MBR (Membrane Bioreactor) process with high membrane flux and efficient phosphorus removal
The MBR process addresses membrane pollution and high replacement costs by integrating anaerobic, anoxic, and aerobic zones with a sedimentation zone and dosing pipes, enhancing membrane flux and phosphorus removal efficiency.
Patent Information
- Application Number
- CN202411256996.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-09-09
AI Technical Summary
MBR membrane technology faces issues such as high replacement costs, membrane pollution due to deposits, and increased maintenance frequency, which affect membrane flux and efficiency.
An MBR process with high membrane flux and efficient phosphorus removal, incorporating anaerobic, anoxic, and aerobic zones, a diversion zone, and a sedimentation zone, along with calculated pool capacities and dosing pipes for dephosphorization agents, to enhance membrane permeability and phosphorus removal.
The process effectively reduces membrane pollution, extends membrane module replacement cycles, increases water production, and improves phosphorus removal efficiency while minimizing operational costs and maintenance.
Smart Images

Figure CN119080242A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of sewage treatment, and in particular to an MBR process with high membrane flux and efficient phosphorus removal. Background Art
[0002] As an efficient sewage treatment process, MBR membrane technology is widely used in sewage treatment in various cities. MBR membrane technology has the following advantages: using membrane tanks instead of secondary sedimentation tanks, there is no need to consider the depth of the filter tank, which can greatly save construction costs and land; in addition, the effluent quality is good, the impact resistance is strong, and the sludge age can be maintained for a long time, which is conducive to the growth and reproduction of slow-growing nitrifying bacteria, and it is easy to realize automatic control and convenient operation and management.
[0003] The advantages of MBR membrane technology are obvious, but it also has disadvantages that are difficult to overcome. The disadvantages are as follows:
[0004] (1) The biggest disadvantage is that the membrane module needs to be replaced regularly, and the general replacement cycle is 5 to 8 years. The replacement cost of the membrane module is high. If it is not replaced, the flux of the membrane will become worse and worse as the use time increases, and it cannot meet the water production demand. (2) During the daily use of the membrane module, the suspended pollutants, dissolved organic matter, and microorganisms in the mixed liquid form deposits on the membrane surface. At the same time, the fibers and debris in the activated sludge are folded and entangled. Both will cause membrane pollution and reduce the permeability of the membrane to varying degrees. (3) The membrane module needs regular maintenance, that is, the membrane of the membrane module is regularly cleaned online and offline to reduce the pollution rate of the membrane. Regular maintenance of the membrane module increases the operating costs. Summary of the invention
[0005] In order to solve the above problems, the present invention provides an MBR process with high membrane flux and efficient phosphorus removal.
[0006] The technical solution adopted by the present invention is:
[0007] An MBR process with high membrane flux and efficient phosphorus removal, the MBR process includes utilizing anaerobic zones to degrade organic matter, remove nitrogen, and degrade sulfide in sewage to achieve primary purification and biological waterproofing; utilizing anoxic zones to degrade secondary organic matter, remove secondary nitrogen, and reduce sulfur and nitrate in sewage to achieve filter material regeneration and reasonable control of sludge generation; utilizing aerobic zones to perform biological oxidation, tertiary nitrogen removal, and abnormal gas removal in sewage to achieve abnormal gas removal, biological decomposition of COD and BOD in wastewater, and biofilm reconstruction; utilizing membrane modules of MBR membrane pools to perform final solid-liquid separation and biological treatment of sewage;
[0008] The MBR process also has a diversion zone and a sedimentation zone between the aerobic zone and the MBR membrane tank;
[0009] The diversion area is a pool structure, a diversion wall is provided between it and the aerobic zone, a partition wall is provided between it and the sedimentation zone, a diversion hole is provided on the diversion wall, a water inlet is provided above the partition wall, and a return pump is installed in the pool body of the diversion area; the sewage in the aerobic zone enters the diversion area through the diversion hole on the diversion wall, and part of the sewage flows back to the water inlet end of the anoxic zone through the return pump; after the sewage is buffered by the diversion area, it enters the sedimentation zone through the water inlet above the partition wall;
[0010] The sedimentation zone is also a tank body structure, and a number of triangular weir plates are arranged between it and the MBR membrane tank. A sludge discharge pipe and a sludge discharge pump installed on the sludge discharge pipe are arranged at the bottom of the tank body of the sedimentation zone. The sewage is precipitated and removed in the sedimentation zone, and the sewage supernatant in the sedimentation zone enters the MBR membrane tank through the triangular weir plates.
