Road and bridge construction distance mark dotting equipment and method thereof
By introducing technical means such as rolling tracks and shooting mechanisms into road bridge construction equipment, the problem of insufficient marking accuracy in the existing technology has been solved, and more efficient obstacle avoidance and marking accuracy have been achieved.
Patent Information
- Application Number
- CN202310726992.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-19
- Publication Date
- 2024-12-20
AI Technical Summary
The existing road and bridge construction marking methods cannot effectively avoid obstacles between two points, resulting in insufficient position deviation and accuracy of the station, which requires repeated calculations.
A device including a first rolling track and a second rolling track is designed. Through the driving of the first rolling track and the circumferential movement of the second rolling track, the circular rolling and obstacle avoidance of the vehicle body are realized, and a photographing mechanism and a paint bucket are equipped. and drilling spray guns to ensure the accuracy and clarity of drilling positions.
It improves the accuracy of the dot marking, reduces the complexity of measurement and calculation of staff, enhances the camera clarity and obstacle avoidance performance of the equipment in strong light environments, and ensures the accuracy and clarity of the dot marking.
Smart Images

Figure CN119162915A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of roads and bridges, and in particular relates to a distance marking device and a method for road and bridge construction. Background Art
[0002] Road, Bridge and River Crossing Engineering mainly studies the basic knowledge and skills of road engineering, bridge engineering, underground engineering, etc., and conducts planning, design and construction of roads and bridges. For example: road renovation and construction, design and construction of overpasses, survey of roadbed and pavement, design of road surrounding landscape, etc.
[0003] In the process of dot marking, it is necessary to move between two points, but the existing dot marking method cannot effectively avoid obstacles between the two points, which leads to deviations in the dot marking position of subsequent devices. When staff perform measurements and calculations, they need to perform repeated calculations, resulting in insufficient accuracy of the dot marking of the device. Summary of the invention
[0004] The object of the present invention is to provide a road and bridge construction distance marking device and method thereof, wherein a first rolling track is arranged to roll in a circular manner on a first driving wheel and a first auxiliary wheel, so that a vehicle body can move under the drive of the first rolling track, and the angle of the second rolling track is adjusted in a circular manner in cooperation with the second driving wheel, so that the vehicle body can be tilted with the second rolling track as a fulcrum to avoid obstacles, so as to solve the problem that the existing device cannot effectively avoid obstacles between two points, thereby causing deviations in the dot marking position of subsequent devices, and the staff needs to repeatedly calculate when performing measurements and calculations, resulting in insufficient accuracy of the dot marking device.
[0005] To achieve the above object, the present invention provides the following technical solution: a road bridge construction distance marking device, comprising a vehicle body, a chassis and a first rolling crawler, the left and right sides of the vehicle body are both equipped with a first rolling crawler capable of circular rolling, and the top of the vehicle body is equipped with a chassis for controlling operation;
[0006] A generator is installed in the middle of the top of the vehicle body, a display is installed on the top of the chassis, a dotting mechanism is installed at the front end of the top of the vehicle body, a bracket is installed at the top right end of the dotting mechanism, and a dotting spray gun is installed at the lower end of the dotting mechanism.
[0007] As a preferred embodiment, a group of branched conductive wire bundles are provided on one side of the generator, and the ends of the conductive wire bundles are respectively connected to the chassis and the shooting mechanism, and the left and right sides of the chassis are provided with heat dissipation grooves arranged equidistantly laterally. The interior of the chassis contains a processor, an intelligent module and an optical fiber, and the optical fiber can import the processing signal of the processor into the intelligent module.
[0008] By adopting the above scheme, after the generator generates electricity, the electricity is respectively input into the chassis and the shooting mechanism through the conductive harness, so that the chassis and the shooting mechanism can be used with electricity as the driving source, and the processor inside the chassis can be controlled by the remote controller after power is turned on. After the staff controls the processor through the remote controller, the control signal sent by the processor can be input into the smart module through the optical fiber, and the device completes the specific operation process through the smart module, and the chassis can be cooled through the heat dissipation slots on the left and right sides to avoid overheating of the chassis.
[0009] As a preferred embodiment, the shooting mechanism is arranged on the top of the bracket, and the interior of the bracket is provided with an extension rod that can be retracted in an embedded shape. The shooting mechanism includes a mounting plate and a camera. The mounting plate is located on the four sides of the surface of the shooting mechanism. A group of rotatable rotating support rods are provided at the bottom of the camera, and the rotating support rods are driven by electricity to work. The top of the camera is provided with a sun visor covering the front edge of the camera.
