Monitoring system and method for outdoor rainwater pipe network of metro vehicle base

By designing a monitoring system for subway vehicle bases, the problem of adaptability judgment of rainwater pipeline networks before rainfall and after climate change is solved, and the recommendations for emergency preparedness before rain and post-storm transformation are provided, ensuring the adaptability and safety of rainwater pipeline networks. .

CN119086025APending Publication Date: 2024-12-06CHINA RAILWAY ENG CONSULTING GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411144775.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

It is difficult to accurately judge the adaptability of the outdoor rainwater pipeline network of the subway vehicle base before rainfall, and it is impossible to accurately determine whether it needs to be upgraded and transformed after climate change, resulting in the inability to make effective emergency preparations and transformation measures.

Method used

A monitoring system was designed, including the rainwater pipeline setting module, the rainwater pipeline design flow calculator, the pre-rain emergency preparation monitoring module and the post-rain lifting and transformation module. By obtaining and calculating the basic data of each collection pipe section and the design of the heavy rain intensity formula. Parameters, predict and correct traffic, determine whether an alarm signal needs to be sent and provide emergency preparedness and modification suggestions.

Benefits of technology

Provide a basis for judging emergency preparedness measures before rain, and provide a basis for judging the upgrade and renovation of the rainwater pipeline network after rain, ensuring the adaptability and safety of the outdoor rainwater pipeline network at the subway vehicle base.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119086025A_ABST
    Figure CN119086025A_ABST
Patent Text Reader

Abstract

The invention provides a monitoring system and method for an outdoor rainwater pipe network of a metro vehicle base, and relates to the technical field of metro rail transit, and the monitoring system comprises a rainwater pipe network setting module which is used for setting basic data of each collection pipe section in the outdoor rainwater pipe network of the metro vehicle base and design parameters of a rainstorm intensity formula; the rainwater pipe network design flow calculator is used for calculating the design flow of each collection pipe section; the pre-rain emergency preparation monitoring module is used for calculating the forecast flow of each collection pipe section and judging whether an alarm signal is sent or not according to the forecast flow and the design flow of each collection pipe section to obtain a first judgment result; the after-rain lifting and transformation monitoring module is used for calculating the corrected flow and judging whether an alarm signal is sent or not according to the corrected flow and the designed flow of each collection pipe section to obtain a second judgment result; the system can provide a judgment basis for emergency preparation measures before raining and can provide a judgment basis for lifting and reconstruction of a rainwater pipe network after years of climate change after raining.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of subway rail transit, and in particular to a monitoring system and method for an outdoor rainwater pipe network of a subway vehicle base. Background Art

[0002] The outdoor rainwater pipe network of the subway vehicle base is composed of various collection pipe sections. When it rains, rainwater forms runoff rainwater on the surface of the subway vehicle base. Each collection pipe section of the outdoor rainwater pipe network is responsible for collecting the surface runoff rainwater formed by the catchment area of ​​the plot belonging to its own pipe section. All surface runoff rainwater is uniformly collected through the outdoor rainwater pipe network system formed by various collection pipe sections and discharged into the nearby municipal rainwater pipe network or natural water body. At present, the monitoring of the outdoor rainwater pipe network of the subway vehicle base mainly has the following problems: 1) Before the rainfall, for the weather forecast information, it is impossible to accurately judge the adaptability of each collection pipe section of the outdoor rainwater pipe network to this rainfall, and make corresponding emergency preparations; 2) Each collection pipe section of the outdoor rainwater pipe network is designed and calculated according to the current rainstorm intensity formula in the local area. However, the design service life of the subway project is 100 years. After the outdoor rainwater pipe network is put into use, the climate continues to change. It is impossible to accurately judge the adaptability of each collection pipe section of the outdoor rainwater pipe network to climate change and confirm whether it needs to be upgraded and renovated. Summary of the invention

[0003] The purpose of the present invention is to provide a monitoring system and method for the outdoor rainwater pipe network of a subway vehicle base to improve the above problems. In order to achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0004] In a first aspect, the present application provides a monitoring system for an outdoor rainwater pipe network of a subway vehicle base, wherein the outdoor rainwater pipe network of the subway vehicle base includes several collection pipe sections, including:

[0005] Rainwater pipe network setting module: used to set the basic data of each collection pipe section in the outdoor rainwater pipe network of the subway vehicle base and the design parameters of the rainstorm intensity formula. The basic data include the catchment area, the runoff coefficient of the catchment area, the design rainfall duration and the design recurrence period;

