Project management and visual analysis system
The project management and visual analysis system addresses inefficiencies in traditional project management by integrating real-time data visualization and collaborative tools, enhancing project tracking and risk management for improved efficiency and decision-making.
Patent Information
- Application Number
- CN202411126905.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-12-06
AI Technical Summary
Traditional project management systems struggle with manual recording and centralized data management, leading to inefficiencies in grasping project progress, especially with large volumes of data, and lack effective visualization tools for project managers.
A project management and visual analysis system utilizing a B/S architecture with a server and clients, incorporating a project progress management module, sub-project management, task implementation, interface development, and a visual analysis module to provide real-time, multi-dimensional data visualization and collaborative work tools.
Enhances project management efficiency by providing real-time, intuitive project progress tracking and risk identification, enabling better decision-making through integrated, scalable, and visually intuitive project management.
Smart Images

Figure CN119090134A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of information technology and data visualization technology, and in particular to a project management and visual analysis system. Background Art
[0002] In the process of technological innovation of an enterprise, there is usually a process of technical project establishment and project management.
[0003] Project management in traditional technology is generally recorded and managed manually, and lengthy technical meetings and summaries often occur, which invisibly reduces the company's technological innovation efficiency.
[0004] With the advancement of technology, some project management software has appeared on the market. These project management software usually integrate the function of progress management. However, these software only convert manual written records into data records on a computer terminal, and still use centralized management in management. When the project involves a lot of data, it is difficult for technical managers to accurately grasp the progress of project development.
[0005] Therefore, it is necessary to develop a project management system that can further improve the R&D efficiency of enterprises. Summary of the invention
[0006] In view of the above problems, the purpose of the present invention is to provide a project management and visual analysis system that integrates project progress management, collaborative work and multi-dimensional data visualization analysis functions to improve the efficiency and effectiveness of project management.
[0007] To achieve the above object, the present invention adopts the following technical solutions:
[0008] In a first aspect, the present application provides a project management and visual analysis system, the system comprising: a server and multiple clients using a B / S architecture;
[0009] The server includes a project progress management module, which is used to establish a project progress database of the technical project to be managed according to the instructions of the client;
[0010] The project progress management module includes a sub-project management table, which is used to divide the technical project to be managed into multiple sub-projects according to the instructions of the client, receive the sub-project development data of each client, and update the sub-project progress data of the multiple sub-projects;
[0011] The project progress management module also includes a task implementation and development schedule, which is used to create tasks corresponding to each of the sub-projects according to the instructions of the client, and accept task development data from each client to update the task progress data of each task;
[0012] The project progress management module also includes an interface development schedule, which is used to update the interface progress data of each interface according to the interface development data between each sub-project;
[0013] The server also includes a visual analysis module for analyzing the overall progress of the technical project to be managed based on the sub-project progress data, task progress data and interface progress data, and visually displaying the analysis results.
[0014] In one implementation, the server is used to calculate the overall completion rate OPOCR of the project based on the actual completion rate OPACR of each stage of each sub-project.
[0015] In one implementation, the overall completion rate OPOCR of the project is calculated as follows:
[0016] Sub-item progress completion rate
[0017] In one implementation, the server is used to calculate the project indicator: implementation progress completion rate IPCR according to the progress of each task.
[0018] In one implementation, the calculation formula is specifically:
[0019] Implementation progress completion rate IPCR = (task plan confirmation completion rate + task implementation completion rate + overall interface development progress completion rate IDCR) / 3.
[0020] In one implementation, the server is used to calculate the overall interface development progress completion rate IDCR of the project indicator according to the interface development progress data of the interface:
[0021] The overall interface development progress completion rate IDCR = (SOCR + ROCR) / 2, where
[0022] The overall development completion rate of the sender SOCR = (AVERAGE (sender solution confirmation completion rate) + AVERAGE (sender development completion rate) + AVERAGE (joint debugging test completion rate)) / 3,
[0023] The overall development completion rate of the receiver ROCR = (AVERAGE (receiver solution confirmation completion rate) + AVERAGE (receiver development completion rate) + AVERAGE (joint debugging test completion rate)) / 3.
[0024] In one implementation, the server also includes a project problem and risk tracking table for recording project problems encountered during the implementation of each sub-item. Users can fill in the problem name, problem description, related parties, risk level and whether it is resolved under the responsible sub-item.
[0025] In one implementation, the server also includes a weekly plan progress table for recording the weekly project plan and completion status of each sub-item.
[0026] The technical solution of the present invention has a positive impact on the collaborative management of information project progress, making daily project management, project display, and project reporting more visual and intelligent. Specifically, it includes the following features:
[0027] (1) Multidimensionality: This system builds data scene links that are horizontally connected and vertically connected between all levels of the project, forming a truly networked project management mechanism. The progress of each sub-item and task can be compared horizontally, and the development of each task and interface of a sub-item can be explored vertically to analyze progress bottlenecks and stuck points.
