Method for measuring and calculating carbon emission in structured road construction stage based on budget quota
By adopting a structured method based on budget quotas in highway engineering construction, the carbon emission process is decomposed, and the lack of carbon emission calculation in highway engineering construction is solved, and scientific calculation of highway engineering and the implementation of energy-saving and carbon reduction measures are realized.
Patent Information
- Application Number
- CN202410969318.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-12-27
AI Technical Summary
The lack of unified carbon emission quantitative calculation methods in highway engineering construction has led to the inability to effectively quantitatively calculate and analyze the characteristics of carbon emissions and emissions, which hinders the development of energy conservation and carbon reduction in the highway industry.
Using a structured method based on budget quotas, we can decompose the carbon emission process in the highway construction stage by clarifying the boundaries of carbon emission calculation, determining the source, and building universal and decomposition models. We can summarize the carbon emission process in the bottom-up of each branch project, unit project and total Carbon emissions.
It has achieved scientific and reliable carbon emission calculations, which can accurately calculate carbon emissions during the construction stage of highway engineering, identify the carbon emission intensity of different projects, provide targeted energy-saving and carbon reduction measures, and promote environmental protection and management.
Smart Images

Figure CN119204385A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of highway construction engineering, and in particular to a method for calculating carbon emissions during a structured highway construction phase based on a budget quota. Background Art
[0002] Global warming has become a hot topic of great concern to the international community today. The main cause of global warming is greenhouse gas emissions caused by human activities, and carbon dioxide is the most important anthropogenic greenhouse gas in the atmosphere, accounting for about 66% of the warming effect. The transportation industry is one of the main sources of global carbon dioxide emissions, accounting for about 27% of the total global carbon dioxide emissions related to energy activities, and is also one of the fastest growing industries. In the transportation industry, highway transportation projects are the absolute main body of carbon dioxide emissions and the focus of emission reduction. From the perspective of the development of the transportation industry, with the continuous increase in the total mileage of traffic, the high carbon emissions, high energy consumption and environmental damage brought about by highway construction are serious. Controlling and reducing carbon emissions from highway construction is one of the key and effective ways to reduce transportation carbon emissions and alleviate my country's carbon emission pressure. At present, there is no unified method for quantitative measurement of carbon emissions in my country's highway engineering field. How to quantitatively measure and analyze carbon emissions during the construction period of highway projects, and grasp the characteristic process and emission of carbon emissions during the construction of highway projects. There is still a lack of appropriate methods, which to a certain extent hinders the development and progress of energy conservation and carbon reduction in the highway industry. Therefore, studying the carbon emission calculation method during the highway project construction period is particularly important and urgent in the current important era of energy conservation and carbon reduction in China's national economy. Summary of the invention
[0003] This application provides a structured carbon emission calculation method for the highway construction stage based on budget quotas, which solves the problem of carbon emission calculation during the highway construction stage.
[0004] The technical problem solved by the present invention can be achieved by adopting the following technical solutions:
[0005] A method for calculating carbon emissions during a structured highway construction phase based on budget quotas includes the following steps:
[0006] S1: Clarify the boundaries of carbon emission calculation during the highway construction stage;
[0007] S2: Determine the sources of carbon emissions during the highway construction phase;
[0008] S3: Construction of a universal calculation model for structural carbon emissions during the highway construction phase;
[0009] S4: Construction of carbon emission estimation model from various sources during highway construction stage;
[0010] S5: Calculate carbon emissions of sub-projects during the highway construction phase;
[0011] S6: Calculate the carbon emissions of sub-projects during the highway construction phase;
[0012] S7: Calculate the carbon emissions per unit project during the highway construction phase;
[0013] S8: Calculate the total carbon emissions during the highway construction phase.
[0014] Furthermore, step S1 includes: the sum of carbon dioxide emissions generated during the material or equipment production, transportation stage, and construction stage.
[0015] Furthermore, step S2 clarifies the sources of carbon emissions based on the calculated boundaries of S1, including carbon emissions from construction workers' living energy consumption, carbon emissions from construction machinery energy consumption, carbon emissions increased by construction conditions, carbon emissions from chemical reactions during the construction process, carbon emissions from construction site energy consumption, other direct carbon emissions during the construction period, carbon emissions from the production process of materials or equipment factories, carbon emissions from off-site transportation of materials or equipment, and carbon emissions from the generation of externally purchased electricity.
[0016] Furthermore, step S3 constructs a stage structured model based on the carbon emission sources of S2, wherein the highway construction stage is divided into independent unit processes with a unified carbon emission quantitative expression according to the construction sequence and hierarchical relationship of "unit project-sub-project-sub-project", and then the inverse process of highway construction stage decomposition is calculated, and the total carbon emissions of each sub-project, each unit project and highway construction stage are obtained from the bottom up.
