Container storage device and automatic analysis system

By cutting off and restarting power supply in the automatic analysis system, the problem of the inability of the prior art to maintain the required power units and the need for power units is solved, and the maintenance capability of the container storage device is realized, reducing the downtime of the automatic analysis system.

CN119096145APending Publication Date: 2024-12-06HITACHI HIGH TECH CORP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202380031992.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-04-18
Filing Date
2023-02-17
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The prior art cannot maintain power-demand units in mechanisms where power supply is stopped, resulting in the inability to maintain both power-demand units and power-demand units simultaneously.

Method used

By cutting off communication between the power required and powerless units in the system control device and stopping power supply, power supply to the power required units is restarted to perform maintenance in the state of shutting off communication during maintenance.

Benefits of technology

It realizes the ability to maintain the container storage device and automatic analysis system that require power units and do not require power units at the same time, reducing the downtime of the automatic analysis system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119096145A_ABST
    Figure CN119096145A_ABST
Patent Text Reader

Abstract

The invention provides a container storage device and an automatic analysis system, which can maintain not only unnecessary power units but also necessary power units. This container storage device is provided with a plurality of mechanisms having a prescribed function and a control unit for controlling each mechanism, and is used for storing containers, and is characterized in that: the mechanisms have a power-requiring unit that requires power supply for maintenance and a power-not-requiring unit that does not require power supply for maintenance; the control unit cuts off communication with the power-requiring unit and the power-not-requiring unit and stops power supply, and when the power-requiring unit is maintained, the control unit resumes power supply to the power-requiring unit in a state in which the communication is cut off.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a container storage device and an automatic analysis system. Background Art

[0002] The automatic analysis system includes: an automatic analysis device that analyzes specific components contained in a specimen such as blood or urine; various pretreatment devices that perform various pretreatments on the specimen; and a conveyor device that conveys a specimen container containing the specimen to the automatic analysis device. In order to reduce the downtime of the automatic analysis system, it is desired that when one of the multiple devices is under maintenance, other devices such as the conveyor device can also be operated. In addition, in each device, it is also desired that other mechanisms can also be operated while a specific mechanism is being maintained.

[0003] Patent Document 1 discloses that, in a sample processing apparatus having a plurality of mechanisms having individual functions, power supply to a specific mechanism is stopped while power supply to other mechanisms is continued, thereby allowing other mechanisms to operate while maintenance is performed on the specific mechanism. Prior art literature Patent Literature

[0004] Patent Document 1: Japanese Patent No. 6453078 Summary of the invention Technical problem to be solved by the invention

[0005] However, Patent Document 1 does not consider the case where a specific unit in a mechanism with power supply stopped is operated and maintained at the same time. The mechanism includes a required power unit that is operated while power is supplied and maintained, and an unnecessary power unit that is maintained without operating. When power supply to a specific mechanism is stopped, the required power unit cannot be maintained.

[0006] Therefore, an object of the present invention is to provide a container storage device and an automatic analysis system capable of maintaining not only a unit that does not require power but also a unit that requires power. Technical means for solving technical problems

[0007] In order to achieve the above-mentioned purpose, the container storage device of the present invention includes a plurality of mechanisms having prescribed functions and a control unit that controls each mechanism, and the device is used for storing containers, and is characterized in that the mechanisms have a required power unit that requires power supply for maintenance and an unrequired power unit that does not require power supply for maintenance, and the control unit cuts off communication with the required power unit and the unrequired power unit and stops power supply, and when the required power unit is maintained, the power supply to the required power unit is restarted in the state where the communication is cut off.

[0008] Furthermore, the present invention is an automatic analysis system characterized in that the container storage device is located between an automatic analysis device for analyzing a specimen and a conveying device for conveying the specimen. Effects of the Invention

[0009] According to the present invention, it is possible to provide a container storage device and an automatic analysis system capable of maintaining not only a unit that does not require power but also a unit that requires power. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a diagram showing a configuration example of the automatic analysis system of Example 1. Figure 2 It is a diagram showing a configuration example of a quality control sample storage device. Figure 3 This is a diagram showing an example of connection between the quality control sample storage device and other devices. Figure 4 This is a diagram showing another example of connection between the quality control sample storage device and other devices. Figure 5 This is a diagram showing a structural example of Example 1. Figure 6 This is a diagram showing an example of the flow of processing in Example 1. Figure 7 This is a diagram showing a structural example of Example 2. Figure 8 This is a diagram showing a structural example of Example 3. DETAILED DESCRIPTION

[0011] Hereinafter, embodiments of the container storage device and the automatic analysis system will be described with reference to the drawings. [Example 1]

[0012] use Figure 1 , an example of the structure of the automatic analysis system of Example 1 is described. Figure 1 The automatic analysis system shown includes an automatic analysis device 3 , an input / recovery device 2 , a quality control specimen storage device 1 , a conveyor device 4 , and a system control device 5 .

