Campus weak current project management method and device, computer equipment and storage medium

Through artificial intelligence technology and efficient human-computer interaction mechanism, we use weak current dialogue model to quickly obtain requirements and configurations in campus weak current project design, solving the problems of low efficiency and incomplete information in the existing technology, and achieving accurate design solution generation and High-quality project implementation.

CN119204577AInactive Publication Date: 2024-12-27GUANGZHOU SIJIN ELECTRONIC TECH CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411402095.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-12-27
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the design of campus weak current projects, the existing technology has problems such as inefficiency, incomplete information and relying on personal experience, which leads to a long-term design process and is prone to safety hazards or lack of functions.

Method used

Using artificial intelligence technology and an efficient human-computer interaction mechanism, we quickly obtain weak current construction types and configuration requirements through preset weak current dialogue models, simplify the information collection process, and personalize it with campus environment data to generate accurate design solutions.

Benefits of technology

It greatly improves design efficiency and quality, ensures that the design plan is more comprehensive and reasonable, reduces design deviations caused by incomplete information, and improves the success rate and user satisfaction of project implementation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119204577A_ABST
    Figure CN119204577A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of informatization management, in particular to a campus weak current project management method and device, computer equipment and a storage medium, and the campus weak current project management method comprises the steps: obtaining a weak current project construction demand, and obtaining a weak current construction type according to the weak current project construction demand; based on a preset weak current dialogue model, triggering weak current configuration inquiry according to the weak current building type, and obtaining a corresponding weak current configuration demand; according to the weak current configuration requirement, obtaining weak current equipment types and equipment unit price information corresponding to each weak current equipment type; and based on the weak current dialogue model, triggering a scheme confirmation inquiry according to the equipment unit price information, and generating a weak current project construction scheme according to a scheme confirmation inquiry result. The campus weak current informatization project construction method and device have the advantages that the intelligence of campus weak current informatization project construction is improved, and the subsequent project landing efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of information management, and in particular to a campus weak current project management method, device, computer equipment and storage medium. Background Art

[0002] At present, weak current informatization construction in the field of education has been widely used in recent years as a key step to improve the level of campus intelligence. Traditional weak current engineering projects usually cover multiple aspects such as network architecture, video surveillance, audio transmission and security management, aiming to create a comprehensive digital teaching environment. The application of these technologies has significantly enhanced the ability to share educational resources and the security system, providing teachers and students with more comfortable learning and working conditions.

[0003] During the design phase of campus weak current projects, the mainstream approach still focuses on customized services led by humans. The design team selects the appropriate product model, calculates the required quantity, and evaluates the overall budget based on the specific needs of the customer and the results of the on-site inspection. Although this personalized design can meet the special needs of different schools to a certain extent, it has certain limitations in terms of standardization and service response time.

[0004] The above-mentioned prior art solutions have the following defects: From preliminary research to detailed plan and finalization, each step requires considerable time and effort, especially in large or complex projects. In addition, incomplete information collection is also a major hidden danger, which can easily lead to safety hazards or functional deficiencies, thus hindering the progress and quality control of the entire project. Summary of the invention

[0005] In order to improve the intelligence of the construction of campus weak current information projects and to improve the efficiency of the implementation of subsequent projects, this application provides a campus weak current project management method, device, computer equipment and storage medium.

[0006] The above-mentioned invention objective of the present application is achieved through the following technical solutions: A campus weak current project management method, the campus weak current project management method comprising: Obtain the weak current project construction requirements, and obtain the weak current construction type according to the weak current project construction requirements; Based on the preset weak-current dialogue model, trigger the weak-current configuration inquiry according to the weak-current construction type, and obtain the corresponding weak-current configuration requirements; According to the weak current configuration requirements, obtain the types of weak current equipment and the equipment unit price information corresponding to each type of weak current equipment; Based on the weak-current dialogue model, a solution confirmation inquiry is triggered according to the equipment unit price information, and a weak-current project construction plan is generated according to the solution confirmation inquiry result.

