An eaves support structure and construction method for high-rise steel frame concrete roofs
By using eaves formwork and stiffening rib structures in high-rise steel frame buildings, the problem of difficult installation of eaves support formwork was solved, achieving efficient and safe construction results and improving the overall quality and forming quality of the building.
Patent Information
- Application Number
- CN202411009975.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2044-07-26
AI Technical Summary
The installation of eaves support formwork for high-rise steel frame buildings is difficult. Existing construction methods involve many procedures, pose significant safety hazards, and have numerous quality defects, making it impossible to effectively fix the L-shaped edge sealing plate to the main beam.
The structure employs an eaves formwork and stiffening ribs. The eaves formwork is installed on the outer side of the top of the main beam and connected to the main beam through stiffening ribs. Combined with the steel frame, the reinforcing bars pass through the stiffening rib holes during pouring to form a stable structure.
It simplifies the construction process, improves construction efficiency and the overall integrity of the building, reduces costs, ensures construction safety, and enhances the quality of the finished product.
Smart Images

Figure CN119083669B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of building construction technology, and in particular to an eaves support structure and construction method for high-rise steel frame concrete roofs. Background Technology
[0002] In high-rise steel frame industrial buildings and structures with large heights (greater than 24 meters) and relatively small horizontal projected areas, design units often design floor-deck roofs and eaves to meet the requirements of the "Technical Specification for Concrete Structures of High-Rise Buildings" regarding the structural mass ratio and floor lateral stiffness ratio. In addition, the roof structure must meet the structural and functional requirements. The length of the eaves needs to cover the structural thickness of the wall purlins and color-coated steel sheets. In specific projects, the distance between the outer edge of the eaves and the center line of the beam is about 750 mm, making the installation of the eaves support formwork difficult.
[0003] If the floor decking is erected from the inside to the center line of the main beam, and then an L-shaped edge banding is placed on the outside of the center line of the main beam, the width requirement for the concrete eaves cannot be met. If the floor decking is laid outwards to the eaves position, the edge banding cannot be fixed to the main beam. Therefore, the existing construction technology has evolved into: erecting an outward-projecting inclined steel pipe frame from the inside of the building to support the eaves wooden formwork. The outward-projecting inclined steel pipe frame is tied to the main steel frame, and the eaves wooden formwork and steel frame are tightly fitted together. This construction scheme involves many procedures, poses significant safety hazards, is uneconomical, and the joints between the eaves wooden formwork and the steel frame will cause many common quality defects. Summary of the Invention
[0004] The purpose of this invention is to provide an eaves support structure and construction method for high-rise steel frame concrete roofs, so as to solve the problems mentioned above.
[0005] The technical solution of the present invention includes: an eaves support structure for a high-rise steel frame concrete roof, comprising an eaves template and stiffening ribs installed on a main beam, wherein the eaves template is located at the top of the main beam and extends outward from the main beam; the stiffening ribs are located on the eaves template, one end of which is connected to the main beam for tying the eaves template and the main beam together.
[0006] Preferably, the eaves formwork includes a bottom formwork and a side formwork. One end of the bottom formwork is connected to the main beam by a stud, and the other end is fixed to the side formwork. The stiffening rib is provided on the side of the side formwork near the main beam and is connected to the main beam by a stud.
[0007] Preferably, the stiffening ribs are plate-shaped, and multiple ribs are distributed along the length of the side formwork, with multiple corresponding steel bar through holes distributed on each stiffening rib.
[0008] Preferably, the bottom end and side end of the stiffening rib are fixedly connected to the bottom mold and the side mold, respectively; in a direction away from the side mold, the end of the bottom mold extends beyond the end of the stiffening rib.
[0009] Preferably, away from the side mold, the end of the stiffening rib extends into an ear plate, the ear plate having an arc-shaped portion, the arc-shaped portion being detachably connected to an arc-shaped buckle plate, the two being connected to install the second stud.
[0010] Preferably, one end of the bottom mold along its length is provided with an overlapping plate, the bottom surface of which is flush with the top surface of the bottom mold.
[0011] Preferably, the bottom of the end of the eaves template away from the main beam is provided with an arc-shaped guide section, which extends downward from the bottom surface of the eaves template and has its concave side facing the main beam.