[0017] Furthermore, the unit process carbon emissions are composed of nine parts: carbon emissions from construction workers’ living energy consumption, carbon emissions from construction machinery energy consumption, carbon emissions from construction conditions, carbon emissions from chemical reactions during the construction process, carbon emissions from construction site energy consumption, other direct carbon emissions during the construction period, carbon emissions from the production process of materials or equipment factories, carbon emissions from the off-site transportation of materials or equipment, and carbon emissions from the generation process of purchased electricity.
[0018] The calculation formula for the carbon emissions from the construction workers' living energy consumption is:
[0019]
[0020] In the formula, The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0021] A ubi The number of projects for the u-th infrastructure project, the b-th sub-project, and the i-th sub-project,
[0022] For the u-type infrastructure project, the b-type sub-project and the i-type sub-project,
[0023] EF p is the carbon emission factor of the construction workers’ living energy consumption,
[0024] The calculation formula for carbon emissions from energy consumption of construction machinery is:
[0025]
[0026] Where: The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0027] A ubi The number of projects for the u-th infrastructure project, the b-th sub-project, and the i-th sub-project,
[0028] It is the quota unit-shift consumption of the jth type of construction machinery in the ith type of sub-project of the bth type of infrastructure project of the uth type, among which only the construction machinery burning fossil fuels is calculated.
[0029] EF j is the carbon emission factor of the energy consumption per shift of the j-th type of construction machinery,
[0030] j=1,2,3,…n is the construction machinery serial number;
[0031] The calculation formula for the increase in carbon emissions due to construction conditions is:
[0032]
[0033] Where: Add carbon emissions for the impact of construction conditions in the i-th sub-project of the b-th sub-project of the u-th infrastructure project.
[0034] The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0035] The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0036] α q The carbon emission calculation coefficient is increased for the qth construction condition, where q=1 winter construction increases carbon emissions, q=2 rainy season construction increases carbon emissions, q=3 night construction increases carbon emissions, q=4 plateau construction increases carbon emissions, q=5 sandy area construction increases carbon emissions, q=6 coastal construction increases carbon emissions, and q=7 traffic interference increases carbon emissions.
[0037] The calculation formula for carbon emissions from chemical reactions during the construction process is:
[0038]
[0039] Where: Carbon emissions from chemical reactions during the construction process of the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0040] A ubi The number of projects of the i-th sub-project of the b-th sub-project of the u-th infrastructure project (the listed units in the series of standards for carbon emission calculation quotas for highway projects);
[0041] The quota asphalt mixture consumption in the content of the i-th sub-project of the b-th sub-project of the u-th infrastructure project;
[0042] EF a The carbon emission factor for the chemical reaction during asphalt mixing and paving;
[0043] The calculation formula for carbon emissions from construction site energy consumption is:
[0044]
[0045] Where: The carbon emissions from energy consumption in the construction site of the i-th sub-project of the b-th sub-project of the u-th infrastructure project are:
[0046] The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0047] The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0048] Add carbon emissions (kgCO2) for the impact of construction conditions in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0049] β is the calculation coefficient of carbon emission from energy consumption in construction sites;
[0050] The calculation formula for other direct carbon emissions during the construction period is:
[0051]
[0052] Where: Other direct carbon emissions during the construction period of the i-th sub-project of the b-th sub-project of the u-th infrastructure project;
[0053] The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0054] The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0055] Add carbon emissions for the impact of construction conditions in the i-th sub-project of the b-th sub-project of the u-th infrastructure project.
[0056] Carbon emissions from chemical reactions during the construction process of the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0057] The carbon emissions from energy consumption in the construction site of the i-th sub-project of the b-th sub-project of the u-th infrastructure project are:
[0058] γ is the calculation coefficient of other direct carbon emissions during the construction period (%);
[0059] The calculation formula for carbon emissions during the production process of materials or equipment is:
[0060]
[0061] Where: The carbon emissions from the production process of materials or equipment in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0062] A ubi The number of projects for the u-th infrastructure project, the b-th sub-project, and the i-th sub-project,
[0063] The quota consumption of the kth material or equipment in the ith sub-project of the bth sub-project of the uth infrastructure project.
[0064] EF k is the carbon emission factor of the production process of the kth material or equipment,
[0065] k=1,2,3,…n is the serial number of the material or equipment;
[0066] The calculation formula for carbon emissions during off-site transportation of materials or equipment is:
[0067]
[0068] Where: The carbon emissions from the off-site transportation of materials or equipment in the i-th sub-project of the b-th sub-project of the u-th infrastructure project.
