Planning and management system based on first-level management architecture

By designing a planning and management system based on a first-level management architecture in iron ore management, the problem of low efficiency of traditional methods is solved, and the efficient formulation and execution of plans is achieved, ensuring the improvement of information transmission efficiency and decision-making response speed. The construction of smart mines provides basic guarantees.

CN119168314APending Publication Date: 2024-12-20SHOUGANG GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411306923.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-12-20

AI Technical Summary

Technical Problem

The traditional iron ore management method is inefficient in planning and management methods, which cannot meet the needs of the first-level management architecture, has low information transmission efficiency and slow decision-making response speed.

Method used

A planning and management system based on a first-level management architecture was designed, including planning information module, personnel operation instruction module, planning instruction issuance module and result collection module. The operation plan is generated by collecting production-related condition parameters and combining it with personnel basics. Information generation of operation instructions to achieve efficient planning and direct execution of machine positions.

Benefits of technology

It improves the implementation efficiency of the plan, ensures that the plan can reach the machine position directly, provides a basis for daily work implementation under the first-level management structure, solves the problems of low information transmission efficiency and slow decision-making response speed, and promotes the construction of smart mines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119168314A_ABST
    Figure CN119168314A_ABST
Patent Text Reader

Abstract

The invention discloses a plan making and management system based on a first-level management architecture, and the system comprises a plan information module which is used for collecting production-related condition parameters, and generating one or more of an equipment production operation plan, a blasting operation plan, a maintenance operation plan, and other operation plans based on the production-related condition parameters; the personnel operation instruction module is used for generating a corresponding personnel operation instruction according to one or more of an equipment production operation plan, a blasting operation plan, a maintenance operation plan and other operation plans in combination with personnel basic information; the plan instruction issuing module is used for issuing the personnel operation instruction to the corresponding personnel machine; and the result collection module is used for determining collection information corresponding to one or more of an equipment production operation plan, a blasting operation plan, a maintenance operation plan and other operation plans according to a manual filling or automatic monitoring mode of an operator so as to confirm a plan completion progress.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of mineral management technology, and in particular to a plan formulation and management system based on a primary management architecture. Background Art

[0002] At present, in iron ore management, in order to further improve the efficiency of labor organization, the existing two-level management model of factories, mines and workshops based on location is integrated to form a one-level management structure with factory and mine departments as the "management level" and work teams as the "executive level".

[0003] Since traditional planning and management methods generally adopt the traditional hierarchical planning and management process of factory scheduling-workshop scheduling-on-site execution, which requires multiple people to formulate, decompose and issue, the information transmission efficiency is low and the decision-making response speed is relatively slow. Therefore, traditional planning and management are no longer suitable for management needs. Summary of the invention

[0004] In order to solve or partially solve the technical problem that traditional plan formulation and management are relatively slow and cannot meet the planning requirements of the first-level management architecture, the present invention provides a plan formulation and management system based on the first-level management architecture, which realizes efficient plan formulation, and the plan can directly reach the machine position, providing a basic guarantee for the implementation of daily work under the first-level management architecture.

[0005] In order to solve the above technical problems, the first aspect of the present invention discloses a plan formulation and management system based on a primary management structure, in which the factory and mine departments are used as the management layer and the work teams are used as the execution layer; the system includes:

[0006] A plan information module, used to collect production-related condition parameters, and generate one or more of equipment production operation plans, blasting operation plans, maintenance operation plans, and other operation plans based on the production-related condition parameters;

[0007] The personnel operation instruction module is used to generate corresponding personnel operation instructions according to one or more of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans in combination with the basic information of the personnel;

[0008] A plan instruction issuing module is used to issue the personnel operation instructions to the corresponding personnel machines;

[0009] The result collection module is used to determine the collection information corresponding to one or more plans of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans based on the manual reporting of the operators or automatic monitoring, and then confirm the progress of the plan completion.

[0010] Optionally, the system further includes:

[0011] The process monitoring module is used to collect and analyze the core parameters of the operating equipment in real time, and determine abnormal problems of the operating equipment in the production process based on the core parameters.

[0012] Optionally, the process monitoring module is further used to report the abnormal problem to the management level in the first-level management architecture.

