Design method and related device for heating primary air-powder mixture through steam extraction of coal-fired power plant
By determining the design parameters of the heat exchanger and fitting the relationship between the extraction flow rate and the air powder flow rate in a coal-fired power plant, the design of the extraction heated air powder mixture is solved, and the problem of difficulty in effectively controlling the heat exchanger in the prior art is solved. It improves heating efficiency and life, and enhances the combustion stability and safety of coal-fired power plants.
Patent Information
- Application Number
- CN202411235315.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-12-06
AI Technical Summary
The prior art lacks research on the influence law on the coupling characteristics of primary air powder mixtures for heating steam extraction and coal-fired power plants and quantitative analysis of primary air temperature by heating, which makes it difficult to effectively control and optimize the design and service life of heat exchangers.
By determining the heat exchanger design parameters under the maximum continuous operation of the boiler, and simulation of the steam extraction and heating air powder mixture under the steam turbine heat consumption acceptance conditions at different load levels, fitting the functions of the pumping flow rate and the air powder flow rate Relationship, evaluate the heating effect under load changes, and optimize the heat exchanger design to improve heating efficiency and life.
Effectively control and optimize the heat exchanger design, improve the efficiency of steam extraction and heating air powder under different loads, extend the service life of the heat exchanger, and improve the combustion stability and safety of coal-fired power plants.
Smart Images

Figure CN119089608A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of energy conservation in coal-fired power plants, and in particular relates to a design method and related devices for extracting steam to heat a primary air-powder mixture in a coal-fired power plant. Background Art
[0002] As the world's largest industrial country, my country's total manufacturing output accounts for 35% of the world's total, which is accompanied by huge energy consumption. Energy security is crucial to ensuring industrial production and economic development. In view of my country's energy status of rich coal, less oil and less gas, coal-fired power generation is the main form of electricity acquisition in my country. It has many advantages such as stable operation, mature technology, and high power generation quality. It can effectively alleviate the problem of large impact of new energy power generation on the power grid. However, this mode of coal-fired power generation assisting new energy power generation to complete the grid access also puts higher requirements on the variable load operation of coal-fired units. On this basis, the units participating in peak load regulation have a large load range and often operate between low load and high load. When the unit operates at extremely low load, unstable combustion and reduced hydrodynamic safety often occur, which leads to a significant reduction in boiler efficiency, even boiler flameout and other safety issues. Of course, the situation will be more serious when using high-moisture coal.
[0003] Heating pulverized coal can effectively solve the problems of pulverized coal agglomeration and pulverized coal pipe blockage, and reduce the output of the coal mill. At the same time, the heated pulverized coal has a higher temperature, which can reduce the heat absorption in the early stage of pulverized coal combustion and have a better combustion stabilization effect.
[0004] There are usually two ways to increase the temperature of the pulverized coal entering the furnace: heating the primary air (hereinafter referred to as primary air) and heating the primary air-pulverized coal mixture (hereinafter referred to as air-powder). Air heaters or pre-air preheaters are usually used to heat the air. This solution is relatively easy to implement, but the increase in the temperature of the pulverized coal entering the furnace is relatively limited. Heating the pulverized coal at the outlet of the coal mill can increase the temperature of the pulverized coal entering the furnace to a higher temperature, and the pulverized coal can increase the heat transfer coefficient as a turbulent, but it will also increase the wear of the heat exchanger. The existing technology lacks research on the influence of the coupling characteristics of the extraction steam heating primary air-pulverized mixture, as well as quantitative analysis of the specific effects of heating on the primary air temperature. This makes it difficult to effectively control and optimize the design and service life of the heat exchanger. Summary of the invention
[0005] In view of this, the present invention aims to propose a design method and related device for heating a primary air-powder mixture with extraction steam in a coal-fired power plant, so as to solve the problems existing in the prior art.