[0028] (2) Integration: The system integrates project progress management, collaborative work, and multi-dimensional data visualization and analysis functions.
[0029] (3) Visualization: The system provides a variety of visual charts and reports. The multi-dimensional visual analysis module displays project progress data in an intuitive form, helping users to understand project progress and data trends more intuitively, making it easier for project managers to quickly understand project status.
[0030] (4) Scalability: The system adopts a distributed architecture and cloud computing platform, supporting unlimited expansion and flexible configuration to meet the management needs of projects of different types and sizes. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 Schematic diagram of the functional structure of an embodiment of the present invention. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.
[0033] In view of the defects and problems of the prior art, the present application provides a project management and visual analysis system, the system comprising: a server and multiple clients adopting a B / S architecture; the server comprising a project progress management module, which is used to establish a project progress database of a technical project to be managed according to the instructions of the client; the project progress management module comprises a sub-project management table, which is used to divide the technical project to be managed into multiple sub-projects according to the instructions of the client, receive the sub-project development data of each client, and update the sub-project progress data of the multiple sub-projects; the project progress management module also comprises a task implementation and development schedule, which is used to create tasks corresponding to each of the sub-projects according to the instructions of the client, receive the task development data of each client, and update the task progress data of each task; the project progress management module also comprises an interface development schedule, which is used to update the interface progress data of each interface according to the interface development data between each sub-project; the server also comprises a visual analysis module, which is used to analyze the overall progress of the technical project to be managed according to the sub-project progress data, the task progress data and the interface progress data, and visualize the analysis results.
[0034] In conjunction with the accompanying drawings of the present invention, the above system and method flow are described in a more detailed embodiment.
[0035] In a detailed embodiment, the system is an information-based project progress collaborative management and multi-dimensional visual analysis system. The system integrates project progress management, collaborative work, and multi-dimensional data visual analysis functions to improve the efficiency and effectiveness of project management.
[0036] This system is designed based on B / S architecture. The platform adopts a full-component microservice architecture and supports multi-platform access, including PC, tablets and mobile phones. The back-end uses a high-performance distributed database and cloud computing platform to ensure data stability and scalability; the front-end adopts a responsive design to provide an intuitive and easy-to-use user interface. The specific technical implementation is as follows:
[0037] Back-end development: Java is used for back-end development to ensure the stability and scalability of the system. The database uses MySQL high-performance database to ensure data storage and query efficiency.
[0038] Front-end development: HTML5, CSS3 and JavaScript front-end technologies are used to achieve responsive design and rich user interaction functions. The front-end framework can adopt mainstream frameworks such as React or Vue to improve development efficiency and user experience.
[0039] Data visualization: ECharts data visualization library is used to realize multi-dimensional project progress data visualization. At the same time, it supports custom chart styles and interactive functions to meet the personalized needs of different users.
[0040] Collaborative work technology: WebSocket technology is used to achieve real-time message notification and online collaboration functions. At the same time, file upload and download technology is used to achieve file sharing functions to ensure information exchange and collaboration efficiency among team members.
[0041] This system includes the following functional modules:
[0042] (1) Project progress management module: This module collects, organizes and updates project progress information in real time by establishing a project progress database, including progress planning, monitoring and control. Users can create projects, assign functional development tasks, assign interface development tasks, and develop progress plans. At the same time, the system supports real-time updates of project progress information, including task completion status, progress percentage, remaining time, etc., to ensure the real-time and accuracy of project progress information. This module includes the following forms:
[0043] ① Sub-item management table: This form breaks down the overall project into multiple sub-items. The person in charge, planned completion time, and current stage of each sub-item may be different. At the same time, you can view all the contents of the sub-item in this table, including basic information of the sub-item, sub-item plan, overall progress, progress of each stage, completion of milestones of each task, completion of interfaces of other sub-item systems, and project risks. You can cancel or activate a sub-item through a button. When the sub-item is canceled, the sub-item does not allow new tasks or interface development work, and the sub-item does not participate in the analysis indicator calculation. The indicator items in this form are calculated as follows:
[0044] Project overall completion rate (POCR): Statistics of the actual completion rate (OPACR) of each sub-item in each stage of the project, and the weighted average value reflects the completion of the overall progress of the project. When calculating the overall completion rate of the project, the abolished sub-items need to be excluded.
[0045] The weight table design is as follows Table 1:
[0046]
[0047]
[0048] Table 1
[0049] The actual completion rate (OPACR) of each sub-item and each stage, except for the project implementation stage, is manually entered in the system by the project management personnel.