[0010] By adopting the above scheme, when the staff remotely operates the vehicle to move, the actual road conditions are filmed through the cameras at the four corners of the shooting mechanism, so that the staff can accurately control the movement trajectory of the vehicle according to the on-site images transmitted by the camera, and the camera can rotate under the drive of the rotating support rod, so that the camera's shooting range is wider, effectively reducing the camera blind spot, and when the device is shooting road conditions in a strong light environment, the sun visor on the top of the camera can block the sunlight to avoid exposure when the camera is shooting, thereby improving the clarity of the road condition picture.
[0011] As a preferred embodiment, a paint bucket is installed at the top left end of the dotting mechanism, and the paint bucket includes a paint injection port, a stirring rod, stirring blades and a dripping hole. The paint injection port is funnel-shaped as a whole, and the stirring rod is located in the middle of the paint bucket. The stirring blades are distributed in a longitudinally equidistant arrangement, and the stirring blades rotate in a staggered manner. The dripping holes are flatly distributed at the lower end of the interior of the paint bucket.
[0012] By adopting the above scheme, the paint required for dot marking can be stirred by rotating the stirring blades driven by the stirring rod when it is injected into the paint bucket through the paint injection port, so as to avoid the paint from settling and agglomerating, thereby ensuring that the marking can be clear during the dot marking process and the paint flows out through the drip hole.
[0013] As a preferred embodiment, the first rolling track includes a first driving wheel, a first auxiliary wheel and track teeth, the first driving wheels are respectively located on the first rolling track, and the track teeth are arranged at equal intervals laterally on the front and back sides of the first rolling track, the tooth marks on the surface of the first driving wheel are in a bite-like shape with the track teeth on the inner circle of the first rolling track, the first auxiliary wheel presses against and arches the top middle of the first rolling track, and one end of the first auxiliary wheel is connected to the side of the vehicle body.
[0014] By adopting the above scheme, the first rolling track is driven by the first driving wheels on the left and right sides of the inner circle when rolling, in a manner that the surface tooth marks bite the track teeth of the inner circle of the first rolling track, so that the first rolling track can roll in a cycle, and the friction of the first rolling track is increased by the contact between the track teeth on the outer circle surface of the first rolling track and the ground, which can prevent the vehicle body from slipping and improve the grip. While the first rolling track improves the rolling smoothness of the first rolling track by rolling the first auxiliary wheel, it can also strengthen the tension of the first rolling track to prevent the first rolling track from falling off due to being too loose or breaking due to being too tight.
[0015] As a preferred embodiment, auxiliary devices are installed on both sides of the left and right sides of the vehicle body, and second rotatable auxiliary wheels are installed on both ends of the bottom of the auxiliary devices, the surface of the second auxiliary wheel is toothed, and the tooth marks on the surface of the second auxiliary wheel are engaged with the track teeth at the lower end of the inner ring of the first rolling track, and the second auxiliary wheel is flat and pressed against the first rolling track.
[0016] By adopting the above scheme, when the bottom of the first rolling track touches the ground, the driving performance of the first rolling track can be enhanced by the second auxiliary wheel at the bottom of the auxiliary device biting the inner ring track teeth of the first rolling track, and the flatness of the first rolling track where it touches the ground can be ensured, thereby avoiding bumps in the vehicle body during movement.
[0017] As a preferred embodiment, a second rolling track that can perform circular movement is provided on one side of the first driving wheel, and the second rolling track includes a second driving wheel, a connecting arm and a third auxiliary wheel. The second driving wheel and the first driving wheel can perform fixed-point circular rotation movement, and the connecting arm is located on the left and right sides of the second driving wheel, and one end of the connecting arm is connected to the third auxiliary wheel.
[0018] By adopting the above scheme, if the vehicle body encounters a steep slope or an obstacle while maintaining a straight line to mark dots, a force point is formed by adjusting the second rolling track forward, so that the vehicle body can be lifted into the air by the second rolling track, and the second rolling track rolls in a circle with the second driving wheel taking the first driving wheel as the axis of action, driving the internal connecting arm of the second rolling track to unfold forward, and the unfolding angle of the second rolling track can be adjusted by different rotation angles, thereby improving the obstacle avoidance performance of the device during the marking process.