[0006] In order to solve the above technical problems, the technical solutions provided by the present invention are as follows:
[0007] In a first aspect, the present invention provides a design method for heating a primary air-powder mixture with extraction steam in a coal-fired power plant, comprising the following steps:
[0008] Under the maximum continuous operation condition of the boiler, the design parameters of the heat exchanger are determined according to the heating index requirements of the extraction steam heating the primary air-powder mixture;
[0009] The designed heat exchanger is applied to the steam turbine heat rate acceptance conditions at different load levels to determine the steam extraction flow rate that can heat the heat exchanger outlet air powder temperature to meet the heating index requirements under each steam turbine heat rate acceptance condition;
[0010] The extraction steam flow and the heated air and powder flow are fitted under the maximum continuous operation condition of the boiler and the heat consumption acceptance condition of the steam turbine at different load levels to obtain the functional relationship between the extraction steam flow and the air and powder flow.
[0011] Based on the functional relationship between the extraction steam flow and the air-powder flow, the ratio of the air-powder flow to the extraction steam flow under different loads is calculated, and the relationship between the ratio and the load is determined;
[0012] Based on the relationship between the ratio and load, the effect of extraction steam heating air powder under different loads is evaluated, and the design of the heat exchanger under the corresponding load is optimized based on the heating effect.
[0013] Furthermore, the design parameters of the heat exchanger are determined according to the heating index requirements of the extraction steam heating the primary air-powder mixture under the maximum continuous operation condition of the boiler, including:
[0014] The pre-established heat exchanger model is used to simulate the extraction steam heating air powder under the maximum continuous operation condition of the boiler. The design parameters of the heat exchanger model are determined based on the given heat exchanger inlet and outlet parameters and flow parameters. The heat exchanger inlet and outlet parameters meet the heating index requirements. The design parameters at least include the convective heat transfer coefficient and the heat exchange area.
[0015] Furthermore, the process of simulating the extraction steam heating air powder includes:
[0016] The air-powder mixture with a first temperature flows into the heat exchanger from the inlet, is heated by the extraction steam, and the heated air-powder flows out from the outlet of the heat exchanger. The extraction steam is cooled to drain water after heat exchange and leaves the heat exchanger.
[0017] Furthermore, the process of extraction steam heating air powder simulation satisfies the following relationship:
[0018]
[0019]
[0020]
[0021] In the formula, is the thermal power, is the mass flow rate, is the specific enthalpy, is the logarithmic mean temperature difference of heat transfer, subscript and They represent air powder and extraction steam respectively, and 0 and 1 represent the inlet and outlet of the heat exchanger respectively.
[0022] Furthermore, the designed heat exchanger is applied to steam turbine heat rate acceptance conditions at different load levels, including:
[0023] According to the ratio of the air-powder flow rate under the steam turbine heat rate acceptance condition at different load levels to the maximum continuous operation condition of the boiler, the convective heat transfer coefficient and heat transfer area of the heat exchanger under each steam turbine heat rate acceptance condition are determined;
[0024] Keep the inlet air and powder temperature of the heat exchanger unchanged, and adjust the extraction steam flow rate so that the difference between the outlet air and powder temperature of the heat exchanger and the inlet air and powder temperature meets the heating index requirements.
[0025] Further, the relationship between the ratio and the load is determined, including:
[0026] Determine the mass flow rate of air powder that can be heated by unit mass flow extraction steam at different load levels to meet the heating index requirements.
[0027] Furthermore, the heat rate acceptance conditions of steam turbines at different load levels include:
[0028] 100% steam turbine heat rate acceptance condition, 75% steam turbine heat rate acceptance condition, 50% steam turbine heat rate acceptance condition and 40% steam turbine heat rate acceptance condition.
[0029] In a second aspect, the present invention provides a design device for heating a primary air-powder mixture with extraction steam in a coal-fired power plant, comprising:
[0030] Heat exchanger design module, used to determine the design parameters of the heat exchanger according to the heating index requirements of the primary air-powder mixture heated by extraction steam under the maximum continuous operation condition of the boiler;
[0031] The variable load simulation module is used to apply the designed heat exchanger to the turbine heat rate acceptance conditions at different load levels, and determine the steam extraction flow rate that can heat the heat exchanger outlet air powder temperature to meet the heating index requirements under each turbine heat rate acceptance condition;
[0032] The first fitting module is used to fit the extraction steam flow rate and the heated air powder flow rate under the maximum continuous operation condition of the boiler and the heat consumption acceptance condition of the steam turbine at different load levels to obtain the functional relationship between the extraction steam flow rate and the air powder flow rate;
[0033] The second fitting module is used to calculate the ratio of the air-powder flow rate to the extraction flow rate under different loads based on the functional relationship between the extraction flow rate and the air-powder flow rate, and determine the relationship between the ratio and the load;
[0034] The result analysis module is used to evaluate the effect of extraction steam heating air powder under different loads based on the relationship between the ratio and load, and optimize the design of the heat exchanger under the corresponding load based on the heating effect.