[0013] Optionally, the system further includes:

[0014] The data analysis module is used to customize analysis reports according to enterprise management requirements and improvement goals, and optimize based on user feedback.

[0015] Optionally, the planning information module is also used to form a daily production operation plan report based on one or more of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans, and upload it to the management level in the first-level management structure for review.

[0016] Optionally, the personnel operation instruction module is specifically used to automatically extract the equipment operating personnel of the previous shift based on the equipment production operation plan and shift information, and generate equipment production operation instructions based on the actual handling matters of the equipment operating personnel of the previous shift.

[0017] Optionally, the personnel operation instruction module is specifically used to automatically extract blasting personnel on the last planned date according to the blasting project, and generate blasting personnel operation instructions according to the actual handling matters of the blasting personnel.

[0018] Optionally, the personnel work instruction module is specifically used to screen personnel according to the maintenance work plan and skill information, and create maintenance personnel work instructions.

[0019] Optionally, the system further includes: a real-time database for storing each operation plan and its collection information.

[0020] Optionally, the production-related condition parameters include at least the product of the equipment, unit efficiency, shift length, equipment downtime period, and operation rate.

[0021] Through one or more technical solutions of the present invention, the present invention has the following beneficial effects or advantages:

[0022] The technical solution provided by the present invention includes a plan information module, a personnel operation instruction module, a plan instruction issuing module, and a result collection module. By collecting production-related condition parameters, one or more of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans are generated, and then the corresponding personnel operation instructions are generated in combination with the basic personnel information and issued to the corresponding personnel and machines, and the corresponding collection information is collected to confirm the completion progress, thereby realizing efficient planning, and the plan can directly reach the machine position, providing a basic guarantee for the implementation of daily work under the first-level management structure.

[0023] The above description is only an overview of the technical solution of the present invention. In order to more clearly understand the technical means of the present invention, it can be implemented according to the contents of the specification. In order to make the above and other purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0025] Figure 1 A schematic diagram of the structure of a plan formulation and management system based on a primary management architecture according to an embodiment of the present invention is shown.

[0026] Reference numerals: plan information module 101 , personnel operation instruction module 102 , plan instruction issuing module 103 , result collection module 104 , process monitoring module 105 , data analysis module 106 , real-time database 107 . DETAILED DESCRIPTION

[0027] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to enable the scope of the present invention to be fully communicated to those skilled in the art.

[0028] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present invention and to enable the scope of the present invention to be fully communicated to those skilled in the art.

[0029] First, as Figure 1 1 is a schematic diagram of the structure of a plan formulation and management system based on a primary management architecture provided by an embodiment of the present invention.

[0030] Among them, in the first-level management structure, the factory and mine departments are regarded as the management level, and the work teams are regarded as the execution level.

[0031] The system is implemented in a first-level management framework, and mainly includes: a plan information module 101, a personnel operation instruction module 102, a plan instruction issuing module 103, a result collection module 104, a process monitoring module 105, and a data analysis module 106. In addition, the system also includes a real-time database 107.

[0032] In the specific implementation process, the planning information module 101 is used to collect production-related condition parameters, and generate one or more of equipment production operation plans, blasting operation plans, maintenance operation plans, and other operation plans based on the production-related condition parameters.

[0033] Among them, the production-related condition parameters at least include the product of the equipment, unit efficiency, shift duration, equipment downtime period, operation rate and other information, so as to know the current status of each equipment and lay a good foundation for formulating the operation plan.

[0034] The equipment production operation plan is a detailed plan formulated for the operation tasks to be performed by the equipment on that day, including information such as the operation location, operation volume, and operation time period.

[0035] The blasting operation plan is a detailed plan developed for the day's blasting tasks, including information such as blasting type, blasting location, operation time period, blasting time period, and affected equipment.

[0036] The maintenance work plan is a preventive maintenance and care plan formulated to ensure the normal operation of the equipment, including information such as the maintenance date, maintenance equipment, maintenance content, and maintenance time period.

[0037] Other operation plans include temporary key work plans and shutdown plans. Among them, temporary key work plans are plans made for sudden and unplanned key work contents in production, including information such as operation points, operation time periods, and operation contents. The shutdown plan is a plan made for various shutdown events that affect production, including shutdown types, affected equipment, affected locations, and other information. Shutdown types include wind outage, power outage, water outage, peak avoidance, and others.

