invention is a schematic diagram of the circuit structure of a gas supply circuit system for protective gas for continuous casting of steel.

[0050] In the figure,

[0051] M1-nitrogen inlet manual stop valve;

[0052] M2-low pressure argon manual stop valve;

[0053] M3-high pressure argon manual stop valve;

[0054] Y1-stopper nitrogen solenoid valve;

[0055] Y2-upper water inlet nitrogen solenoid valve;

[0056] Y3-mechanism sealed nitrogen and argon gas switching solenoid valve;

[0057] Y4-stopper nitrogen bypass solenoid valve;

[0058] Y5- stopper argon Pantone solenoid valve;

[0059] Y6-upper water inlet nitrogen bypass solenoid valve;

[0060] Y7- Argon bypass solenoid valve at the upper water inlet;

[0061] Y8-mechanism sealing gas bypass solenoid valve;

[0062] PI01 to PI10 - Remote pressure sensors;

[0063] PT01 to PT10 - pressure gauge;

[0064] CV1 to CV6 - check valves;

[0065] FI01 to FI10 - Remote flow meter;

[0066] AV1 to AV5 - automatic flow regulator;

[0067] V1 to V5-manual flow control valve;

[0068] PV1 to PV4 - pressure regulating valve;

[0069] Mixer-Gas mixer. DETAILED DESCRIPTION

[0070] Next, a protective gas supply method for continuous casting of steel and a circuit system thereof will be further described in detail according to the accompanying drawings and specific implementation methods of the present invention.

[0071] To facilitate the understanding of this technical solution, the working principle and process are described as follows:

[0072] A protective gas supply method for continuous casting steel is used to blow protective gas to the stopper rod, water inlet and mechanism seal in the three stages of the baking process section before pouring, the pouring process section and after the pouring. Specifically, when in the baking process section before pouring, nitrogen is used to cool the stopper rod, water inlet and mechanism seal; when in the pouring process section, argon is used to cool the stopper rod, water inlet and mechanism seal; when pouring is completed, nitrogen is used to cool the stopper rod, water inlet and mechanism seal. This control setting effectively achieves the consideration of cost reduction and consumption reduction. At the same time, in order to further reduce costs and consumption, the cooling protective gas and steel type are combined and innovatively set. When the current steel type has strict requirements on nitrogen, a single argon gas is used for cooling. When the current steel type has no strict requirements on nitrogen, a nitrogen-argon mixed gas is used for cooling; when nitrogen-argon mixed gas is used for cooling, the specific mixed concentration ratio is determined according to the actual steel type. Through this setting, the innovative concept based on cost reduction and consumption reduction is fully infiltrated into each process section. For specific control logic, see Figure 1, specifically:

[0073] S1: When the PLC detects that the tundish car has reached the preheating position, it sends a baking start signal to the regenerative baking device. At the same time, the baking start signal is used as a trigger signal to trigger the nitrogen pipeline leading to the stopper rod, the water inlet and the mechanism seal to form a passage;

[0074] S2: When the PLC receives the baking end signal, it triggers the pipelines leading to the stopper rod, the water inlet and the mechanism seal to enter the nitrogen-argon switching mode; at the same time, it reads the corresponding relationship between the current steel grade and nitrogen in the process computer; when it is read that the current steel grade has strict requirements on nitrogen, it enters step S3, otherwise it enters step S4;

[0075] S3: When the PLC detects that the tundish car moves to the pouring position, it triggers the argon pipeline leading to the stopper rod, the water inlet and the mechanism seal to form a passage; until the pouring is completed, enter step S5;

[0076] S4: When the PLC detects that the tundish car moves to the pouring position, the nitrogen pipeline and the argon pipeline leading to the stopper rod and the water inlet are triggered to form passages respectively, and the stopper rod and the water inlet are cooled in the form of mixed gas; the argon pipeline leading to the mechanism seal is triggered to form a passage; until the pouring is completed, enter step S5;

[0077] S5: The PLC-controlled nitrogen passage is the passage leading to the stopper rod, the water inlet and the mechanism sealing pipeline.