[0006] Stormwater pipe network design flow calculator: used to calculate the design flow of each collection pipe section based on the basic data of each collection pipe section and the design parameters of the storm intensity formula;

[0007] Pre-rain emergency preparedness monitoring module: used to obtain the forecast rainfall of each collection pipe section under the designed rainfall duration to calculate the forecast flow of each collection pipe section, and determine whether to send an alarm signal according to the forecast flow and the designed flow of each collection pipe section to obtain a first judgment result;

[0008] Pre-rain emergency preparedness monitoring display: used to display the basic data of each collection pipe section, the design parameters of the rainstorm intensity formula, the design flow, the forecast rainfall, the forecast flow and the first judgment result;

[0009] Post-rainfall lifting and transformation monitoring module: used to obtain the annual rainfall of each collection pipe section within the preset period of time and the annual rainfall of the current year to calculate the corrected flow rate, and determine whether to send an alarm signal to obtain a second judgment result based on the corrected flow rate and the design flow rate of each collection pipe section;

[0010] Post-rainfall upgrade and transformation monitoring display: used to display the basic data, design flow, corrected flow and second judgment results of each collection pipe section.

[0011] In a second aspect, the present application further provides a monitoring method for an outdoor rainwater pipe network of a subway vehicle base, wherein the outdoor rainwater pipe network of the subway vehicle base includes several collection pipe sections, including:

[0012] Obtaining basic data of each collection pipe section in the outdoor rainwater pipe network of the subway vehicle base and design parameters of the rainstorm intensity formula, wherein the basic data includes the catchment area, the runoff coefficient of the catchment area, the design rainfall duration and the design return period;

[0013] Calculate the design flow of each collection pipe section based on the basic data of each collection pipe section and the design parameters of the rainstorm intensity formula;

[0014] Obtaining the forecast rainfall of each collecting pipe section under the designed rainfall duration to calculate the forecast flow of each collecting pipe section, and determining whether to send an alarm signal according to the forecast flow and the designed flow of each collecting pipe section to obtain a first determination result;

[0015] Display the basic data of each collection pipe section, the design parameters of the rainstorm intensity formula, the design flow, the forecast rainfall, the forecast flow and the first judgment result on the pre-rain emergency preparedness monitoring display;

[0016] Obtaining the annual rainfall of each collecting pipe section within a preset period of time and the annual rainfall of the current year to calculate the corrected flow rate, and determining whether to send an alarm signal according to the corrected flow rate and the design flow rate of each collecting pipe section to obtain a second determination result;

[0017] The basic data of each collection pipe section, the design parameters and correction parameters of the rainstorm intensity formula, the corrected flow rate and the second judgment result are displayed on the post-rainfall upgrade and transformation monitoring display.

[0018] In a third aspect, the present application also provides a monitoring device for an outdoor rainwater pipe network of a subway vehicle base, comprising:

[0019] Memory for storing computer programs;

[0020] A processor is used to implement the steps of the monitoring method for the outdoor rainwater pipe network of a subway vehicle base when executing the computer program.

[0021] In a fourth aspect, the present application further provides a readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the above-mentioned monitoring method based on the outdoor rainwater pipe network of a subway vehicle base are implemented.

[0022] The beneficial effects of the present invention are:

[0023] 1. Before it rains, calculate the forecast flow of each collection pipe section of the outdoor rainwater pipe network of the subway vehicle base based on the forecast rainfall data, compare the forecast flow with the design flow, and provide a basis for judging emergency preparedness measures before the rain based on the comparison results.

[0024] 2. After the rain, calculate the correction parameters of the rainstorm intensity formula based on the rainfall over the years and the rainfall of this year, and then calculate the corrected flow of each collection pipe section of the outdoor rainwater pipe network of the subway vehicle base. Then, based on the comparison results of the corrected flow and the design flow, provide a basis for judging the improvement and transformation of the rainwater pipe network after the rain.

[0025] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or be understood by implementing the embodiments of the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description, claims, and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0027] Figure 1 It is a schematic diagram of the structure of a monitoring system for an outdoor rainwater pipe network of a subway vehicle base described in an embodiment of the present invention;

[0028] Figure 2 It is a flow chart of a monitoring method for an outdoor rainwater pipe network of a subway vehicle base described in an embodiment of the present invention;

[0029] Figure 3 It is a schematic diagram of the structure of the monitoring equipment for the outdoor rainwater pipe network of a subway vehicle base described in an embodiment of the present invention.