[0050] ②Task implementation and development schedule: This form breaks down sub-items into multiple tasks / milestone nodes. Each sub-task is independent. Users can create tasks, make task plans, track the progress of each stage of tasks, and assign interface development tasks. Tasks can be canceled or activated through buttons. When the task is canceled, new interface development work is not allowed for the task, and the task does not participate in the analysis indicator calculation. The indicator items in this form are calculated as follows:
[0051] Implementation Progress Completion Rate (IPCR): The ratio of the number of completed functions implemented in each sub-item of the project to the number of planned completions, reflecting the progress of function implementation. When calculating the task implementation completion rate, the abolished tasks need to be excluded.
[0052] Implementation progress completion rate IPCR = (task plan confirmation completion rate + task implementation completion rate + overall interface development progress completion rate IDCR) / 3.
[0053] The task plan confirmation completion rate is manually input by the project manager, and the task implementation completion rate is based on the actual implementation of the user. Select the on or off switch in the table below. If the switch is on, it will be included in the calculation, and the weight can be adjusted according to the actual project. In this case, the weight is 1.
[0054] The weight table is shown in Table 2.
[0055] Implementation progress category Weight coefficient ω Solution Confirmation 1 Function development 1 Interface development 1 Table Configuration 1 Association configuration 1 Process Configuration 1 Menu permission configuration 1
[0056] Table 2
[0057] ③Interface development schedule: This form will refine the various interface development tasks in the task. Each interface development task is independent. Users can create interface tasks and fill in the interface lists of the data sender and the data receiver. One interface task may involve multiple interface lists. Each interface list includes information such as interface name, transmission method, interface plan and related progress. As the data receiver, you are also required to provide development document attachments. At the same time, the multiple requirements and solution changes that may arise in the interface between the two parties are tracked through the solution change record. The interface development task can be abolished or activated through the button. When the interface development task is abolished, the interface development task does not allow the creation of new interface development work, and the interface development task does not participate in the analysis indicator calculation. The indicator items in this form are calculated as follows:
[0058] Overall interface development progress completion rate (IDCR): The ratio of the completed number of interface development of each sub-item of the statistical project to the planned completion number reflects the progress of interface development. Among them, a certain interface development task actually consists of multiple interface lists of the sender and the receiver. For example, interface development task a of platform A and platform B actually includes 3 development tasks of platform A and 2 development tasks of platform B. Therefore, the development completion rate of the sender and receiver of a development task is obtained by the progress average of multiple development interface lists of the development task. At the same time, when calculating the interface completion rate, the abolished interface tasks need to be excluded.
[0059] Sender's overall development completion rate SOCR = (AVERAGE (sender's solution confirmation completion rate) + AVERAGE (sender's development completion rate) + AVERAGE (joint debugging test completion rate)) / 3
[0060] Receiver overall development completion rate ROCR = (AVERAGE (receiver solution confirmation completion rate) + AVERAGE (receiver development completion rate) + AVERAGE (joint debugging test completion rate)) / 3
[0061] Overall interface development progress completion rate IDCR = (SOCR + ROCR) / 2
[0062] Among them, the sender's solution confirmation completion rate, sender's development completion rate, joint debugging and testing completion rate, receiver's solution confirmation completion rate, and receiver's development completion rate are all manually input by project managers.
[0063] ④ Project Problem and Risk Tracking Form: Record the project problems encountered during the implementation of each sub-item. Users can fill in the problem name, problem description, related parties, risk level and whether it has been resolved under the sub-item they are responsible for. If necessary, you can upload relevant attachments. The indicator items in this form are calculated as follows:
[0064] Project Risk Index (RI): Based on the sum of the risk level weights corresponding to the existing risk items of each sub-item, the project's risk level is comprehensively assessed. The higher the RI, the greater the project risk. It is necessary to assess whether the project progress is affected as soon as possible and adjust the project implementation strategy and plan in a timely manner. Among them, low risk α = 1, medium risk α = 2, and high risk α = 3.
[0065] ⑤ Weekly Plan Progress Form: This form is used to report the weekly plan and completion status of each sub-item. The weekly plan progress form template that needs to be filled in this week is automatically generated every Thursday, and the relevant sub-item person in charge completes it. The newly generated weekly plan progress form automatically brings out the work plan for this week reported last week, and the sub-item person in charge fills in the actual completion status of this week, the items that were not completed as planned and the reasons, the items to be coordinated, and the work plan for next week. The contents filled in by each sub-item are summarized through the statistical table.