[0035] Accordingly, the present invention provides a computer device, the device comprising a processor and a memory:
[0036] The memory is used to store the computer program and send the instructions of the computer program to the processor;
[0037] The processor executes the design method of using extraction steam to heat primary air-powder mixture in a coal-fired power plant as described in the first aspect according to the instructions of the computer program.
[0038] Accordingly, the present invention provides a computer-readable storage medium, characterized in that a computer program is stored on the computer-readable storage medium, and when the computer program is executed by a processor, a design method for extracting steam to heat a primary air-powder mixture in a coal-fired power plant is implemented as in the first aspect.
[0039] In summary, the present invention provides a design method and related device for extracting steam to heat a primary air-powder mixture in a coal-fired power plant, including determining the design parameters of a heat exchanger according to the heating index requirements of the extracting steam to heat the primary air-powder mixture under BMCR conditions; applying the designed heat exchanger to THA conditions with different load levels, and determining the extraction flow rate that heats the air-powder temperature at the heat exchanger outlet to meet the heating index requirements under each THA condition; fitting the extraction flow rate and the heated air-powder flow rate under BMCR conditions and THA conditions with different load levels to obtain the functional relationship between the extraction flow rate and the air-powder flow rate; calculating the ratio of the air-powder flow rate to the extraction flow rate under different loads based on the functional relationship between the extraction flow rate and the air-powder flow rate, and determining the relationship between the ratio and the load; evaluating the effect of extracting steam to heat the air-powder under different loads based on the relationship between the ratio and the load, and optimizing the design of the heat exchanger under the corresponding load based on the heating effect. The present invention determines the influence law of the coupling characteristics of the extraction steam heating primary air-powder mixture through variable load simulation under different conditions, and further determines the quantitative influence of heating on the primary air temperature, thereby effectively controlling and optimizing the design and service life of the heat exchanger. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0041] Figure 1A flow chart of a design method for heating primary air-powder mixture with extraction steam in a coal-fired power plant provided by an embodiment of the present invention;
[0042] Figure 2 A schematic diagram of extracting steam to heat air powder provided in an embodiment of the present invention;
[0043] Figure 3 The air powder and extraction steam temperature diagram provided by the embodiment of the present invention;
[0044] Figure 4 The air powder and extraction steam flow diagram provided by the embodiment of the present invention;
[0045] Figure 5 A graph showing mass ratio changes with load provided in an embodiment of the present invention;
[0046] Figure 6 A block diagram of a design device for heating primary air-powder mixture with extraction steam in a coal-fired power plant provided by an embodiment of the present invention;
[0047] Figure 7 A block diagram of a computer device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0048] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0049] See also Figure 1 This embodiment provides a design method for heating a primary air-powder mixture with extraction steam in a coal-fired power plant, comprising the following steps:
[0050] S1: Determine the design parameters of the heat exchanger according to the heating index requirements of the primary air-powder mixture heated by extraction steam under the maximum continuous operation condition of the boiler.
[0051] It should be noted that the boiler maximum continuous operating condition, namely the BMCR (Boiler Maximum Continuous Rating) condition, is the benchmark condition based on which the heat exchanger is designed. It refers to the maximum output state of the boiler under the conditions of meeting the steam parameters and furnace safety, that is, the maximum load at which the boiler can operate stably for a long time. Under this condition, various parameters of the boiler, such as steam flow, steam pressure, water level, fuel consumption, etc., have reached the design maximum value. The heating index requirement refers to the temperature that the primary air-powder mixture needs to reach before entering the burner. The design parameters include heat exchange area, pipe diameter, flow channel layout, etc. These parameters determine the performance of the heat exchanger.
[0052] This step determines the design parameters of the heat exchanger under BMCR conditions to ensure that the heat exchanger can meet the heating index requirements when operating at full load.