[0038] Furthermore, the plan information module 101 is also used to form a daily production operation plan report based on one or more of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans, and upload it to the management level in the first-level management structure for review. After the management level reviews it, the personnel operation instruction module 102 is triggered to execute.

[0039] The personnel operation instruction module 102 is used to generate corresponding personnel operation instructions according to one or more of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans in combination with the basic information of the personnel.

[0040] In an optional implementation, the personnel operation instruction module 102 is specifically used to automatically extract the equipment operators of the previous shift based on the equipment production operation plan and shift information, and generate equipment production operation instructions based on the actual processing items of the equipment operators of the previous shift. For example, among the equipment operators of the previous shift, there may be personnel who are processing other matters in the operation section of the equipment production operation plan of the current shift. In order to avoid confusion in personnel allocation and the problem of insufficient actual operators, operators are matched based on the actual processing items and equipment production operation instructions are generated.

[0041] When the equipment production operation plan is first allocated, the corresponding personnel are selected based on the nature of the position and skill information, and are allocated to the corresponding equipment. The allocation method includes but is not limited to manual allocation and automatic matching. The nature of the position is equipment or process control personnel; the skill information includes main shaft hoisting system, LH514 internal combustion scraper, anchor trolley and other information.

[0042] In an optional implementation, the personnel operation instruction module 102 is specifically used to automatically extract the blasting operators of the last planned date according to the blasting project, and generate blasting operator operation instructions according to the actual processing matters of the blasting operators. The blasting operator operation instructions refer to the allocation instructions of the operators who execute the blasting project.

[0043] When the blasting operation plan is first assigned, personnel are screened based on the nature of their positions and their skill information, and manually assigned to blasting projects. The nature of the position is blasting personnel; the skill information includes blasting and charging trolley operation; blasting projects include risk clearance and charging, receiving explosives, guards, vehicle drivers, drilling personnel, secondary blasting personnel, etc.

[0044] In an optional embodiment, the personnel operation instruction module 102 is specifically used to screen personnel according to the maintenance operation plan and skill information, and create maintenance personnel operation instructions. Specifically, when creating the maintenance operation plan, the personnel are screened according to the skill information, and the maintenance operation plan is matched, and the maintenance personnel operation instructions are generated after adjustment. The skill information includes internal combustion, electrical, welding, and mechanical. The generated personnel operation instructions include information such as the instruction date, shift, operation time period, and matching personnel.

[0045] In an optional implementation, the personnel operation instruction module 102 is specifically used to generate other operator instructions based on other operation plans and the actual matters handled by the operators. Taking a temporary key work plan as an example, when a temporary key work plan is generated for sudden and unplanned key operation contents in production, the operators are matched according to the information including operation points, operation time periods, operation contents, etc. in the temporary key work plan, and corresponding operator instructions are generated.

[0046] The plan instruction issuing module 103 is used to issue the personnel operation instructions to the corresponding personnel machines. Specifically, the instructions are quickly and accurately transmitted to the corresponding personnel machines through the mobile terminal or PC terminal.

[0047] The result collection module 104 is used to determine the collection information corresponding to one or more plans of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans according to the manual filling of the operator or the automatic monitoring method, such as: equipment production operation plan collection, blasting operation plan collection, maintenance operation plan collection, and other operation plan collection, and then confirm the progress of the plan completion. Specifically, on the one hand, the completion status of various operation plans can be collected by manual entry; on the other hand, the equipment operation parameters in each operation plan, such as the equipment operation time, can be automatically monitored, and the completion status of the operation plan can be confirmed accordingly.

[0048] In an optional implementation, the process monitoring module 105 is used to determine abnormal problems, operating efficiency, etc. of the operating equipment in the production process based on the core parameters by real-time collection and analysis of the core parameters of the operating equipment. Further, after the abnormal problem is determined, the abnormal problem is reported to the management level in the first-level management structure. Specifically, the abnormal problem is divided into equipment problems and non-equipment problems. After the abnormal problem is determined, the equipment problems and non-equipment problems on site are reported to the management level in the first-level management structure through the mobile terminal and PC terminal applications, so that the management level can quickly obtain the details of the abnormal problem and take countermeasures.