[0019] As a preferred embodiment, the dotting spray gun includes a nozzle, a hollow hose, a fixed mounting frame, a telescopic rod and a material receiving funnel. The material receiving funnel wraps the bottom of the paint bucket, and the connection between the hollow hose, the material receiving funnel and the dotting spray gun is coated with leak-proof glue. The top of the fixed mounting frame is installed in the middle of the bottom of the dotting mechanism, and the material receiving funnel is located inside the dotting mechanism. The fixed mounting frame is a double-layer design, and the telescopic rods are located at the four corners between the two fixed mounting frames.
[0020] By adopting the above scheme, the stirred paint is discharged from the drip hole and then received through the material receiving funnel, and is input into the interior of the dot spray gun through the hollow hose on one side of the material receiving funnel. The paint is then compressed by the dot spray gun and sprayed onto the ground through the nozzle to complete the dot marking work. When the vehicle body is avoiding or crossing an obstacle, the distance between the dot spray gun and the ground can be adjusted by telescopic rod extension and retraction to prevent the dot spray gun from colliding with the obstacle during the obstacle avoidance process.
[0021] As a preferred embodiment, a method for adjusting the distance marking device for road and bridge construction comprises the following steps:
[0022] S1: The generator introduces electricity into the chassis through the conductive harness, so that the processor inside the chassis starts to work. The staff can manually control the processor through the remote controller, and the control signal is input into the intelligent module through the optical fiber, thereby completing the control steps of the device;
[0023] S2: The first rolling crawler is driven by the first driving wheels on the left and right sides of the inner circle in a manner that the surface tooth marks bite the track teeth of the inner circle of the first rolling crawler, so that the first rolling crawler can be cyclically rolled, and the friction of the first rolling crawler is improved by the contact between the track teeth on the outer circle surface of the first rolling crawler and the ground, which can prevent the vehicle body from slipping and improve the grip. While the first rolling crawler improves the rolling smoothness of the first rolling crawler through the rolling of the first auxiliary wheel, it can also strengthen the tension of the first rolling crawler to avoid the first rolling crawler from falling off due to being too loose or breaking due to being too tight. When the vehicle body encounters a steep slope or obstacle while maintaining a straight line to mark dots, a force point is formed by adjusting the second rolling crawler forward, so that the vehicle body can be lifted up by the second rolling crawler, and the second rolling crawler rolls in a circle in a manner that the second driving wheel takes the first driving wheel as the axis of action, driving the internal connecting arm of the second rolling crawler to unfold forward, and the unfolding angle of the second rolling crawler can be adjusted by different rotation angles, thereby improving the obstacle avoidance performance of the device during the marking process.
[0024] S3: The staff injects the paint for dot marking into the paint bucket from the paint injection port, and the paint injected into the paint bucket can be stirred by the stirring blades driven by the stirring rod inside the paint bucket. Since the stirring blades stir in a staggered manner, the paint inside the paint bucket can be stirred multiple times in a short period of time, avoiding the occurrence of lumps inside the paint bucket and ensuring the clarity of the marking when the device is marking dots. The stirred paint is discharged through the drip hole;
[0025] S4: The stirred paint is discharged from the drip hole and then received through the receiving funnel, and is input into the dot spray gun through the hollow hose on one side of the receiving funnel. The paint is then compressed by the dot spray gun and sprayed onto the ground through the nozzle to complete the dot marking work. When the vehicle body is avoiding or crossing an obstacle, the distance between the dot spray gun and the ground can be adjusted by telescopic rod to avoid collision between the dot spray gun and the obstacle during obstacle avoidance.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] The road bridge construction distance marking device and method thereof are provided with a first rolling crawler that rolls in a circular manner on a first driving wheel and a first auxiliary wheel, so that the vehicle body can move under the drive of the first rolling crawler, and the angle of the second rolling crawler is adjusted in a circular manner in cooperation with the second driving wheel, so that the vehicle body can be tilted with the second rolling crawler as a fulcrum to avoid obstacles, thereby resulting in accurate marking positions of subsequent devices, and workers do not need to repeatedly calculate when performing measurement and calculation, thereby improving the accuracy of the device's marking.
[0028] The road bridge construction distance marking device and method thereof are provided with a shooting mechanism, a shooting device, a sun visor and a rotating support rod. When a staff member remotely operates the vehicle body 1 to move, the camera at the four corners of the shooting mechanism shoots the actual road conditions, so that the staff member can accurately control the moving trajectory of the vehicle body 1 according to the on-site images transmitted by the camera. The camera can rotate under the drive of the rotating support rod, so that the camera can shoot a wider range of images, effectively reducing the blind spots of the camera. Moreover, when the device shoots road conditions in a strong light environment, the sun visor on the top of the camera can block the sunlight, avoiding the exposure of the camera when shooting, thereby improving the clarity of the road condition images.