[0069] A ubi The number of projects of Category i sub-projects of Category b sub-projects of Category u infrastructure projects;
[0070] The quota consumption of the kth material or equipment in the ith sub-project of the bth sub-project of the uth infrastructure project.
[0071] L k is the average off-site transportation distance of the kth type of material or equipment in the ith category of the bth category of the uth infrastructure project,
[0072] EF t is the carbon emission factor per unit turnover of the t-th type of transport equipment,
[0073] t is the type of transport equipment or vehicle;
[0074] The calculation formula for carbon emissions in the power generation process of purchased electricity is:
[0075]
[0076] Where: The carbon emissions from the generation of electricity purchased from the i-th sub-project of the b-th sub-project of the u-th infrastructure project are:
[0077] A ubi The number of projects of Category U infrastructure project, Category B sub-project and Category I sub-project,
[0078] The quota unit-shift consumption of the jth type of construction machinery in the ith type of sub-project of the bth type of infrastructure project of the uth type,
[0079] B j is the power consumption per unit shift of the j-th type of construction machinery;
[0080] EF d is the average carbon dioxide emission factor of the regional power grid,
[0081] j=1,2,3,…n is the construction machinery serial number;
[0082] In the above formula, i is a sub-project, i=1,2,3,…n respectively represent felling, root digging, weeding, topsoil removal, silt digging, wet soil, quicksand, manual digging and blasting of permafrost,…;
[0083] u is the infrastructure project and b is the sub-project.
[0084] Furthermore, the carbon emission calculation model of the sub-project in step S5 is:
[0085]
[0086] In the formula, E ubi is the carbon emissions of the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0087] is the carbon emission of the sth carbon emission source in the ith sub-project of the bth sub-project of the uth infrastructure project,
[0088] s is the source of carbon emissions, s=1 "Carbon emissions from construction workers' living energy consumption", s=2 "Carbon emissions from construction machinery energy consumption", s=3 "Carbon emissions increased by construction conditions", s=4 "Carbon emissions from chemical reactions during the construction process", s=5 "Carbon emissions from construction site construction energy consumption", s=6 "Other direct carbon emissions during the construction period", s=7 "Carbon emissions from the production process of materials or equipment in factories", s=8 "Carbon emissions from off-site transportation of materials or equipment", and s=9 "Carbon emissions from the generation of purchased electricity".
[0089] Among them, "9" is the sum of the number of carbon emission sources.
[0090] Furthermore, the carbon emission calculation model of the sub-project in step S6 is:
[0091]
[0092] In the formula, E ub is the carbon emissions of the b-type subproject of the u-type infrastructure project,
[0093] E ubi is the carbon emissions of the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0094] i is a sub-project, i=1,=1,2,3,…n respectively represent felling trees, digging roots, weeding, clearing topsoil, digging silt, wet soil, quicksand, manual excavation and blasting permafrost, etc.
[0095] Furthermore, the unit project carbon emission calculation model in step S7 is:
[0096]
[0097] In the formula, E u is the carbon emissions of the u-th infrastructure project,
[0098] E ub is the carbon emissions of the b-type subproject of the u-type infrastructure project,
[0099] b is the sub-project b=1,2,3,…,
[0100] n represents roadbed earthwork engineering, special roadbed treatment process, drainage engineering, etc.
[0101] Furthermore, the total carbon emission calculation model in step S8 highway construction stage is:
[0102]
[0103] In the formula, E sum is the total carbon emissions during the highway project construction phase,
[0104] E u is the carbon emissions of the u-th infrastructure project,
[0105] u is the unit project, u=1 "roadbed project", u=2 "pavement project", u=3 "tunnel project", u=4 "bridge and culvert project", u=5 "traffic project and facilities along the line", u=6 "greening and environmental protection project", u=7 "temporary project".
[0106] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the above-mentioned method for calculating carbon emissions in the structured highway construction phase based on budget quotas.