[0030] Markings in the figure:

[0031] 800. Monitoring equipment for outdoor rainwater pipe network of subway vehicle base; 801. Processor; 802. Memory; 803. Multimedia component; 804. I / O interface; 805. Communication component. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention generally described and shown in the drawings herein can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present invention provided in the drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0033] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0034] Embodiment 1:

[0035] This embodiment provides a monitoring system for an outdoor rainwater pipe network of a subway vehicle base, wherein the outdoor rainwater pipe network of the subway vehicle base includes n collection pipe sections.

[0036] See also Figure 1 , the figure shows that the system includes a rainwater pipe network setting module, a rainwater pipe network design flow calculator, a pre-rain emergency preparation monitoring module, a pre-rain emergency preparation monitoring display, a post-rain lifting and transformation monitoring module, and a post-rain lifting and transformation monitoring display;

[0037] Rainwater pipe network setting module: used to set the basic data of each collection pipe section in the outdoor rainwater pipe network of the subway vehicle base and the design parameters of the rainstorm intensity formula. The basic data includes the catchment area F i , the runoff coefficient of the catchment area Ψ i , Design rainfall duration t i and the design return period P i , where i represents the i-th collecting pipe segment.

[0038] Stormwater network design flow calculator: used to calculate the design flow of each collection pipe section based on the basic data of each collection pipe section and the design parameters of the storm intensity formula:

[0039]

[0040] In the formula, Q i1 represents the design flow of the ith collecting pipe section, and A1, C, b and n are the preset parameters of the rainstorm intensity formula.

[0041] Pre-rain emergency preparedness monitoring module: used to obtain the forecast rainfall of each collection pipe section under the designed rainfall duration to calculate the forecast flow of each collection pipe section, and determine whether to send an alarm signal according to the forecast flow and the designed flow of each collection pipe section to obtain a first judgment result;

[0042] Based on the above embodiments, the pre-rain emergency preparedness monitoring module includes:

[0043] Predicted rainfall collection device: used to collect the designed rainfall duration t of each collection pipe section i The forecast rainfall of the meteorological department is i1 ;

[0044] Stormwater pipe network forecast flow calculator: used to calculate the forecast flow Q of each collection pipe section based on the design parameters of each collection pipe section and the forecast rainfall i2 :

[0045] Q i2 =H i1 ·Ψ i ·F i ; (2)

[0046] Pre-rain data processor: used to calculate the ratio of the design flow and forecast flow of each collection pipe section

[0047] Pre-rainfall alarm signal processor: used to determine the alarm signal based on the ratio of design flow and forecast flow, where:

[0048] When the ratio is less than or equal to 1.0, no alarm signal is generated;

[0049] When the ratio is greater than 1.0 and less than 1.5, a low-frequency alarm signal is generated;

[0050] When the ratio is greater than 1.5 and less than 2.0, a high-frequency alarm signal is generated;

[0051] When the ratio is greater than or equal to 2.0, an ultra-high frequency alarm signal is generated;

[0052] Pre-rain alarm device: used for sound and light alarm according to the alarm signal;

[0053] Specifically, if there is no alarm signal, green light is displayed; if a low-frequency alarm signal is received, yellow light is displayed; if a high-frequency alarm signal is received, red light is displayed; if an ultra-high-frequency alarm signal is received, red light is displayed and an alarm is sounded.

[0054] Pre-rain emergency preparation trigger: used to send a text signal to the pre-rain emergency preparation monitoring display according to the alarm signal, specifically:

[0055] If there is no alarm signal, a text signal of "normal rainfall" is sent;

[0056] If a low-frequency alarm signal is received, a text signal of "conventional flood prevention" is sent;

[0057] If a high-frequency alarm signal is received, a text signal of "emergency flood prevention, activate emergency plan" is sent;

[0058] If an ultra-high frequency alarm signal is received, a text signal of "emergency flood prevention and rescue, activate emergency plan, evacuate people" will be sent.

[0059] Pre-rain emergency preparedness monitoring display: used to display the basic data of the rainwater pipe network setting module, design flow, forecast rainfall, forecast flow, design parameters of the rainstorm intensity formula and the first judgment result;

[0060] Post-rainfall lifting and transformation monitoring module: used to obtain the annual rainfall of each collection pipe section within the preset period of time and the annual rainfall of the current year to calculate the corrected flow rate, and determine whether to send an alarm signal to obtain a second judgment result based on the corrected flow rate and the design flow rate of each collection pipe section;

[0061] Specifically, the post-rainfall lifting and transformation monitoring module includes:

[0062] Past rainfall data collection storage device: used to collect the historical rainfall of each collection pipe section at each rainfall duration within 20 years; specifically, including the rainfall corresponding to rainfall durations of 5min, 10min, 15min, 20min, 30min, 45min, 60min, 90min, 120min, 150min, and 180min.