[0007] By adopting the above technical solution, the three core problems of low efficiency, incomplete information and reliance on personal experience in the existing manual design process are addressed. By introducing artificial intelligence technology and efficient human-computer interaction mechanism, the rapid generation of design solutions is achieved, which greatly improves the design efficiency and quality. Specifically: by using the preset weak current dialogue model, the weak current construction type can be quickly obtained according to the weak current project construction requirements, and the corresponding weak current configuration inquiry can be triggered accordingly, so as to obtain the weak current configuration requirements, thereby avoiding the cumbersome steps brought by the need to record and analyze a large amount of information item by item in the traditional method. Users can conveniently complete the input of required data in the form of questions and answers, greatly simplifying the information collection link, so that most of the basic work can be completed efficiently in a short time; through the comprehensive analysis and utilization of campus environmental data, the present invention can build a more accurate demand model at the beginning of the design. When obtaining the weak current project construction requirements, the equipment construction area and its functional requirements are used as input parameters to further refine the configuration requirements, ensuring that the final design solution is more comprehensive and reasonable.

[0008] In a preferred example, the present application may be further configured as follows: before triggering a weak current configuration inquiry based on the preset weak current dialogue model according to the weak current construction type and obtaining the corresponding weak current configuration requirements, the campus weak current project management method further includes: Acquire campus environment data, and extract campus environment features from the campus environment data; A weak current configuration basic model is obtained, and the weak current configuration basic model is trained according to the campus environment characteristics to obtain the weak current dialogue model.

[0009] By adopting the above technical solution, by obtaining campus environment data and extracting campus environment features from it, and combining it with the weak current configuration basic model for training to obtain a weak current dialogue model, the model can be customized according to the specific conditions of each campus, thereby generating weak current configuration requirements that are highly matched with the actual conditions of each campus, greatly improving the pertinence and effectiveness of the design scheme, and significantly reducing the design deviation caused by incomplete information, ensuring that the design scheme can more accurately meet the actual needs of the campus weak current informationization project. Specifically, by analyzing the geographical layout, building characteristics, crowd density and other factors in the campus environment data, the key elements in the project implementation can be more accurately grasped, such as the layout location of surveillance cameras, the reasonable distribution of network access points, the coverage of the alarm system, etc., thereby avoiding the uncertainty caused by relying on experience and intuition in the traditional design process. In addition, the weak current dialogue model obtained by training based on the weak current configuration basic model can more intelligently understand user needs in the process of interaction with users, quickly locate the core problems in the design scheme, and simultaneously consider the specific impact of environmental characteristics on the design scheme, so that the configuration requirements output by the system are more comprehensive, and the accuracy and feasibility of the overall design scheme are improved.

[0010] In a preferred example, the present application can be further configured as follows: based on the preset weak current dialogue model, triggering a weak current configuration inquiry according to the weak current construction type, and obtaining corresponding weak current configuration requirements, specifically including: Triggering a device location query according to the weak current construction type, and obtaining a device construction area and a corresponding device function requirement corresponding to the device location query; The equipment construction area and the equipment construction requirements are input into the weak current dialogue model, the regional function data is obtained according to the equipment construction area, and the weak current configuration requirements are generated according to the campus environment characteristics, the regional function data and the equipment function requirements.

[0011] By adopting the above technical solution, based on the preset weak current dialogue model, it is possible to trigger accurate weak current configuration inquiries according to the specific weak current construction types of different campuses, so as to obtain the corresponding weak current configuration requirements, trigger equipment location inquiries according to the weak current construction types, clarify the specific areas of equipment construction and their functional requirements, and then input this information into the weak current dialogue model, using the campus environment characteristics, combined with regional functional data and equipment functional requirements, to generate highly targeted weak current configuration requirements, avoiding the design defects caused by incomplete information collection in traditional manual design. For example, art schools often need to add large-screen display equipment to meet creative needs, while science and technology schools may focus more on high-performance computing and network facilities. Through customized configuration inquiries and model training, the special needs of different campuses are obtained, so that the output design scheme not only fits the actual use scenario, but also effectively avoids resource waste and redundancy, significantly improves the quality and reliability of the design scheme, reduces the cost of later adjustments, and at the same time ensures the system's sensitive response ability and improves user satisfaction.

