Lamination maintenance device and reinspection bagging equipment

By designing the lamination maintenance device, rapid maintenance of unqualified laminations and direct delivery of qualified laminations to the next process are achieved, which solves the problem of low production efficiency and improves the efficiency of the production process and equipment utilization rate.

CN119216252APending Publication Date: 2024-12-31WUXI AUTOWELL TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411470010.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-21
Publication Date
2024-12-31

AI Technical Summary

Technical Problem

During the silicon wafer production process, when the stacking test fails, the handling mechanism needs to wait for the next stacking test to be completed, resulting in the equipment in the next process being shut down and low production efficiency.

Method used

Design a lamination maintenance device, including a first conveying mechanism, a first detection mechanism, a first conveying mechanism and a second conveying mechanism, and sends the unqualified lamination to the maintenance station for inspection through the second conveying mechanism, and The qualified laminates after maintenance are sent directly to the next process to avoid re-testing, realize synchronous conveying and transit, and improve production efficiency.

Benefits of technology

It effectively improves production efficiency, avoids shutdown and waits when lamination inspection fails, reduces the demand for lamination re-inspection after maintenance, and improves the efficiency of the overall production process and equipment utilization rate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119216252A_ABST
    Figure CN119216252A_ABST
Patent Text Reader

Abstract

The invention discloses a lamination maintenance device and reinspection bagging equipment, and the lamination maintenance device comprises a first conveying mechanism, a first detection mechanism, a first carrying mechanism and a second conveying mechanism, wherein the first detection mechanism is configured to perform a first type of detection on the laminated sheets which are conveyed to the first detection station by the first conveying mechanism in a stepping manner; the first carrying mechanism is configured to pick up the laminations located at the discharging station and carry the laminations which are detected to be qualified in the first type to the next procedure or carry the laminations which are detected to be unqualified in the first type to the second conveying mechanism. The second conveying mechanism is configured to receive the unqualified laminations carried by the first carrying mechanism and convey the unqualified laminations to a maintenance station for maintenance; and the first carrying mechanism is further configured to pick up the overhauled qualified laminations on the second conveying mechanism and carry the qualified laminations to the next process. According to the invention, the problem of low lamination production efficiency is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of silicon wafer production, and in particular to a stacking repair device and a re-inspection bagging device. Background Art

[0002] After the silicon wafers are inspected and sorted by the sorting machine, the qualified silicon wafers will be stacked in the material box in sequence. The silicon wafers are stacked into stacks in the material box. Then the stacks in the material box are taken out and transported to the stack inspection device for appearance inspection of the stack. If the stack inspection is qualified, the qualified stack will be sent to the next process for bagging and packaging through the conveying mechanism.

[0003] If the stacking detection device detects unqualified stacking, the handling mechanism will send the unqualified stacking to the maintenance station for manual repair, and then the handling mechanism needs to wait for the stacking detection device to complete the inspection of the next stacking. If the next stacking is qualified, the handling mechanism can send the qualified stacking to the next process. Therefore, when no qualified stacking is sent to the next process, the equipment of the next process can only stop and wait, resulting in low production efficiency. Summary of the invention

[0004] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a stacking repair device and a re-inspection bagging device to solve the problem of low stacking production efficiency.

[0005] In a first aspect, the present application provides a stacking repair device, which includes a first conveying mechanism, a first detection mechanism, a first handling mechanism, and a second conveying mechanism, wherein:

[0006] A first inspection station is provided on the first conveying mechanism, the first inspection mechanism is located at the first inspection station, and the first inspection mechanism is configured to perform a first type of inspection on the stacked sheets conveyed stepwise by the first conveying mechanism to the first inspection station;

[0007] The first conveying mechanism is also configured to convey the laminated sheets inspected at the first inspection station to the discharging station in a step-by-step manner;

[0008] The first conveying mechanism is configured to pick up the stacks located at the unloading station and convey the stacks that pass the first type of inspection to the next process or convey the stacks that fail the first type of inspection to the second conveying mechanism;

[0009] The second conveying mechanism is configured to receive unqualified stacks conveyed by the first conveying mechanism and convey the unqualified stacks to the repair station for repair, and the second conveying mechanism is also configured to receive qualified stacks after repair at the repair station and convey the qualified stacks to the picking range of the first conveying mechanism;

[0010] The first conveying mechanism is also configured to pick up qualified stacks after inspection on the second conveying mechanism and convey the qualified stacks to the next process.

[0011] The stack inspection device of the present application sends unqualified stacks to the second conveying mechanism through the first transport mechanism, and picks up the stacks that have passed the previous inspection from the second conveying mechanism and sends them to the next process. The stack bagging equipment of the next process does not need to stop and wait, and the stacks after inspection do not need to enter the inspection mechanism for re-inspection, which effectively improves production efficiency.

[0012] Optionally, the second conveying mechanism includes a first conveying component and a second conveying component;

[0013] The first conveying assembly is configured to receive the unqualified stacks conveyed by the first conveying mechanism through the material box and convey the unqualified stacks to the maintenance station;

[0014] The second conveying assembly is configured to receive qualified stacks after inspection at the inspection station through a material box and convey the qualified stacks to a picking range of the first transport mechanism.