[0012] The technical solution of the present invention also includes: a construction method for an eaves support structure for a high-rise steel frame concrete roof, comprising the following steps:
[0013] Pre-fabrication of eaves templates and reinforcing ribs;
[0014] Install the steel frame and floor decking, assemble multiple eaves formwork along the length of the main beam of the steel frame, and fix the stiffening ribs to the eaves formwork;
[0015] Check the flatness of each eaves formwork joint, and fix the eaves formwork and stiffening ribs to the main beam with studs one and two respectively, and then pour the roof and eaves.
[0016] Preferably, when pouring the roof and eaves, two layers of steel bars are laid. The bottom layer of steel bars extends in the same direction as the main beam and passes through the steel bar holes on the stiffening ribs. The top layer of steel bars is perpendicular to the extension direction of the main beam and is placed on the top of the stiffening ribs.
[0017] The beneficial effects of this invention are as follows: It makes full use of the main beam to fix the eaves formwork. The eaves formwork itself has high rigidity and is tightly integrated with the steel frame. The operation process is small and the installation is simple. It solves the inconvenience and quality problems caused by the inability to connect and fix the L-shaped edge plate to the main beam in traditional technology and the need to set up an external inclined steel pipe frame to support the eaves wooden formwork. It improves the construction efficiency of the roof and eaves, as well as the integrity and forming quality of the building, reduces the construction cost, and is safer than the external inclined steel pipe frame. The arc-shaped guide part at the bottom of the eaves formwork meets the waterproof structure of the roof. After the concrete is formed, the eaves formwork is not removed but forms the whole roof, further improving the forming quality of the building. Attached Figure Description
[0018] Figure 1 This is a perspective view of an embodiment of the present invention;
[0019] Figure 2 This is a front view of an embodiment of the present invention;
[0020] Figure 3 This is a bottom view of the stiffening rib in an embodiment of the present invention.
[0021] In the picture:
[0022] 1. Main beam; 2. Eaves formwork; 2-1. Bottom formwork; 2-2. Side formwork; 3. Stiffening ribs; 3-1. Reinforcing bar perforation; 4. Stud 1; 5. Stud 2; 6. Ear plate; 6-1. Curved section; 7. Curved buckle plate; 8. Bolt; 9. Lap plate; 10. Curved guide section. Detailed Implementation
[0023] The technical solution of the present invention will be clearly and completely described below with reference to the embodiments of the present invention. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0024] In the description of this invention, it should be understood that the terms "center," "longitudinal," "lateral," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," and "outer," etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of the invention. Furthermore, the terms "first," "second," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of indicated technical features. Thus, a feature defined with "first," "second," etc., may explicitly or implicitly include one or more of that feature. In the description of this invention, unless otherwise stated, "a plurality of" means two or more.
[0025] In the description of this invention, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art will understand the specific meaning of the above terms in this invention based on the specific circumstances.
[0026] Reference Appendix Figure 1-3This invention provides an eaves support structure for a high-rise steel-framed concrete roof, comprising an eaves template 2 and stiffening ribs 3 installed on a main beam 1. The eaves template 2 is located at the top of the main beam 1 and extends outward from the main beam 1. The stiffening ribs 3 are located on the eaves template 2, with one end connected to the main beam 1, for tying the eaves template 2 and the main beam 1 together. The eaves template 2 and the stiffening ribs 3 are connected to the main beam 1 by stud 4 and stud 5, respectively. The main beam 1 is a horizontal beam of a steel frame structure, serving as the installation support part of this eaves support structure. This application does not specifically limit its shape or structure; the accompanying drawings only show some possible shapes and are not intended to limit the scope of protection of this application.
[0027] The aforementioned eaves formwork 2 includes a bottom formwork 2-1 and a side formwork 2-2. Both of them are in the same length direction as the main beam 1. The plate surface of the bottom formwork 2-1 is parallel to the top surface of the main beam 1 and is erected on the top surface of the main beam 1 and fixed by stud 4. The plate surface of the side formwork 2-2 is perpendicular to the top surface of the main beam 1 and is welded and fixed to the end of the bottom formwork 2-1 away from the main beam 1. The stiffening rib 3 is provided on the side of the side formwork 2-2 close to the main beam 1. Its length direction is perpendicular to the length direction of the side formwork 2-2. One end is welded and fixed to the side formwork 2-2, the bottom end is welded and fixed to the bottom formwork 2-1, and the other end is fixed to the main beam 1 by stud 5.