[0078] When the mixed gas is blown cold, in order to ensure that the pressure of the blowing gas is smooth, a gas mixer (i.e. Figure 2 in Mixer).

[0079] The corresponding line structure system is as follows Figure 2 As shown, the entire control is based on PLC, and data interaction is established between PLC and process control machine to determine and issue whether to use argon alone or nitrogen-argon mixed gas for cooling the casting section. The established system is supplied by nitrogen N2, low-pressure argon Ar.L and high-pressure argon Ar.H. Figure 2As shown, three parallel nitrogen pipelines are respectively arranged between the nitrogen supply source and the stopper rod, the upper water inlet, and the mechanism seal; the first parallel nitrogen pipeline is arranged between the gas supply source and the stopper rod air inlet, the second parallel nitrogen pipeline is arranged between the gas supply source and the upper water inlet, and the third parallel nitrogen pipeline is arranged between the gas supply source and the mechanism seal air inlet; at the same time, three argon pipelines are respectively arranged between the argon supply source and the stopper rod, the upper water inlet, and the mechanism seal; a low-pressure argon pipeline is arranged between the argon supply source and the stopper rod air inlet, and a first high-pressure argon pipeline is arranged between the argon supply source and the upper water inlet; a second high-pressure argon pipeline is arranged between the argon supply source and the mechanism seal air inlet, and a mechanism seal nitrogen-argon switching solenoid valve is arranged at the front end of the mechanism seal air inlet, and the nitrogen pipeline and the argon pipeline leading to the mechanism seal air inlet lead to the mechanism seal air inlet via the mechanism seal nitrogen-argon switching solenoid valve. On the first parallel nitrogen pipeline, the second parallel nitrogen pipeline, the low-pressure argon pipeline, the first high-pressure argon pipeline, and the pipeline between the mechanism-sealed air inlet and the mechanism-sealed nitrogen-argon switching solenoid valve, a main flow control setting and a bypass branch flow control setting are formed respectively. In the circuit set up in this way, during specific operation, the gas supply of the plug rod and the gas supply of the upper water inlet are respectively collected by the nitrogen and argon branches to the gas mixer Mixer for gas supply. Each nitrogen branch is composed of an electromagnetic shut-off valve, a pressure regulating valve, a mass flow regulating valve and a bypass branch, wherein the bypass branch is provided with an electromagnetic shut-off valve, a flow meter, and a manual flow regulating valve. The bypass branch is only used when the mass flow controller fails, and when in use, the corresponding bypass solenoid valve needs to be opened before ventilation. The one-way valve used in the system is used to prevent gas backflow.

[0080] Refer to Table 1. The flow rate shown in Table 1 is only the flow rate in a specific actual situation; different actual situations can set different flow rates, but the control logic follows the provisions of Table 1, where the + sign indicates triggering on, and the - sign indicates triggering off. The listed modes are selected according to different working conditions. The specific control of the system is divided into the following control modes. According to the different positions of the tundish, the PLC collects the limit signal of the tundish car for switching. When it reaches the preheating position, it automatically switches to the baking mode after receiving the baking start signal of the regenerative baking device, and switches to the nitrogen-argon switching mode when receiving the baking end signal. When the tundish car walks to the pouring position, it automatically switches to the normal pouring mode, and switches to the final pouring mode when leaving the pouring position. The one-button emergency mode is used for fast flow setting during rapid deceleration during pouring to prevent excessive gas flow during rapid deceleration from causing the steel liquid surface in the crystallizer to churn and splash.

[0081]

[0082] Table 1

[0083] At the same time, the system can also make full use of the automatic timing setting of the PLC flow rate to develop a one-key leak detection function. Specifically, by adding a bulkhead to the end of the pipeline, the program controls the flow rate of each route to 30l / min. The system records the results of each leak detection operation. If the actual flow rate is greater than 0l / min, the system will issue an alarm while recording the leak detection record. The operator is required to handle the leak point and then detect the leak again to complete the leak detection operation.

