Traffic state transition domain estimation method considering MFD parameter uncertainty

The method addresses the challenge of accurately estimating traffic state transition domains by constructing a probability density model and performing double integration, enhancing the characterization of urban road network traffic flow evolution and supporting traffic operation evaluation and control.

CN119091629APending Publication Date: 2024-12-06XINJIANG UNIVERSITY
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411250033.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Existing methods struggle to accurately and individually discriminate the traffic operation status of specific urban road networks due to the inability to consider the uncertainty of Macroscopic Fundamental Diagram (MFD) parameter variations, leading to inconsistent model parameter estimation and insufficient empirical analysis of actual traffic flow data.

Method used

A method for estimating traffic state transition domains by constructing a probability density distribution model of road network traffic operation status transition points, using maximum likelihood estimation to determine mean and covariance parameters, and performing double integration to estimate the transition domain, considering the uncertainty of MFD parameters.

Benefits of technology

Enhances the accuracy of traffic state transition domain estimation, improving the characterization of urban road network traffic flow evolution and supporting traffic operation evaluation and control scheme optimization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119091629A_ABST
    Figure CN119091629A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of urban road network traffic, and particularly provides a traffic state transition domain estimation method considering MFD parameter uncertainty, and the method comprises the steps: obtaining the data of a road network traffic operation state transition point; constructing a probability density distribution model of the data of the road network traffic operation state transition points; and estimating the road network traffic state transition domain. On the basis of early-stage road network traffic operation state conversion point identification research, the road network traffic operation state conversion domain research considering the MFD time sequence uncertainty is developed by using multi-source complex traffic perception data, the accuracy of road network traffic flow state evolution feature description is improved, and the accuracy of road network traffic flow state evolution feature description is improved. And support is provided for applications such as urban road network traffic operation evaluation and traffic control scheme optimization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of urban road network traffic technology, and in particular to a traffic state transition domain estimation method considering MFD parameter uncertainty. Background Art

[0002] Characterization of the traffic operation status of urban road networks is an important part of accurately studying and judging the traffic operation rules of road networks to serve traffic congestion management. Although existing studies have proposed evaluation indicators or discrimination methods based on congestion index, there are still problems such as the inability to accurately and individually discriminate the traffic operation status of specific road networks in a data-driven manner. The macro basic map dynamically describes the traffic operation status of the road network at the macro level and is widely used in road network traffic status monitoring, regional threshold control, congestion charging, traffic safety, etc. Its existence has been confirmed in many cities around the world, and it has attracted the attention of more and more scholars. Many scholars have conducted research on the characteristics of the traffic operation status of road networks based on the macro basic map in theory and simulation. These studies have revealed important theoretical characteristics of the macro traffic flow state of the road network, such as: when the accumulated traffic volume of the road network reaches a certain level, the overall operation efficiency of the road network is optimal. This feature is also used in regional traffic control strategies (threshold control). However, most of the studies are based on the settings of simple road network structure, signal control and other factors, and the difference between it and the actual road network traffic flow characteristics still needs to be further explored.

[0003] Accurately grasping the traffic operation status of urban road networks and optimizing the spatial and temporal distribution of traffic demand are the core contents of actively alleviating urban road traffic congestion. The Macroscopic Fundamental Diagram (MFD) reveals the relationship between the accumulated traffic volume and the output flow of the road network at the macro level, providing a new way to analyze the traffic flow status of the road network.

[0004] On the one hand, the research based on theoretical methods analyzed the characteristics of the road network traffic flow state of the macro basic diagram. Daganzo and Gayah proved that when the road network accumulation reaches a certain value, a bifurcation point will appear in the MFD macro basic diagram, which distinguishes different road network traffic flow operation states. On this basis, a method based on the dynamic equation phase diagram is proposed to determine the boundaries of the stable and unstable regions of the road network traffic flow operation state in the MFD. Gayah and Daganzo found that the clockwise hysteresis phenomenon during congestion recovery is caused by the instability of the road network traffic flow. Daganzo and Geroliminis proposed an analytical approximation method to obtain the upper limit of the average flow constrained by the average traffic flow density of the road network. The road network traffic flow obtained in the study is defined as the theoretical capacity of the road network traffic flow. Later, Geroliminis and Boyac studied the impact of different section lengths and signal phases on the road network traffic capacity. Although these studies have revealed important characteristics of the macro road network traffic flow state, such characteristics are mostly based on the setting of simple road network structure, signal control and other factors, and their differences from the actual road network traffic characteristics still need to be further explored.