[0063] Actual rainfall data collection memory: used to collect annual rainfall at each rainfall duration of the current year;

[0064] In this embodiment, after the subway vehicle base is put into use, it is used to collect and store the annual rainfall of the subway vehicle base, including the rainfall corresponding to rainfall durations of 5min, 10min, 15min, 20min, 30min, 45min, 60min, 90min, 120min, 150min, and 180min.

[0065] Modified rainstorm intensity formula calculator: used to calculate the modified parameters of the rainstorm intensity formula according to the historical rainfall and annual rainfall;

[0066] Specifically, the annual maximum value method is used for sampling and the exponential distribution method is used to calculate the rainfall frequency distribution curve, and the correction parameters A′1, C′, b′ and n′ are calculated using the Gauss-Newton method according to the rainfall frequency distribution curve;

[0067] Rainwater pipe network modified design flow calculator: used to obtain the modified flow Q based on the design parameters of each collection pipe section and the modified parameters of the storm intensity formula i3 :

[0068]

[0069] After-rain data processor: used to calculate the ratio of the design flow and the corrected flow of each collection pipe section

[0070] Post-rainfall alarm signal processor: used to determine the alarm signal S according to the ratio of the design flow rate and the corrected flow rate, where:

[0071] When the ratio is less than or equal to 1.0, no alarm signal is generated;

[0072] When the ratio is greater than 1.0 and less than 1.5, a low-frequency alarm signal is generated;

[0073] When the ratio is greater than 1.5 and less than 2.0, a high-frequency alarm signal is generated;

[0074] When the ratio is greater than or equal to 2.0, an ultra-high frequency alarm signal is generated;

[0075] After-rain alarm device: used for sound and light alarm according to the alarm signal;

[0076] Post-rain emergency preparation trigger: used to send a text signal to the post-rain emergency preparation monitoring display according to the alarm signal, specifically:

[0077] If there is no alarm signal, a text signal of "normal rainfall" is sent;

[0078] If a low-frequency alarm signal is received, a text signal of "conventional flood prevention" is sent;

[0079] If a high-frequency alarm signal is received, a text signal of "emergency flood prevention, activate emergency plan" is sent;

[0080] If an ultra-high frequency alarm signal is received, a text signal of "emergency flood prevention and rescue, activate emergency plan, evacuate people" will be sent.

[0081] Post-rain upgrade and transformation monitoring display: used to display the basic data of each collection pipe section, design flow, corrected flow, design parameters of the rainstorm intensity formula, corrected parameters and the second judgment result.

[0082] In summary, this system can provide a basis for judging the emergency preparation of the outdoor rainwater pipe network of the subway vehicle base before the rain, and provide a basis for judging the upgrading and transformation of the rainwater pipe network after years of climate change after the rain.

[0083] Embodiment 2:

[0084] like Figure 2 As shown, this embodiment provides a monitoring method for an outdoor rainwater pipe network of a subway vehicle base, the method comprising:

[0085] S1. Obtain the basic data of each collection pipe section in the outdoor rainwater pipe network of the subway vehicle base and the design parameters of the rainstorm intensity formula, wherein the basic data include the catchment area, the runoff coefficient of the catchment area, the design rainfall duration and the design return period;

[0086] Based on the above embodiments, the method further includes:

[0087] S2. Calculate the design flow of each collection pipe section based on the basic data of each collection pipe section and the design parameters of the rainstorm intensity formula;

[0088] Based on the above embodiments, the method further includes:

[0089] S3. Obtain the forecast rainfall of each collection pipe section under the design rainfall duration to calculate the forecast flow of each collection pipe section, and determine whether to send an alarm signal according to the forecast flow and design flow of each collection pipe section to obtain a first judgment result;

[0090] Specifically, step S3 includes:

[0091] S31. Collect the forecast rainfall of the meteorological department under the designed rainfall duration of each collection pipe section;

[0092] S32. Calculate the forecast flow of each collection pipe section based on the basic data of each collection pipe section and the forecast rainfall;

[0093] S33. Calculate the ratio of the design flow rate and the forecast flow rate of each collection pipe section;