[0011] Furthermore, the pool capacity of the diversion area is calculated by the following formula:
[0012]
[0013] In the formula, T is the sedimentation time; q is the water inflow; L is the total length of the pool; H is the depth of the pool; and B is the width of the pool.
[0014] Furthermore, the water flow rate of the diversion area is calculated by the following formula:
[0015] Water flow in the diversion area Q = q × (1 + R)
[0016] Where q is the water inlet volume and R is the reflux ratio.
[0017] The number of diversion holes on the diversion wall and the diameter of the diversion holes are determined by the calculated water flow.
[0018] Further, the pool capacity of the sedimentation zone is calculated by the following formula:
[0019] Sedimentation tank capacity V 1 =T×q
[0020] Where, T is the sedimentation time; q is the water inflow (m 3 / h).
[0021] Furthermore, the water flow rate between the pool body of the sedimentation zone and the MBR membrane pool is equal to the hourly water inflow when two reflux pumps are turned on simultaneously, that is, the designed maximum flow rate.
[0022] Furthermore, the triangular weir plate in the sedimentation zone is calculated by the following formula:
[0023]
[0024] The water outlet weir adopts a 90-degree triangular weir for water outlet, and N weir openings are set per meter of weir plate;
[0025]
[0026] Water head on weir h 1 =(q 1 / 1.4) (2 / 5) ;
[0027] Sump width B = 0.9 × (maximum design flow × 1.3) (1 / 3) ;
[0028] Water depth at the beginning of the sump h 0 =1.73×critical water depth of sump h k ;
[0029] The free fall height of the water outlet is h 2 ;
[0030] Total depth of sump = h 0 +h 1 +h 2 .
[0031] Furthermore, a first dosing pipe is provided on the side of the sedimentation zone body close to the diversion zone, and a second dosing pipe 18 is provided in the MBR membrane pool; dephosphorus agent can be added to the sedimentation zone body and the MBR membrane pool separately or simultaneously through the first dosing pipe and the second dosing pipe.
[0032] Furthermore, the amount of phosphorus removal agent that needs to be added to the pool body in the sedimentation zone is calculated by the following formula:
[0033] When iron salt is used as a dephosphorization agent:
[0034] m=2.7×(C 0 -C)×Q
[0035] When aluminum salt is used as a phosphorus removal agent:
[0036] m=1.3×(C 0 -C)×Q
[0037] Where m is the mass of the reagent; C 0 is the inlet total phosphorus concentration, C is the effluent total phosphorus concentration, and Q is the water volume.
[0038] The beneficial effects of the present invention are:
[0039] 1. The MBR process uses the anaerobic zone and MBR membrane pool in the existing sewage treatment process, and only transforms the post-anoxic section of the biochemical reaction pool. By setting a diversion zone and a sedimentation zone between the aerobic zone and the MBR membrane pool; using the diversion zone to buffer the sewage entering the sedimentation zone from the aerobic zone; using the sedimentation zone to precipitate the sewage before entering the MBR membrane pool, a large amount of sludge solid pollutants are effectively precipitated and removed, reducing the filtration load of the membrane pool, greatly alleviating membrane pollution, increasing water production, extending the replacement cycle of the membrane module, ensuring the permeability of the membrane, and reducing the maintenance frequency of the membrane module, thereby saving operating costs.
