Flat plate double-open type full-automatic disaster blocking and preventing method for mine

The mine flat double-opening fully automatic disaster prevention method addresses the timeliness issue by integrating intelligent monitoring and early warning systems with a central control unit and auxiliary protections, ensuring timely activation and sealing of the blocking device to manage disasters effectively.

CN119084079APending Publication Date: 2024-12-06HUANENG QINGYANG COAL POWER CO LTD HETAOYU COAL MINE +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411233783.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Existing mine disaster prevention systems fail to respond in time due to insufficient sensitivity of monitoring equipment and delayed information transmission, leading to the inability to close the flat double-opening blocking device before a disaster occurs.

Method used

Implement a mine flat double-opening fully automatic disaster prevention method involving the installation of a double-opening flat plate blocking device with intelligent monitoring and early warning systems, a central control unit, and auxiliary protection systems, along with a disaster risk database and emergency response plans, ensuring timely activation and sealing of the blocking device.

Benefits of technology

The method enables immediate closure of the blocking device before a disaster strikes, providing comprehensive disaster management through real-time data analysis and coordinated response, enhancing safety and reducing damage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084079A_ABST
    Figure CN119084079A_ABST
Patent Text Reader

Abstract

The invention relates to the field of mine safety protection, and discloses a mine flat plate double-open type full-automatic disaster blocking and preventing method which comprises the following specific steps: step 1, pre-planning and installing a flat plate double-open type blocking and preventing device which is composed of two flat plates made of metal materials in a key channel and an area where disasters are likely to occur of a mine, each flat plate is filled with a fireproof, heat-insulating and pressure-resistant special material, after installation is completed, the flat plates are driven by the opening and closing mechanism of the flat plates, multiple simulation opening and closing tests are carried out, and it is ensured that the device can operate normally. An intelligent monitoring and early warning system is optimized, sensors are distributed in all key areas of a mine, environment data are collected in real time, a central control unit is adopted for data analysis and model establishment for comparison, corresponding operation can be carried out at the moment when a threshold value is exceeded, and a flat plate double-open type blocking and preventing device is closed immediately before danger comes. And the situation that closing cannot be achieved due to blocking of the water pressure flat plate during mine water bursting is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mine safety protection, in particular to a mine flat plate double-opening fully automatic disaster blocking and prevention method. Background Art

[0002] The operating environment of mines is extremely complex and changeable. Various serious disasters are like lurking demons that may wreak havoc at any time. The horrific disaster of gas explosion can release huge energy in an instant and destroy everything. The raging fire mercilessly devours lives and resources. The collapse of the roof is like the collapse of the sky and the earth, bringing disaster to the personnel underground. The surging water seepage accident is even more unexpected, turning the mine into a water town in an instant.

[0003] In terms of timeliness, existing disaster prevention and control measures often fail to respond in time due to insufficient sensitivity of monitoring equipment and delayed information transmission. As a result, the flat double-opening blocking device cannot be closed before the disaster arrives, making it impossible for the blocking device to be closed and sealed due to disaster factors. Summary of the invention

[0004] In view of the deficiencies in the prior art, the present invention provides a mine flat plate double-opening fully automatic disaster blocking and prevention method, which solves the problem that the flat plate double-opening blocking and prevention device does not respond in time and cannot be closed for blocking.

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a mine flat double-opening fully automatic disaster prevention method, comprising the following specific steps:

[0006] Step 1: Plan and install a double-opening flat plate blocking device in advance in the key passages and disaster-prone areas of the mine. The device consists of two flat plates made of metal materials. Each plate is filled with special fireproof, heat-insulating and pressure-resistant materials. After installation, the plate is driven by its opening and closing mechanism, and multiple simulated opening and closing tests are performed to ensure that the device can operate normally.

[0007] Step 2: Then build an intelligent monitoring and early warning system. These sensors are distributed in various key areas of the mine to collect environmental data in real time. The sensors transmit the collected data to the central control unit through wired or wireless communication. The central control unit uses advanced data analysis algorithms and artificial intelligence models to process and analyze the data in real time. When the monitoring data exceeds the preset threshold, the system immediately sends out an audible and visual alarm signal and sends an early warning message to the mobile terminal of the relevant personnel;

[0008] Step 3: Establish a disaster risk database to record geological conditions and equipment conditions, conduct risk assessments on various types of disasters that may occur, analyze the probability of occurrence, degree of harm, and scope of impact of each disaster, and formulate a detailed emergency plan based on the risk assessment results, including the activation conditions of the flat double-opening blocking device, personnel evacuation routes, and deployment of rescue resources;

[0009] Step 4: Based on whether the disaster assessment result exceeds the threshold, it is determined whether to start the flat double-opening blocking device. The central control system automatically sends a start command. After the drive system receives the command, the flat double-opening blocking device is started, and the two flat plates are closed toward the middle. During the closing process of the flat plates, precise position sensors and speed controllers are used to ensure that the two flat plates can be accurately docked to form a tight and seamless blocking structure.