[0053] S2: Apply the designed heat exchanger to the steam turbine heat rate acceptance conditions at different load levels, and determine the steam extraction flow rate that can heat the outlet air powder temperature of the heat exchanger to meet the heating index requirements under each steam turbine heat rate acceptance condition.
[0054] It should be noted that the turbine heat acceptance condition, namely the THA (Turbine Heat Acceptance) condition, refers to the condition where the turbine can operate continuously and output rated power under specific operating conditions, namely, rated steam inlet parameters, rated back pressure, normal operation of the heat recovery system, and a feed water rate of 0%. Preferably, it includes full load (100% THA), 75% THA, 50% THA and 40% THA, etc. Extraction steam is used to heat the primary air-powder mixture, and the extraction steam flow determines the heating capacity and efficiency.
[0055] This step adjusts the extraction steam flow rate to ensure that the temperature of the air-powder mixture at the heat exchanger outlet can meet the heating index requirements at different load levels.
[0056] S3: Fit the extraction steam flow and the heated air-powder flow under the maximum continuous operation condition of the boiler and the heat consumption acceptance condition of the steam turbine at different load levels to obtain the functional relationship between the extraction steam flow and the air-powder flow.
[0057] It should be noted that this step determines the functional relationship between the extraction steam flow and the air-powder flow by mathematical methods, thereby obtaining a quantitative relationship between the extraction steam flow and the air-powder flow, so as to facilitate the prediction and control of the heating process under different loads.
[0058] S4: Based on the functional relationship between the extraction steam flow and the air-powder flow, the ratio of the air-powder flow to the extraction steam flow under different loads is calculated, and the relationship between the ratio and the load is determined.
[0059] It should be noted that the ratio of air-powder flow rate to extraction steam flow rate reflects the efficiency and performance of the heating process. The change relationship shows the trend of the ratio changing with load, which helps to understand the heating efficiency under different load levels.
[0060] This step understands the ratio relationship of the extraction steam heating air-powder mixture under different load levels, providing a basis for further optimization.
[0061] S5: Based on the relationship between the ratio and load, the effect of extraction steam heating air powder under different loads is evaluated, and the design of the heat exchanger under the corresponding load is optimized based on the heating effect.
[0062] It should be noted that this step evaluates the effect of extraction steam heating the air-powder mixture under different loads based on the relationship between the ratio of extraction steam flow rate to air-powder flow rate and load. Then, based on the evaluation results, the design parameters of the heat exchanger are adjusted to improve the heating efficiency under different load levels.
[0063] This embodiment provides a design method for extracting steam to heat the primary air-powder mixture in a coal-fired power plant. Through variable load simulation under different operating conditions, the method is used to determine the influence law of the coupling characteristics of the extracting steam to heat the primary air-powder mixture, and further determine the quantitative effect of heating on the primary air temperature, so as to effectively control and optimize the design and service life of the heat exchanger.
[0064] In some embodiments, the design parameters of the heat exchanger are determined according to the heating index requirements of the extraction steam heating the primary air-powder mixture under BMCR conditions, including:
[0065] Under BMCR conditions, the pre-established heat exchanger model is used to simulate the extraction steam heating air powder. The design parameters of the heat exchanger model are determined based on the given heat exchanger inlet and outlet parameters and flow parameters. The heat exchanger inlet and outlet parameters meet the heating index requirements, and the design parameters at least include the convective heat transfer coefficient and the heat exchange area.
[0066] In this embodiment, the heat exchanger inlet and outlet parameters may include the heat exchanger inlet temperature, outlet temperature, inlet pressure, outlet pressure, etc. The flow parameters are the extraction steam flow and the air-powder mixture flow.
[0067] The present embodiment is introduced below by taking an example.
[0068] In this example, the pulverizing system adopts a medium-speed mill positive pressure cold primary air fan direct blowing pulverizing system. The boiler is equipped with 6 coal mills, of which 5 are in operation and 1 is on standby. The coal mill model is HP1003, and every two coal mills provide coal powder for the burner on the same floor. The parameters of the coal mill inlet raw coal and primary air under various working conditions are shown in Table 1:
[0069] Table 1 Raw coal and primary air parameters
[0070]
[0071] Increasing the air powder temperature to enhance the stable combustion of the boiler under low load is an effective method. This example uses four-extraction heating air powder. Although the use of four-extraction heating air powder reduces part of the work of the steam turbine, the high-temperature air powder will also reduce the heat absorbed from the boiler, which is equivalent to using low-quality heat to replace high-quality chemical energy. At the same time, since this part of the extraction steam does not flow through the condenser, it also reduces the cold end loss of the condenser.