[0028] To improve connection stability and ease of operation, in this embodiment, the end of the bottom mold 2-1 extends beyond the end of the stiffening rib 3 in the direction away from the side mold 2-2, so as to first position the bottom mold 2-1 and then fix the stiffening rib 3.
[0029] When constructing a high-rise steel frame concrete roof and eaves, floor decking and the eaves support structure are installed on both sides of the center line at the top of the main beam 1, and the roof and eaves concrete are poured on them. Due to the tying effect of the stiffening ribs 3, the eaves formwork 2 can be stably fixed on the main beam 1 and support the concrete. After pouring, there is no need to remove the eaves support structure, so that the roof and eaves are constructed as one unit. The connection stability between the roof and the eaves is improved through the eaves support structure, thereby improving the overall quality of the building.
[0030] This technical solution makes full use of the main beam 1 to fix the eaves formwork 2. The eaves formwork 2 has high rigidity and is tightly integrated with the steel frame. It has fewer operation steps and is simple to install. It solves the inconvenience and quality problems caused by the inability to connect and fix the L-shaped edge plate to the main beam 1 and the need to set up an external inclined steel pipe frame to support the eaves wooden formwork in the traditional technology. It improves the construction efficiency of the roof and eaves, as well as the integrity and forming quality of the building, reduces construction costs, and is safer than the external inclined steel pipe frame.
[0031] In this embodiment, the stiffening rib 3 is plate-shaped, and multiple stiffening ribs are distributed along the length of the side formwork 2-2. Each stiffening rib 3 has multiple corresponding steel bar through holes 3-1. The steel bar through holes 3-1 are used to insert the bottom steel bar of the eaves to improve the structural stability of the eaves.
[0032] Due to the shape and structure of the stiffening rib 3, to facilitate its connection with the bottom mold 2-1 and the main beam 1, in this embodiment, an ear plate 6 extends from the end of the stiffening rib 3 in the direction away from the side mold 2-2. The ear plate 6 is provided with an arc-shaped part 6-1, and an arc-shaped buckle plate 7 is detachably connected to the arc-shaped part 6-1. The two are connected to install the second stud 5. Optionally, the arc-shaped part 6-1 and the arc-shaped buckle plate 7 can be connected by bolts 8.
[0033] Typically, eaves are quite long, requiring the splicing of multiple eave support structures. Therefore, in this embodiment, an overlapping plate 9 is provided at one end of the bottom mold 2-1 along the length direction. The overlapping plate 9 is located above the bottom, and its bottom surface is flush with the top surface of the bottom mold 2-1, so that the bottom surface of the overlapping plate 9 can abut against the top surface of another bottom mold 2-1, improving the tightness of the connection and the flatness of the connection part. Usually, the eave template 2 is prefabricated, so an eave template 2 of appropriate length can be designed according to common eave dimensions, specifically for supplementing the length at the edge. This template does not need to be equipped with an overlapping plate 9. Of course, all eave templates 2 can be of a general size, and after splicing, the edges are cut according to the length of the eave.
[0034] Since the eaves formwork 2 is not removed after the eaves are poured and becomes part of the building structure, in this embodiment, an arc-shaped guide section 10 is provided at the bottom of the end of the eaves formwork 2 away from the main beam 1. That is, an arc-shaped guide section 10 is provided on the bottom surface of the bottom formwork 2-1. The arc-shaped guide section 10 extends downward from the bottom surface of the bottom formwork 2-1 and the concave side faces the main beam 1 to prevent water from entering the gap between the wall panel and the roof panel, thereby affecting the building quality.
[0035] The above-described method for constructing eaves support structures for high-rise steel-framed concrete roofs includes the following steps:
[0036] (1) Shape and fabricate the eaves template 2 and stiffening ribs 3;
[0037] (2) Install the steel frame and floor deck, assemble multiple eaves templates 2 along the length of the main beam 1 of the steel frame, and weld the stiffening ribs 3 to the eaves templates 2. Specifically, weld the bottom surface of the stiffening ribs 3 to the top surface of the bottom formwork 2-1 in the eaves template 2, and weld one side end of the stiffening ribs 3 to the side formwork 2-2 in the eaves template 2.