[0015] By setting up the second conveying mechanism, it is possible to convey unqualified stacking sheets and qualified stacking sheets after inspection respectively through different conveying lines, so that the first conveying mechanism can select the corresponding conveying component to place unqualified stacking sheets or pick up qualified stacking sheets after inspection according to the conveying requirements without stopping and waiting. A conveying mechanism that can convey unqualified stacking sheets and qualified stacking sheets after inspection simultaneously is provided, which has high conveying efficiency, ensures the conveying efficiency of the first conveying mechanism, and further improves production efficiency.

[0016] Optionally, the first conveying assembly and the second conveying assembly are arranged in the same vertical direction and in opposite conveying directions, the second conveying mechanism further comprises a first lifting conveying assembly, the first lifting conveying assembly comprises a first driving member and a first conveying member, the driving end of the first driving member is connected to the first conveying member, and the first driving member is configured to drive the first conveying member to move alternately to the first position or the second position;

[0017] The first position is close to the discharge end of the second conveying assembly, and the first conveying member located at the first position is configured to receive and temporarily store unqualified stacks conveyed by the first conveying mechanism through a material box or receive qualified stacks conveyed by the second conveying assembly after inspection and convey them to the picking range of the first conveying mechanism;

[0018] The second position is close to the feeding end of the first conveying assembly, and the first conveying member located at the second position is configured to convey the temporarily stored unqualified stacks to the first conveying assembly.

[0019] By arranging the first conveying assembly and the second conveying assembly in the same vertical direction, a conveying mechanism with a compact structure and small space is provided; by the cooperation of the first lifting conveying assembly, the first conveying assembly and the second conveying assembly, the first conveying mechanism can place unqualified stacks and pick up qualified stacks after maintenance at the same position, which is beneficial to improving the handling accuracy and handling efficiency of the first conveying mechanism. At the same time, by setting the first lifting conveying assembly, it is possible to transport the unqualified stacks received at the first position to the first conveying assembly located at the height of the second position, so that the unqualified stacks can be smoothly transported to the maintenance station for maintenance, and a lifting conveying assembly with both material receiving and material feeding is provided, which has a compact structure, occupies a small space, and effectively improves the conveying efficiency of the entire second conveying mechanism.

[0020] Optionally, the stack maintenance device further includes a third conveying mechanism;

[0021] The first conveying member at the second position is further configured to convey the magazine from which the qualified stacked sheets are taken by the first conveying mechanism to the third conveying mechanism;

[0022] The third conveying mechanism is configured to receive the material box conveyed by the first conveying member and convey the material box to the material box recovery process.

[0023] Through the cooperation of the first lifting and conveying assembly and the third conveying mechanism, the recovery circulation of the empty material box with the stacked sheets removed is realized, which is beneficial to the subsequent recycling of the empty material box.

[0024] Optionally, the second conveying mechanism further includes a second lifting conveying assembly, the second lifting conveying assembly includes a second driving member and a second conveying member, the driving end of the second driving member is connected to the second conveying member, and the second driving member is configured to drive the second conveying member to move alternately to the third position or the fourth position;

[0025] The third position is close to the discharge end of the first conveying assembly, and the second conveying member located at the third position is configured to receive and temporarily store unqualified stacks conveyed by the first conveying assembly;

[0026] The fourth position is close to the feed end of the second conveying assembly. The second conveying member at the fourth position is configured to convey the temporarily stored unqualified stacks to the maintenance station or to receive qualified stacks after maintenance of unqualified stacks through a material box and convey the qualified stacks to the second conveying assembly.

[0027] By setting up the second lifting and conveying assembly, it is possible to receive unqualified stacking sheets conveyed by the first conveying assembly at the third position height and deliver the unqualified stacking sheets to the fourth position height. At the same time, through the cooperation of the second lifting and conveying assembly, the first conveying assembly and the second conveying assembly, it is possible to receive qualified stacking sheets after maintenance at the same position and feed unqualified stacking sheets to the maintenance station, which is convenient for manual or equipment to take and place stacking sheets at the same position height, and is beneficial to improving the maintenance efficiency of unqualified stacking sheets and the efficiency of conveying qualified stacking sheets after maintenance.

[0028] Optionally, the stack inspection device includes a transfer mechanism, and the first transport mechanism includes a first transport assembly and a second transport assembly;

[0029] The first handling assembly is configured to pick up the stacks located at the unloading station and to carry the stacks that have passed the first type of inspection to the next process or to carry the stacks that have failed the first type of inspection to the receiving station;

[0030] The transfer mechanism is configured to carry the first type of unqualified stacking sheets at the receiving station or to receive the qualified stacking sheets after the unqualified stacking sheets are repaired;

[0031] The second transport assembly is configured to pick up unqualified stacks on the transfer mechanism and transport them to the second conveying mechanism, or pick up qualified stacks after inspection on the second conveying mechanism and transport them to the transfer mechanism located at the receiving station;

[0032] The first transport assembly is also configured to pick up the qualified stacks after inspection on the transfer mechanism located at the receiving station and transport the qualified stacks to the next process.