[0107] The beneficial effects of the present invention are as follows: due to the introduction of the "unit-sub-section-sub-item" structured highway engineering construction stage carbon emission calculation model construction idea, the calculation is performed according to the inverse process of the highway construction stage decomposition, and the total carbon emissions of each sub-project, unit project and highway construction stage in the construction stage are obtained from the bottom up. The calculation process is simple, scientific and reliable. Based on the budget quota, the carbon emissions in the structured highway construction stage can be accurately calculated, which is conducive to identifying the carbon emission intensity of different unit projects, sub-projects and sub-projects in the highway engineering construction stage, so as to take targeted energy-saving and carbon reduction measures, thereby achieving a win-win situation for highway engineering construction and environmental protection, and better strengthening the technical support for carbon emission management during the highway engineering construction period. BRIEF DESCRIPTION OF THE DRAWINGS
[0108] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0109] Figure 1 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION
[0110] Embodiment 1:
[0111] Reference Figure 1 , a method for calculating carbon emissions in a structured highway construction phase based on budget quota, comprising the following steps:
[0112] S1: Clarify the boundaries of carbon emission calculation during the highway construction stage;
[0113] S2: Determine the sources of carbon emissions during the highway construction phase;
[0114] S3: Construction of a universal calculation model for structural carbon emissions during the highway construction phase;
[0115] S4: Construction of carbon emission estimation model from various sources during highway construction stage;
[0116] S5: Calculate carbon emissions of sub-projects during the highway construction phase;
[0117] S6: Calculate the carbon emissions of sub-projects during the highway construction phase;
[0118] S7: Calculate the carbon emissions per unit project during the highway construction phase;
[0119] S8: Calculate the total carbon emissions during the highway construction phase.
[0120] Furthermore, step S1 includes: the sum of carbon dioxide emissions generated during the material or equipment production, transportation stage, and construction stage.
[0121] Furthermore, step S2 clarifies the sources of carbon emissions based on the calculated boundaries of S1, including carbon emissions from construction workers' living energy consumption, carbon emissions from construction machinery energy consumption, carbon emissions increased by construction conditions, carbon emissions from chemical reactions during the construction process, carbon emissions from construction site energy consumption, other direct carbon emissions during the construction period, carbon emissions from the production process of materials or equipment factories, carbon emissions from off-site transportation of materials or equipment, and carbon emissions from the generation of externally purchased electricity.
[0122] Furthermore, step S3 constructs a stage structured model based on the carbon emission sources of S2, wherein the highway construction stage is divided into independent unit processes with a unified carbon emission quantitative expression according to the construction sequence and hierarchical relationship of "unit project-sub-project-sub-project", and then the inverse process of highway construction stage decomposition is calculated, and the total carbon emissions of each sub-project, each unit project and highway construction stage are obtained from the bottom up.
[0123] Furthermore, the unit process carbon emissions are composed of nine parts: carbon emissions from construction workers’ living energy consumption, carbon emissions from construction machinery energy consumption, carbon emissions from construction conditions, carbon emissions from chemical reactions during the construction process, carbon emissions from construction site energy consumption, other direct carbon emissions during the construction period, carbon emissions from the production process of materials or equipment factories, carbon emissions from the off-site transportation of materials or equipment, and carbon emissions from the generation process of purchased electricity.
[0124] The calculation formula for the carbon emissions from the construction workers' living energy consumption is:
[0125]
[0126] In the formula, The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0127] A ubi The number of projects for the u-th infrastructure project, the b-th sub-project, and the i-th sub-project,
[0128] For the u-type infrastructure project, the b-type sub-project and the i-type sub-project,
[0129] EFp is the carbon emission factor of the construction workers’ living energy consumption, and empirical data should be used first. When empirical data is lacking, it can be calculated as 1.84kgCO2 / work day;
[0130] The calculation formula for carbon emissions from energy consumption of construction machinery is:
[0131]
[0132] Where: The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0133] A ubi The number of projects for the u-th infrastructure project, the b-th sub-project, and the i-th sub-project,
[0134] It is the quota unit-shift consumption of the jth type of construction machinery in the ith type of sub-project of the bth type of infrastructure project of the uth type, among which only the construction machinery burning fossil fuels is calculated.
[0135] EF j is the carbon emission factor of the energy consumption per shift of the j-th type of construction machinery, which can be determined according to the carbon emission factor of the energy consumption per shift of construction machinery in the series of standards for carbon emission calculation of highway projects.
[0136] j=1,2,3,…n is the construction machinery serial number;
[0137] The calculation formula for the increase in carbon emissions due to construction conditions is:
[0138]
[0139] Where: Add carbon emissions for the impact of construction conditions in the i-th sub-project of the b-th sub-project of the u-th infrastructure project.
[0140] The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0141] The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0142] α q It is the carbon emission calculation coefficient increased by the impact of construction conditions for the qth item, where q=1 increased carbon emissions from winter construction, q=2 increased carbon emissions from rainy season construction, q=3 increased carbon emissions from night construction, q=4 increased carbon emissions from plateau areas, q=5 increased carbon emissions from sandy areas, q=6 increased carbon emissions from coastal areas, and q=7 increased carbon emissions from driving interference. It can be determined according to the values in the calculation coefficient table of construction conditions impact in the carbon emission calculation standard for highway projects.