[0029] The road bridge construction distance marking device and method thereof are provided with a paint bucket, a paint injection port, a stirring rod, a stirring blade and a drip hole. A worker injects the paint for marking into the paint bucket from the paint injection port, and the paint injected into the paint bucket can be stirred by the stirring blade driven by the stirring rod inside the paint bucket. Since the stirring blade stirs in an interlaced manner, the paint inside the paint bucket can be stirred multiple times in a short time, thereby avoiding the occurrence of agglomeration inside the paint bucket and ensuring the clarity of the marking position when the device is marking. The stirred paint is discharged through the drip hole.
[0030] The road and bridge construction distance marking dotting equipment and method thereof are provided with a dotting spray gun, a nozzle, a hollow hose, a fixed mounting frame, a material receiving funnel and a telescopic rod. The stirred paint is discharged from the drip hole and then received through the material receiving funnel, and is input into the interior of the dotting spray gun through the hollow hose on one side of the material receiving funnel. Subsequently, the paint is compressed by the dotting spray gun and sprayed onto the ground through the nozzle to complete the dotting marking work. When the vehicle body is avoiding or crossing an obstacle, the distance between the dotting spray gun and the ground can be adjusted by telescoping the telescopic rod to avoid the dotting spray gun and the obstacle from colliding during the obstacle avoidance process. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0032] Figure 2 It is a structural schematic diagram of the bracket and the shooting mechanism of the present invention;
[0033] Figure 3 It is a schematic diagram of the structure of the first wheel track and the second rolling track of the present invention;
[0034] Figure 4 This is a schematic diagram of the structure inside the paint bucket of the present invention;
[0035] Figure 5 It is a structural schematic diagram of the dotting gun head of the present invention;
[0036] Figure 6 It is a schematic diagram of the structure inside the chassis of the present invention.
[0037] In the figure: 1, vehicle body; 2, chassis; 201, heat sink; 202, processor; 203, intelligent module; 204, optical fiber; 3, display; 5, generator; 501, conductive wire harness; 4, first rolling track; 401, first driving wheel; 402, first auxiliary wheel; 403, track teeth; 6, dotting mechanism; 601, paint bucket; 602, paint injection port; 603, stirring rod; 604, stirring blade; 605, drip hole; 7, bracket; 701, extension rod; 8, shooting mechanism; 801, mounting plate; 9, camera; 901, rotating support rod; 902, sun visor; 10, auxiliary device; 11, second auxiliary wheel; 12, second rolling track; 1201, second driving wheel; 1202, connecting arm; 1203, third auxiliary wheel; 13, dotting spray gun; 1301, spray head; 1302, hollow hose; 1303, fixed mounting bracket; 1304, telescopic rod; 1305, material receiving funnel. DETAILED DESCRIPTION
[0038] The present invention will be further described below in conjunction with the embodiments.
[0039] The following examples are used to illustrate the present invention, but they cannot be used to limit the scope of protection of the present invention. The conditions in the examples can be further adjusted according to specific conditions. Simple improvements to the method of the present invention under the premise of the concept of the present invention belong to the scope of protection claimed in the present invention.
[0040] See also Figure 1-6 The present invention provides a road and bridge construction distance marking device, comprising a vehicle body 1, a chassis 2 and a first rolling crawler 4, the first rolling crawler 4 capable of circular rolling is installed on both sides of the vehicle body 1, and the chassis 2 for controlling operation is installed on the top of the vehicle body 1;
[0041] A generator 5 is installed in the middle of the top of the vehicle body 1, a display 3 is installed on the top of the chassis 2, a dotting mechanism 6 is installed at the top front end of the vehicle body 1, a bracket 7 is installed at the top right end of the dotting mechanism 6, and a dotting spray gun 13 is installed at the lower end of the dotting mechanism 6.