[0033] Through the cooperation of the first conveying component, the second conveying component and the transfer mechanism, the alternating conveying of the first type of unqualified stacking sheets and the qualified stacking sheets after overhaul is realized. The first conveying component can directly pick up the qualified stacking sheets after overhaul carried by the second conveying component from the transfer mechanism and send them to the next process. The stack bagging and packaging equipment of the next process does not need to stop and wait, and the stacking sheets after overhaul do not need to enter the inspection mechanism for re-inspection, which effectively improves production efficiency. At the same time, the second conveying component can directly pick up the unqualified stacking sheets carried by the first conveying component from the transfer mechanism and send them to the second conveying mechanism. There is no need to manually take out the stacking sheets for conveying, which is beneficial to improving the overhaul efficiency. Through the setting of the transfer mechanism, the transfer and temporary storage of unqualified stacking sheets and qualified stacking sheets are realized, and a transfer mechanism with a simple structure is provided, which is convenient for the conveying mechanism to pick up stacking sheets.

[0034] Optionally, the transfer mechanism includes a first driving assembly, a first transfer platform and a second transfer platform, and the first transfer platform and the second transfer platform are respectively located at the receiving station and the temporary storage station;

[0035] The first handling assembly is configured to place the unqualified stack on the first transfer platform located at the receiving station, and the second handling assembly is configured to pick up the unqualified stack on the first transfer platform located at the receiving station;

[0036] The first driving component is configured to drive the first transfer platform and the second transfer platform to move synchronously, so that the first transfer platform is separated from the receiving station while the second transfer platform moves from the temporary storage station to the receiving station. The second conveying component is configured to place the stacked sheets that have passed the inspection on the second transfer platform located at the receiving station. The first conveying component is configured to pick up the stacked sheets that have passed the inspection on the second transfer platform located at the receiving station.

[0037] By setting up the transfer mechanism, it is possible to move the stacks between the temporary storage station and the receiving station, which is convenient for the first handling assembly and the second handling assembly to pick up or place the stacks required for the corresponding process, and provides a transfer mechanism with a compact structure and stable stack load bearing capacity; through the cooperation of the first transfer platform, the second transfer platform, the first handling assembly and the second handling assembly, the feeding efficiency of qualified stacks to the stack bagging and packaging equipment of the next process is improved, so that the stack bagging and packaging equipment does not need to stop and wait, and at the same time, the transportation efficiency of unqualified stacks to the maintenance station is improved, which is conducive to improving the maintenance efficiency.

[0038] Optionally, the lamination maintenance device further includes a second maintenance mechanism;

[0039] A second inspection station is provided on the first conveying mechanism, the second inspection station is located in front of the first inspection station, and a second inspection mechanism is located at the second inspection station. The second inspection mechanism is configured to perform a second type of inspection on the stacked sheets conveyed stepwise by the first conveying mechanism to the second inspection station;

[0040] The first conveying mechanism is further configured to convey the laminates of the second type that pass the inspection to the first inspection station or convey the laminates of the second type that fail the inspection to the second conveying mechanism;

[0041] The second conveying mechanism is configured to receive the second type of unqualified stacks conveyed by the first conveying mechanism and convey the unqualified stacks to the maintenance station for maintenance. The second conveying mechanism is also configured to receive the qualified stacks after maintenance of the second type of unqualified stacks at the maintenance station and convey the qualified stacks to the picking range of the first handling mechanism.

[0042] The second inspection mechanism first performs the second type of inspection on the stack, such as neatness inspection, and first removes a portion of unqualified stacks, and transports the unqualified stacks to the inspection station through the second conveying mechanism for inspection as soon as possible, so as to avoid the situation where the stacks cannot be packaged smoothly due to unevenness after the first type of inspection and other subsequent procedures, thereby affecting production efficiency. At the same time, the second conveying mechanism directly transports the qualified stacks after inspection of the unqualified stacks in the second type of inspection to the picking range of the first conveying mechanism, so that the first conveying mechanism can directly send them to the next process without entering the inspection mechanism for re-inspection, thereby effectively improving production efficiency.

[0043] Optionally, the stack repair device further includes a second transport mechanism; the first conveying mechanism includes a third conveying assembly and a fourth conveying assembly;

[0044] The third conveyor assembly is configured to receive the magazine containing the stack and convey the magazine and the stack to the second inspection station for a second type of inspection;

[0045] The second conveying mechanism is configured to pick up the qualified second-type stacks in the material box and convey the qualified second-type stacks to the fourth conveying assembly;

[0046] The fourth conveying assembly is configured to receive the laminates of the second type that have passed the inspection and transported by the second conveying mechanism and transport the laminates of the second type that have passed the inspection to the first inspection station for the first type inspection;

[0047] The third conveying assembly is further configured to convey the material box containing the second type of laminated sheets that have passed the inspection taken away by the second transport mechanism to the material box recovery process or to convey the material box containing the second type of laminated sheets that have failed the inspection to the second conveying mechanism.

[0048] Through the cooperation of the second transport mechanism, the third conveying assembly and the fourth conveying assembly, the transportation of stacked sheets with different test results after the second type of test is realized, and the circulation of empty material boxes is realized at the same time. The overall structure is compact and occupies little space, providing a stacking maintenance device with two types of tests.