[0010] Step 5: During the entire disaster prevention process, the real-time situation in the mine is transmitted to the command center on the ground through the remote monitoring system. The experts and managers of the command center can understand the development trend and prevention effect of the disaster in real time, and make further decisions and commands according to the actual situation. At the same time, the command center maintains close contact with external rescue forces to coordinate resource allocation and rescue operations to achieve comprehensive response and effective disposal of disasters;

[0011] Step 6: After the disaster is under control, inspect and maintain the flat double-opening blocking device and related equipment, replace damaged parts, replenish consumable materials, ensure that the equipment is in good standby condition at all times, conduct a comprehensive safety assessment of the mine, repair damaged facilities and passages, and resume normal production operations.

[0012] Preferably, in step one, the opening and closing mechanism of the flat plate adopts an advanced electric hydraulic drive system, which is composed of a high-performance motor, oil pump, oil cylinder and control valve. The system can realize rapid opening and closing of the flat plate in a very short time, and the response time does not exceed 0.2 seconds. At the same time, in order to ensure normal operation in an emergency situation of power outage, an emergency power supply and a manual operating device are provided.

[0013] Preferably, in step 2, the intelligent monitoring and early warning system covers a variety of sensors, which can collect environmental data in the mine in real time, and analyze, process and warn through a central control unit. When a sensor fails, the system can automatically switch to other normally working sensors and issue a fault alarm in time. The sensors in the intelligent monitoring and early warning system include gas concentration sensors, temperature sensors, humidity sensors, pressure sensors and water level sensors.

[0014] Preferably, when the flat double-opening blocking device is activated, a series of auxiliary protection systems also operate in coordination:

[0015] The automatic sprinkler system begins spraying water into the blocked area to reduce the temperature and extinguish the fire;

[0016] The ventilation system adjusts the wind direction and air volume to control the spread of harmful gases;

[0017] The gas purification system starts to absorb and treat harmful gases;

[0018] The pressure balance system works to maintain pressure balance inside and outside the blocking area.

[0019] Preferably, the two flat plates of the flat double-opening blocking and prevention device are made of high-strength, high-temperature-resistant and corrosion-resistant alloy material, and are filled with a composite metal material with good thermal insulation, fireproof and buffering properties, and the composite metal material is an aluminum-silicon alloy.

[0020] Preferably, the central control unit has self-learning and self-adaptation capabilities, and can continuously optimize warning thresholds and emergency plans based on the actual operation of the mine and historical disaster data.

[0021] Preferably, in step six, when inspecting and maintaining the flat double-opening blocking device and related equipment, intelligent detection equipment is introduced to quickly and accurately diagnose potential faults of the equipment and generate a detailed detection report.

[0022] The present invention provides a mine flat double-opening fully automatic disaster prevention method. It has the following beneficial effects:

[0023] 1. The present invention optimizes the intelligent monitoring and early warning system, distributes sensors in various key areas of the mine, collects environmental data in real time, and uses a central control unit to analyze the data and build a model for comparison. The corresponding operation can be performed at the moment when the threshold is exceeded. The flat double-opening blocking and prevention device is immediately closed before the danger comes, avoiding the situation where the water pressure plate cannot be closed due to obstruction when water gushes in the mine.

[0024] 2. The present invention covers the entire process from device installation planning, monitoring and early warning, risk assessment, emergency start-up, remote command to later maintenance, and accurately transmits information to the command center on the ground, so that experts and managers at the command center can understand the development trend and prevention effect of disasters in real time and in detail, and make wise and effective further decisions and precise commands based on actual conditions, making disaster prevention more comprehensive. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 The present invention is a flow chart of a mine flat plate double-opening fully automatic disaster blocking and prevention method. DETAILED DESCRIPTION

[0026] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] Example:

[0028] Please refer to the attached Figure 1 The embodiment of the present invention provides a mine flat double-opening fully automatic disaster prevention method, including the following specific steps:

[0029] Step 1: Plan and install a double-opening flat plate blocking device in advance in key passages and disaster-prone areas of the mine, such as ventilation shafts, transportation tunnels, and mining face joints. The device consists of two flat plates made of metal materials. The size and thickness of the plates are designed according to the size of the passage and the expected pressure. Each plate is filled with special fireproof, heat-insulating, and pressure-resistant materials. During the installation process, ensure that the opening and closing tracks of the plates are smooth and the drive system is stable and reliable. At the same time, set up necessary protective structures around the device to prevent accidental damage during normal operation. After the installation is completed, use the opening and closing mechanism of the plate to drive the plate, and conduct multiple simulated opening and closing tests to ensure that the device can operate normally.