[0094] S34. Determine an alarm signal based on the ratio of the design flow rate to the forecast flow rate, wherein:

[0095] When the ratio is less than or equal to 1.0, no alarm signal is generated;

[0096] When the ratio is greater than 1.0 and less than 1.5, a low-frequency alarm signal is generated;

[0097] When the ratio is greater than 1.5 and less than 2.0, a high-frequency alarm signal is generated;

[0098] When the ratio is greater than or equal to 2.0, an ultra-high frequency alarm signal is generated;

[0099] S35. Sound and light alarm according to the alarm signal;

[0100] Specifically, the step S35 includes:

[0101] If there is no alarm signal, it will display green light;

[0102] If a low-frequency alarm signal is received, a yellow light is displayed;

[0103] If a high-frequency alarm signal is received, a red light will be displayed;

[0104] If an ultra-high frequency alarm signal is received, a red light will be displayed and an alarm will sound.

[0105] S36. Sending a text signal to the pre-rain emergency preparedness monitoring display according to the alarm signal;

[0106] Specifically, step S36 includes:

[0107] If there is no alarm signal, a text signal of "normal rainfall" is sent;

[0108] If a low-frequency alarm signal is received, a text signal of "conventional flood prevention" is sent;

[0109] If a high-frequency alarm signal is received, a text signal of "emergency flood prevention, activate emergency plan" is sent;

[0110] If an ultra-high frequency alarm signal is received, a text signal of "emergency flood prevention and rescue, activate emergency plan, evacuate people" will be sent.

[0111] Based on the above embodiments, the method further includes:

[0112] S4. Display the basic data of each collection pipe section, the design parameters of the rainstorm intensity formula, the design flow, the forecast rainfall, the forecast flow and the first judgment result on the pre-rain emergency preparedness monitoring display;

[0113] Based on the above embodiments, the method further includes:

[0114] S5. Obtain the annual rainfall of each collection pipe section within the preset period of time and the annual rainfall of the current year to calculate the corrected flow rate, and determine whether to send an alarm signal to obtain a second judgment result based on the corrected flow rate and the design flow rate of each collection pipe section;

[0115] Specifically, step S5 includes:

[0116] S51. Collect the annual rainfall of each collection pipe section at each rainfall duration within 20 years;

[0117] S52. Collect the annual rainfall of each rainfall period in the current year;

[0118] S53. Calculate the correction parameters of the rainstorm intensity formula based on the historical rainfall and annual rainfall;

[0119] S54. Obtaining a corrected flow rate according to the basic data of each collection pipe section and the correction parameters of the rainstorm intensity formula;

[0120] S55. Calculate the ratio of the design flow rate and the modified flow rate of each collection pipe section;

[0121] S56. Determine an alarm signal based on the ratio of the design flow rate to the corrected flow rate, wherein:

[0122] When the ratio is less than or equal to 1.0, no alarm signal is generated;

[0123] When the ratio is greater than 1.0 and less than 1.5, a low-frequency alarm signal is generated;

[0124] When the ratio is greater than 1.5 and less than 2.0, a high-frequency alarm signal is generated;

[0125] When the ratio is greater than or equal to 2.0, an ultra-high frequency alarm signal is generated;

[0126] S57. Perform an audible and visual alarm according to the alarm signal;

[0127] Specifically, step S57 includes:

[0128] If there is no alarm signal, it will display green light;

[0129] If a low-frequency alarm signal is received, a yellow light is displayed;

[0130] If a high-frequency alarm signal is received, a red light will be displayed;

[0131] If an ultra-high frequency alarm signal is received, a red light will be displayed and an alarm will sound.

[0132] S58. Sending a text signal to the post-rain emergency preparedness monitoring display according to the alarm signal;

[0133] Specifically, the S58 includes:

[0134] If there is no alarm signal, a text signal of "normal rainfall" is sent;

[0135] If a low-frequency alarm signal is received, a text signal of "conventional flood prevention" is sent;

[0136] If a high-frequency alarm signal is received, a text signal of "emergency flood prevention, activate emergency plan" is sent;

[0137] If an ultra-high frequency alarm signal is received, a text signal of "emergency flood prevention and rescue, activate emergency plan, evacuate people" will be sent.

[0138] Based on the above embodiments, the method further includes:

[0139] S6. Display the basic data of each collection pipe section, the design parameters and correction parameters of the rainstorm intensity formula, the corrected flow rate and the second judgment result on the post-rainfall upgrading and transformation monitoring display.