[0049] Optionally, the stack inspection device further includes a third lifting and conveying assembly, the third lifting and conveying assembly includes a third driving member and a third conveying member, the driving end of the third driving member is connected to the third conveying member, and the third driving member is configured to drive the third conveying member to move alternately to the fifth position, the sixth position or the seventh position;

[0050] The fifth position is close to the discharge end of the third conveying component, and the third conveying member at the fifth position is configured to receive and temporarily store the material box conveyed by the third conveying component, which has taken away the second type of qualified stacking sheets or the material box containing the second type of unqualified stacking sheets;

[0051] The height of the sixth position is consistent with the height of the conveying surface of the second conveying mechanism, and the third conveying member located at the sixth position is configured to convey the temporarily stored material box containing the second type of unqualified stacked sheets to the second conveying mechanism;

[0052] The height of the seventh position is lower than that of the sixth position, and the third conveyor at the seventh position is configured to convey the temporarily stored material box with the second type of qualified stacked sheets removed to the material box recovery process.

[0053] By setting up the third lifting and conveying assembly, it is possible to convey the empty material boxes or material boxes of the second type of unqualified stacked sheets received at the discharge end of the third conveying assembly to the next process corresponding to different height positions, thereby providing a lifting and conveying assembly with a compact structure that is convenient for the circulation of unqualified stacked sheets and empty material boxes.

[0054] Optionally, the second conveying mechanism is further configured to convey the material box containing the qualified stacks after the first handling mechanism takes away the second type of unqualified stacks and repairs to the material box recovery process.

[0055] By setting up the second conveying mechanism, the material box flowing from the third conveying component can be recovered, which is beneficial to the reuse of the material box.

[0056] In a second aspect, the present application provides a re-inspection bagging device, which comprises a bagging mechanism and a stack repair device as described in any one of the first aspects, wherein:

[0057] The bagging mechanism is located at the next process, and is configured to receive qualified stacked sheets transported by the first transporting mechanism and bag the stacked sheets.

[0058] The re-inspection and bagging equipment of the present application, the stack repair device transports the qualified stacks after the first type of repair to the bagging mechanism for bagging through the first transport mechanism, or sends the unqualified stacks to the second transport mechanism through the first transport mechanism, and picks up the qualified stacks from the second transport mechanism and sends them to the bagging mechanism, thereby realizing multi-party feeding to the bagging mechanism. The bagging mechanism does not need to stop and wait, and the stacks after repair do not need to enter the inspection mechanism for re-inspection, thereby effectively improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] The disclosure of the present application will become more easily understood with reference to the accompanying drawings. It is easy for those skilled in the art to understand that these drawings are only for illustrative purposes and are not intended to limit the scope of protection of the present application. In addition, similar numbers in the drawings are used to represent similar components, among which:

[0060] Figure 1 This is a schematic diagram of the three-dimensional structure of a lamination repair device according to one embodiment of the present application;

[0061] Figure 2is a schematic diagram of the three-dimensional structure of the second conveying mechanism of one embodiment of the present application;

[0062] Figure 3 It is a three-dimensional structural schematic diagram of the second conveying mechanism and the third conveying mechanism of one embodiment of the present application;

[0063] Figure 4 It is a three-dimensional structural schematic diagram of a first transport mechanism, a transfer mechanism and a first lifting and conveying assembly of one embodiment of the present application;

[0064] Figure 5 It is a three-dimensional structural schematic diagram of a first transport assembly, a second transport assembly and a transfer mechanism in one embodiment of the present application;

[0065] Figure 6 It is a three-dimensional structural schematic diagram of a lamination repair device with second type detection in one embodiment of the present application;

[0066] Figure 7 This is a schematic diagram of the three-dimensional structure of the conveyor line of the lamination repair device of one embodiment of the present application from another perspective;

[0067] Figure 8 It is a three-dimensional structural schematic diagram of a lifting and conveying assembly of one embodiment of the present application.

[0068] Figures 1 to 8 The following reference numerals are included:

[0069] 10. First conveying mechanism; 11. Third conveying assembly; 12. Fourth conveying assembly; 13. Third lifting conveying assembly; 131. Third driving member; 132. Third conveying member;

[0070] 20. The first testing agency;

[0071] 30. First transport mechanism; 31. First transport assembly; 32. Second transport assembly; 33. Transverse drive assembly;

[0072] 40. Second conveying mechanism; 41. First conveying assembly; 42. Second conveying assembly; 43. First lifting and lowering conveying assembly; 431. First driving member; 432. First conveying member; 44. Second lifting and lowering conveying assembly; 441. Second driving member; 442. Second conveying member; 45. Fifth conveying assembly;

[0073] 50. The third conveying mechanism;

[0074] 60. Transfer mechanism; 61. First drive assembly; 62. First transfer platform; 63. Second transfer platform; 64. Sliding seat;

[0075] 70. Second transport mechanism; 81. Lifting drive module; 82. Mounting seat; 831. First pulley assembly; 832. Second pulley assembly. DETAILED DESCRIPTION

[0076] Some embodiments of the present application are described below with reference to the accompanying drawings. Those skilled in the art should understand that these embodiments are only used to explain the technical principles of the present application and are not intended to limit the protection scope of the present application.

[0077] As described in the background technology, if the stack detection device detects unqualified stacks, the handling mechanism will send the unqualified stacks to the maintenance station for manual repair, and then the handling mechanism needs to wait for the stack detection device to complete the next stack detection. If the next stack is qualified, the handling mechanism can send the qualified stack to the next process. Therefore, when there are no qualified stacks sent to the next process, the equipment of the next process can only stop and wait, which has the problem of low production efficiency. Based on this, the present application proposes a stack maintenance device to solve the problem of low stack production efficiency.