[0042] A group of branched conductive harnesses 501 are provided on one side of the generator 5, and the ends of the conductive harnesses 501 are respectively connected to the chassis 2 and the shooting mechanism 8. The left and right sides of the chassis 2 are provided with heat dissipation slots 201 that are arranged equidistantly in the horizontal direction. The interior of the chassis 2 includes a processor 202, an intelligent module 203 and an optical fiber 204. The optical fiber 204 can introduce the processing signal of the processor 202 into the intelligent module 203. After the generator 5 generates electricity, the electricity is input into the chassis 2 and the shooting mechanism 8 respectively through the conductive harness 501, so that the chassis 2 and the shooting mechanism 8 can be used with electricity as the driving source. After the processor 202 inside the chassis 2 is powered on, it can be controlled and operated by a remote controller. After the staff controls the processor 202 through the remote controller, the control signal sent by the processor 202 can be input into the intelligent module 203 through the optical fiber 204, and the device completes the specific operation process through the intelligent module 203. In addition, the chassis 2 can be cooled through the heat dissipation slots 201 on the left and right sides to prevent the chassis 2 from overheating.
[0043] The shooting mechanism 8 is arranged on the top of the bracket 7, and the inside of the bracket 7 is provided with an extension rod 701 that can be embedded and retracted. The shooting mechanism 8 includes a mounting plate 801 and a camera 9. The mounting plate 801 is located on the four sides of the surface of the shooting mechanism 8. A group of rotatable rotating rods 901 are arranged at the bottom of the camera 9, and the rotating rods 901 are driven by electricity to work. The top of the camera 9 is provided with a sunshade 902 covering the front edge of the camera 9. When the staff remotely operates the vehicle body 1 to move, the shooting mechanism 8 The cameras 9 at the four corners shoot the actual road conditions, so that the staff can accurately control the movement trajectory of the vehicle body 1 according to the on-site images transmitted by the camera 9, and the camera 9 can rotate under the drive of the rotating support rod 901, so that the shooting range of the camera 9 is wider, effectively reducing the blind spots of the camera, and when the device shoots the road conditions in a strong light environment, the sun visor 902 on the top of the camera 9 can block the sunlight, avoiding exposure when the camera 9 shoots, thereby improving the clarity of the road condition picture.
[0044] A paint bucket 601 is installed at the left end of the top of the dotting mechanism 6. The paint bucket 601 includes a paint injection port 602, a stirring rod 603, a stirring blade 604 and a drip hole 605. The paint injection port 602 is funnel-shaped as a whole, and the stirring rod 603 is located in the middle of the paint bucket 601. The stirring blades 604 are distributed in a longitudinally equidistant arrangement, and the stirring blades 604 rotate in a staggered manner. The drip holes 605 are flatly distributed at the lower end of the paint bucket 601. When the paint required for dotting marking is injected into the paint bucket 601 through the paint injection port 602, the stirring rod 603 can drive the stirring blades 604 to rotate and stir, so as to avoid the paint from settling and agglomerating, thereby ensuring that the marking can be clear during the dotting marking process, and the paint flows out through the drip hole 605.
[0045] The first rolling crawler 4 includes a first driving wheel 401, a first auxiliary wheel 402 and a track tooth 403. The first driving wheel 401 is respectively located on the first rolling crawler 4, and the track teeth 403 are arranged at equal intervals in the horizontal direction and distributed on the front and back sides of the first rolling crawler 4. The tooth marks on the surface of the first driving wheel 401 are in a bite shape with the track teeth 403 of the inner circle of the first rolling crawler 4. The first auxiliary wheel 402 presses the top middle of the first rolling crawler 4 tightly and arches it, and one end of the first auxiliary wheel 402 is connected to the side of the vehicle body 1. The first rolling crawler 4 is composed of the first driving wheel 401 on the left and right sides of the inner circle. When the vehicle body 1 is moving, the surface tooth marks are engaged with the inner ring track teeth 403 of the first rolling track 4 to drive the first rolling track 4, so that the first rolling track 4 can roll in a cycle, and the contact between the track teeth 403 on the outer ring surface of the first rolling track 4 and the ground increases the friction of the first rolling track 4, thereby preventing the vehicle body 1 from slipping and increasing the grip. While the first rolling track 4 increases the rolling smoothness of the first rolling track 4 by rolling through the first auxiliary wheel 402, the tension of the first rolling track 4 can also be increased to avoid the first rolling track 4 from falling off due to being too loose or breaking due to being too tight.
[0046] An auxiliary device 10 is installed on both sides of the vehicle body 1, and a rollable second auxiliary wheel 11 is installed on both ends of the bottom of the auxiliary device 10. The surface of the second auxiliary wheel 11 is toothed, and the tooth marks on the surface of the second auxiliary wheel 11 are engaged with the track teeth 403 at the lower end of the inner circle of the first rolling track 4, and the second auxiliary wheel 11 is flat and pressed against the first rolling track 4. When the bottom of the first rolling track 4 is in contact with the ground, the second auxiliary wheel 11 at the bottom of the auxiliary device 10 can be used to engage with the track teeth 403 of the inner circle of the first rolling track 4 to enhance the driving performance of the first rolling track 4, and ensure the flatness of the first rolling track 4 where it is in contact with the ground, thereby avoiding bumps in the vehicle body 1 during movement.