[0005] On the other hand, empirical studies have mostly focused on constructing MFD using different data sources. MFD construction is the basis for characterizing the characteristics of road network traffic operation status. Existing MFD construction methods can be divided into three types according to different data sources: based on cross-section detection traffic flow data, based on vehicle trajectory data, and based on the MFD fusion construction method of two types of data sources. In the early days, due to the limited spatial coverage of fixed vehicle detectors (magnetic coils, geomagnetism, microwaves, etc.), MFD construction mainly used cross-section traffic flow data collected by fixed vehicle detectors to expand the travel time and travel distance estimated based on floating vehicle vehicle trajectory sample data. With the gradual improvement of the spatial coverage of fixed vehicle detectors, considering the high reliability of the estimation of the average traffic flow of the road network under cross-section detection traffic flow data and the high reliability of the estimation of the average traffic flow density of the road network under vehicle trajectory data, in recent years, methods for estimating different MFD model parameters based on different data sources have emerged. The MFD construction method based on cross-section detection traffic flow data is greatly affected by the layout position of the detector in the road section, and cannot describe the overall traffic operation status of the road network. The MFD construction based on vehicle trajectory data has high requirements for the penetration rate of floating vehicles and the balance of the spatial distribution of floating vehicles in the road network. The method of estimating traffic flow parameters of different road networks using different data sources does not take into account the characteristic differences of different vehicle detectors, which leads to the problem of inconsistent model parameter estimation results. Compared with the MFD construction, the empirical analysis of road network traffic flow characteristics based on actual communication data is slightly insufficient. Saberi and Mahmassani conducted a comparative analysis of the coil detector data of three different highway networks and studied the phenomenon of reduced road network traffic capacity. Keyvan-Ekbatani and other scholars determined the optimal accumulation state through observation. Ampountolas and Kouvelas proposed a method based on Kalman filter to identify whether the current road network state is the optimal accumulation state according to the slope change trend between continuous state points in MFD. According to literature search, there is no report on the research on road network traffic operation state recognition and state evolution pattern recognition based on actual traffic flow data. Summary of the invention

[0006] The present disclosure aims to solve at least one of the technical problems existing in the prior art, and proposes a traffic state transition domain estimation method considering the uncertainty of MFD parameters.

[0007] In a first aspect, the present disclosure provides a method for estimating a traffic state transition domain considering MFD parameter uncertainty, comprising the following steps:

[0008] S1, obtaining data of the traffic operation status transition point of the road network;

[0009] S2, constructing a probability density distribution model of the data of the road network traffic operation status transition points;

[0010] S3, estimates the road network traffic state transition domain.

[0011] Preferably, before step S1, the method further includes S0:

[0012] The distribution form of the traffic operation status transition points of the road network is analyzed to obtain the data of the status transition points that conform to the normal distribution.

[0013] Preferably, the S0 specifically includes:

[0014] S01, firstly process the sample data and select the data to be tested;

[0015] S02, use R language to calculate the value of Shapiro-Wilk statistic W of the data;

[0016] S03, according to the sample size and significance level α = 0.05, find or calculate the corresponding critical value;

[0017] S04, finally, analyze the results and compare the value of W with the critical value; if the value of W is greater than the critical value, accept the null hypothesis that the data comes from a normal distribution; if the value of W is less than or equal to the critical value, reject the null hypothesis and believe that the data does not conform to a normal distribution.

[0018] Preferably, the probability density distribution model in S2 is expressed as:

[0019]

[0020] In the above formula, σ1, σ2, μ1, μ2, ρ are all constants, and σ1>0, σ2>0, -1<ρ<1. The function that satisfies the above formula becomes (X, Y) obeys the two-dimensional normal distribution;

[0021] When constructing the model, the existing data are the average road network occupancy O and the average road network traffic flow Q, which correspond to x and y in the data respectively; the unknown parameters include the mean μ1 and standard deviation σ1 of the average road network occupancy O, and the mean μ2 and standard deviation σ2 of the average road network traffic flow Q, as well as the correlation coefficient ρ between the average road network occupancy O and the average road network traffic flow Q; the study adopts the maximum likelihood estimation method to estimate and solve the above unknown parameters.