[0078] See attached Figure 1 , Figure 1 Schematic diagram of the structure of a lamination repair device according to an embodiment of the present application. Figure 1 As shown, in one or more embodiments, the stack repair device of the present application includes a first conveying mechanism 10, a first detection mechanism 20, a first handling mechanism 30 and a second conveying mechanism 40, wherein: a first detection station is provided on the first conveying mechanism 10, the first detection mechanism 20 is located at the first detection station, and the first detection mechanism 20 is configured to perform a first type of detection on the stack conveyed by the first conveying mechanism 10 to the first detection station in a step-by-step manner; the first conveying mechanism 10 is also configured to convey the stack detected at the first detection station to the discharge station in a step-by-step manner; the first handling mechanism 30 is configured to pick up the stack located at the discharge station The first conveying mechanism 40 is configured to receive the unqualified laminates transported by the first conveying mechanism 30 and transport the unqualified laminates to the maintenance station for maintenance. The second conveying mechanism 40 is also configured to receive the qualified laminates after maintenance at the maintenance station and transport the qualified laminates to the picking range of the first conveying mechanism 30. The first conveying mechanism 30 is also configured to pick up the qualified laminates after maintenance on the second conveying mechanism 40 and transport the qualified laminates to the next process. Specifically, the first type of inspection can be to inspect the appearance of the laminates.

[0079] The stack inspection device of the embodiment of the present application sends unqualified stacks to the second conveying mechanism 40 through the first transport mechanism 30, and picks up the stacks that have passed the previous inspection from the second conveying mechanism 40 and sends them to the next process. The stack bagging equipment of the next process does not need to stop and wait, and the stacks after inspection do not need to enter the inspection mechanism for re-inspection, which effectively improves production efficiency.

[0080] In one embodiment, see Figure 1 and Figure 2 , the second conveying mechanism 40 includes a first conveying component 41 and a second conveying component 42;

[0081] The first conveying assembly 41 is configured to receive the unqualified stacks conveyed by the first conveying mechanism 30 through the material box and convey the unqualified stacks to the maintenance station;

[0082] The second conveying assembly 42 is configured to receive qualified stacks after inspection at the inspection station through a material box and convey the qualified stacks to the picking range of the first transport mechanism 30 .

[0083] Specifically, the first conveying assembly 41 and the second conveying assembly 42 can be set according to the actual picking range position of the first conveying mechanism 30 and the position of the maintenance station. The first conveying assembly 41 conveys unqualified stacks to the maintenance station for manual or equipment to take away and repair the stacks; the second conveying assembly 42 conveys qualified stacks after maintenance to the picking range of the first conveying mechanism 30, so that the first conveying mechanism 30 can pick up qualified stacks and transport them to the bagging equipment for bagging, so as to improve production efficiency. Furthermore, the first conveying assembly 41 and the second conveying assembly 42 both carry and transport stacks through material boxes, which have a stabilizing effect on the stacks and can effectively prevent the stacks from displacement and damage during transportation.

[0084] By setting up the second conveying mechanism 40, it is possible to convey unqualified stacking sheets and qualified stacking sheets after inspection respectively through different conveying lines, so that the first conveying mechanism 30 can select the corresponding conveying component to place unqualified stacking sheets or pick up qualified stacking sheets after inspection according to the conveying requirements without stopping for waiting. A conveying mechanism that can convey unqualified stacking sheets and qualified stacking sheets after inspection simultaneously is provided, which has high conveying efficiency, ensures the conveying efficiency of the first conveying mechanism, and further improves production efficiency.

[0085] In one possible implementation, see Figure 1 and Figure 2The first conveying assembly 41 and the second conveying assembly 42 are arranged in the same vertical direction and in opposite conveying directions. The second conveying mechanism 40 further includes a first lifting conveying assembly 43. The first lifting conveying assembly 43 includes a first driving member 431 and a first conveying member 432. The driving end of the first driving member 431 is connected to the first conveying member 432. The first driving member 431 is configured to drive the first conveying member 432 to move alternately to the first position or the second position.

[0086] The first position is close to the discharge end of the second conveying assembly 42, and the first conveying member 432 located at the first position is configured to receive and temporarily store unqualified stacks conveyed by the first conveying mechanism 30 through a material box or receive qualified stacks conveyed by the second conveying assembly 42 after inspection and convey them to the picking range of the first conveying mechanism 30;

[0087] The second position is close to the feeding end of the first conveying assembly 41 , and the first conveying member 432 located at the second position is configured to convey the temporarily stored unqualified stacks to the first conveying assembly 41 .

[0088] Specifically, the first conveying assembly 41 and the second conveying assembly 42 are arranged in the Z direction in an upper and lower layer structure to save space; the first conveying assembly 41 conveys unqualified stacking sheets along the X1 direction, and the second conveying assembly 42 conveys qualified stacking sheets after inspection along the X2 direction. The X1 direction and the X2 direction are opposite and perpendicular to the Z direction to ensure stable transportation of the stacking sheets; the first conveying assembly 41 is arranged below the second conveying assembly 42, and the height of the second conveying assembly 42 is set according to the height of the inspection station. The height needs to be convenient for manual or equipment to pick up or place the stacking sheets. Since the second conveying assembly 42 conveys qualified stacking sheets after inspection, the second conveying assembly 42 is set at this height, and the qualified stacking sheets after inspection do not need to adjust the height position during the transportation journey from the inspection station back to the picking range of the first conveying mechanism 30, thereby avoiding the shaking problem of the qualified stacking sheets after inspection due to height adjustment.