[0066] (2) Multi-dimensional visualization analysis module: Use big data analysis and visualization technology to conduct multi-dimensional analysis of project progress data. Display information on project progress, cost, quality, etc. through charts, dashboards, etc., to help project managers quickly identify potential risks and problems. At the same time, this module also supports custom analysis dimensions to meet the personalized needs of different projects. In the multi-dimensional visualization analysis module, users can perform statistics, analysis, mining, and other operations on project progress data from different perspectives (such as time, tasks, resources, etc.) to discover potential problems and opportunities. The cockpit has a wealth of visualization charts and reports, including pie charts, bar charts, bullet charts, dashboards, etc., to help users understand the project progress more intuitively. Users can select different dimensions for analysis and display according to their needs, such as time, cost, quality, etc. Determine whether the project has a risk of delay through project progress and project countdown, and make timely predictions and warnings.
[0067] In summary, the method of the present invention has a positive impact on the collaborative management of information project progress, making daily project management, project display, and project reporting more visual and intelligent. Specifically, it includes the following features:
[0068] (1) Multidimensionality: This system builds data scene links that are horizontally connected and vertically connected between all levels of the project, forming a truly networked project management mechanism. The progress of each sub-item and task can be compared horizontally, and the development of each task and interface of a sub-item can be explored vertically to analyze progress bottlenecks and stuck points.
[0069] (2) Integration: The system integrates project progress management, collaborative work, and multi-dimensional data visualization and analysis functions.
[0070] (3) Visualization: The system provides a variety of visual charts and reports. The multi-dimensional visual analysis module displays project progress data in an intuitive form, helping users to understand project progress and data trends more intuitively, making it easier for project managers to quickly understand project status.
[0071] (4) Scalability: The system adopts a distributed architecture and cloud computing platform, supporting unlimited expansion and flexible configuration to meet the management needs of projects of different types and sizes.
[0072] In the several embodiments provided by the present invention, it should be understood that the disclosed method can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the above units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0073] The above-mentioned integrated unit implemented in the form of a software functional unit can be stored in a computer-readable storage medium. The above-mentioned software functional unit is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) or a processor (Processor) to perform some steps of the above-mentioned method of each embodiment of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), disk or optical disk and other media that can store program codes.
[0074] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A project management and visual analysis system, characterized in that: The system comprises: a server adopting a B / S architecture and multiple clients; The server includes a project progress management module, which is used to establish a project progress database of the technical project to be managed according to the instructions of the client; The project progress management module includes a sub-project management table, which is used to divide the technical project to be managed into multiple sub-projects according to the instructions of the client, receive the sub-project development data of each client, and update the sub-project progress data of the multiple sub-projects; The project progress management module also includes a task implementation and development schedule, which is used to create tasks corresponding to each of the sub-projects according to the instructions of the client, and accept task development data from each client to update the task progress data of each task; The project progress management module also includes an interface development schedule, which is used to update the interface progress data of each interface according to the interface development data between each sub-project; The server also includes a visual analysis module for analyzing the overall progress of the technical project to be managed based on the sub-project progress data, task progress data and interface progress data, and visually displaying the analysis results.
2. The project management and visual analysis system according to claim 1, characterized in that: The server is used to calculate the overall completion rate OPOCR of the project according to the actual completion rate OPACR of each stage of each sub-project.
3. The project management and visual analysis system according to claim 2, characterized in that: The overall completion rate OPOCR calculation formula of the project is:
4. The project management and visual analysis system according to claim 1, characterized in that: The server is used to calculate the project indicator: implementation progress completion rate IPCR according to the progress of each task.
5. The project management and visual analysis system according to claim 4, characterized in that: The specific calculation formula is: Implementation progress completion rate IPCR = (task plan confirmation completion rate + task implementation completion rate + overall interface development progress completion rate IDCR) / 3.
6. The project management and visual analysis system according to claim 1, characterized in that: The server is used to calculate the overall interface development progress completion rate IDCR of the project indicator according to the interface development progress data of the interface: Overall interface development progress completion rate IDCR = (SOCR + ROCR) / 2, where The overall development completion rate of the sender SOCR = (AVERAGE (sender solution confirmation completion rate) + AVERAGE (sender development completion rate) + AVERAGE (joint debugging test completion rate)) / 3, The overall development completion rate of the receiver ROCR = (AVERAGE (receiver solution confirmation completion rate) + AVERAGE (receiver development completion rate) + AVERAGE (joint debugging test completion rate)) / 3.
7. The project management and visual analysis system according to claim 1, characterized in that: The server also includes a project problem and risk tracking table for recording project problems encountered during the implementation of each sub-item. Users can fill in the problem name, problem description, related parties, risk level and whether it is resolved under the responsible sub-item.
8. The project management and visual analysis system according to claim 1, characterized in that: The server also includes a weekly plan progress table for recording the weekly project plan and completion status of each sub-item.