[0072] Ebsilon software can design heat exchangers according to needs. Under the design conditions, a sub-condition of BMCR non-design is established, and the heat exchanger is designed using the local design mode. The software does not calculate the convective heat transfer coefficient k and the heat transfer area A separately, but calculates the product of the two kA as a whole, and kA will change with the change of the mass flow rate of the cold fluid. The functional relationship between the two is built into the software in the form of a characteristic curve.
[0073] The air powder inlet temperature is set to 75℃. Shenhua coal has better quality and lower volatile matter content, so its air powder outlet temperature can be set to 105℃. The temperature of the fourth extraction is 377.95℃, and the drain temperature after heat release can be set to 90℃. According to the mass flow of air powder, the total steam extraction flow can be calculated to be 2.27kg / s.
[0074] The heat exchanger inlet and outlet parameters are shown in Table 2:
[0075] Table 2 Heat exchanger inlet and outlet parameters and total flow rate
[0076]
[0077] Based on the above data, the software can calculate the Δt (logarithmic mean temperature difference of heat exchange) and kA of the heat exchanger.
[0078] In this example, the controller is used to control the extraction steam flow rate to heat the air powder temperature to 105° C. The extraction steam flow rate required to heat the air powder to the target temperature is calculated.
[0079] Table 3 Heat exchanger design parameters
[0080]
[0081] In some embodiments, the process of extraction steam heating air powder simulation satisfies the following relationship:
[0082]
[0083] In the formula, is the thermal power, kW; is the mass flow rate, kg / s; is the specific enthalpy, kJ / kg; is the logarithmic mean temperature difference of heat exchange, using countercurrent arrangement, ℃. and They represent air powder and extraction steam, i.e., cold and hot fluids, respectively; 0 and 1 represent the inlet and outlet of the heat exchanger, respectively.
[0084] In this embodiment, the specific enthalpy is related to temperature and pressure, and is calculated by the software based on the built-in database. According to the law of conservation of energy, the heat release of hot fluid, the heat absorption of cold fluid, and the heat transfer between heat exchangers are consistent. Based on this, the extraction steam heating air powder simulation can be performed.
[0085] In some embodiments, the process of extraction steam heating air powder simulation is as follows: after the raw coal is ground into coal powder by the coal mill, it will be entrained by the high-temperature primary air from the air preheater. The primary air and coal powder are mixed with each other to form a uniformly distributed air-powder mixture with a temperature of about 75°C. The air-powder mixture then flows into the heat exchanger and is heated by the four-extraction steam. The high-temperature air powder is finally sprayed into the furnace through the burner for combustion, and the extraction steam is cooled to drain water after heat exchange and leaves the heat exchanger. The process of extraction steam heating air powder is as follows: Figure 2 shown.
[0086] In some embodiments, the designed heat exchanger is applied to THA conditions with different load levels, including:
[0087] The heat exchanger under each THA condition is determined based on the ratio of the air-powder flow rate under THA conditions at different load levels to that under BMCR conditions. Value, where is the convective heat transfer coefficient, is the heat exchange area;
[0088] Keep the inlet air and powder temperature of the heat exchanger unchanged, and adjust the extraction steam flow rate so that the difference between the outlet air and powder temperature of the heat exchanger and the inlet air and powder temperature meets the heating index requirements.
[0089] The present embodiment will be described below in conjunction with the aforementioned examples.
[0090] The kA value software under THA conditions can be automatically corrected according to the ratio of the flow rate of the cold fluid under this condition and the flow rate under BMCR conditions. Since the boiler has three layers of burners, three heat exchangers are designed to correspond to it in this example. The specifications of each heat exchanger are the same, and the design parameters of the heat exchanger are shown in Table 3. When calculating the heat exchange rate under other loads, the component will operate in non-design mode. The software will calculate the actual kA value based on the ratio of the mass flow rate of the actual cold fluid in the heat exchanger to the design flow rate, and then calculate the outlet temperature of the cold and hot fluids based on the law of conservation of energy. At the same time, in this example, a controller is used to control the extraction steam flow rate to heat the air powder temperature to 105°C. The extraction steam flow rate required to heat the air powder to the target temperature is calculated.