[0089] Specifically, the first driving member 431 can adopt a linear module, and the first driving member 431 drives the first conveying member 432 to rise and fall vertically along the Z direction so that the first conveying member 432 moves alternately to the first position or the second position; the first conveying member 432 can adopt a pulley assembly, and the conveying direction of the pulley assembly is the same as that of the first conveying assembly 41 and the second conveying assembly 42. It can receive qualified stacking sheets after inspection from the second conveying assembly 42, and can also convey unqualified stacking sheets to the first conveying assembly 41.

[0090] By arranging the first conveying component 41 and the second conveying component 42 in the same vertical direction, a conveying mechanism with a compact structure and small space is provided; by the cooperation of the first lifting conveying component 43, the first conveying component 41 and the second conveying component 42, the first handling mechanism 30 can place unqualified stacks and pick up qualified stacks after maintenance at the same position, which is beneficial to improving the handling accuracy and handling efficiency of the first handling mechanism 30. At the same time, by setting the first lifting conveying component 43, it is possible to transport the unqualified stacks received at the first position to the first conveying component 41 located at the height of the second position, so that the unqualified stacks can be smoothly transported to the maintenance station for maintenance, and a lifting conveying component with both material receiving and material feeding is provided, which has a compact structure, occupies a small space, and effectively improves the conveying efficiency of the entire second conveying mechanism 40.

[0091] In one possible implementation, see Figure 1-Figure 3 As shown, the stack repair device further includes a third conveying mechanism 50;

[0092] The first conveying member 432 at the second position is further configured to convey the magazine from which the qualified stacked sheets are taken by the first conveying mechanism 30 to the third conveying mechanism 50 ;

[0093] The third conveying mechanism 50 is configured to receive the material box conveyed by the first conveying member 432 and convey the material box to the material box recovery process.

[0094] Specifically, the receiving end of the third conveying mechanism 50 is arranged close to the second position so that the first conveying member 432 can convey the empty material box to the third conveying mechanism 50. The specific conveying direction and path of the third conveying mechanism 50 can be specifically set according to the position of the actual material box recovery station, and no specific restrictions are made in this application. The first conveying member 432 can use multiple groups of pulley assemblies with different conveying directions to achieve feeding in different directions. It should be understood that the third conveying mechanism 50 can also be set at any height position that the first conveying member 432 can reach along the Z direction, which can be set according to the actual material box recovery process.

[0095] Through the cooperation of the first lifting and conveying assembly 43 and the third conveying mechanism 50, the empty material box with the stacked sheets removed can be recycled, which is beneficial to the subsequent recycling of the empty material box.

[0096] In one possible implementation, see Figure 1-Figure 3 The second conveying mechanism 40 further includes a second lifting conveying assembly 44, the second lifting conveying assembly 44 includes a second driving member 441 and a second conveying member 442, the driving end of the second driving member 441 is connected to the second conveying member 442, and the second driving member 441 is configured to drive the second conveying member 442 to move alternately to the third position or the fourth position;

[0097] The third position is close to the discharge end of the first conveying assembly 41 , and the second conveying member 442 located at the third position is configured to receive and temporarily store unqualified stacks conveyed by the first conveying assembly 41 ;

[0098] The fourth position is close to the feed end of the second conveying component 42. The second conveying member 442 located at the fourth position is configured to convey the temporarily stored unqualified stacks to the maintenance station or receive qualified stacks after maintenance of unqualified stacks through a material box and convey the qualified stacks to the second conveying component 42.

[0099] Specifically, the second driving member 441 can adopt a linear module, and the second driving member 441 drives the second conveying member 442 to rise and fall vertically along the Z direction so that the second conveying member 442 moves alternately to the third position or the fourth position; the second conveying member 442 can adopt a pulley assembly, and the conveying direction of the pulley assembly is the same as that of the first conveying assembly 41 and the second conveying assembly 42. It can receive unqualified stacks conveyed by the first conveying assembly 41, and can also convey the received qualified stacks after inspection to the second conveying assembly 42.

[0100] An optional working process of the second conveying mechanism 40 in the embodiment of the present application: the first driving member 431 drives the first conveying member 432 to move to the first position, the first conveying member 432 receives and temporarily stores the unqualified stacking sheets transported by the first transport mechanism 30 through the material box, and after receiving the unqualified stacking sheets, the first driving member 431 drives the first conveying member 432 to descend to the second position along the Z direction, and the first conveying member 432 conveys the temporarily stored unqualified stacking sheets to the first conveying assembly 41; the first conveying assembly 41 transports the received unqualified stacking sheets along the X1 direction to the second conveying member 442 located at the third position; after the second conveying member 442 receives the unqualified stacking sheets at the third position, the second driving member 441 drives the second conveying member 442 to rise to the fourth position along the Z direction, so that the unqualified stacking sheets on the second conveying member 442 are moved to the fourth position; the second conveying member 442 conveys the temporarily stored unqualified stacking sheets to the maintenance station at the fourth position, and the stacking sheets are taken away manually or by equipment for maintenance.