[0030] Step 2: Then build an intelligent monitoring and early warning system. These sensors are distributed in various key areas of the mine to collect environmental data in real time. The sensors transmit the collected data to the central control unit through wired or wireless communication. The central control unit uses advanced data analysis algorithms and artificial intelligence models to process and analyze the data in real time. When the monitoring data exceeds the preset threshold, the system immediately sends out an audible and visual alarm signal and sends an early warning message to the mobile terminal of the relevant personnel to remind them to take emergency response measures;

[0031] Step 3: Establish a disaster risk database to record geological conditions and equipment conditions, conduct risk assessments on various types of disasters that may occur, analyze the probability of occurrence, degree of harm, and scope of impact of each disaster, and formulate a detailed emergency plan based on the risk assessment results, including the activation conditions of the flat double-opening blocking device, personnel evacuation routes, and deployment of rescue resources;

[0032] Step 4: Based on whether the disaster assessment result exceeds the threshold, it is determined whether to start the flat double-opening blocking device. The central control system automatically sends a start command. After the drive system receives the command, the flat double-opening blocking device is started, and the two flat plates are closed toward the middle. During the closing process of the flat plates, precise position sensors and speed controllers are used to ensure that the two flat plates can be accurately docked to form a tight and seamless blocking structure.

[0033] Step 5: During the entire disaster prevention process, the real-time situation in the mine is transmitted to the command center on the ground through the remote monitoring system. The experts and managers of the command center can understand the development trend of the disaster and the prevention effect in real time, and make further decisions and commands according to the actual situation. If necessary, the operating parameters of the flat double-opening prevention device and auxiliary systems can be adjusted remotely to ensure the efficient prevention work. At the same time, the command center maintains close contact with external rescue forces to coordinate resource allocation and rescue operations to achieve comprehensive response and effective disposal of disasters;

[0034] Step 6: After the disaster is under control, inspect and maintain the flat double-opening blocking and prevention device and related equipment, replace damaged parts, replenish consumable materials, ensure that the equipment is in good standby condition at all times, conduct a comprehensive safety assessment of the mine, repair damaged facilities and passages, and resume normal production operations. At the same time, summarize the lessons learned from this disaster response, optimize and improve the blocking and prevention methods and systems, and enhance the mine's ability to respond to possible disasters in the future.

[0035] In step one, the opening and closing mechanism of the flat plate adopts an advanced electric hydraulic drive system, which is composed of a high-performance motor, oil pump, oil cylinder and control valve. The system can realize the rapid opening and closing action of the flat plate in a very short time, and the response time does not exceed 0.2 seconds. At the same time, in order to ensure that it can still work normally in an emergency situation of power outage, it is equipped with an emergency power supply and a manual operating device.

[0036] The flat double-opening blocking and prevention device is accurately installed in the key passages and disaster-prone areas of the mine. The installation process strictly follows the design requirements and construction specifications to ensure that the device is installed accurately and firmly, and the opening and closing tracks are smooth and smooth. After the installation is completed, the device is fully debugged and tested, and the opening and closing action and sealing performance of the flat plate are tested. By simulating different disaster scenarios, the blocking and prevention effect of the device is verified and optimized to ensure that it can operate reliably when an actual disaster occurs;

[0037] During the debugging process, various test data and debugging results are recorded in detail to form a debugging report. Problems and defects found are rectified and improved in a timely manner until the device fully meets the design requirements and usage standards.

[0038] In step two, the intelligent monitoring and early warning system covers a variety of sensors, which can collect environmental data in the mine in real time, and analyze and process and issue early warnings through the central control unit. When a sensor fails, the system can automatically switch to other normally working sensors and issue a fault alarm in time. The sensors in the intelligent monitoring and early warning system include gas concentration sensors, temperature sensors, humidity sensors, pressure sensors and water level sensors.

[0039] When the flat double-opening blocking device is activated, a series of auxiliary protection systems also operate in coordination:

[0040] The automatic sprinkler system begins spraying water into the blocked area to reduce the temperature and extinguish the fire;

[0041] The ventilation system adjusts the wind direction and air volume to control the spread of harmful gases;

[0042] The gas purification system starts to absorb and treat harmful gases;

[0043] The pressure balance system works to maintain pressure balance inside and outside the blocking area.

[0044] The two flat plates of the flat double-opening blocking and prevention device are made of high-strength, high-temperature-resistant and corrosion-resistant alloy materials, and are filled with composite metal materials with good thermal insulation, fireproof and buffering properties. The composite metal material is aluminum-silicon alloy.

[0045] The central control unit has self-learning and adaptive capabilities, and can continuously optimize warning thresholds and emergency plans based on the actual operating conditions of the mine and historical disaster data.