[0040] 2. The MBR process transformation process is relatively simple, and each pool can be transformed separately without affecting production. No new buildings need to be added during the transformation process. It can be achieved by adding some equipment and partially transforming the post-anoxic section. The transformation cost is low, and no new operating costs need to be added after the transformation.
[0041] 3. The MBR process is equipped with dosing pipes on the side of the sedimentation area close to the diversion area and in the MBR membrane pool. The dephosphorization agent can be added to the sedimentation area and the MBR membrane pool at multiple points through the dosing pipes. Combined with the microfiltration performance of the membrane itself, the particulate total phosphorus in the water can be greatly removed, thereby improving the phosphorus removal efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 It is a schematic diagram of the overall layout of the MBR process of the present invention;
[0043] Figure 2 It is a structural schematic diagram of the diversion zone and the sedimentation zone of the MBR process of the present invention;
[0044] Figure 1 —2, 1—anaerobic zone, 2—anoxic zone, 3—aerobic zone, 4—MBR membrane pool, 5—membrane module, 6—diversion zone, 7—sedimentation zone, 8—diversion wall, 9—partition wall, 10—diversion hole, 11—water inlet, 12—reflux pump, 13—triangular weir plate, 14—sludge pipe, 15—sludge pump, 16—aeration plate, 17—sewage pipe, 18—mixer, 19—first dosing pipe, 20—second dosing pipe. DETAILED DESCRIPTION
[0045] The following will be combined with the accompanying drawings of the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0046] Example 1
[0047] The present embodiment provides an MBR process with high membrane flux and efficient phosphorus removal. The MBR process uses the anaerobic zone 1 and the MBR membrane pool 4 in the existing sewage treatment process, and only transforms the post-anoxic section of the biochemical reaction pool. Without changing the land use area, the anoxic zone and the aerobic zone are transformed into the anoxic zone 2, the aerobic zone 3, the diversion zone 6 and the sedimentation zone 7.
[0048] like Figure 1 As shown, first, the sewage enters the anaerobic zone 1 through the sewage pipe 17. After the sewage is stirred by the agitator 18 in the anaerobic zone 1, the sewage is subjected to organic matter degradation, nitrogen removal, and sulfide degradation, thereby achieving preliminary purification and biological waterproofing. The sewage treated in the anaerobic zone 1 enters the anoxic zone 2, which is provided with an agitator 18 and a reflux pump 12. The anoxic zone is used to perform secondary organic matter degradation, secondary nitrogen removal, and sulfur and nitrate reduction on the sewage, thereby achieving filter material regeneration and reasonable control of sludge generation. The sewage treated in the anoxic zone 2 enters the aerobic zone 3, which is provided with an aerobic tank I and an aerobic tank II. The sewage is subjected to biological oxidation, tertiary nitrogen removal, and abnormal gas removal through the aeration disk 16 in the aerobic tank I and the aerobic tank II, thereby achieving abnormal gas removal, biological decomposition of COD and BOD in the wastewater, and biofilm reconstruction.
[0049] The wastewater treated in the aerobic zone 3 is diverted through the diversion zone 6 and then enters the sedimentation zone 7. Figure 1 and Figure 2 As shown, the diversion area 6 is a pool structure, and a diversion wall 8 is provided between the pool of the diversion area 6 and the aerobic pool II, and a diversion hole 10 is provided at the lower part of the diversion wall 8, so that the sewage in the aerobic pool II can enter the pool of the diversion area 6 through the diversion hole 10 on the diversion wall 8. At the same time, a reflux pump 12 is installed in the pool of the diversion area, and part of the sewage is refluxed to the water inlet end of the anoxic zone 2 through the reflux pump 12. A partition wall 9 is provided between the pool of the diversion area 6 and the sedimentation zone 7, and a water inlet 11 is provided on the upper part of the partition wall 9; because the water inlet 11 of the partition wall 9 is located higher than the diversion hole 10 of the diversion wall 8, the diversion area 6 adopts a method of low water inlet and high water outlet, so that the sewage in the aerobic pool II enters the pool of the diversion area 6, and the sewage enters the sedimentation zone 7 after being buffered in the pool of the diversion area 6.