[0143] The calculation formula for carbon emissions from chemical reactions during the construction process is:
[0144]
[0145] Where: Carbon emissions from chemical reactions during the construction process of the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0146] A ubi The number of projects of the i-th sub-project of the b-th sub-project of the u-th infrastructure project (the listed units in the series of standards for carbon emission calculation quotas for highway projects);
[0147] The quota asphalt mixture consumption in the content of the i-th sub-project of the b-th sub-project of the u-th infrastructure project;
[0148] EFa is the carbon emission factor of the chemical reaction during the mixing and paving process of asphalt mixture. Empirical data should be used first. When empirical data is lacking, it can be calculated as 1.2×10-5kgCO2 / kg asphalt.
[0149] The calculation formula for carbon emissions from construction site energy consumption is:
[0150]
[0151] Where: The carbon emissions from energy consumption in the construction site of the i-th sub-project of the b-th sub-project of the u-th infrastructure project are:
[0152] The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0153] The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0154] Add carbon emissions (kgCO2) for the impact of construction conditions in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0155] β is the calculation coefficient of carbon emission from energy consumption of construction sites. Empirical data should be used first. When empirical data is lacking, it can be calculated as 1%;
[0156] The calculation formula for other direct carbon emissions during the construction period is:
[0157]
[0158] Where: Other direct carbon emissions during the construction period of the i-th sub-project of the b-th sub-project of the u-th infrastructure project;
[0159] The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0160] The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0161] Add carbon emissions for the impact of construction conditions in the i-th sub-project of the b-th sub-project of the u-th infrastructure project.
[0162] Carbon emissions from chemical reactions during the construction process of the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0163] The carbon emissions from energy consumption in the construction site of the i-th sub-project of the b-th sub-project of the u-th infrastructure project are:
[0164] γ is the calculation coefficient of other direct carbon emissions during the construction period (%), and empirical data should be used first. When empirical data is lacking, it shall be calculated at 9% in the feasibility study stage, 5% in the preliminary design stage, and 3% in the construction drawing design stage;
[0165] The calculation formula for carbon emissions during the production process of materials or equipment is:
[0166]
[0167] Where: The carbon emissions from the production process of materials or equipment in the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0168] A ubi The number of projects for the u-th infrastructure project, the b-th sub-project, and the i-th sub-project,
[0169] The quota consumption of the kth material or equipment in the ith sub-project of the bth sub-project of the uth infrastructure project.
[0170] EF k is the carbon emission factor of the production process of the kth material or equipment. It is advisable to use the carbon footprint data of the material or equipment obtained by a third party. When there is no third-party data, it can be determined according to the carbon emission factor of the material or equipment production process in the highway engineering carbon emission calculation quota series standard.
[0171] k=1,2,3,…n is the serial number of the material or equipment;
[0172] The calculation formula for carbon emissions during off-site transportation of materials or equipment is:
[0173]
[0174] Where: The carbon emissions from the off-site transportation of materials or equipment in the i-th sub-project of the b-th sub-project of the u-th infrastructure project.
[0175] A ubi The number of projects of Category i sub-projects of Category b sub-projects of Category u infrastructure projects;
[0176] The quota consumption of the kth material or equipment in the ith sub-project of the bth sub-project of the uth infrastructure project.
[0177] L k is the average off-site transportation distance of the kth type of material or equipment in the ith category of the bth category of the uth infrastructure project,
[0178] EF t is the carbon emission factor per unit turnover of the t-th type of transport equipment,
[0179] t is the type of transport equipment or vehicle;
[0180] The calculation formula for carbon emissions in the power generation process of purchased electricity is:
[0181]
[0182] Where: The carbon emissions from the generation of electricity purchased from the i-th sub-project of the b-th sub-project of the u-th infrastructure project are:
[0183] A ubi The number of projects of Category U infrastructure project, Category B sub-project and Category I sub-project,
[0184] The quota unit-shift consumption of the jth type of construction machinery in the ith type of sub-project of the bth type of infrastructure project of the uth type,
[0185] B j is the power consumption per unit shift of the j-th type of construction machinery;
[0186] EF d The average carbon dioxide emission factor of the regional power grid should be based on the area where the highway project is located and the average carbon dioxide emission factor of the corresponding regional power grid published by relevant national agencies.
[0187] j=1,2,3,…n is the construction machinery serial number;
[0188] In the above formula, i is a sub-project, i=1,2,3,…n respectively represent felling, root digging, weeding, topsoil removal, silt digging, wet soil, quicksand, manual digging and blasting of permafrost,…;
[0189] u is the infrastructure project and b is the sub-project.