[0012] In a preferred example, the present application may be further configured as follows: the acquisition of the type of weak current equipment and the equipment unit price information corresponding to each type of weak current equipment according to the weak current configuration requirement specifically includes: Triggering a project budget scope inquiry based on the weak current dialogue model, obtaining a project construction budget, and obtaining a weak current equipment type according to the weak current configuration requirements; According to the project construction budget, obtain the equipment unit price data and equipment installation quantity corresponding to each type of weak current equipment; A scheme confirmation inquiry is triggered according to the equipment unit price data and the equipment installation quantity, and the type of weak current equipment and the equipment unit price information are obtained according to the scheme confirmation reply.

[0013] By adopting the above technical solutions, according to the specific environmental characteristics of the campus and the weak current construction requirements, the weak current configuration requirements are accurately obtained with the help of the weak current dialogue model, so that the output weak current project construction plan is more in line with the actual situation of each campus. First, the weak current dialogue model obtained through pre-training can quickly understand the campus environmental characteristics and the actual needs of users, avoiding the problem of incomplete information collection in the traditional design process and ensuring the data accuracy in the initial stage of solution generation. Secondly, after obtaining the specific weak current configuration requirements, the equipment selection and quantity are dynamically adjusted in combination with the project budget range to ensure that both technical requirements are met and costs can be effectively controlled. The weak current dialogue model is used to trigger the project budget range inquiry, and the unit price data and installation quantity of different equipment types are obtained accordingly, which provides detailed data support for the subsequent solution confirmation and enhances the rationality and economy of the final design solution; the solution confirmation inquiry link triggered by the equipment unit price data and installation quantity information not only makes the final weak current equipment type and its price information more accurate, but also makes the solution more targeted, avoiding the situation where the design solution is out of touch with the actual situation of the campus, and significantly improves the success rate of project implementation.

[0014] In a preferred example, the present application can be further configured as follows: based on the weak current dialogue model, triggering a solution confirmation inquiry according to the equipment unit price information, and generating a weak current project construction plan according to the solution confirmation inquiry result, specifically including: Generate an equipment construction plan according to the type of weak current equipment and the equipment unit price information, and trigger the plan confirmation inquiry according to the equipment construction plan; A weak current project design plan is generated according to the campus environment characteristics and the plan confirmation inquiry result, and the weak current project construction plan is generated according to the weak current project design plan.

[0015] By adopting the above technical solution, based on the preset weak current dialogue model, the scheme confirmation inquiry can be triggered more accurately according to the equipment unit price information, and the weak current project construction plan can be generated according to the results of the scheme confirmation inquiry. In this process, the campus environment characteristics are fully considered to ensure that the output scheme is highly matched with the specific situation of each campus. First, after obtaining the types of weak current equipment and the corresponding equipment unit price information, a preliminary equipment construction plan will be generated in combination with campus environment characteristics, such as campus layout, building characteristics and usage requirements. This ensures that the generated plan not only meets the technical standards, but also adapts to the actual needs and environmental conditions of a specific campus to the greatest extent; based on this equipment construction plan, a detailed scheme confirmation inquiry is triggered, and further interactive confirmation is carried out with the user to ensure that all details are fully considered, which not only enhances the personalization of the plan, but also effectively reduces the problems and errors that may occur during the implementation of the project; finally, according to the user's confirmation results, the campus environment characteristics and other relevant data are comprehensively used to generate the final weak current project design plan, so that the plan is not only accurate and practical, but also greatly improves the efficiency of design work, avoiding the problems of information omission and over-reliance on manual experience in traditional manual design.

[0016] The second object of the invention is achieved by the following technical solutions: A campus weak current project management device, the campus weak current project management device comprising: A project acquisition module is used to obtain the weak current project construction requirements and obtain the weak current construction type according to the weak current project construction requirements; A demand inquiry module is used to trigger a weak current configuration inquiry based on a preset weak current dialogue model and according to the weak current construction type, and obtain corresponding weak current configuration requirements; A price calculation module, used to obtain the type of weak current equipment and the equipment unit price information corresponding to each type of weak current equipment according to the weak current configuration requirements; The solution inquiry module is used to trigger a solution confirmation inquiry based on the weak current dialogue model and the equipment unit price information, and generate a weak current project construction plan according to the solution confirmation inquiry result.