[0050] like Figure 1 and Figure 2The sedimentation area 7 is also a tank structure. A number of triangular weir plates 13 are arranged between the sedimentation area 7 and the MBR membrane tank 4. A sludge discharge pipe 14 and a sludge discharge pump 15 installed on the sludge discharge pipe are arranged at the bottom of the tank body of the sedimentation area. The sludge discharge pipe 14 can share a group with the MBR membrane tank 4. The sewage enters the sedimentation area 7 after being buffered in the tank body of the diversion area 6. The sewage is precipitated and removed in the sedimentation area 7. The sewage supernatant in the sedimentation area 7 enters the MBR membrane tank 4 through the triangular weir plates 13. Since the sludge concentration of the sewage supernatant is low, the filtration load of the MBR membrane tank 4 can be reduced, membrane pollution can be greatly alleviated, water production can be increased, and the replacement cycle of the membrane module 5 in the MBR membrane tank 4 can be extended. The permeability of the membrane of the membrane module 5 is ensured, the maintenance frequency of the membrane module 5 is reduced, and the operating cost is saved. When the sludge in the tank body of the sedimentation area 7 reaches a certain level, the sludge discharge pump 15 can be turned on to discharge the sludge at the bottom of the tank body of the sedimentation area 7 through the sludge discharge pipe 14.
[0051] Furthermore, the MBR process must calculate the corresponding pool capacity and sewage flow rate before modifying the post-anoxic section of the biochemical reaction pool, and then modify the anoxic zone 2, aerobic zone 3, diversion zone 6 and sedimentation zone 7 accordingly based on the calculated pool capacity and sewage flow rate, as follows:
[0052] 1. Pool size design:
[0053] Since the floor area and tank capacity of the anaerobic zone 1 and the MBR membrane tank 4 do not change during the entire transformation process, they are known quantities; the tank capacity of the anoxic zone 2, aerobic zone 3, diversion zone 6 and sedimentation zone 7 are calculated based on these two known quantities.
[0054]
[0055] Where, T is the sedimentation time, which is 1.5-2h; q is the water inflow, in m 3 / h; L is the total length of the pool, in m; H is the depth of the pool, in m; B is the width of the pool, in m.
[0056] Sedimentation tank capacity: V 1 =T×q
[0057] Where T is the sedimentation time, which is 1.5-2h; q is the water inflow, in m 3 / h.
[0058] The pool capacity ratio of the diversion area and the sedimentation area is about 1:2.
[0059] When the pool capacity of the diversion zone and the sedimentation zone has been determined, the pool capacity of the anoxic zone and the aerobic zone shall be determined according to actual needs.
[0060] 2. Sewage flow design:
[0061] The water flow rate of the diversion area is calculated by the following formula:
[0062] Water flow in the diversion area Q = q × (1 + R)
[0063] Where q is the water inlet volume and R is the reflux ratio.
[0064] The water flow rate between the pool body of the sedimentation zone and the MBR membrane pool is equal to the hourly water inflow when the two reflux pumps are turned on at the same time, that is, the maximum design flow rate.
[0065] The triangular weir plate of the sedimentation zone is calculated by the following formula:
[0066]
[0067] The water outlet weir adopts a 90-degree triangular weir for water outlet, and N weir openings are set per meter of weir plate;
[0068]
[0069] Water head on weir h 1 =(q 1 / 1.4) (2 / 5) ;
[0070] Sump width B = 0.9 × (maximum design flow × 1.3) (1 / 3) ;
[0071] Water depth at the beginning of the sump h 0 =1.73×critical water depth of sump h k ;
[0072] The free fall height of the water outlet is h 2 ;
[0073] Total depth of sump = h 0 +h 1 +h 2 .