[0140] It should be noted that, regarding the method in the above embodiment, the specific manner of executing the operation in each step has been described in detail in the embodiment of the system, and will not be elaborated here.

[0141] Embodiment 3:

[0142] Corresponding to the above method embodiment, this embodiment also provides a monitoring device for the outdoor rainwater pipe network of a subway vehicle base. The monitoring device for the outdoor rainwater pipe network of a subway vehicle base described below and the monitoring method for the outdoor rainwater pipe network of a subway vehicle base described above can be referenced to each other.

[0143] Figure 3 FIG. 8 is a block diagram of a monitoring device 800 for an outdoor rainwater pipe network of a subway vehicle base according to an exemplary embodiment. Figure 3 As shown, the monitoring device 800 for the outdoor rainwater pipe network of a subway vehicle base may include: a processor 801, a memory 802. The monitoring device 800 for the outdoor rainwater pipe network of a subway vehicle base may also include one or more of a multimedia component 803, an I / O interface 804, and a communication component 805.

[0144] The processor 801 is used to control the overall operation of the monitoring device 800 for the outdoor rainwater pipe network of the subway vehicle base to complete all or part of the steps in the above-mentioned monitoring method for the outdoor rainwater pipe network of the subway vehicle base. The memory 802 is used to store various types of data to support the operation of the monitoring device 800 for the outdoor rainwater pipe network of the subway vehicle base, and these data may include, for example, instructions for any application or method operated on the monitoring device 800 for the outdoor rainwater pipe network of the subway vehicle base, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 802 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, disk or optical disk. The multimedia component 803 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone for receiving external audio signals. The received audio signal may be further stored in the memory 802 or sent via the communication component 805. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 804 provides an interface between the processor 801 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 805 is used for wired or wireless communication between the monitoring device 800 for the outdoor rainwater pipe network of the subway vehicle base and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 805 can include: Wi-Fi module, Bluetooth module, NFC module.

[0145] In an exemplary embodiment, the monitoring device 800 for the outdoor rainwater pipe network of a subway vehicle base can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned monitoring method for the outdoor rainwater pipe network of a subway vehicle base.

[0146] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned monitoring method for an outdoor rainwater pipe network of a subway vehicle base are implemented. For example, the computer-readable storage medium may be the above-mentioned memory 802 including program instructions, and the above-mentioned program instructions may be executed by a processor 801 of a monitoring device 800 for an outdoor rainwater pipe network of a subway vehicle base to complete the above-mentioned monitoring method for an outdoor rainwater pipe network of a subway vehicle base.

[0147] Embodiment 4:

[0148] Corresponding to the above method embodiment, a readable storage medium is also provided in this embodiment. The readable storage medium described below and the monitoring method for the outdoor rainwater pipe network of the subway vehicle base described above can refer to each other.

[0149] A readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the monitoring method for an outdoor rainwater pipe network of a subway vehicle base of the above method embodiment.

[0150] The readable storage medium may specifically be a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or other readable storage medium that can store program codes.

[0151] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

[0152] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A monitoring system for an outdoor rainwater pipe network of a subway vehicle base, wherein: The outdoor rainwater pipe network of the subway vehicle base includes several collection pipe sections, which are characterized by including: Rainwater pipe network setting module: used to set the basic data of each collection pipe section in the outdoor rainwater pipe network of the subway vehicle base and the design parameters of the rainstorm intensity formula. The basic data include the catchment area, the runoff coefficient of the catchment area, the design rainfall duration and the design recurrence period; Stormwater pipe network design flow calculator: used to calculate the design flow of each collection pipe section based on the basic data of each collection pipe section and the design parameters of the storm intensity formula; Pre-rain emergency preparedness monitoring module: used to obtain the forecast rainfall of each collection pipe section under the designed rainfall duration to calculate the forecast flow of each collection pipe section, and determine whether to send an alarm signal according to the forecast flow and the designed flow of each collection pipe section to obtain a first judgment result; Pre-rain emergency preparedness monitoring display: used to display the basic data of each collection pipe section, the design parameters of the rainstorm intensity formula, the design flow, the forecast rainfall, the forecast flow and the first judgment result; Post-rainfall lifting and transformation monitoring module: used to obtain the annual rainfall of each collection pipe section within the preset period of time and the annual rainfall of the current year to calculate the corrected flow rate, and determine whether to send an alarm signal to obtain a second judgment result based on the corrected flow rate and the design flow rate of each collection pipe section; Post-rain upgrade and transformation monitoring display: used for basic data of each collection pipe section, design parameters and correction parameters of the rainstorm intensity formula, corrected flow rate and second judgment result.