[0038] (3) Check the flatness of the joints of each eave template 2. Fix the eave template 2 and stiffening rib 3 to the main beam 1 with stud 1 4 and stud 2 5 respectively. Pour the roof and eaves. During pouring, lay two layers of steel bars. The bottom layer of steel bars extends in the same direction as the main beam 1 and passes through the steel bar through hole 3-1 on the stiffening rib 3. The top layer of steel bars is perpendicular to the extension direction of the main beam 1 and is laid on the top of the stiffening rib 3.
[0039] Compared with the prior art, the beneficial effects of the present invention are as follows: It makes full use of the main beam 1 to fix the eaves template 2. The eaves template 2 has high rigidity and is tightly integrated with the steel frame. The operation process is less and the installation is simple. It solves the inconvenience and quality problems caused by the inability to connect and fix the L-shaped edge plate to the main beam 1 and the need to set up an external inclined steel pipe frame to support the eaves wooden template in the traditional technology. It improves the construction efficiency of the roof and eaves, as well as the integrity and forming quality of the building, reduces the construction cost, and is safer than the external inclined steel pipe frame. The arc-shaped guide part 10 at the bottom of the eaves template 2 meets the roof waterproofing structure. After the concrete is formed, the eaves template 2 is not removed but forms the whole roof, which further improves the forming quality of the building.
[0040] The above are preferred embodiments of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be considered within the scope of protection of the present invention.
Claims
1. A cornice support structure for a high-rise steel framed concrete roof, characterized by, It includes an eaves template and stiffening ribs installed on the main beam. The eaves template is located at the top of the main beam and extends outward from the main beam. The stiffening ribs are located on the eaves template, with one end connected to the main beam, for tying the eaves template and the main beam together. The eaves formwork includes a bottom formwork and a side formwork. One end of the bottom formwork is connected to the main beam by a stud, and the other end is fixed to the side formwork. The stiffening rib is provided on the side of the side formwork near the main beam and is connected to the main beam by a stud. The bottom and side ends of the stiffening rib are fixedly connected to the bottom mold and the side mold, respectively; in a direction away from the side mold, the end of the bottom mold extends beyond the end of the stiffening rib. The bottom of the eaves template away from the main beam is provided with an arc-shaped guide section. The arc-shaped guide section extends downward from the bottom surface of the eaves template and the concave side faces the main beam.
2. The eave support structure for a high-rise steel frame concrete roof according to claim 1, wherein The stiffening ribs are plate-shaped, and multiple ribs are distributed along the length of the side formwork. Each stiffening rib has multiple corresponding steel bar through holes.
3. The eave support structure for a high-rise steel frame concrete roof according to claim 1, wherein Away from the side mold, the end of the stiffening rib extends into an ear plate, which has an arc-shaped portion. The arc-shaped portion is detachably connected to an arc-shaped buckle plate, and the two are connected to install the second stud.
4. The eaves support structure for high-rise steel frame concrete roofs according to claim 1, characterized in that, One end of the bottom mold along its length is provided with an overlapping plate, the bottom surface of which is flush with the top surface of the bottom mold.
5. A construction method for an eaves support structure for a high-rise steel-framed concrete roof, characterized in that, The construction method is implemented based on the eaves support structure for high-rise steel frame concrete roofs as described in claim 1, and the construction method includes the following steps: Pre-fabrication of eaves templates and reinforcing ribs; Install the steel frame and floor decking, assemble multiple eaves formwork along the length of the main beam of the steel frame, and fix the stiffening ribs to the eaves formwork; Check the flatness of each eaves formwork joint, and fix the eaves formwork and stiffening ribs to the main beam with studs one and two respectively, and then pour the roof and eaves.
6. The construction method for the eaves support structure of a high-rise steel frame concrete roof according to claim 5, characterized in that, When pouring the roof and eaves, two layers of steel bars are laid. The bottom layer of steel bars extends in the same direction as the main beam and passes through the steel bar holes on the stiffening ribs. The top layer of steel bars is perpendicular to the extension direction of the main beam and is placed on the top of the stiffening ribs.
Citation Information
Patent Citations
Fabricated cornice sloping roof and installation and construction method thereof
CN114033111A
Rapid construction method for outer cornice of high-rise building
CN114215333A