[0190] Furthermore, the carbon emission calculation model of the sub-project in step S5 is:
[0191]
[0192] In the formula, E ubi is the carbon emissions of the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0193] is the carbon emission of the sth carbon emission source in the ith sub-project of the bth sub-project of the uth infrastructure project,
[0194] s is the source of carbon emissions, s=1 "Carbon emissions from construction workers' living energy consumption", s=2 "Carbon emissions from construction machinery energy consumption", s=3 "Carbon emissions increased by construction conditions", s=4 "Carbon emissions from chemical reactions during the construction process", s=5 "Carbon emissions from construction site construction energy consumption", s=6 "Other direct carbon emissions during the construction period", s=7 "Carbon emissions from the production process of materials or equipment in factories", s=8 "Carbon emissions from off-site transportation of materials or equipment", and s=9 "Carbon emissions from the generation of purchased electricity".
[0195] Among them, "9" is the sum of the number of carbon emission sources.
[0196] Furthermore, the carbon emission calculation model of the sub-project in step S6 is:
[0197]
[0198] In the formula, E ub is the carbon emissions of the b-type subproject of the u-type infrastructure project,
[0199] E ubi is the carbon emissions of the i-th sub-project of the b-th sub-project of the u-th infrastructure project,
[0200] i is a sub-project, i=1,=1,2,3,…n respectively represent felling trees, digging roots, weeding, clearing topsoil, digging silt, wet soil, quicksand, manual excavation and blasting permafrost, etc.
[0201] Furthermore, the unit project carbon emission calculation model in step S7 is:
[0202]
[0203] In the formula, E u is the carbon emissions of the u-th infrastructure project,
[0204] E ub is the carbon emissions of the b-type subproject of the u-type infrastructure project,
[0205] b is the sub-project b=1,2,3,…,
[0206] n represents roadbed earthwork engineering, special roadbed treatment process, drainage engineering, etc.
[0207] Furthermore, the total carbon emission calculation model in step S8 highway construction stage is:
[0208]
[0209] In the formula, E sum is the total carbon emissions during the highway project construction phase,
[0210] E u is the carbon emissions of the u-th infrastructure project,
[0211] u is the unit project, u=1 "roadbed project", u=2 "pavement project", u=3 "tunnel project", u=4 "bridge and culvert project", u=5 "traffic project and facilities along the line", u=6 "greening and environmental protection project", u=7 "temporary project".
[0212] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the above-mentioned method for calculating carbon emissions in the structured highway construction phase based on budget quotas.
[0213] The above is a detailed description of the embodiments of the present invention in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments. Within the knowledge scope of ordinary technicians in the field, various changes can be made without departing from the purpose of the present invention, which are all within the protection scope of this technology.
Claims
1. A method for calculating carbon emissions during the structured highway construction phase based on budget quotas, characterized in that: The steps include: S1: Clarify the boundaries of carbon emission calculation during the highway construction stage; S2: Determine the sources of carbon emissions during the highway construction phase; S3: Construction of a universal calculation model for structural carbon emissions during the highway construction phase; S4: Construction of carbon emission estimation model from various sources during highway construction stage; S5: Calculate carbon emissions of sub-projects during the highway construction phase; S6: Calculate the carbon emissions of sub-projects during the highway construction phase; S7: Calculate the carbon emissions per unit project during the highway construction phase; S8: Calculate the total carbon emissions during the highway construction phase.
2. According to the method for calculating carbon emissions in the structured highway construction phase based on budget quotas according to claim 1, it is characterized in that: Step S1 includes: the sum of carbon dioxide emissions generated during the material or equipment production, transportation stage, and construction stage.
3. The method for calculating carbon emissions during the structured highway construction phase based on budget quota according to claim 2 is characterized in that: Step S2 clarifies the sources of carbon emissions based on the calculated boundaries of S1, including carbon emissions from construction workers' living energy consumption, carbon emissions from construction machinery energy consumption, carbon emissions increased by construction conditions, carbon emissions from chemical reactions during the construction process, carbon emissions from construction site energy consumption, other direct carbon emissions during the construction period, carbon emissions from the production process of materials or equipment factories, carbon emissions from off-site transportation of materials or equipment, and carbon emissions from the generation of externally purchased electricity.
4. The method for calculating carbon emissions during the structured highway construction phase based on budget quota according to claim 3 is characterized in that: Step S3 constructs a stage structured model based on the carbon emission sources in S2, in which the highway construction stage is divided into independent unit processes with unified carbon emission quantitative expression according to the construction sequence and hierarchical relationship of "unit project-sub-project-sub-project", and then the inverse process of highway construction stage decomposition is calculated to obtain the total carbon emissions of each sub-project, each unit project and highway construction stage from bottom to top.