[0022] Preferably, the specific steps of the maximum likelihood estimation are as follows:

[0023] S21, given sample data X = {x1, x2, x3, ···, x N}, where each x i is an n-dimensional vector, and the likelihood function L(μ, Σ) is the product of the probability density functions of all sample points:

[0024]

[0025] Substitute the expression of the probability density function into the form of the likelihood function, where μ is the mean vector and ∑ is the covariance matrix.

[0026] S22, solve for the maximum likelihood estimate: Maximum likelihood estimate and is the parameter value that maximizes the likelihood function L(μ, Σ);

[0027] S23, estimation of the mean vector μ: Derivative the likelihood function L(μ, Σ) with respect to μ and set its solution equal to zero, and the solution is That is, the mean sample;

[0028] S24, estimation of the covariance matrix ∑: Derivative the likelihood function L(μ, ∑) with respect to ∑ and set its solution equal to zero, and the solution is: That is, the sample covariance matrix.

[0029] Preferably, the S3 specifically includes:

[0030] Based on the probability density distribution model of the state transition point obtained in step S2, double integration is performed within the specified interval, and the integration result is the state transition domain estimation result.

[0031] Preferably, the double integral formula in S3 is as follows:

[0032]

[0033] In the above formula, a and c correspond to the lower limits of the average road network occupancy rate O and the average road network traffic flow Q, respectively; b and d correspond to the upper limits of the average road network occupancy rate O and the average road network traffic flow Q, respectively; f xy (x, y) is the probability density distribution model.

[0034] Preferably, the double integral is solved as follows:

[0035] With the help of R language tools, cubature data packages and mvtnorm data packages are used to perform double integration on the data, so as to obtain the required double integration results, and determine whether it is within the transformation domain based on the integration results. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 A flow chart of a traffic state transition domain estimation method considering MFD parameter uncertainty provided by an embodiment of the present disclosure;

[0037] Figure 2 The traffic state transition point identification diagram provided by the prior art does not consider the uncertainty of MFD parameters;

[0038] Figure 3A traffic state transition domain identification diagram considering MFD parameter uncertainty provided in an embodiment of the present disclosure;

[0039] Figure 4 A QQ diagram for formal verification of the state transition point distribution provided by the embodiment of the present disclosure;

[0040] Figure 5 Result plot of the traffic state transition domain estimation method considering MFD parameter uncertainty. DETAILED DESCRIPTION

[0041] In order to enable those skilled in the art to better understand the technical solution of the present disclosure, the present disclosure is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0042] Unless otherwise defined, the technical terms or scientific terms used in the present disclosure should be understood by people with ordinary skills in the field to which the present disclosure belongs. The "first", "second" and similar words used in the present disclosure are not any order, quantity or importance, but are only used to distinguish different components. Similarly, similar words such as "one", "one" or "the" are not limited to quantity, but are at least one. "Including" or "including" and similar words mean that the elements or objects appearing before the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used for relative positional relationships. When the absolute position of the described target changes, the relative positional relationship may also change accordingly.

[0043] In each of the accompanying drawings, the same elements are represented by similar reference numerals. For the sake of clarity, the various parts in the accompanying drawings are not all drawn to scale. In addition, some well-known parts may not be shown in the drawings.

[0044] Many specific details of the present disclosure are described below, such as component structures, materials, dimensions, processing techniques, and technologies, in order to more clearly understand the present disclosure. However, as those skilled in the art will appreciate, the present disclosure may be implemented without following these specific details.

[0045] Many scholars have conducted research on the characteristics of road network traffic status in theory and simulation, but these characteristics are mostly obtained based on the settings of simple road network structures, signal control and other factors, and the differences between them and the actual road network traffic flow characteristics still need to be further explored.