[0047] A second rolling track 12 capable of circular movement is provided on one side of the first driving wheel 401. The second rolling track 12 comprises a second driving wheel 1201, a connecting arm 1202 and a third auxiliary wheel 1203. The second driving wheel 1201 and the first driving wheel 401 are in fixed-point circular rotation movement. The connecting arm 1202 is located on the left and right sides of the second driving wheel 1201, and one end of the connecting arm 1202 is connected to the third auxiliary wheel 1203. When the vehicle body 1 encounters a steep slope or an obstacle while maintaining a straight line dotting mark, a force point is formed by adjusting the second rolling track 12 forward, so that the vehicle body 1 can be lifted up by the second rolling track 12. The second rolling track 12 rolls in a circle with the second driving wheel 1201 and the first driving wheel 401 as the axis of action, driving the connecting arm 1202 inside the second rolling track 12 to unfold forward, and the unfolding angle of the second rolling track 12 can be adjusted by different rotation angles, thereby improving the obstacle avoidance performance of the device during the dotting process.
[0048] The dotting spray gun 13 includes a spray head 1301, a hollow hose 1302, a fixed mounting frame 1303, a telescopic rod 1304 and a material receiving funnel 1305. The material receiving funnel 1305 wraps the bottom of the paint bucket 601, and the connection between the hollow hose 1302, the material receiving funnel 1305 and the dotting spray gun 13 is coated with leak-proof glue. The top of the fixed mounting frame 1303 is installed in the middle of the bottom of the dotting mechanism 6, and the material receiving funnel 1305 is located inside the dotting mechanism 6. The fixed mounting frame 1303 is a double-layer design, and the telescopic rod 1304 is located between the two fixed mounting frames 13 03, the stirred paint is discharged from the drip hole 605 and then received through the material receiving funnel 1305, and is input into the interior of the dot spray gun 13 through the hollow hose 1302 on one side of the material receiving funnel 1305, and then the paint is compressed by the dot spray gun 13 and sprayed onto the ground through the nozzle 1301 to complete the dot marking work. When the vehicle body 1 is avoiding or crossing an obstacle, the telescopic rod 1304 can be used to adjust the distance between the dot spray gun 13 and the ground to prevent the dot spray gun 13 from colliding with the obstacle during the obstacle avoidance process.
[0049] This embodiment also provides a method for using a road and bridge construction distance marking device, comprising the following steps:
[0050] S1: The generator 5 introduces electricity into the chassis 2 through the conductive harness 501, so that the processor 202 inside the chassis 2 starts to work. The staff can manually control the processor 202 through the remote controller, and the control signal is input into the smart module 203 through the optical fiber 204, thereby completing the control steps of the device;
[0051] S2: The first rolling crawler 4 is driven by the first driving wheels 401 on the left and right sides of the inner circle when rolling, so that the surface tooth marks bite the inner circle track teeth 403 of the first rolling crawler 4, so that the first rolling crawler 4 can be cyclically rolled, and the contact between the track teeth 403 on the outer circle surface of the first rolling crawler 4 and the ground increases the friction of the first rolling crawler 4, which can prevent the vehicle body 1 from slipping and improve the grip. While the first rolling crawler 4 is rolled by the first auxiliary wheel 402 to improve the rolling smoothness of the first rolling crawler 4, the tension of the first rolling crawler 4 can also be strengthened to prevent the first rolling crawler 4 from being too loose. In the event of falling off or breaking due to over-tightening, if the vehicle body 1 encounters a steep slope or obstacle while maintaining a straight line to mark dots, a force point is formed by adjusting the second rolling track 12 forward, so that the vehicle body 1 can be lifted up by the second rolling track 12, and the second rolling track 12 rolls in a circle with the second driving wheel 1201 and the first driving wheel 401 as the axis of action, driving the internal connecting arm 1202 of the second rolling track 12 to unfold forward, and the unfolding angle of the second rolling track 12 can be adjusted by different rotation angles, thereby improving the obstacle avoidance performance of the device during the marking process.