[0013] The automatic analyzer 3 is a device for automatically analyzing specific components contained in a specimen such as blood or urine provided by a patient. The input / recovery device 2 is a device for inputting or recovering a specimen container containing a specimen. The precision management specimen storage device 1 is a device for storing a specimen container containing a precision management specimen. The precision management specimen is a specimen used for managing the analysis precision of the automatic analyzer 3. The conveying device 4 is a device for conveying specimen containers to the automatic analyzer 3, the input / recovery device 2, and the precision management specimen storage device 1.

[0014] The system control device 5 is a device that controls the automatic analysis device 3, the input / recovery device 2, and the quality control specimen storage device 1, and is composed of, for example, a computer. Input / output devices such as a keyboard, a mouse, a monitor, and a touch panel may be connected to the system control device 5. The input / output device inputs the operating conditions of the automatic analysis system or displays the operating status.

[0015] The automatic analysis system may also include a pre-processing device for performing pre-processing such as centrifugal separation of blood, opening / closing of the specimen container, dispensing for subdividing the specimen, and attaching labels to the specimen container. In addition, the input / recovery device 2, the precision management specimen storage device 1, the automatic analysis device 3, and the pre-processing device include a plurality of mechanisms having prescribed functions and a control unit for controlling each mechanism. In this embodiment, the precision management specimen storage device 1 is described as a container storage device, but the input / recovery device 2, the automatic analysis device 3, and the pre-processing device for temporarily storing a container containing a specimen or liquid such as a reagent may also be used as a container storage device to apply the present invention.

[0016] use Figure 2 , a structural example of the precision management specimen storage device 1 is described. The precision management specimen storage device 1 includes a storage mechanism 13 and a conveying mechanism 14. The storage mechanism 13 is a mechanism having a function of storing a specimen container 15 containing a precision management specimen, and includes a cold storage for keeping a plurality of specimen containers 15 cold at a predetermined temperature. The conveying mechanism 14 is a mechanism having a function of conveying the specimen container 15, and includes a main line for conveying the specimen container 15 in a first direction and a return line for conveying the specimen container 15 in a direction opposite to the first direction. The precision management specimen storage device 1 is connected to other devices via the conveying mechanism 14.

[0017] Figure 3 The figure shows a configuration example in which the quality control specimen storage device 1 is connected between the conveyor device 4 and the input / recovery device 2. The specimen container 15 is conveyed from the conveyor device 4 to the input / recovery device 2 via the main line via the quality control specimen storage device 1, and is conveyed from the input / recovery device 2 to the conveyor device 4 via the return line via the quality control specimen storage device 1.

[0018] Figure 4 This shows a configuration example in which the quality control specimen storage device 1 is connected only to the input / recovery device 2. The specimen container 15 inserted by the operator from the emergency specimen insertion port 16 is transported from the quality control specimen storage device 1 to the input / recovery device 2 via the main line, and is transported from the input / recovery device 2 to the quality control specimen storage device 1 via the return line.

[0019] use Figure 5, taking the precision management specimen storage device 1 as an example, the detailed structure of the container storage device of Example 1 is described. The precision management specimen storage device 1 includes a storage mechanism 13 and a conveying mechanism 14, and includes a control unit 10, a power supply 11, and a power supply switching unit 12a~d. In addition, the storage mechanism 13 has a cold storage plate drive unit 20 and a cold storage baffle unit 21, etc., and the conveying mechanism 14 has a transfer line unit 22, a main line unit 23, etc. In addition, each unit includes a control substrate 30a~d, an actuator 31a~d, and a sensor 32a~d.

[0020] The control unit 10 is a device that controls the operation of each unit according to the control signal sent from the system control device 5, and is, for example, an MPU (Micro Processor Unit). The power supply 11 is a device that supplies power to each unit via the power supply switching units 12a to d, and is, for example, a converter that converts a commercial voltage into a DC voltage. The power supply switching units 12a to d are circuits that switch to continue or stop the power supply from the power supply 11 according to the control signal sent from the control unit 10.

[0021] The cold plate drive unit 20 is a unit that drives the cold plate placed in the cold storage with the specimen container placed thereon to rotate. The cold plate is driven to rotate by operating the actuator 31a using a control signal from the control substrate 30a and by causing the sensor 32a to detect the position of the cold plate. Maintenance of the cold plate drive unit 20 includes position adjustment in the rotation direction, and therefore power is required to drive the cold plate to rotate. That is, the cold plate drive unit 20 is a power-required unit that requires power during maintenance.