[0017] By adopting the above technical solution, the three core problems of low efficiency, incomplete information and reliance on personal experience in the existing manual design process are addressed. By introducing artificial intelligence technology and efficient human-computer interaction mechanism, the rapid generation of design solutions is achieved, which greatly improves the design efficiency and quality. Specifically: by using the preset weak current dialogue model, the weak current construction type can be quickly obtained according to the weak current project construction requirements, and the corresponding weak current configuration inquiry can be triggered accordingly, so as to obtain the weak current configuration requirements, thereby avoiding the cumbersome steps brought by the need to record and analyze a large amount of information item by item in the traditional method. Users can conveniently complete the input of required data in the form of questions and answers, greatly simplifying the information collection link, so that most of the basic work can be completed efficiently in a short time; through the comprehensive analysis and utilization of campus environmental data, the present invention can build a more accurate demand model at the beginning of the design. When obtaining the weak current project construction requirements, the equipment construction area and its functional requirements are used as input parameters to further refine the configuration requirements, ensuring that the final design solution is more comprehensive and reasonable.

[0018] The third objective of the present application is achieved through the following technical solutions: A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-mentioned campus weak current project management method when executing the computer program.

[0019] The fourth objective of the present application is achieved through the following technical solutions: A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the above-mentioned campus weak current project management method.

[0020] In summary, the present application includes at least one of the following beneficial technical effects: 1. By combining the characteristics of the campus environment, this application can generate more accurate weak current configuration requirements based on specific campus environment data, significantly improving the matching degree between the design scheme and the actual environment and reducing the need for subsequent adjustments; 2. By using the weak current dialogue model to train the campus environment characteristics, this application can dynamically adjust the equipment location and functional requirements to ensure the rationality and efficiency of the design plan, thereby improving the overall quality of the design plan; 3. By automatically generating weak current project construction plans that adapt to the characteristics of the campus environment, this application realizes an integrated process from preliminary demand collection to final solution design, greatly reducing the design cycle and the number of manual interventions, and reducing the time cost and potential error rate of solution generation. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a flow chart of a campus weak current project management method in one embodiment of the present application; Figure 2 This is another implementation flow chart of the method for campus weak current project management in one embodiment of the present application; Figure 3 This is a flowchart for implementing step S20 of the method for campus weak current project management in one embodiment of the present application; Figure 4 This is a flowchart for implementing step S30 of the method for campus weak current project management in one embodiment of the present application; Figure 5 This is a flowchart for implementing step S40 of the method for campus weak current project management in one embodiment of the present application; Figure 6 This is a principle block diagram of a campus weak current project management system in one embodiment of the present application; Figure 7 It is a schematic diagram of a device in an embodiment of the present application. DETAILED DESCRIPTION

[0022] The present application is further described in detail below in conjunction with the accompanying drawings.

[0023] In one embodiment, if Figure 1 As shown, the present application discloses a campus weak current project management method, which specifically includes the following steps: S10: Obtain the weak current project construction requirements, and obtain the weak current construction type according to the weak current project construction requirements.

[0024] In this embodiment, the weak current project construction requirement refers to the weak current project that needs to be built in the current campus. The weak current construction type refers to the type of weak current function that needs to be built.

[0025] Specifically, when a weak current project needs to be built on campus, such as adding a network, fire fighting equipment, smart classrooms or other weak current projects, the corresponding construction requirements are entered, such as the need to add network configuration to the campus, improve fire fighting conditions or add smart classrooms. Further, the corresponding weak current construction type is obtained according to the weak current project construction requirements, such as building a network, building fire fighting equipment or building equipment related to smart classrooms.

[0026] S20: Based on the preset weak-current dialogue model, trigger the weak-current configuration inquiry according to the weak-current construction type, and obtain the corresponding weak-current configuration requirements.

[0027] In this embodiment, the weak current dialogue model refers to a model that is pre-trained corresponding to the campus and is used to gradually obtain the specific needs of users for building weak current projects on campus through multiple rounds of dialogue.

[0028] Specifically, the weak current dialogue model is trained in advance according to the actual situation of the campus. Further, after obtaining the weak current construction type, the weak current configuration inquiry is triggered to the user, and the specific configuration requirements of the weak current project that the user intends to build on campus are obtained through a single discussion or multiple rounds of dialogue, such as the need to build a specific weak current device with one or more functions in a certain area, and the expected effect after the construction is completed, etc., as the weak current configuration requirements.