[0101] Another optional working process of the second conveying mechanism 40 in the embodiment of the present application: the second conveying member 442 receives the qualified stacking sheets after inspection through the material box at the fourth position and conveys the qualified stacking sheets to the second conveying component 42 at the fourth position; the second conveying component 42 receives the qualified stacking sheets after inspection and transports the qualified stacking sheets along the X2 direction to the first conveying member 432 located at the first position; the first conveying member 432 receives the qualified stacking sheets from the second conveying component 42 and conveys the qualified stacking sheets to the picking range of the first handling mechanism 30.

[0102] By setting up the second lifting and conveying assembly 44, it is possible to receive unqualified stacking sheets conveyed by the first conveying assembly 41 at the third position height and deliver the unqualified stacking sheets to the fourth position height. At the same time, through the cooperation of the second lifting and conveying assembly 44, the first conveying assembly 41 and the second conveying assembly 42, it is possible to receive qualified stacking sheets after maintenance at the same position and feed unqualified stacking sheets to the maintenance station, which is convenient for manual or equipment to take and place stacking sheets at the same position height, and is beneficial to improving the maintenance efficiency of unqualified stacking sheets and the efficiency of conveying qualified stacking sheets after maintenance.

[0103] In one embodiment, see Figure 1-Figure 4 , the lamination repair device includes a transfer mechanism 60, and the first transport mechanism 30 includes a first transport assembly 31 and a second transport assembly 32;

[0104] The first handling assembly 31 is configured to pick up the stacks located at the unloading station and to carry the stacks of the first type that have passed the inspection to the next process or to carry the stacks of the first type that have failed the inspection to the receiving station;

[0105] The transfer mechanism 60 is configured to carry the first type of unqualified laminations at the receiving station or receive the qualified laminations after the unqualified laminations are repaired;

[0106] The second transport assembly 32 is configured to pick up unqualified stacks on the transfer mechanism 60 and transport them to the second conveying mechanism 40 or pick up qualified stacks after inspection on the second conveying mechanism 40 and transport them to the transfer mechanism 60 located at the receiving station;

[0107] The first transport assembly 31 is also configured to pick up the qualified stacks after inspection on the transfer mechanism 60 located at the receiving station and transport the qualified stacks to the next process.

[0108] Specifically, the first conveying mechanism 30 also includes a transverse driving component 33, a driving end of the transverse driving component 33 is connected to the first conveying component 31 and the second conveying component 32, and the transverse driving component 33 can drive the first conveying component 31 and the second conveying component 32 to move along the X direction, so that the first conveying component 31 can be moved laterally to the corresponding unloading station, the transfer mechanism 60 or the position of the next process located at M, and at the same time, the second conveying component 32 can be moved laterally to the corresponding transfer mechanism 60 or the first lifting and conveying component 43; the first conveying component 31 and the second conveying component 32 can both be lifted and moved along the Z direction to pick up or place the corresponding stacked sheets.

[0109] An optional working process of the stack maintenance device in the embodiment of the present application: the first conveying component 31 picks up the stack conveyed by the first conveying mechanism 10 to its unloading station, if the stack is a stack that has passed the first type of inspection, it is conveyed to the corresponding position of the next process located at M; if the stack is a stack that has failed the first type of inspection, it is conveyed to the transfer mechanism 60 located at the receiving station; the second conveying component 32 picks up the unqualified stack on the transfer mechanism 60 at the receiving station, and conveys the stack to the first conveying member 432 of the second conveying mechanism 40, and the first conveying member 432 conveys the unqualified stack to the maintenance station through the first conveying component 41, and the unqualified stack is taken away by humans or equipment for maintenance.

[0110] Another optional working process of the stack maintenance device in the embodiment of the present application: the first conveying member 432 receives the qualified stack after maintenance conveyed by the second conveying component 42 and conveys the stack to the picking range of the second handling component 32; the second handling component 32 picks up the qualified stack after maintenance on the first conveying member 432 and places the stack on the transfer mechanism 60 located at the receiving station; the first handling component 31 picks up the qualified stack after maintenance on the transfer mechanism 60 located at the receiving station, and directly transports the stack to the corresponding position of the next process located at M.

[0111] Through the cooperation of the first conveying component 31, the second conveying component 32 and the transfer mechanism 60, the alternating conveying of the first type of unqualified stacking sheets and the qualified stacking sheets after maintenance is realized. The first conveying component 31 can directly pick up the qualified stacking sheets after maintenance carried by the second conveying component 32 from the transfer mechanism 60 and send them to the next process. The stack bagging and packaging equipment of the next process does not need to stop and wait, and the stacking sheets after maintenance do not need to enter the inspection mechanism for re-inspection, which effectively improves production efficiency. At the same time, the second conveying component 32 can directly pick up the unqualified stacking sheets carried by the first conveying component 31 from the transfer mechanism 60 and send them to the second conveying mechanism 40, without manually taking out the conveying stacking sheets, which is beneficial to improving the maintenance efficiency. Through the setting of the transfer mechanism 60, the transfer and temporary storage of unqualified stacking sheets and qualified stacking sheets are realized, and a transfer mechanism 60 with a simple structure is provided, which is convenient for the conveying mechanism to pick up stacking sheets.