[0022] The cold storage damper unit 21 is a unit that drives the damper that opens and closes the cold storage opening. The damper is opened and closed by operating the actuator 31b using the control signal from the control substrate 30b and detecting the damper by the sensor 32b. Since only the parts replacement or cleaning is performed in the maintenance of the cold storage damper unit 21, no power supply is required. That is, the cold storage damper unit 21 is a power-free unit that does not require power supply during maintenance.

[0023] The transfer line unit 22 is a unit for transferring sample containers between lines for conveying sample containers. Since power supply is required for maintenance including horizontal position adjustment, a power unit is required.

[0024] The main line unit 23 is a unit that transports the specimen container in the first direction. During maintenance, only component replacement or cleaning is performed and power supply is not required. Therefore, the main line unit 23 is a power-free unit.

[0025] use Figure 6 An example of the flow of maintenance processing performed on the accuracy control sample storage device 1 is described step by step.

[0026] (S601) The control unit 10 determines whether a maintenance start signal has been received. S601 is repeated until a maintenance start signal is received, and when a maintenance start signal is received, the process proceeds to S602. The maintenance start signal is transmitted to the control unit 10 from the system control device 5 that has received a maintenance start operation from an operator.

[0027] (S602) The control unit 10 transmits a communication cutoff signal to the control boards 30 a and 30 b to stop the normal operation of the storage mechanism 13 .

[0028] (S603) The control unit 10 sends a power failure signal to the power switching units 12a and 12b to stop the power supply from the power supply 11 to the storage mechanism 13. By disconnecting the communication between the control unit 10 and the storage mechanism 13 in S602 and stopping the power supply to the storage mechanism 13 in S603, the storage mechanism 13 becomes a maintenance-ready state, and the cold storage baffle unit 21, which is a power-unnecessary unit, is maintained. The cold storage plate drive unit 20, which is a power-required unit, becomes a maintenance-ready state after the power supply is resumed. In addition, since the communication between the control unit 10 and the transmission mechanism 14 is not disconnected, and the power supply to the transmission mechanism 14 is not stopped, the transmission mechanism 14 maintains normal operation.

[0029] (S604) The control unit 10 determines whether a maintenance completion signal of an unnecessary power unit is received. S604 is repeated until a maintenance completion signal is received, and when a maintenance completion signal is received, the process proceeds to S605. The maintenance completion signal is sent to the control unit 10 from the system control device 5 that has received the maintenance completion operation of the operator.

[0030] (S605) The control unit sends a power supply signal to the power switching units 12a and 12b to restart the power supply from the power supply 11 to the storage mechanism 13. By restarting the power supply to the storage mechanism 13 in S605, the cold plate drive unit 20, which is a power unit requiring maintenance, becomes a maintenance-ready state. In the control substrates 30a to d, a program for performing a specific action when maintenance of the power unit is required is executed. The program can also be stored in a removable recording medium such as an SD card and executed by inserting the removable recording medium into the control substrates 30a to d.

[0031] (S606) The control unit 10 determines whether a maintenance completion signal of the required power unit is received. S606 is repeated until a maintenance completion signal is received. If a maintenance completion signal is received, the process proceeds to S607. The maintenance completion signal is sent to the control unit 10 from the system control device 5 that has received the maintenance completion operation of the operator.

[0032] (S607) The control unit 10 transmits a communication restart signal to the control boards 30 a and 30 b to restart the normal operation of the storage mechanism 13 .

[0033] By using Figure 6 The processing flow described above can maintain not only unnecessary power units but also necessary power units of the storage mechanism 13. Furthermore, during the maintenance of the storage mechanism 13, the transport mechanism 14 can be operated normally, thereby reducing the downtime of the automatic analysis system. [Example 2]

[0034] In the first embodiment, the control boards 30a to 30d execute the maintenance program for the required power unit stored in the removable recording medium. In the second embodiment, the maintenance program for the required power unit is executed by connecting an external PC storing the maintenance program to the control boards 30a to 30d.

[0035] use Figure 7 The detailed structure of the second embodiment will be described. Figure 7 is relative to Figure 5 Since a diagram of an external PC 40 is added, the external PC 40 will be described. The external PC 40 is, for example, a notebook computer, and stores a program for making the power unit perform a specific operation when maintenance is required. The external PC 40 is connected to a control substrate 30a of a unit to be maintained, for example, a cold plate drive unit 20.

[0036] The flow of the maintenance process in the second embodiment is performed based on the first embodiment. That is, in a state where the communication between the control unit 10 and the storage mechanism 13 is disconnected and the power supply to the storage mechanism 13 is stopped, the cold storage baffle unit 21, which is a unit that does not require power, is maintained. The transmission mechanism 14 maintains normal operation. Then, after the power supply to the storage mechanism 13 is restarted, the cold storage plate drive unit 20, which is a unit that requires power, is maintained by executing a maintenance program stored in the external PC 40 connected to the control substrate 30a. When the maintenance of the unit that does not require power and the unit that requires power is completed, the communication between the control unit 10 and the storage mechanism 13 is restarted, and the storage mechanism 13 resumes normal operation.