[0091] The designed heat exchanger was applied in non-design mode to four working conditions: 100%THA, 75%THA, 50%THA, and 40%THA. The inlet air-powder temperature of the heat exchanger was 75°C under each working condition. The controller component in the software was used to adjust the extraction steam flow rate to heat the outlet air-powder temperature of the heat exchanger to 105°C under each load. The extraction steam flow rate and drain temperature under each load were shown in Table 4:
[0092] Table 4 Variable load extraction steam and pulverized coal parameters
[0093]
[0094] It can be seen from the above table that as the load decreases, the extraction steam temperature gradually increases and the extraction steam volume gradually decreases.
[0095] According to the simulation results, the temperatures of air powder and extraction steam entering and leaving the heat exchanger are shown in Figure 3 As shown: the extraction temperature and air powder temperature are set according to the boiler operation data, and the air powder outlet temperature is the target value set by the controller. The drain temperature is calculated by the software based on the parameters of the heat exchanger and the cold and hot fluids.
[0096] The simulation results show that as the load increases, the extraction temperature tends to increase, while the drainage temperature tends to decrease. Figure 4 shown.
[0097] In some embodiments, determining the relationship between the ratio and the load includes:
[0098] Determine the mass flow rate of air powder that can be heated by unit mass flow extraction steam at different load levels to meet the heating index requirements.
[0099] In this embodiment, a cubic polynomial can be used to fit the functional relationship between the air-powder mass flow rate and the extraction steam flow rate. For the above example, the functional relationship is as follows:
[0100]
[0101] Correlation coefficient R 2 =0.9999, it can be seen that the function has a high degree of fit with the data. Figure 4 From the data, we can see that the change trend of the extraction steam flow and the pulverized coal flow with load is basically the same, both showing a decreasing trend. However, the change of the extraction steam flow with load is slightly higher than that of the air pulverized coal flow.
[0102] This embodiment further defines the mass ratio as the ratio of the air-powder mass flow rate to the extraction steam mass flow rate under a certain working condition. This data can describe that each kg / s of extraction steam heats a certain mass flow rate of air-powder to 105°C. The coal mass flow rate is used to replace the boiler load. The mass ratio changes with the coal mass flow rate. Figure 5 As shown. Figure 5 It can be seen that with the increase of load, the mass of air powder that can be heated by unit mass flow rate is gradually decreasing. This shows that the effect of heating air powder with extraction steam is better at low load. On the one hand, as the load decreases, the temperature of the extracted steam increases slightly, making the heat exchange efficiency better. On the other hand, as the load decreases, the air powder flow rate decreases almost linearly, but the decrease in the heat transfer coefficient is weaker than the change in flow rate, which enables the heat exchanger to cool the extraction steam to a lower temperature at low load, further improving the heat exchange temperature difference. However, the overall difference in heating ratio under low load and high load is small. This is because the main source of heat for heating air powder is the latent heat of extraction steam, compared with which, the proportion of sensible heat in heat transfer is smaller.
[0103] Combined with the above analysis, when designing the heat exchanger, the design of the heat exchanger can be optimized for low load conditions to make full use of the higher extraction temperature. At the same time, the heat exchange efficiency can be further improved by optimizing the heat exchanger design, such as by increasing the heat exchange area or adjusting the fluid flow path.
[0104] In some embodiments, THA conditions at different load levels include:
[0105] 100%THA, 75%THA, 50%THA and 40%THA.
[0106] Based on the same inventive concept, the embodiment of the present application also provides a design device for heating a primary air-powder mixture with steam extraction in a coal-fired power plant, which is used to implement the design method for heating a primary air-powder mixture with steam extraction in a coal-fired power plant. The implementation scheme for solving the problem provided by the system is similar to the implementation scheme recorded in the above method, so the specific limitations in the embodiment of the design device for heating a primary air-powder mixture with steam extraction in a coal-fired power plant provided below can be referred to the limitations of the design method for heating a primary air-powder mixture with steam extraction in a coal-fired power plant above, and will not be repeated here.