[0046] Characterization of the traffic operation status of urban road networks is an important part of accurately studying and judging the traffic operation rules of road networks to serve traffic congestion management. Although existing studies have proposed evaluation indicators or discrimination methods based on congestion index, there are still problems such as the inability to accurately and individually discriminate the traffic operation status of specific road networks in a data-driven manner. The macro basic map dynamically describes the traffic operation status of the road network at the macro level and is widely used in road network traffic status monitoring, regional threshold control, congestion charging, traffic safety, etc. Its existence has been confirmed in many cities around the world, and it has attracted the attention of more and more scholars. Many scholars have conducted research on the characteristics of the traffic operation status of road networks based on the macro basic map in theory and simulation. These studies have revealed important theoretical characteristics of the macro traffic flow state of the road network, such as: when the accumulated traffic volume of the road network reaches a certain level, the overall operation efficiency of the road network is optimal. This feature is also used in regional traffic control strategies (threshold control). However, most of the studies are based on the settings of simple road network structure, signal control and other factors, and the difference between it and the actual road network traffic flow characteristics still needs to be further explored.

[0047] Based on actual traffic flow data, preliminary research has found that the two-dimensional time series characteristics of the average density and average flow of the road network before and after the two ends of the optimal cumulative state (best road network operation efficiency) in the macro basic diagram are significantly different. Considering that traffic flow has a continuous characteristic in time, the sudden change of its evolution characteristics usually means the change of traffic operation state. Based on this, Figure 1 As shown, an embodiment of the present invention provides a method for estimating a traffic state transition domain considering MFD parameter uncertainty, comprising the following steps:

[0048] S1, obtaining data of the traffic operation status transition point of the road network;

[0049] S2, constructing a probability density distribution model of the data of the road network traffic operation status transition points;

[0050] S3, estimates the road network traffic state transition domain.

[0051] This method is based on the study of actual road network traffic flow data and found that the proposed state transition point identification method preliminarily characterizes the characteristics of the optimal cumulative state (that is, the best overall road network operation efficiency). Taking into account that changes in factors such as traffic demand distribution, signal timing parameters, and weather environment will lead to the uncertainty of the urban road network traffic operation state parameters themselves, the present invention intends to use the previous research on the identification of road network traffic operation state transition points as a basis, and use multi-source complex traffic perception data to carry out research on the road network traffic operation state transition domain that considers the uncertainty of the MFD time series. Inspired by the idea of ​​identifying sudden changes in the state of road section traffic flow, it is proposed to use the abnormal changes in the characteristics between adjacent time series of the road network traffic operation state as the basis for identifying the transition of the road network traffic operation state. Improve the accuracy of the characterization of the evolution characteristics of the road network traffic flow state, and provide support for applications such as urban road network traffic operation evaluation and traffic control scheme optimization.

[0052] In a specific implementation scenario, refer to Figure 2 and Figure 3 As shown in the figure, by using the cross-sectional traffic flow data collected by the road section microwave detector, the average traffic flow and average traffic density of the road network are used as the state variables of the road network MFD, and the MFD time series before and after a certain state point under a certain window length (such as Figure 2 The dynamic time-bending distance between the two states represents the degree of change of the road network traffic flow evolution characteristic sequence corresponding to the state point, and the state point with the largest degree of change is the state transition point. The study preliminarily characterizes the characteristics of the optimal accumulation state.

[0053] However, previous studies have used the macro basic graph time series on typical working days as the research object to characterize the road network traffic flow operation status, and have not considered the problem that the parameters of urban road network traffic operation status are dynamically changed by the combined influence of factors such as weather, traffic demand, and control. In view of this, this project intends to further consider the uncertainty characteristics of road network traffic flow status based on the macro basic graph time series of multiple days to conduct a study on the road network traffic operation status conversion domain (research ideas such as Figure 3 The basic idea of ​​describing the uncertainty characteristics of road network traffic flow parameters is to regard the state transition points in the MFD of the same period on different weekdays / weekends as some kind of continuous random variables, assuming that they obey a known continuous probability distribution, and on this basis, use the MFD parameter distribution characteristics of the state transition points to describe their uncertainty, and then perform state transition domain estimation.

[0054] The preferred solution is to first analyze the distribution form of the road network traffic operation state transition points. Using the Shapiro-Wilk test method, the results show that the data of the state transition points conform to the normal distribution. After confirming that the data of the road network traffic operation state transition points with normal distribution are obtained, subsequent modeling is carried out to ensure the effectiveness and accuracy of the model.

[0055] The specific inspection steps are as follows:

[0056] The first step is to process the sample data and select the data to be tested.

[0057] The second step is to use R language to calculate the value of the Shapiro-Wilk statistic W of the data.

[0058] The third step is to find or calculate the corresponding critical value based on the sample size and significance level (such as α=0.05).