[0029] S30: Acquire the types of weak current equipment and the equipment unit price information corresponding to each type of weak current equipment according to the weak current configuration requirements.

[0030] Specifically, after obtaining the weak-current configuration requirements, the type of weak-current equipment that can meet the user's requirements for building this function in the area is obtained according to the weak-current configuration requirements as the type of weak-current equipment, and the current market unit price of each type of weak-current equipment is obtained as the unit price information of the equipment, to facilitate subsequent cost budgeting.

[0031] S40: Based on the weak current dialogue model, trigger a solution confirmation inquiry according to the equipment unit price information, and generate a weak current project construction plan according to the solution confirmation inquiry result.

[0032] Specifically, based on the weak current dialogue model again, after obtaining the equipment unit price information, a design plan is formulated. After formulating multiple design plans, the weak current dialogue model is used to confirm the corresponding design plan with the user, and then the weak current project construction plan is generated.

[0033] In this embodiment, in view of the three core problems of low efficiency, incomplete information and reliance on personal experience in the existing manual design process, the rapid generation of design solutions is achieved by introducing artificial intelligence technology and efficient human-computer interaction mechanism, which greatly improves the design efficiency and quality. Specifically: by using the preset weak current dialogue model, the weak current construction type can be quickly obtained according to the weak current project construction requirements, and the corresponding weak current configuration inquiry can be triggered accordingly, so as to obtain the weak current configuration requirements, thereby avoiding the cumbersome steps brought by the need to record and analyze a large amount of information item by item in the traditional method. Users can conveniently complete the input of required data in the form of questions and answers, greatly simplifying the information collection link, so that most of the basic work can be completed efficiently in a short time; through the comprehensive analysis and utilization of campus environmental data, the present invention can build a more accurate demand model at the beginning of the design. When obtaining the weak current project construction requirements, the equipment construction area and its functional requirements are used as input parameters to further refine the configuration requirements, ensuring that the final design plan is more comprehensive and reasonable.

[0034] In one embodiment, if Figure 2 As shown, before step S20, the campus weak current project management method further includes: S201: Acquire campus environment data, and extract campus environment features from the campus environment data.

[0035] Specifically, the campus building environment, such as the geographical location of the campus, the area it covers, the distribution of teaching buildings, and the number of students, is obtained as the campus environment data.

[0036] Furthermore, the characteristics of the campus environment data, such as the characteristics of the geographical environment, the characteristics of the building functions, the characteristics of the classroom functions, etc., are extracted as campus environment characteristics.

[0037] S202: Obtain a weak current configuration basic model, train the weak current configuration basic model according to campus environment characteristics, and obtain a weak current dialogue model.

[0038] In this embodiment, the weak current configuration basic model refers to a model that is pre-trained for use in constructing weak current projects for campus buildings, so that users can conduct multiple rounds of dialogue to determine a construction plan for the weak current project.

[0039] Specifically, by obtaining the historical construction plan of the weak current project on the campus and combining it with the function of semantic recognition, the weak current configuration basic model is trained. Furthermore, the weak current configuration basic model is used as the initial model, and the model is further trained through the campus environment characteristics to obtain the weak current dialogue model corresponding to the campus.

[0040] In one embodiment, if Figure 3 As shown, in step S20, based on the preset weak-current dialogue model, a weak-current configuration query is triggered according to the weak-current construction type, and the corresponding weak-current configuration requirements are obtained, specifically including: S21: triggering a device location query according to the weak current construction type, and obtaining a device construction area corresponding to the device location query and a corresponding device function requirement.

[0041] Specifically, through the weak current dialogue model, the user is asked about the specific location where the weak current equipment needs to be installed, that is, the equipment location inquiry, such as certain classrooms in a certain teaching building, and the corresponding content is obtained from the user's answer. According to the content of the equipment location inquiry, the corresponding data is extracted from the content of the answer as the equipment installation area, and the equipment function requirements corresponding to the area, such as the functions corresponding to a specific classroom, such as a multimedia classroom, an art room or a music room.