[0049] In an optional implementation, the data analysis module 106 is used to customize the analysis report according to the enterprise management and control requirements and improvement goals, and optimize it based on user feedback. Specifically, the data analysis module 106 combines the collected information with the enterprise management and control requirements and improvement goals, generates a corresponding analysis report, and presents the progress of the plan completion in the form of a report. In addition, based on user feedback and actual application effects, the report is continuously optimized to ensure the accuracy and effectiveness of data analysis, providing strong data support for enterprises.

[0050] In an optional implementation, the real-time database 107 is used to store each operation plan and its collection information.

[0051] The technical solution of the present invention generates one or more of equipment production operation plans, blasting operation plans, maintenance operation plans, and other operation plans by collecting production-related condition parameters, and then generates corresponding personnel operation instructions based on personnel basic information and issues them to corresponding personnel and machines, and collects corresponding collection information to confirm completion progress, thereby achieving efficient planning, and the plan can directly reach the machine position, providing a basic guarantee for the implementation of daily work under the first-level management structure.

[0052] In addition, since the execution feedback of existing plans often relies on paper records, the workload of personnel at each level is increased, and there are problems that data accuracy is affected by factors such as recording, updating and transmission. In the technical solution of the present invention, after specifying each operation plan, it can be combined with basic personnel information, such as the actual execution matters of the personnel, to generate corresponding personnel operation instructions and issue them to the corresponding personnel machines, without the need to modify the feedback layer by layer. Therefore, it can solve the problems of low information transmission efficiency, slow decision-making response speed, and poor data accuracy in the process of plan formulation and management, and create conditions for optimizing and integrating human resources and improving labor organization efficiency. It provides a basic guarantee for the implementation of the first-level management structure, promotes the construction of intelligent mines, and has good demonstration significance and promotion value in the industry.

[0053] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present application.

[0054] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A plan formulation and management system based on a first-level management architecture, characterized in that: In the first-level management structure, the factory and mine departments are used as the management level, and the work teams are used as the execution level; the system includes: A plan information module, used to collect production-related condition parameters, and generate one or more of equipment production operation plans, blasting operation plans, maintenance operation plans, and other operation plans based on the production-related condition parameters; The personnel operation instruction module is used to generate corresponding personnel operation instructions according to one or more of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans in combination with the basic information of the personnel; A plan instruction issuing module is used to issue the personnel operation instructions to the corresponding personnel machines; The result collection module is used to determine the collection information corresponding to one or more plans of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans based on the manual reporting of the operators or automatic monitoring, and then confirm the progress of the plan completion.

2. The system according to claim 1, characterized in that The system further comprises: The process monitoring module is used to collect and analyze the core parameters of the operating equipment in real time, and determine abnormal problems of the operating equipment in the production process based on the core parameters.

3. The system according to claim 2, characterized in that The process monitoring module is further used to report the abnormal problem to the management layer in the first-level management architecture.

4. The system according to claim 1, characterized in that The system further comprises: The data analysis module is used to customize analysis reports according to enterprise management requirements and improvement goals, and optimize based on user feedback.

5. The system according to claim 1, wherein: The plan information module is also used to form a daily production operation plan report based on one or more of the equipment production operation plan, blasting operation plan, maintenance operation plan, and other operation plans, and upload it to the management level in the first-level management structure for review.

6. The system according to claim 1, characterized in that The personnel operation instruction module is specifically used to automatically extract the equipment operating personnel of the previous shift according to the equipment production operation plan and shift information, and generate equipment production operation instructions according to the actual processing matters of the equipment operating personnel of the previous shift.

7. The system according to claim 1, characterized in that The personnel operation instruction module is specifically used to automatically extract the blasting operation personnel on the last planned date according to the blasting project, and generate the blasting operation instructions according to the actual processing matters of the blasting operation personnel.

8. The system of claim 1, wherein: The personnel operation instruction module is specifically used to screen personnel according to the maintenance operation plan and skill information, and create maintenance personnel operation instructions.

9. The system of claim 1, wherein: The system also includes: a real-time database for storing each operation plan and its collection information.

10. The system according to claim 1, wherein: The production-related condition parameters include at least the product of the equipment, unit efficiency, shift length, equipment downtime period, and operation rate.