[0084] The present invention provides a protective gas supply method and circuit system for continuous casting of steel, which can automatically switch the required gas according to different production processes according to the process and cost control requirements during the pouring and baking process, that is, when the tundish is baked, nitrogen can be automatically used to replace argon to cool the plug rod and the water inlet to prevent the passage and the air plug from being blocked and the pipe fittings and seals from being damaged by heat and causing leakage. When the tundish is baked and the baking position is left, the baking mode is automatically turned off and switched to the nitrogen-argon switching mode, that is, the nitrogen is turned off and the argon is automatically turned on according to the process control parameter settings. After the final pouring, it is switched to the nitrogen cooling mode again to protect the sealing ring of the quick connector at the interface with the plug rod and the immersed argon blowing pipe, extending the service life of the sealing ring and thus improving the service life of the quick connector. At the same time, the PLC is used to realize the one-key leak detection function, which greatly reduces the labor intensity of the operator in detecting leaks in the gas supply pipeline.

[0085] In short, it takes into account the needs of auxiliary gas for continuous casting and steel pouring under different working conditions on site, starting from the perspective of energy conservation and environmental protection. Through the programmed control of the control device, combined with the function of parameter adjustment, that is, the preset values ​​of each flow rate in different modes, the gas use under different working conditions is realized. After using this device, the consumption of a large amount of rare inert gas in each tundish baking process can be reduced, and the labor intensity of front-line operators can also be reduced.

Claims

1. A method for supplying protective gas for continuous casting of steel, which is used to blow protective gas to the stopper rod, water inlet and mechanism seal in the three stages of the baking process before pouring, the pouring process and after the pouring, characterized in that: During the baking process before pouring, nitrogen is used to cool the stopper rod, water inlet and mechanism seal; During the pouring process, the stopper rod, water inlet and mechanism seal are cooled by argon gas. When pouring is completed, the stopper rod, water inlet and mechanism seal are cooled by nitrogen blowing.

2. A method for supplying protective gas for continuous casting of steel according to claim 1, characterized in that: When in the pouring process stage, the stopper rod and the water inlet are cooled by argon gas or nitrogen-argon mixed gas.

3. A method for supplying protective gas for continuous casting of steel according to claim 2, characterized in that: The gas supply method specifically comprises the following steps: S1: When the PLC detects that the tundish car has reached the preheating position, it sends a baking start signal to the regenerative baking device. At the same time, the baking start signal is used as a trigger signal to trigger the nitrogen pipeline leading to the stopper rod, the water inlet and the mechanism seal to form a passage; S2: When the PLC receives the baking end signal, it triggers the pipelines leading to the stopper rod, the water inlet and the mechanism seal to enter the nitrogen-argon switching mode; at the same time, it reads the corresponding relationship between the current steel grade and nitrogen in the process computer; when it is read that the current steel grade has strict requirements on nitrogen, it enters step S3, otherwise it enters step S4; S3: When the PLC detects that the tundish car moves to the pouring position, it triggers the argon pipeline leading to the stopper rod, the water inlet and the mechanism seal to form a passage; until the pouring is completed, enter step S5; S4: When the PLC detects that the tundish car moves to the pouring position, the nitrogen pipeline and the argon pipeline leading to the stopper rod and the water inlet are triggered to form passages respectively, and the stopper rod and the water inlet are cooled in the form of mixed gas; the argon pipeline leading to the mechanism seal is triggered to form a passage; until the pouring is completed, enter step S5; S5: The PLC-controlled nitrogen passage is the passage leading to the stopper rod, the water inlet and the mechanism sealing pipeline.