[0107] See also Figure 6 This embodiment provides a design device for heating a primary air-powder mixture with extraction steam in a coal-fired power plant, comprising:
[0108] Heat exchanger design module, used to determine the design parameters of the heat exchanger according to the heating index requirements of the primary air-powder mixture heated by extraction steam under the maximum continuous operation condition of the boiler;
[0109] The variable load simulation module is used to apply the designed heat exchanger to the turbine heat rate acceptance conditions at different load levels, and determine the steam extraction flow rate that can heat the heat exchanger outlet air powder temperature to meet the heating index requirements under each turbine heat rate acceptance condition;
[0110] The first fitting module is used to fit the extraction steam flow rate and the heated air powder flow rate under the maximum continuous operation condition of the boiler and the heat consumption acceptance condition of the steam turbine at different load levels to obtain the functional relationship between the extraction steam flow rate and the air powder flow rate;
[0111] The second fitting module is used to calculate the ratio of the air-powder flow rate to the extraction flow rate under different loads based on the functional relationship between the extraction flow rate and the air-powder flow rate, and determine the relationship between the ratio and the load;
[0112] The result analysis module is used to evaluate the effect of extraction steam heating air powder under different loads based on the relationship between the ratio and load, and optimize the design of the heat exchanger under the corresponding load based on the heating effect.
[0113] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0114] Reference Figure 7 An embodiment of the present invention further provides a computer device, comprising: a memory and a processor and a computer program stored in the memory. When the computer program is executed on the processor, a design method for heating a primary air-powder mixture with extraction steam in a coal-fired power plant as described in any one of the above methods is implemented.
[0115] The computer device may be a desktop computer, a notebook, a PDA, a cloud server or other computing device. The computer device may include, but is not limited to, a processor and a memory. Those skilled in the art will understand that Figure 7 It is only an example of a computer device and does not constitute a limitation of the computer device. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.
[0116] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0117] In some embodiments, the memory may be an internal storage unit of the computer device, such as a hard disk or memory of the computer device. In other embodiments, the memory may also be an external storage device of the computer device, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the computer device. Further, the memory may include both an internal storage unit and an external storage device of the computer device. The memory is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program. The memory may also be used to temporarily store data that has been output or is to be output.
[0118] An embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon. When the computer program is executed by a processor, the design method for heating primary air-powder mixture with extraction steam of a coal-fired power plant as described in any one of the above methods is implemented.
[0119] In this embodiment, if the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned various method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium can at least include: any entity or device that can carry the computer program code to the camera / terminal device, recording medium, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. For example, USB flash drive, mobile hard disk, disk or optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0120] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0121] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0122] In the embodiments disclosed in the present application, it should be understood that the disclosed devices / terminal equipment and methods can be implemented in other ways. For example, the device / terminal equipment embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0123] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A design method for heating primary air-powder mixture with extraction steam in a coal-fired power plant, characterized in that: The steps include: Under the maximum continuous operation condition of the boiler, the design parameters of the heat exchanger are determined according to the heating index requirements of the extraction steam heating the primary air-powder mixture; The designed heat exchanger is applied to the steam turbine heat rate acceptance working conditions at different load levels, and the extraction steam flow rate that heats the outlet air powder temperature of the heat exchanger to meet the heating index requirements is determined under each steam turbine heat rate acceptance working condition; Fitting the extraction steam flow and the heated air-powder flow under the maximum continuous operation condition of the boiler and under the heat consumption acceptance condition of the steam turbine at different load levels to obtain a functional relationship between the extraction steam flow and the air-powder flow; Calculating the ratio of the air-powder flow rate to the extraction flow rate at different loads based on the functional relationship between the extraction flow rate and the air-powder flow rate, and determining the relationship between the ratio and the load; Based on the relationship between the ratio and load, the effect of extraction steam heating air powder under different loads is evaluated, and the design of the heat exchanger under the corresponding load is optimized based on the heating effect.