[0042] S22: Input the equipment installation area and equipment installation requirements into the weak current dialogue model, obtain regional function data according to the equipment installation area, and generate weak current configuration requirements according to campus environment characteristics, regional function data and equipment function requirements.

[0043] Specifically, the equipment construction area and the corresponding equipment construction requirements are input into the weak-current dialogue model in the format of "constructing equipment with XX function in XX building, room XX", and the corresponding regional function data is obtained according to "XX building, room XX", that is, the teaching function or living function included in the area where the weak-current equipment is constructed, and combined with the environmental characteristics of the campus, including old buildings, special climate environment, the number and layout of surveillance cameras, network access point density, coverage of the fire alarm system, etc., to generate the weak-current configuration requirements to meet the actual situation of the campus.

[0044] In one embodiment, if Figure 4 As shown, in step S30, the types of weak current equipment and the equipment unit price information corresponding to each type of weak current equipment are obtained according to the weak current configuration requirements, specifically including: S31: Trigger a query on the project budget range based on the weak current dialogue model, obtain the project construction budget, and obtain the weak current equipment type according to the weak current configuration requirements.

[0045] Specifically, after determining the weak current configuration requirements, the weak current dialogue model is used to trigger the budget range inquiry of the project to the user again to obtain the corresponding budget requirements of the user as the project construction budget. Further, according to the weak current configuration requirements, the types of weak current equipment that can meet the requirements are obtained, such as network equipment, electrical equipment and other weak current equipment.

[0046] S32: Obtain the equipment unit price data and equipment installation quantity corresponding to each type of weak current equipment according to the project construction budget.

[0047] Specifically, according to the acquired weak-current equipment type, the equipment unit price data corresponding to each weak-current equipment is obtained, and the number of equipment installations corresponding to each weak-current equipment type with the same function but the same function is calculated according to the project construction budget.

[0048] S33: triggering a plan confirmation inquiry based on the equipment unit price data and the number of equipment installed, and obtaining the type of weak current equipment and equipment unit price information based on the plan confirmation reply.

[0049] Specifically, according to different types of weak current equipment and the corresponding number of equipment to be installed, a corresponding equipment purchase plan is formulated, and a plan confirmation inquiry is triggered based on the equipment purchase plan, and the type and unit price selected by the user are obtained from the corresponding plan confirmation reply.

[0050] In one embodiment, if Figure 5 As shown, in step S40, based on the weak current dialogue model, a scheme confirmation inquiry is triggered according to the equipment unit price information, and a weak current project construction scheme is generated according to the scheme confirmation inquiry result, specifically including: S41: Generate an equipment construction plan according to the type of weak current equipment and the unit price information of the equipment, and trigger a plan confirmation inquiry according to the equipment construction plan.

[0051] Specifically, after obtaining the type of weak current equipment and equipment unit price information selected by the user, a corresponding design plan is generated according to the construction area as an equipment construction plan. When generating the equipment construction plan, multiple plans can be generated for the user to choose from, thereby triggering a confirmation inquiry for the plan.

[0052] S42: Generate a weak current project design plan based on campus environmental characteristics and plan confirmation inquiry results, and generate a weak current project construction plan based on the weak current project design plan.

[0053] Specifically, after obtaining the results of the plan confirmation inquiry, a specific project design plan is generated based on the characteristics of the campus environment, including the corresponding equipment, installation location, installation requirements, operation and maintenance requirements and other plans, and the final weak current project construction plan is generated.

[0054] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0055] In one embodiment, a campus weak current project management device is provided, and the campus weak current project management device corresponds one-to-one with the campus weak current project management method in the above embodiment. Figure 6 As shown, the campus weak current project management device includes a project acquisition module, a demand inquiry module, a price calculation module and a solution inquiry module. The detailed description of each functional module is as follows: The project acquisition module is used to obtain the weak current project construction requirements and obtain the weak current construction type according to the weak current project construction requirements; The demand inquiry module is used to trigger the weak current configuration inquiry based on the preset weak current dialogue model and the weak current construction type, and obtain the corresponding weak current configuration requirements; The price calculation module is used to obtain the types of weak current equipment and the unit price information of each type of weak current equipment according to the weak current configuration requirements; The solution inquiry module is used to trigger the solution confirmation inquiry based on the weak current dialogue model according to the equipment unit price information, and generate the weak current project construction plan according to the solution confirmation inquiry results.