4. A method for supplying protective gas for continuous casting of steel according to claim 3, characterized in that: Gas mixers are respectively arranged at the front end of the stopper rod air inlet and the front end of the water inlet. The stopper rod and the water inlet are cooled by blowing mixed gas in step S4, which is achieved by arranging argon pipelines and nitrogen pipelines leading to the respective gas mixers.

5. A method for supplying protective gas for continuous casting of steel according to claim 3, characterized in that: In step S4, the concentration ratio of the nitrogen-argon mixed gas flowing to the stopper rod and the upper water inlet is determined according to the current steel grade.

6. A method for supplying protective gas for continuous casting of steel according to claim 1, characterized in that: The argon gas leading to the stopper rod is low-pressure argon gas, and the argon gas leading to the water inlet and the mechanism seal is high-pressure argon gas.

7. A gas supply line system for protective gas for continuous casting of steel, characterized in that: Three parallel nitrogen pipelines are respectively arranged between the nitrogen supply source and the stopper rod, the water inlet, and the mechanism seal; The first parallel nitrogen pipeline is arranged between the gas supply source and the stopper rod gas inlet. The second parallel nitrogen pipeline is set between the gas supply source and the upper water inlet. A third parallel nitrogen pipeline is provided between the gas supply source and the mechanism sealing gas inlet; at the same time, Three argon pipelines are respectively arranged between the argon gas supply source and the stopper rod, the water inlet, and the mechanism seal; A low-pressure argon gas pipeline is set between the argon gas supply source and the stopper rod gas inlet. A first high-pressure argon pipeline is arranged between the argon gas supply source and the upper water inlet; A second high-pressure argon pipeline is arranged between the argon gas supply source and the mechanism sealing gas inlet.

8. A protective gas supply line system for continuous casting of steel according to claim 7, characterized in that: A first gas mixer is arranged at the front end of the stopper rod gas inlet, and a nitrogen pipeline and an argon pipeline leading to the stopper rod gas inlet are introduced through the first gas mixer; A second gas mixer is arranged at the front end of the air inlet of the upper water inlet, and the nitrogen pipeline and the argon pipeline leading to the air inlet of the upper water inlet are introduced through the second gas mixer.

9. A protective gas supply line system for continuous casting of steel according to claim 7, characterized in that: The first high-pressure argon gas pipeline and the second high-pressure argon gas pipeline are arranged in parallel; The low-pressure argon gas pipeline and the parallel pipeline consisting of the first high-pressure argon gas pipeline and the second high-pressure argon gas pipeline are independently arranged; or The first high-pressure argon gas pipeline is arranged in parallel with the second high-pressure argon gas pipeline and then arranged in parallel with the low-pressure argon gas pipeline.

10. A protective gas supply line system for continuous casting of steel according to claim 7, characterized in that: A mechanism-sealed nitrogen-argon gas switching solenoid valve is arranged at the front end of the mechanism-sealed air inlet, and a nitrogen pipeline and an argon pipeline leading to the mechanism-sealed air inlet are led to the mechanism-sealed air inlet via the mechanism-sealed nitrogen-argon gas switching solenoid valve.

11. A protective gas supply line system for continuous casting of steel according to claim 10, characterized in that: A main flow control setting and a bypass branch flow control setting are respectively formed on the first parallel nitrogen pipeline, the second parallel nitrogen pipeline, the low-pressure argon pipeline, the first high-pressure argon pipeline, and the pipeline between the mechanism-sealed air inlet and the mechanism-sealed nitrogen-argon switching solenoid valve.

Citation Information

Patent Citations

  • Method for controlling content of nitrogen in semi-steel smelted tire cord steel or hard wire steel

    CN102851433A

  • Continuous casting protection pouring method for austenitic stainless steel

    CN103008639A

  • Nitrogen increment method for vanadium-nitrogen microalloying steel grade in continuous casting process

    CN104550898A

  • Method for reducing blocking of water gap

    CN109128129A

  • Method for holding heat under nonoxidation in tundish

    JP1996155599A