2. The design method for heating primary air-powder mixture with extraction steam in a coal-fired power plant according to claim 1 is characterized in that: Under the maximum continuous operation condition of the boiler, the design parameters of the heat exchanger are determined according to the heating index requirements of the extraction steam heating the primary air-powder mixture, including: The extraction steam heating air powder simulation is performed using a pre-established heat exchanger model under the maximum continuous operation condition of the boiler. The design parameters of the heat exchanger model are determined based on the given heat exchanger inlet and outlet parameters and flow parameters. The heat exchanger inlet and outlet parameters meet the heating index requirements. The design parameters include at least the convective heat transfer coefficient and the heat exchange area.
3. The design method for heating primary air-powder mixture with extraction steam of coal-fired power plant according to claim 2 is characterized in that: The process of simulating the extraction steam heating air powder includes: The air-powder mixture with a first temperature flows into the heat exchanger from the inlet, is heated by the extraction steam, and the heated air-powder flows out from the outlet of the heat exchanger. The extraction steam is cooled to drain water after heat exchange and leaves the heat exchanger.
4. The design method for heating primary air-powder mixture with extraction steam of coal-fired power plant according to claim 2 or 3, characterized in that: The process of the extraction steam heating air powder simulation satisfies the following relationship: In the formula, is the thermal power, is the mass flow rate, is the specific enthalpy, is the logarithmic mean temperature difference of heat transfer, subscript and They represent air powder and extraction steam respectively, and 0 and 1 represent the inlet and outlet of the heat exchanger respectively.
5. The design method for heating primary air-powder mixture with extraction steam of coal-fired power plant according to claim 1 is characterized in that: The designed heat exchanger is applied to steam turbine heat rate acceptance conditions at different load levels, including: Determine the convective heat transfer coefficient and heat exchange area of the heat exchanger under each steam turbine heat rate acceptance condition according to the ratio of the air powder flow rate under the steam turbine heat rate acceptance condition at different load levels to the maximum continuous operation condition of the boiler; Keep the inlet air and powder temperature of the heat exchanger unchanged, and adjust the extraction steam flow rate so that the difference between the outlet air and powder temperature of the heat exchanger and the inlet air and powder temperature meets the heating index requirements.
6. The design method for heating primary air-powder mixture with extraction steam in a coal-fired power plant according to claim 1, characterized in that: Determining the relationship between the ratio and the load includes: Determine the mass flow rate of air powder that can be heated by unit mass flow extraction steam at different load levels to meet the heating index requirements.
7. The design method for heating primary air-powder mixture with extraction steam of coal-fired power plant according to claim 1, 2, 3, 5 or 6, characterized in that: The steam turbine heat rate acceptance conditions at different load levels include: 100% steam turbine heat rate acceptance condition, 75% steam turbine heat rate acceptance condition, 50% steam turbine heat rate acceptance condition and 40% steam turbine heat rate acceptance condition.
8. A design device for heating primary air-powder mixture with extraction steam in coal-fired power plants, characterized in that: include: Heat exchanger design module, used to determine the design parameters of the heat exchanger according to the heating index requirements of the primary air-powder mixture heated by extraction steam under the maximum continuous operation condition of the boiler; The variable load simulation module is used to apply the designed heat exchanger to the steam turbine heat rate acceptance conditions at different load levels, and determine the steam extraction flow rate that heats the heat exchanger outlet air powder temperature to meet the heating index requirements under each steam turbine heat rate acceptance condition; A first fitting module is used to fit the extraction steam flow and the heated air powder flow under the maximum continuous operation condition of the boiler and the heat consumption acceptance condition of the steam turbine at different load levels to obtain a functional relationship between the extraction steam flow and the air powder flow; A second fitting module is used to calculate the ratio of the air-powder flow rate to the extraction flow rate under different loads based on the functional relationship between the extraction flow rate and the air-powder flow rate, and determine the relationship between the ratio and the load; The result analysis module is used to evaluate the effect of steam extraction heating air powder under different loads based on the relationship between the ratio and the load, and optimize the design of the heat exchanger under the corresponding load based on the heating effect.
9. A computer device, characterized in that: The device comprises a processor and a memory: The memory is used to store a computer program and send instructions of the computer program to the processor; The processor executes a design method for heating a primary air-powder mixture with extraction steam in a coal-fired power plant according to any one of claims 1 to 7 according to the instructions of the computer program.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method for designing a coal-fired power plant steam extraction heating primary air-powder mixture according to any one of claims 1 to 7 is implemented.