[0074] In the actual transformation process, the tank bodies of the anoxic zone 2, the aerobic zone 3, the diversion zone 6 and the sedimentation zone 7 can be transformed one by one without affecting the normal operation of the water plant. After the transformation, the residence time of the sewage in the anaerobic zone 1, the anoxic zone 2 and the aerobic zone 3 remains unchanged. The sewage in the anaerobic zone 1 only needs to be stirred to control the dissolved oxygen content of the sewage to 0.2-0.5 mg / L. The diversion zone 6 and the sedimentation zone 7 do not need to be stirred. The sewage is initially precipitated in the sedimentation zone 6, and the sewage supernatant enters the MBR membrane pool 4 through the triangular weir plate 13. The supernatant entering the MBR membrane pool 4 will also contain a small amount of sludge, and then after being filtered by the membrane fibers of the membrane group 5, it reaches the effluent standard. Since the mud content in the sewage entering the MBR membrane pool 4 is greatly reduced, it is not easy to deposit on the surface of the membrane fibers, thereby greatly reducing the speed of membrane pollution of the membrane group 5 and extending the service life of the membrane.
[0075] Example 2
[0076] Since the phosphorus removal agent is added before the biochemical pool in the existing sewage treatment process, it may have a certain impact on the activity of microorganisms; this embodiment is based on Example 1, in order to improve the phosphorus removal efficiency, such as Figure 1 As shown, in this embodiment, a first dosing pipe 19 is further provided on the side of the pool body of the sedimentation zone 7 close to the diversion zone 6, and a second dosing pipe 20 is provided in the MBR membrane pool 4; the dephosphorization agent can be added to the pool body of the sedimentation zone 7 and the MBR membrane pool 4 separately or simultaneously through the first dosing pipe 19 and the second dosing pipe 20.
[0077] Furthermore, the amount of phosphorus removal agent that needs to be added to the pool in the sedimentation area is calculated by the following formula:
[0078] When iron salt is used as a dephosphorization agent:
[0079] m=2.7×(C 0 -C)×Q
[0080] When aluminum salt is used as a phosphorus removal agent:
[0081] m=1.3×(C 0 -C)×Q
[0082] Where m is the mass of the reagent; C 0 is the inlet total phosphorus concentration, C is the effluent total phosphorus concentration, and Q is the water volume.
[0083] The phosphorus removal agent is directly added to the head end of the sedimentation zone 7, which does not affect the biological activity. In the process of discharging sludge in the sedimentation zone 7, most of the phosphorus-containing pollutants have been discharged. After the filtration of the membrane fibers of the membrane module 5, the phosphorus can be better removed, achieving the effect of efficient phosphorus removal. Through multi-point dosing and early sludge discharge, combined with the microfiltration performance of the membrane module 5 itself, the particulate total phosphorus in the water is greatly removed, and the phosphorus removal efficiency is improved.
[0084] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. An MBR process with high membrane flux and efficient phosphorus removal, the MBR process comprising utilizing anaerobic zone to degrade organic matter, remove nitrogen and degrade sulfide in sewage to achieve preliminary purification and biological waterproofing; utilizing anoxic zone to degrade secondary organic matter, remove secondary nitrogen and reduce sulfur and nitrate in sewage to achieve filter material regeneration and reasonable control of sludge generation; utilizing aerobic zone to perform biological oxidation, tertiary nitrogen removal and abnormal gas removal in sewage to achieve abnormal gas removal, biological decomposition of COD and BOD in wastewater, and biofilm reconstruction; utilizing membrane modules of MBR membrane pool to perform final solid-liquid separation and biological treatment of sewage; characterized by: The MBR process also has a diversion zone and a sedimentation zone between the aerobic zone and the MBR membrane tank; The diversion area is a pool structure, a diversion wall is provided between it and the aerobic zone, a partition wall is provided between it and the sedimentation zone, a diversion hole is provided on the diversion wall, a water inlet is provided above the partition wall, and a return pump is installed in the pool body of the diversion area; the sewage in the aerobic zone enters the diversion area through the diversion hole on the diversion wall, and part of the sewage flows back to the water inlet end of the anoxic zone through the return pump; after the sewage is buffered by the diversion area, it enters the sedimentation zone through the water inlet above the partition wall; The sedimentation zone is also a tank body structure, and a number of triangular weir plates are arranged between it and the MBR membrane tank. A sludge discharge pipe and a sludge discharge pump installed on the sludge discharge pipe are arranged at the bottom of the tank body of the sedimentation zone. The sewage is precipitated and removed in the sedimentation zone, and the sewage supernatant in the sedimentation zone enters the MBR membrane tank through the triangular weir plates.