[0059] The fourth step is to analyze the results and compare the value of W with the critical value. If the value of W is greater than the critical value, the null hypothesis is accepted (that is, the data comes from a normal distribution); if the value of W is less than or equal to the critical value, the null hypothesis is rejected and the data is considered to be not in accordance with a normal distribution.

[0060] The preferred solution is to construct a joint probability distribution model of the parameters of the state transition point. Since the data obtained by S1 is normally distributed, the maximum likelihood method can be used to estimate the likelihood of the parameters required to build the model, and the obtained parameter estimation results can be substituted into the model for fitting verification. The parameter estimation method is reasonable and effective.

[0061] The constructed model is a two-dimensional normal distribution joint probability model (i.e., joint density distribution model), and the joint density formula can be expressed as:

[0062]

[0063] In the above formula, σ1, σ2, μ1, μ2, ρ are all constants, and σ1>0, σ2>0, -1<ρ<1. The function that satisfies the above formula becomes (X, Y) obeys the two-dimensional normal distribution.

[0064] When constructing the model, the existing data are the average road network occupancy rate O and the average road network traffic flow rate Q. They correspond to x and y in the data respectively. The unknown parameters include the mean μ1 and standard deviation σ1 of the average road network occupancy rate O, the mean μ2 and standard deviation σ2 of the average road network traffic flow rate Q, and the correlation coefficient ρ between the average road network occupancy rate O and the average road network traffic flow rate Q. The study uses the maximum likelihood estimation method to estimate and solve the above unknown parameters. Figure 4 As shown, the fitting results show that the parameters are highly reliable.

[0065] The specific steps of maximum likelihood estimation are as follows:

[0066] S21, construct likelihood function: given sample data X = {x1, x2, x3, ···, x N}, where each x i is an n-dimensional vector, and the likelihood function L(μ, Σ) is the product of the probability density functions of all sample points:

[0067]

[0068] Substituting the expression of the probability density function, we can obtain the specific form of the likelihood function.

[0069] S22, solve for the maximum likelihood estimate: Maximum likelihood estimate and It is the parameter value that maximizes the likelihood function L(μ, Σ). This is usually achieved by solving the derivative of the likelihood function and setting it equal to zero.

[0070] S23, estimation of mean vector μ: Derivative the likelihood function L(μ, Σ) with respect to μ and set its solution equal to zero, and the solution is: That is, the mean sample.

[0071] S24, estimation of the covariance matrix ∑: Derivative the likelihood function L(μ, ∑) with respect to ∑ and set its solution equal to zero, and the solution is: That is, the sample covariance matrix.

[0072] Through the above steps, we can get the mean vector and the covariance matrix These estimates can be used as the estimation results of the parameters of the multivariate normal distribution model for subsequent statistical analysis and prediction. The results of the state transition domain estimation model parameters based on the maximum likelihood estimation method are shown in the following table:

[0073]

[0074] The preferred solution is to obtain the probability density distribution model of the state transition point based on step S2, and perform double integration within the specified interval, and the integration result is the state transition domain estimation result. Figure 5 It can be seen that the characteristics of the probability of each state point belonging to the transition point estimated by the model changing over time are basically consistent with the expected probability change law. Among them, the probability of the transition point estimated to belong to the transition point is near the probability peak, and the model estimation result is relatively reasonable.

[0075] The study of traffic state transition domain is essentially an in-depth study of the specific interval where the traffic state transition point is located. The core goal of this study is to estimate the probability of a known pair of road network average occupancy O and average road network traffic flow Q data sets appearing in the transition domain. To achieve this goal, it is necessary to establish a joint probability distribution model (i.e., probability density distribution model) of the normal distribution of traffic state transition points. By double integrating the model, the required probability value can be obtained. The required formula is as follows:

[0076]

[0077] In the above formula, a and c correspond to the lower limits of O and Q respectively, and b and d correspond to the upper limits of O and Q respectively. When using the above formula for double integration, the project uses R language tools, cubature data packages and mvtnorm data packages to perform double integration on the data, thereby obtaining the required double integration results, and judging whether it is within the conversion domain based on the integration results. This method is efficient and can ensure the correctness of the solution value.