5. A method for calculating carbon emissions during the structured highway construction phase based on budget quota according to claims 1-4, characterized in that: The unit process carbon emissions are composed of nine parts: carbon emissions from construction workers’ living energy consumption, carbon emissions from construction machinery energy consumption, carbon emissions from construction conditions, carbon emissions from chemical reactions during the construction process, carbon emissions from construction site energy consumption, other direct carbon emissions during the construction period, carbon emissions from the production process of materials or equipment factories, carbon emissions from the off-site transportation of materials or equipment, and carbon emissions from the generation of purchased electricity. The calculation formula for the carbon emissions from the construction workers' living energy consumption is: In the formula, The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project, A ubi The number of projects for the u-th infrastructure project, the b-th sub-project, and the i-th sub-project, For the u-type infrastructure project, the b-type sub-project and the i-type sub-project, EF p is the carbon emission factor of the construction workers’ living energy consumption, The calculation formula for carbon emissions from energy consumption of construction machinery is: Where: The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project, A ubi The number of projects for the u-th infrastructure project, the b-th sub-project, and the i-th sub-project, It is the quota unit-shift consumption of the jth type of construction machinery in the ith type of sub-project of the bth type of infrastructure project of the uth type, among which only the construction machinery burning fossil fuels is calculated. EF j is the carbon emission factor of the energy consumption per shift of the j-th type of construction machinery, j=1,2,3,…n is the construction machinery serial number; The calculation formula for the increase in carbon emissions due to construction conditions is: Where: Add carbon emissions for the impact of construction conditions in the i-th sub-project of the b-th sub-project of the u-th infrastructure project. The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project, The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project, α q The carbon emission calculation coefficient is increased for the qth construction condition, where q=1 winter construction increases carbon emissions, q=2 rainy season construction increases carbon emissions, q=3 night construction increases carbon emissions, q=4 plateau construction increases carbon emissions, q=5 sandy area construction increases carbon emissions, q=6 coastal construction increases carbon emissions, and q=7 traffic interference increases carbon emissions. The calculation formula for carbon emissions from chemical reactions during the construction process is: Where: Carbon emissions from chemical reactions during the construction process of the i-th sub-project of the b-th sub-project of the u-th infrastructure project, A ubi The number of projects of the i-th sub-project of the b-th sub-project of the u-th infrastructure project (the listed units in the series of standards for carbon emission calculation quotas for highway projects); The quota asphalt mixture consumption in the content of the i-th sub-project of the b-th sub-project of the u-th infrastructure project; EF a The carbon emission factor for the chemical reaction during asphalt mixing and paving; The calculation formula for carbon emissions from construction site energy consumption is: Where: The carbon emissions from energy consumption in the construction site of the i-th sub-project of the b-th sub-project of the u-th infrastructure project are: The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project, The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project, Add carbon emissions for the impact of construction conditions in the i-th sub-project of the b-th sub-project of the u-th infrastructure project. β is the calculation coefficient of carbon emission from energy consumption in construction sites; The calculation formula for other direct carbon emissions during the construction period is: Where: Other direct carbon emissions during the construction period of the i-th sub-project of the b-th sub-project of the u-th infrastructure project; The carbon emissions from the living energy consumption of construction workers in the i-th sub-project of the b-th sub-project of the u-th infrastructure project, The carbon emissions from energy consumption of construction machinery in the i-th sub-project of the b-th sub-project of the u-th infrastructure project, Add carbon emissions for the impact of construction conditions in the i-th sub-project of the b-th sub-project of the u-th infrastructure project. Carbon emissions from chemical reactions during the construction process of the i-th sub-project of the b-th sub-project of the u-th infrastructure project, The carbon emissions from energy consumption in the construction site of the i-th sub-project of the b-th sub-project of the u-th infrastructure project are: γ is the calculation coefficient of other direct carbon emissions during the construction period (%); The calculation formula for carbon emissions during the production process of materials or equipment is: Where: The carbon emissions from the production process of materials or equipment in the i-th sub-project of the b-th sub-project of the u-th infrastructure project, A ubi The number of projects for the u-th infrastructure project, the b-th sub-project, and the i-th sub-project, The quota consumption of the kth material or equipment in the ith sub-project of the bth sub-project of the uth infrastructure project. EF k is the carbon emission factor of the production process of the kth material or