2. The monitoring system for the outdoor rainwater pipe network of a subway vehicle base according to claim 1 is characterized in that: The pre-rain emergency preparedness monitoring module includes: Predicted rainfall collection device: used to collect the predicted rainfall of the meteorological department under the designed rainfall duration of each collection pipe section; Stormwater pipe network forecast flow calculator: used to calculate the forecast flow of each collection pipe section based on the basic data of each collection pipe section and the forecast rainfall; Pre-rain data processor: used to calculate the ratio of design flow and forecast flow of each collection pipe section; Pre-rainfall alarm signal processor: used to determine the alarm signal based on the ratio of design flow and forecast flow, where: When the ratio is less than or equal to 1.0, no alarm signal is generated; When the ratio is greater than 1.0 and less than 1.5, a low-frequency alarm signal is generated; When the ratio is greater than 1.5 and less than 2.0, a high-frequency alarm signal is generated; When the ratio is greater than or equal to 2.0, an ultra-high frequency alarm signal is generated; Pre-rain alarm device: used for sound and light alarm according to the alarm signal; Pre-rain emergency preparation trigger: used to send a text signal to the pre-rain emergency preparation monitoring display according to the alarm signal.

3. The monitoring system for the outdoor rainwater pipe network of a subway vehicle base according to claim 2 is characterized in that: The text signal sent by the pre-rain emergency preparation trigger includes: If there is no alarm signal, a text signal of "normal rainfall" is sent; If a low-frequency alarm signal is received, a text signal of "conventional flood prevention" is sent; If a high-frequency alarm signal is received, a text signal of "emergency flood prevention, activate emergency plan" is sent; If an ultra-high frequency alarm signal is received, a text signal of "emergency flood prevention and rescue, activate emergency plan, evacuate people" will be sent.

4. The monitoring system for the outdoor rainwater pipe network of a subway vehicle base according to claim 1 is characterized in that: The post-rain lifting transformation monitoring module includes: Past rainfall data collection storage: used to collect the historical rainfall of each collection pipe section at each rainfall duration within 20 years; Actual rainfall data collection memory: used to collect annual rainfall at each rainfall duration of the current year; Modified rainstorm intensity formula calculator: used to calculate the modified parameters of the rainstorm intensity formula according to the historical rainfall and annual rainfall; Rainwater pipe network modified design flow calculator: used to obtain the modified flow according to the basic data of each collection pipe section and the modified parameters of the rainstorm intensity formula; Post-rain data processor: used to calculate the ratio of the design flow and the corrected flow of each collection pipe section; Post-rainfall alarm signal processor: used to determine the alarm signal based on the ratio of the design flow rate to the corrected flow rate, where: When the ratio is less than or equal to 1.0, no alarm signal is generated; When the ratio is greater than 1.0 and less than 1.5, a low-frequency alarm signal is generated; When the ratio is greater than 1.5 and less than 2.0, a high-frequency alarm signal is generated; When the ratio is greater than or equal to 2.0, an ultra-high frequency alarm signal is generated; After-rain alarm device: used for sound and light alarm according to the alarm signal; Post-rain emergency preparedness trigger: used to send a text signal to the post-rain emergency preparedness monitoring display according to the alarm signal.

5. The monitoring system for the outdoor rainwater pipe network of a subway vehicle base according to claim 4 is characterized in that: The sound and light alarm modes of the after-rain alarm device include: If there is no alarm signal, it will display green light; If a low-frequency alarm signal is received, a yellow light is displayed; If a high-frequency alarm signal is received, a red light will be displayed; If an ultra-high frequency alarm signal is received, a red light will be displayed and an alarm will sound.