2. The MBR process with high membrane flux and efficient phosphorus removal according to claim 1, characterized in that: The pool capacity of the diversion area is calculated by the following formula: Diversion area pool capacity In the formula, T is the sedimentation time; q is the water inflow; L is the total length of the pool; H is the depth of the pool; and B is the width of the pool.
3. The MBR process with high membrane flux and efficient phosphorus removal according to claim 1, characterized in that: The water flow rate of the diversion area is calculated by the following formula: Water flow in the diversion area Q = q × (1 + R) Where q is the water inlet volume and R is the reflux ratio. The number of diversion holes on the diversion wall and the diameter of the diversion holes are determined by the calculated water flow.
4. The MBR process with high membrane flux and efficient phosphorus removal according to claim 1, characterized in that: The pool capacity of the sedimentation zone is calculated by the following formula: Sedimentation tank capacity V1 = T × q Where, T is the sedimentation time; q is the water inflow (m 3 / h).
5. The MBR process with high membrane flux and efficient phosphorus removal according to claim 1, characterized in that: The water flow rate between the pool body of the sedimentation zone and the MBR membrane pool is equal to the hourly water inflow when the two reflux pumps are turned on at the same time, that is, the designed maximum flow rate.
6. The MBR process with high membrane flux and efficient phosphorus removal according to claim 5, characterized in that: The triangular weir plate of the sedimentation zone is calculated by the following formula: The water outlet weir adopts a 90-degree triangular weir for water outlet, and N weir openings are set per meter of weir plate; Flow rate at each weir Water head on weir h1=(q1 / 1.4) (2 / 5) ; Sump width B = 0.9 × (maximum design flow × 1.3) (1 / 3) ; Water depth at the beginning of the sump h0 = 1.73 × critical water depth of the sump h k ; The free fall height of the water outlet is h2; Total depth of sump = h0+h1+h2.
7. The MBR process with high membrane flux and efficient phosphorus removal according to claim 1, characterized in that: A first dosing pipe is also provided on the side of the sedimentation zone body close to the diversion zone, and a second dosing pipe is provided in the MBR membrane pool; phosphorus removal agent can be added to the sedimentation zone body and the MBR membrane pool separately or simultaneously through the first dosing pipe and the second dosing pipe.
8. The MBR process with high membrane flux and efficient phosphorus removal according to claim 7, characterized in that: The phosphorus removal agent that needs to be added to the pool body of the sedimentation zone is calculated by the following formula: When iron salt is used as a dephosphorization agent: m=2.7×(C0-C)×Q When aluminum salt is used as a phosphorus removal agent: m=1.3×(C0-C)×Q In the formula, m is the mass of the reagent; C0 is the total phosphorus concentration of the inlet water, C is the total phosphorus concentration of the outlet water, and Q is the water volume.
Citation Information
Patent Citations
Sewage treatment system
CN101704618A
Combined removal device and method for heavy metals and antibiotics in wastewater
CN117550753A
System and method for urban sewage chemical-biologic composite deep phosphorous removal
CN1654352A
Integrated sedimentation built-in deepwater aeration bioreactor
CN214299767U
Inclined tube precipitator
CN215627234U