[0052] S3: The staff injects the paint for dot marking into the paint bucket 601 from the paint injection port 602, and the paint injected into the paint bucket 601 can be stirred by the stirring rod 603 inside the paint bucket 601 rotating and driving the stirring blade 604. Since the stirring blade 604 stirs in a staggered manner, the paint inside the paint bucket 601 can be stirred multiple times in a short period of time, thereby avoiding the occurrence of lumps inside the paint bucket 601 and ensuring the clarity of the marking when the device is marking dots. The stirred paint is discharged through the drip hole 605;
[0053] S4: The stirred paint is discharged from the drip hole 605 and then received by the material receiving funnel 1305, and is input into the interior of the dot spray gun 13 through the hollow hose 1302 on one side of the material receiving funnel 1305. The paint is then compressed by the dot spray gun 13 and sprayed onto the ground through the nozzle 1301 to complete the dot marking work. When the vehicle body 1 is avoiding or crossing an obstacle, the distance between the dot spray gun 13 and the ground can be adjusted by telescopic rod 1304 to avoid collision between the dot spray gun 13 and the obstacle during the obstacle avoidance process.
[0054] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A distance marking device for road and bridge construction. Features: The vehicle comprises a vehicle body (1), a chassis (2) and a first rolling crawler (4); the first rolling crawler (4) capable of circular rolling is installed on both the left and right sides of the vehicle body (1); and the chassis (2) for controlling operation is installed on the top of the vehicle body (1); A generator (5) is installed in the middle of the top of the vehicle body (1), a display (3) is installed on the top of the chassis (2), a dotting mechanism (6) is installed at the front end of the top of the vehicle body (1), a bracket (7) is installed at the top right end of the dotting mechanism (6), and a dotting spray gun (13) is installed at the lower end of the dotting mechanism (6).
2. The road and bridge construction distance marking device according to claim 1, Features: A group of branched conductive wire bundles (501) are provided on one side of the generator (5), and the ends of the conductive wire bundles (501) are respectively connected to the chassis (2) and the camera mechanism (8). The left and right sides of the chassis (2) are both provided with heat dissipation slots (201) arranged and distributed in a horizontally equidistant manner. The interior of the chassis (2) contains a processor (202), an intelligent module (203), and an optical fiber (204). The optical fiber (204) can guide the processing signal of the processor (202) to the intelligent module (203).
3. The road and bridge construction distance marking device according to claim 2, Features: The shooting mechanism (8) is arranged on the top of the bracket (7), and the inside of the bracket (7) is provided with an extension rod (701) that can be embedded and retracted. The shooting mechanism (8) includes a mounting plate (801) and a camera (9). The mounting plate (801) is located on the four sides of the surface of the shooting mechanism (8). The bottom of the camera (9) is provided with a group of rotatable rotating support rods (901), and the rotating support rods (901) are driven by electricity to work. The top of the camera (9) is provided with a sunshade (902) that covers the front edge of the camera (9).
4. The road and bridge construction distance marking device according to claim 1, Features: A paint bucket (601) is installed at the left end of the top of the dotting mechanism (6). The paint bucket (601) comprises a paint injection port (602), a stirring rod (603), stirring blades (604) and a drip hole (605). The paint injection port (602) is funnel-shaped as a whole, and the stirring rod (603) is located in the middle of the paint bucket (601). The stirring blades (604) are arranged in a longitudinally equidistant manner, and the stirring blades (604) rotate in a staggered manner. The drip holes (605) are flatly distributed at the lower end of the paint bucket (601).
5. The road and bridge construction distance marking device according to claim 4, Features: The first rolling crawler (4) comprises a first driving wheel (401), a first auxiliary wheel (402) and a track tooth (403); the first driving wheel (401) is respectively located on the first rolling crawler (4), and the track teeth (403) are arranged at equal intervals in the transverse direction and distributed on the front and back sides of the first rolling crawler (4); the tooth marks on the surface of the first driving wheel (401) are in a bite-like shape with the track teeth (403) on the inner circle of the first rolling crawler (4); the first auxiliary wheel (402) presses against the middle of the top of the first rolling crawler (4) and arches it, and one end of the first auxiliary wheel (402) is connected to the side of the vehicle body (1).
6. The road and bridge construction distance marking device according to claim 1, Features: An auxiliary device (10) is installed on both left and right sides of the vehicle body (1), and a second auxiliary wheel (11) that can roll is installed on both left and right ends of the bottom of the auxiliary device (10), the surface of the second auxiliary wheel (11) is toothed, and the tooth marks on the surface of the second auxiliary wheel (11) are engaged with the track teeth (403) at the lower end of the inner ring of the first rolling track (4), and the second auxiliary wheel (11) is flat and pressed against the first rolling track (4).