6. A monitoring method for an outdoor rainwater pipe network of a subway vehicle base, wherein: The outdoor rainwater pipe network of the subway vehicle base includes several collection pipe sections, which are characterized by including: Obtaining basic data of each collection pipe section in the outdoor rainwater pipe network of the subway vehicle base and design parameters of the rainstorm intensity formula, wherein the basic data includes the catchment area, the runoff coefficient of the catchment area, the design rainfall duration and the design return period; Calculate the design flow of each collection pipe section based on the basic data of each collection pipe section and the design parameters of the rainstorm intensity formula; Obtaining the forecast rainfall of each collecting pipe section under the designed rainfall duration to calculate the forecast flow of each collecting pipe section, and determining whether to send an alarm signal according to the forecast flow and the designed flow of each collecting pipe section to obtain a first determination result; Display the basic data of each collection pipe section, the design parameters of the rainstorm intensity formula, the design flow, the forecast rainfall, the forecast flow and the first judgment result on the pre-rain emergency preparedness monitoring display; Obtaining the annual rainfall of each collecting pipe section within a preset period of time and the annual rainfall of the current year to calculate the corrected flow rate, and determining whether to send an alarm signal according to the corrected flow rate and the design flow rate of each collecting pipe section to obtain a second determination result; The basic data of each collection pipe section, the design parameters and correction parameters of the rainstorm intensity formula, the corrected flow rate and the second judgment result are displayed on the post-rainfall upgrade and transformation monitoring display.

7. The monitoring method for the outdoor rainwater pipe network of a subway vehicle base according to claim 1 is characterized in that: Obtaining the forecast rainfall of each collecting pipe section under the designed rainfall duration to calculate the forecast flow of each collecting pipe section, and judging whether to send an alarm signal according to the forecast flow and the designed flow of each collecting pipe section to obtain a first judgment result, including: Collect the rainfall forecast from the meteorological department under the designed rainfall duration of each collection pipe section; According to the basic data of each collecting pipe section and the predicted rainfall, the predicted flow of each collecting pipe section is calculated; Calculate the ratio of the design flow rate to the forecast flow rate for each collecting pipe section; The alarm signal is determined based on the ratio of the design flow rate to the forecast flow rate, where: When the ratio is less than or equal to 1.0, no alarm signal is generated; When the ratio is greater than 1.0 and less than 1.5, a low-frequency alarm signal is generated; When the ratio is greater than 1.5 and less than 2.0, a high-frequency alarm signal is generated; When the ratio is greater than or equal to 2.0, an ultra-high frequency alarm signal is generated; Performing an audible and visual alarm according to the alarm signal; A text signal is sent to the pre-rain emergency preparedness monitoring display according to the alarm signal.

8. The monitoring method for the outdoor rainwater pipe network of a subway vehicle base according to claim 1 is characterized in that: Sending a text signal to the pre-rain emergency preparedness monitoring display according to the alarm signal includes: If there is no alarm signal, a text signal of "normal rainfall" is sent; If a low-frequency alarm signal is received, a text signal of "conventional flood prevention" is sent; If a high-frequency alarm signal is received, a text signal of "emergency flood prevention, activate emergency plan" is sent; If an ultra-high frequency alarm signal is received, a text signal of "emergency flood prevention and rescue, activate emergency plan, evacuate people" will be sent.

9. The monitoring method for the outdoor rainwater pipe network of a subway vehicle base according to claim 1 is characterized in that: The method of obtaining the annual rainfall of each collecting pipe section within a preset period of time and the annual rainfall of the current year to calculate the corrected flow rate, and determining whether to send an alarm signal according to the corrected flow rate and the designed flow rate of each collecting pipe section to obtain a second determination result includes: Collect the annual rainfall of each collection pipe section at each rainfall duration within 20 years; Collect annual rainfall at each rainfall duration of the current year; Calculate the correction parameters of the rainstorm intensity formula based on the historical rainfall and annual rainfall; The corrected flow is obtained based on the basic data of each collection pipe section and the correction parameters of the rainstorm intensity formula; Calculate the ratio of the design flow rate and the corrected flow rate of each collecting pipe section; The alarm signal is determined based on the ratio of the design flow rate to the corrected flow rate, where: When the ratio is less than or equal to 1.0, no alarm signal is generated; When the ratio is greater than 1.0 and less than 1.5, a low-frequency alarm signal is generated; When the ratio is greater than 1.5 and less than 2.0, a high-frequency alarm signal is generated; When the ratio is greater than or equal to 2.0, an ultra-high frequency alarm signal is generated; Performing an audible and visual alarm according to the alarm signal; A text signal is sent to the post-rain emergency preparedness monitoring display according to the alarm signal.

10. The monitoring method for the outdoor rainwater pipe network of a subway vehicle base according to claim 1 is characterized in that: Performing an audible and visual alarm according to the alarm signal includes: If there is no alarm signal, it will display green light; If a low-frequency alarm signal is received, a yellow light is displayed; If a high-frequency alarm signal is received, a red light will be displayed; If an ultra-high frequency alarm signal is received, a red light will be displayed and an alarm will sound.