[0056] Optionally, the campus weak current project management device also includes: A campus feature extraction module is used to obtain campus environment data and extract campus environment features from the campus environment data; The dialogue model training module is used to obtain the weak current configuration basic model, train the weak current configuration basic model according to the campus environment characteristics, and obtain the weak current dialogue model.

[0057] Optional, demand inquiry modules include: The equipment requirement inquiry submodule is used to trigger the equipment location inquiry according to the weak current construction type, and obtain the equipment construction area and the corresponding equipment function requirements corresponding to the equipment location inquiry; The configuration requirement generation submodule is used to input the equipment construction area and equipment construction requirements into the weak current dialogue model, obtain the regional function data according to the equipment construction area, and generate the weak current configuration requirements according to the campus environment characteristics, regional function data and equipment function requirements.

[0058] Optionally, the price calculation module includes: The budget inquiry submodule is used to trigger the project budget scope inquiry based on the weak current dialogue model, obtain the project construction budget, and obtain the weak current equipment type according to the weak current configuration requirements; The quantity calculation submodule is used to obtain the equipment unit price data and equipment installation quantity corresponding to each type of weak current equipment according to the project construction budget; The price inquiry submodule is used to trigger the plan confirmation inquiry based on the equipment unit price data and the equipment installation quantity, and obtain the type of weak current equipment and equipment unit price information based on the plan confirmation reply.

[0059] Optionally, the solution inquiry module includes: The scheme inquiry submodule is used to generate an equipment construction scheme according to the type of weak current equipment and the unit price information of the equipment, and trigger a scheme confirmation inquiry according to the equipment construction scheme; The scheme generation submodule is used to generate a weak current project design scheme based on campus environmental characteristics and scheme confirmation inquiry results, and to generate a weak current project construction plan based on the weak current project design scheme.

[0060] For the specific limitations of the campus weak current project management device, please refer to the limitations of the campus weak current project management method above, which will not be repeated here. Each module in the above-mentioned campus weak current project management device can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.

[0061] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 7As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a campus weak current project management method is implemented.

[0062] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program: Obtain the weak current project construction requirements, and obtain the weak current construction type according to the weak current project construction requirements; Based on the preset weak current dialogue model, trigger weak current configuration inquiry according to the weak current construction type, and obtain the corresponding weak current configuration requirements; According to the weak current configuration requirements, obtain the types of weak current equipment and the corresponding equipment unit price information for each type of weak current equipment; Based on the weak-current dialogue model, the scheme confirmation inquiry is triggered according to the equipment unit price information, and the weak-current project construction plan is generated according to the scheme confirmation inquiry results.

[0063] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented: Obtain the weak current project construction requirements, and obtain the weak current construction type according to the weak current project construction requirements; Based on the preset weak current dialogue model, trigger weak current configuration inquiry according to the weak current construction type, and obtain the corresponding weak current configuration requirements; According to the weak current configuration requirements, obtain the types of weak current equipment and the corresponding equipment unit price information for each type of weak current equipment; Based on the weak-current dialogue model, the scheme confirmation inquiry is triggered according to the equipment unit price information, and the weak-current project construction plan is generated according to the scheme confirmation inquiry results.

[0064] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.

[0065] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.

[0066] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A campus weak current project management method, characterized in that: The campus weak current project management method includes: Obtain the weak current project construction requirements, and obtain the weak current construction type according to the weak current project construction requirements; Based on the preset weak-current dialogue model, trigger the weak-current configuration inquiry according to the weak-current construction type, and obtain the corresponding weak-current configuration requirements; According to the weak current configuration requirements, obtain the types of weak current equipment and the equipment unit price information corresponding to each type of weak current equipment; Based on the weak-current dialogue model, a solution confirmation inquiry is triggered according to the equipment unit price information, and a weak-current project construction plan is generated according to the solution confirmation inquiry result.