[0078] It is to be understood that the above embodiments are merely exemplary embodiments used to illustrate the principles of the present disclosure, but the present disclosure is not limited thereto. For those of ordinary skill in the art, various modifications and improvements can be made without departing from the spirit and substance of the present disclosure, and these modifications and improvements are also considered to be within the scope of protection of the present disclosure.

Claims

1. A traffic state transition domain estimation method considering MFD parameter uncertainty, characterized in that: The following steps are involved: S1, obtaining data of the traffic operation status transition point of the road network; S2, constructing a probability density distribution model of the data of the road network traffic operation status transition points; S3, estimates the road network traffic state transition domain.

2. The method for estimating the traffic state transition domain considering MFD parameter uncertainty according to claim 1, characterized in that: Before step S1, step S0 is also included: The distribution form of the traffic operation status transition points of the road network is analyzed to obtain the data of the status transition points that conform to the normal distribution.

3. The traffic state transition domain estimation method considering MFD parameter uncertainty according to claim 2, characterized in that: The S0 specifically includes: S01, firstly process the sample data and select the data to be tested; S02, use R language to calculate the value of Shapiro-Wilk statistic W of the data; S03, according to the sample size and significance level α = 0.05, find or calculate the corresponding critical value; S04, finally, analyze the results and compare the value of W with the critical value; if the value of W is greater than the critical value, accept the null hypothesis that the data comes from a normal distribution; if the value of W is less than or equal to the critical value, reject the null hypothesis and believe that the data does not conform to a normal distribution.

4. The traffic state transition domain estimation method considering MFD parameter uncertainty according to claim 1, characterized in that: The probability density distribution model in S2 is expressed as: In the above formula, σ1, σ2, μ1, μ2, ρ are all constants, and σ1>0, σ2>0, -1<ρ<1. The function that satisfies the above formula becomes (X, Y) obeys the two-dimensional normal distribution; When constructing the model, the existing data are the average road network occupancy O and the average road network traffic flow Q, which correspond to x and y in the data respectively; the unknown parameters include the mean μ1 and standard deviation σ1 of the average road network occupancy O, and the mean μ2 and standard deviation σ2 of the average road network traffic flow Q, as well as the correlation coefficient ρ between the average road network occupancy O and the average road network traffic flow Q; the study adopts the maximum likelihood estimation method to estimate and solve the above unknown parameters.

5. The method for estimating the traffic state transition domain considering MFD parameter uncertainty according to claim 4, characterized in that: The specific steps of the maximum likelihood estimation are as follows: S21, given sample data X = {x1, x2, x3, ···, x N }, where each x i is an n-dimensional vector, and the likelihood function L(μ, Σ) is the product of the probability density functions of all sample points: Substitute the expression of the probability density function into the form of the likelihood function, where μ is the mean vector and ∑ is the covariance matrix. S22, solve for the maximum likelihood estimate: Maximum likelihood estimate and is the parameter value that maximizes the likelihood function L(μ, Σ); S23, estimation of the mean vector μ: Derivative the likelihood function L(μ, Σ) with respect to μ and set its solution equal to zero, and the solution is That is, the mean sample; S24, estimation of the covariance matrix ∑: Derivative the likelihood function L(μ, ∑) with respect to ∑ and set its solution equal to zero, and the solution is: That is, the sample covariance matrix.

6. The traffic state transition domain estimation method considering MFD parameter uncertainty according to claim 1, characterized in that: The S3 specifically includes: Based on the probability density distribution model of the state transition point obtained in step S2, double integration is performed within the specified interval, and the integration result is the state transition domain estimation result.

7. The method for estimating the traffic state transition domain considering MFD parameter uncertainty according to claim 6, characterized in that: The double integral formula in S3 is as follows: In the above formula, a and c correspond to the lower limits of the average road network occupancy rate O and the average road network traffic flow Q, respectively; b and d correspond to the upper limits of the average road network occupancy rate O and the average road network traffic flow Q, respectively; f xy (x, y) is the probability density distribution model.

8. The method for estimating traffic state transition domain considering MFD parameter uncertainty according to claim 7, characterized in that: The double integral is solved as follows: With the help of R language tools, cubature data packages and mvtnorm data packages are used to perform double integration on the data, so as to obtain the required double integration results, and determine whether it is within the transformation domain based on the integration results.

Citation Information

Cited By

  • Ramp coordination control method and device suitable for novel mixed traffic flow scene

    CN119832740A