equipment, k=1,2,3,…n is the serial number of the material or equipment; The calculation formula for carbon emissions during off-site transportation of materials or equipment is: Where: The carbon emissions from the off-site transportation of materials or equipment in the i-th sub-project of the b-th sub-project of the u-th infrastructure project. A ubi The number of projects of Category i sub-projects of Category b sub-projects of Category u infrastructure projects; The quota consumption of the kth material or equipment in the ith sub-project of the bth sub-project of the uth infrastructure project. L k is the average off-site transportation distance of the kth type of material or equipment in the ith category of the bth category of the uth infrastructure project, EF t is the carbon emission factor per unit turnover of the t-th type of transport equipment, t is the type of transport equipment or vehicle; The calculation formula for carbon emissions in the power generation process of purchased electricity is: Where: The carbon emissions from the generation of electricity purchased from the i-th sub-project of the b-th sub-project of the u-th infrastructure project are: A ubi The number of projects of Category U infrastructure project, Category B sub-project and Category I sub-project, The quota unit-shift consumption of the jth type of construction machinery in the ith type of sub-project of the bth type of infrastructure project of the uth type, B j is the power consumption per unit shift of the j-th type of construction machinery; EF d is the average carbon dioxide emission factor of the regional power grid, j=1,2,3,…n is the construction machinery serial number; In the above formula, i is a sub-project, i=1,2,3,…n respectively represent felling, root digging, weeding, topsoil removal, silt digging, wet soil, quicksand, manual digging and blasting of permafrost,…; u is the infrastructure project and b is the sub-project.
6. A method for calculating carbon emissions during the structured highway construction phase based on budget quota according to claims 1 and 5, characterized in that: The carbon emission calculation model of the sub-project in step S5 is: In the formula, E ubi is the carbon emissions of the i-th sub-project of the b-th sub-project of the u-th infrastructure project, is the carbon emission of the sth carbon emission source in the ith sub-project of the bth sub-project of the uth infrastructure project, s is the source of carbon emissions, s=1 "carbon emissions from construction workers' living energy consumption", s=2 "carbon emissions from construction machinery energy consumption", s=3 "carbon emissions increased by construction conditions", s=4 "carbon emissions from chemical reactions during the construction process", s=5 "carbon emissions from construction site construction energy consumption", s=6 "other direct carbon emissions during the construction period", s=7 "carbon emissions from the production process of materials or equipment in the factory", s=8 "carbon emissions from the off-site transportation of materials or equipment", and s=9 "carbon emissions from the generation of purchased electricity". Among them, "9" is the sum of the number of carbon emission sources.
7. A method for calculating carbon emissions during the structured highway construction phase based on budget quota according to claims 1 and 6, characterized in that: Step S6 The carbon emission calculation model of the sub-project is: In the formula, E ub is the carbon emissions of the b-type subproject of the u-type infrastructure project, E ubi is the carbon emissions of the i-th sub-project of the b-th sub-project of the u-th infrastructure project, i is a sub-project, i=1,=1,2,3,…n respectively represent felling trees, digging roots, weeding, clearing topsoil, digging silt, wet soil, quicksand, manual excavation and blasting permafrost, etc.
8. A method for calculating carbon emissions during the structured highway construction phase based on budget quota according to claims 1 and 7, characterized in that: The carbon emission calculation model of the unit project in step S7 is: In the formula, E u is the carbon emissions of the u-th infrastructure project, E ub is the carbon emissions of the b-type subproject of the u-type infrastructure project, b is the sub-project b=1,2,3,…, n represents roadbed earthwork engineering, special roadbed treatment process, drainage engineering, etc.
9. A method for calculating carbon emissions during the structured highway construction phase based on budget quota according to claims 1-8, characterized in that: Step S8: The total carbon emission calculation model for the highway construction stage is: In the formula, E sum is the total carbon emissions during the highway project construction phase, E u is the carbon emissions of the u-th infrastructure project, u is the unit project, u=1 "roadbed project", u=2 "pavement project", u=3 "tunnel project", u=4 "bridge and culvert project", u=5 "traffic project and facilities along the line", u=6 "greening and environmental protection project", u=7 "temporary project".
10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, it implements a method for calculating carbon emissions during the structured highway construction phase based on budget quotas as described in any one of claims 1 to 9.
Citation Information
Patent Citations
Carbon emission measuring and calculating method for process-level, working condition-level and project-level road construction activities
CN113065254A
Road engineering construction period carbon emission calculation method based on construction process
CN116467548A
Carbon emission measuring and calculating method and device for water transportation engineering project, and electronic equipment
CN117974162A
Carbon emission measurement and calculation method for process-level, working condition-level, and project-level highway construction activities
WO2022206354A1