2. The campus weak current project management method according to claim 1 is characterized in that: Before triggering a weak current configuration inquiry based on the preset weak current dialogue model according to the weak current construction type and obtaining the corresponding weak current configuration requirements, the campus weak current project management method further includes: Acquire campus environment data, and extract campus environment features from the campus environment data; A weak current configuration basic model is obtained, and the weak current configuration basic model is trained according to the campus environment characteristics to obtain the weak current dialogue model.

3. The campus weak current project management method according to claim 2 is characterized in that: The preset weak current dialogue model triggers a weak current configuration query according to the weak current construction type, and obtains the corresponding weak current configuration requirements, specifically including: Triggering a device location query according to the weak current construction type, and obtaining a device construction area and a corresponding device function requirement corresponding to the device location query; The equipment construction area and the equipment construction requirements are input into the weak current dialogue model, the regional function data is obtained according to the equipment construction area, and the weak current configuration requirements are generated according to the campus environment characteristics, the regional function data and the equipment function requirements.

4. The campus weak current project management method according to claim 2 is characterized in that: The step of obtaining the type of weak current equipment and the equipment unit price information corresponding to each type of weak current equipment according to the weak current configuration requirement specifically includes: Triggering a project budget scope inquiry based on the weak current dialogue model, obtaining a project construction budget, and obtaining a weak current equipment type according to the weak current configuration requirements; According to the project construction budget, obtain the equipment unit price data and equipment installation quantity corresponding to each type of weak current equipment; A scheme confirmation inquiry is triggered according to the equipment unit price data and the equipment installation quantity, and the type of weak current equipment and the equipment unit price information are obtained according to the scheme confirmation reply.

5. The campus weak current project management method according to claim 4 is characterized in that: Based on the weak current dialogue model, triggering a solution confirmation inquiry according to the equipment unit price information, and generating a weak current project construction plan according to the solution confirmation inquiry result specifically includes: Generate an equipment construction plan according to the type of weak current equipment and the equipment unit price information, and trigger the plan confirmation inquiry according to the equipment construction plan; A weak current project design plan is generated according to the campus environment characteristics and the plan confirmation inquiry result, and the weak current project construction plan is generated according to the weak current project design plan.

6. A campus weak current project management device, characterized in that: The campus weak current project management device comprises: A project acquisition module is used to obtain the weak current project construction requirements and obtain the weak current construction type according to the weak current project construction requirements; A demand inquiry module is used to trigger a weak current configuration inquiry based on a preset weak current dialogue model and according to the weak current construction type, and obtain corresponding weak current configuration requirements; A price calculation module, used to obtain the type of weak current equipment and the equipment unit price information corresponding to each type of weak current equipment according to the weak current configuration requirements; The solution inquiry module is used to trigger a solution confirmation inquiry based on the weak current dialogue model and the equipment unit price information, and generate a weak current project construction plan according to the solution confirmation inquiry result.

7. The campus weak current project management device according to claim 6 is characterized in that: The campus weak current project management device also includes: A campus feature extraction module, used to obtain campus environment data and extract campus environment features from the campus environment data; The dialogue model training module is used to obtain a weak current configuration basic model, train the weak current configuration basic model according to the campus environment characteristics, and obtain the weak current dialogue model.

8. The campus weak current project management device according to claim 7 is characterized in that: The demand inquiry module includes: An equipment requirement inquiry submodule is used to trigger an equipment location inquiry according to the weak current construction type, and obtain an equipment construction area and corresponding equipment function requirements corresponding to the equipment location inquiry; The configuration requirement generation submodule is used to input the equipment installation area and the equipment installation requirements into the weak current dialogue model, obtain the regional function data according to the equipment installation area, and generate the weak current configuration requirements according to the campus environment characteristics, the regional function data and the equipment function requirements.

9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the campus weak current project management method as described in any one of claims 1 to 5 are implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the campus weak current project management method as described in any one of claims 1 to 5 are implemented.

Citation Information

Patent Citations

  • Multi-GPT collaborative overseas engineering construction standard retrieval system and construction method thereof

    CN117708288A

  • College crowd innovation space project auxiliary system based on large model

    CN118071294A

  • Network construction method, network construction device, equipment and storage medium

    CN118400747A

  • Intelligent building full-period management method and equipment based on large model, and medium

    CN118627795A

  • Industrial large model optimization method, apparatus and device, and storage medium

    CN118708695A