[0037] According to the second embodiment, similarly to the first embodiment, not only unnecessary power units but also necessary power units can be maintained, and other mechanisms can be operated normally during maintenance, thereby reducing downtime of the automatic analysis system. [Example 3]

[0038] In the second embodiment, the external PC 40 storing the maintenance program of the required power unit is connected to the control boards 30a to 30d respectively. In the third embodiment, the external PC 40 is connected to the control boards 30a to 30d via the switching hub.

[0039] use Figure 8 The detailed structure of Example 3 is described. Figure 8 is relative to Figure 7 Since a diagram of the switch hub 41 is added, the switch hub 41 will be described. The switch hub 41 is a circuit for switching the destination of the control signal, and is disposed between the system control device 5 and the control unit 10, and is connected to all of the control substrates 30a to d. In addition, for example, when the quality control specimen storage device 1 is maintained, an external PC 40 storing a maintenance program is connected to the switch hub 41. Then, the switch hub 41 switches so that the control substrate 30a of the unit to be maintained, for example, the cold plate driving unit 20, becomes the destination of the control signal.

[0040] The flow of the maintenance process in the third embodiment is also performed based on the first embodiment. That is, in a state where the communication between the control unit 10 and the storage mechanism 13 is cut off and the power supply to the storage mechanism 13 is stopped, the cold storage baffle unit 21, which is a unit that does not require power, is maintained. The transmission mechanism 14 maintains normal operation. Then, after the power supply to the storage mechanism 13 is restarted, the cold storage plate drive unit 20, which is a unit that requires power, is maintained by executing the maintenance program stored in the external PC 40 connected to the control substrate 30a. When the maintenance of the unit that does not require power and the unit that requires power is completed, the communication between the control unit 10 and the storage mechanism 13 is restarted, and the storage mechanism 13 resumes normal operation.

[0041] According to the third embodiment, as in the first embodiment, not only unnecessary power units but also necessary power units can be maintained, and during maintenance, other mechanisms can be made to operate normally, thereby reducing the downtime of the automatic analysis system. In addition, by using the switch hub 41, it is not necessary to reconnect the external PC 40 every time the unit to be maintained changes, thereby reducing the trouble of the operator.

[0042] The embodiments of the present invention are described above. The present invention is not limited to the above embodiments, and the structural elements may be deformed within the scope of the gist of the invention. In addition, the multiple structural elements disclosed in the above embodiments may be appropriately combined. In addition, several structural elements may be deleted from all the structural elements shown in the above embodiments. Description of symbols

[0043] 1: Precision management specimen storage device, 2: Input / recovery device, 3: Automatic analysis device, 4: Conveying device, 5: System control device, 10: Control unit, 11: Power supply, 12a~d: Power switching unit, 13: Storage mechanism, 14: Conveying mechanism, 15: Specimen container, 16: Emergency specimen input port, 20: Cold storage plate drive unit, 21: Cold storage baffle unit, 22: Transfer line unit, 23: Main line unit, 23: Main line unit, 30a~d: Control substrate, 31a~d: Actuator, 32a~d: Sensor, 40: Maintenance PC, 41: Switch hub.

Claims

1. A container storage device for storing containers, comprising a plurality of mechanisms having prescribed functions and a control unit for controlling each mechanism, characterized in that: The mechanism has a power-required unit for maintenance that needs power supply and a power-unrequired unit for maintenance that does not need power supply. The control unit cuts off communication with the required power unit and the unnecessary power unit and stops power supply, and when the required power unit is maintained, restarts power supply to the required power unit in a state where the communication is cut off.

2. The container storage device according to claim 1, characterized in that: The required power unit is maintained after the non-required power unit is maintained.

3. The container storage device according to claim 1, characterized in that: The required power unit is maintained by executing a program for performing a specific operation when the required power unit is maintained.

4. The container storage device according to claim 3, characterized in that: The program is stored in a computer connected to the power-requiring unit.

5. The container storage device according to claim 4, characterized in that: The computer is connected to the required power unit via a switching hub that switches a transmission destination of a control signal.

6. The container storage device according to claim 1, characterized in that: The apparatus includes a storage mechanism having a function of storing a specimen container containing a precision-controlled specimen, and a transport mechanism having a function of transporting the specimen container.

7. The container storage device according to claim 6, characterized in that: The storage mechanism includes the required power unit and the unnecessary power unit, and performs maintenance when the transport mechanism is in operation.

8. An automatic analysis system, characterized in that , The container storage device according to claim 1 is located between an automatic analyzer that analyzes a specimen and a conveyor that conveys the specimen.

Citation Information

Patent Citations

  • Fluid compressor

    JP1989053078A