7. The road and bridge construction distance marking device according to claim 5, Features: A second rolling track (12) capable of performing circular motion is provided on one side of the first driving wheel (401); the second rolling track (12) comprises a second driving wheel (1201), a connecting arm (1202) and a third auxiliary wheel (1203); the second driving wheel (1201) and the first driving wheel (401) perform fixed-point circular rotation motion; the connecting arm (1202) is located on the left and right sides of the second driving wheel (1201), and one end of the connecting arm (1202) is connected to the third auxiliary wheel (1203).
8. The road and bridge construction distance marking device according to claim 1, Features: The dotting spray gun (13) comprises a spray head (1301), a hollow hose (1302), a fixed mounting frame (1303), a telescopic rod (1304) and a material receiving funnel (1305). The material receiving funnel (1305) wraps the bottom of the paint bucket (601), and the connection between the hollow hose (1302), the material receiving funnel (1305) and the dotting spray gun (13) is coated with leak-proof glue. The top of the fixed mounting frame (1303) is installed in the middle of the bottom of the dotting mechanism (6), and the material receiving funnel (1305) is located inside the dotting mechanism (6). The fixed mounting frame (1303) is a double-layer design, and the telescopic rod (1304) is located at the four corners between the two fixed mounting frames (1303).
9. A marking method for a distance marking device for road and bridge construction, according to the distance marking device for road and bridge construction according to any one of claims 1 to 8, Features , including the following steps: S1: The generator (5) introduces electric power into the interior of the chassis (2) through the conductive wire harness (501), so that the processor (202) inside the chassis (2) starts to work. The staff can manually control the processor (202) through the remote controller, and the control signal is input into the interior of the intelligent module (203) through the optical fiber (204), thereby completing the control steps of the device; S2: The first rolling crawler (4) is driven by the first driving wheels (401) on the left and right sides of the inner ring when rolling, in a manner that the surface tooth marks bite the crawler teeth (403) of the inner ring of the first rolling crawler (4), so that the first rolling crawler (4) can be cyclically rolled, and the crawler teeth (403) on the outer ring surface of the first rolling crawler (4) contact the ground to increase the friction of the first rolling crawler (4), thereby preventing the vehicle body (1) from slipping and improving the grip. The first rolling crawler (4) can also increase the tension of the first rolling crawler (4) while improving the rolling smoothness of the first rolling crawler (4) through the rolling of the first auxiliary wheel (402), thereby preventing the first rolling crawler (4) from slipping due to the first rolling crawler (4). If the vehicle body (1) is too loose and falls off, or is too tight and breaks, when it encounters a steep slope or an obstacle while maintaining a straight line to mark dots, the second rolling crawler (12) is adjusted forward to form a force point, so that the vehicle body (1) can be lifted up by the second rolling crawler (12), and the second rolling crawler (12) rolls in a circle with the second driving wheel (1201) and the first driving wheel (1201) as the axis of action, driving the internal connecting arm (1202) of the second rolling crawler (12) to unfold forward, and the unfolding angle of the second rolling crawler (12) can be adjusted by different rotation angles, thereby improving the obstacle avoidance performance of the device during the marking process. S3: The staff injects the paint for dot marking into the paint bucket (601) from the paint injection port (602), and the paint injected into the paint bucket (601) can be stirred by the stirring rod (603) inside the paint bucket (601) rotating to drive the stirring blade (604). Since the stirring blade (604) stirs in an interlaced manner, the paint inside the paint bucket (601) can be stirred multiple times in a short period of time, thereby avoiding the occurrence of lumps inside the paint bucket (601) and ensuring the clarity of the marking location when the device is marking dots. The stirred paint is discharged through the drip hole (605); S4: The stirred paint is discharged from the drip hole (605) and then received by the material receiving funnel (1305), and then input into the interior of the dot spray gun (13) through the hollow hose (1302) on one side of the material receiving funnel (1305). The paint is then compressed by the dot spray gun (13) and sprayed onto the ground through the nozzle (1301) to complete the dot marking work. When the vehicle body (1) is avoiding or crossing an obstacle, the distance between the dot spray gun (13) and the ground can be adjusted by telescopic rod (1304) to avoid collision between the dot spray gun (13) and the obstacle during the obstacle avoidance process.