[0046] In step six, when inspecting and maintaining the flat double-opening blocking device and related equipment, intelligent detection equipment is introduced to quickly and accurately diagnose potential faults of the equipment and generate a detailed detection report.

[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A mine flat double-opening fully automatic disaster prevention method, characterized in that: The specific steps include: Step 1: Plan and install a double-opening flat plate blocking device in advance in the key passages and disaster-prone areas of the mine. The device consists of two flat plates made of metal materials. Each plate is filled with special fireproof, heat-insulating and pressure-resistant materials. After installation, the plate is driven by its opening and closing mechanism, and multiple simulated opening and closing tests are performed to ensure that the device can operate normally. Step 2: Then build an intelligent monitoring and early warning system. These sensors are distributed in various key areas of the mine to collect environmental data in real time. The sensors transmit the collected data to the central control unit through wired or wireless communication. The central control unit uses advanced data analysis algorithms and artificial intelligence models to process and analyze the data in real time. When the monitoring data exceeds the preset threshold, the system immediately sends out an audible and visual alarm signal and sends an early warning message to the mobile terminal of the relevant personnel; Step 3: Establish a disaster risk database to record geological conditions and equipment conditions, conduct risk assessments on various types of disasters that may occur, analyze the probability of occurrence, degree of harm, and scope of impact of each disaster, and formulate a detailed emergency plan based on the risk assessment results, including the activation conditions of the flat double-opening blocking device, personnel evacuation routes, and deployment of rescue resources; Step 4: Based on whether the disaster assessment result exceeds the threshold, it is determined whether to start the flat double-opening blocking device. The central control system automatically sends a start command. After the drive system receives the command, the flat double-opening blocking device is started, and the two flat plates are closed toward the middle. During the closing process of the flat plates, precise position sensors and speed controllers are used to ensure that the two flat plates can be accurately docked to form a tight and seamless blocking structure. Step 5: During the entire disaster prevention process, the real-time situation in the mine is transmitted to the command center on the ground through the remote monitoring system. The experts and managers of the command center can understand the development trend and prevention effect of the disaster in real time, and make further decisions and commands according to the actual situation. At the same time, the command center maintains close contact with external rescue forces to coordinate resource allocation and rescue operations to achieve comprehensive response and effective disposal of disasters; Step 6: After the disaster is under control, inspect and maintain the flat double-opening blocking device and related equipment, replace damaged parts, replenish consumable materials, ensure that the equipment is in good standby condition at all times, conduct a comprehensive safety assessment of the mine, repair damaged facilities and passages, and resume normal production operations.

2. A mine flat double-opening fully automatic disaster prevention method according to claim 1, characterized in that: In step 1, the opening and closing mechanism of the flat plate adopts an advanced electric hydraulic drive system, which is composed of a high-performance motor, oil pump, oil cylinder and control valve. The system can realize the rapid opening and closing action of the flat plate in a very short time, and the response time does not exceed 0.2 seconds. At the same time, in order to ensure that it can still work normally in an emergency situation of power outage, it is equipped with an emergency power supply and a manual operating device.

3. A mine flat double-opening fully automatic disaster prevention method according to claim 1, characterized in that: In step 2, the intelligent monitoring and early warning system covers a variety of sensors, which can collect environmental data in the mine in real time, and analyze, process and warn through the central control unit. When a sensor fails, the system can automatically switch to other normally working sensors and issue a fault alarm in time. The sensors in the intelligent monitoring and early warning system include gas concentration sensors, temperature sensors, humidity sensors, pressure sensors and water level sensors.

4. A mine flat double-opening fully automatic disaster prevention method according to claim 1, characterized in that: When the flat double-opening blocking device is activated, a series of auxiliary protection systems also operate in coordination: The automatic sprinkler system begins spraying water into the blocked area to reduce the temperature and extinguish the fire; The ventilation system adjusts the wind direction and air volume to control the spread of harmful gases; The gas purification system starts to absorb and treat harmful gases; The pressure balance system works to maintain pressure balance inside and outside the blocking area.

5. A mine flat double-opening fully automatic disaster prevention method according to claim 1, characterized in that: The two flat plates of the flat double-opening blocking device are made of high-strength, high-temperature-resistant and corrosion-resistant alloy materials, and are filled with composite metal materials with good heat insulation, fireproof and buffering properties. The composite metal material is aluminum-silicon alloy.

6. A mine flat double-opening fully automatic disaster prevention method according to claim 1, characterized in that: The central control unit has self-learning and self-adaptation capabilities, and can continuously optimize warning thresholds and emergency plans based on the actual operation of the mine and historical disaster data.

7. A mine flat double-opening fully automatic disaster prevention method according to claim 1, characterized in that: In step six, when inspecting and maintaining the flat double-opening blocking device and related equipment, intelligent detection equipment is introduced to quickly and accurately diagnose potential faults of the equipment and generate a detailed detection report.