[0112] In one possible implementation, see Figure 1-Figure 5 The transfer mechanism 60 includes a first driving assembly 61, a first transfer platform 62 and a second transfer platform 63. The first transfer platform 62 and the second transfer platform 63 are respectively located at the receiving station H and the temporary storage station G;

[0113] The first handling assembly 31 is configured to place the unqualified stack on the first transfer platform 62 located at the receiving station H, and the second handling assembly 32 is configured to pick up the unqualified stack on the first transfer platform 62 located at the receiving station H;

[0114] The first driving component 61 is configured to drive the first transfer platform 62 and the second transfer platform 63 to move synchronously, so that the first transfer platform 62 is separated from the receiving station H, while the second transfer platform 63 moves from the temporary storage station G to the receiving station H, the second conveying component 32 is configured to place the qualified stacking pieces after inspection on the second transfer platform 63 located at the receiving station H, and the first conveying component 31 is configured to pick up the qualified stacking pieces on the second transfer platform 63 located at the receiving station H.

[0115] Specifically, the first drive component 61 can adopt a linear module, and the direction of the linear guide rail is set in the Y direction. The first drive component 61 drives the first transfer platform 62 and the second transfer platform 63 to move along the Y direction to realize the first transfer platform 62 and the second transfer platform 63 to move alternately between the temporary storage station G and the carrying station H.

[0116] Specifically, the transfer mechanism 60 also includes a sliding seat 64, which is slidably mounted on the linear guide rail of the first driving component 61. The first transfer platform 62 and the second transfer platform 63 are both mounted on the sliding seat 64. The first driving component 61 drives the sliding seat 64 to move along the Y direction, thereby driving the first transfer platform 62 and the second transfer platform 63 on the sliding seat 64 to move synchronously.

[0117] An optional working process of the stacking repair device of this embodiment is as follows: the first handling assembly 31 picks up the unqualified stacking from the unloading station of the first conveying mechanism 10 and transports the unqualified stacking to the first transfer platform 62 at the receiving station H; the second handling assembly 32 picks up the unqualified stacking on the first transfer platform 62 at the receiving station H and transports it to the second conveying mechanism 40, and the second conveying mechanism 40 sends the unqualified stacking to the repair station for repair; the first driving assembly 61 drives the first transfer platform 62 and the second transfer platform 63 to move synchronously, so that the first transfer platform 62 and the second transfer platform 63 are moved synchronously. At the same time as the platform 62 leaves the receiving station H, the second transfer platform 63 moves from the temporary storage station G to the receiving station H. At this time, the second handling component 32 picks up the qualified stacking sheets after inspection from the second conveying mechanism 40 and places them on the second transfer platform 63 located at the receiving station H, thereby facilitating the first handling component 31 to pick up and transport the qualified stacking sheets on the second transfer platform 63 at the receiving station H; the first handling component 31 picks up the qualified stacking sheets after inspection on the second transfer platform 63 at the receiving station H and transports the qualified stacking sheets to the corresponding position of the next process located at M.

[0118] By setting up the transfer mechanism 60, it is possible to move the stacking sheets between the temporary storage station G and the receiving station H, which is convenient for the first conveying assembly 31 and the second conveying assembly 32 to pick up or place the stacking sheets required for the corresponding process, and provides a transfer mechanism 60 with a compact structure and stable stacking capacity. By cooperating with the first transfer platform 62, the second transfer platform 63, the first conveying assembly 31 and the second conveying assembly 32, the feeding efficiency of the stacking bagging and packaging equipment for the next process is improved, so that the stacking bagging and packaging equipment does not need to stop and wait, and at the same time, the transportation efficiency of unqualified stacking sheets to the maintenance station is improved, which is beneficial to improving the maintenance efficiency.

[0119] In one embodiment, see Figure 1-Figure 6 , the lamination maintenance device also includes a second maintenance mechanism;

[0120] The first conveying mechanism 10 is provided with a second inspection station N, the second inspection station N is located in front of the first inspection station, the second inspection mechanism is located at the second inspection station N, and the second inspection mechanism is configured to perform a second type of inspection on the stacked sheets conveyed step by step by the first conveying mechanism 10 to the second inspection station N;

[0121] The first conveying mechanism 10 is also configured to convey the laminates of the second type that pass the inspection to the first inspection station or convey the laminates of the second type that fail the inspection to the second conveying mechanism 40;

[0122] The second conveying mechanism 40 is configured to receive the second type of unqualified stacks conveyed by the first conveying mechanism 10 and convey the unqualified stacks to the maintenance station for maintenance. The second conveying mechanism 40 is also configured to receive the qualified stacks after maintenance of the second type of unqualified stacks at the maintenance station and convey the qualified stacks to the picking range of the first handling mechanism 30.

[0123] Specifically, the second type of inspection can be to inspect the uniformity of the stacking sheets. Through the uniformity inspection, a portion of unqualified stacking sheets can be first eliminated, and the unqualified stacking sheets can be repaired as soon as possible to avoid the situation that the stacking sheets cannot be packaged smoothly due to uneven stacking sheets after subsequent procedures such as appearance inspection. Side inspection of the stacking sheets before appearance inspection can effectively improve production efficiency.

[0124] Specifically, the second conveying mechanism 40 also includes a fifth conveying component 45, which receives the second type of unqualified stacking sheets conveyed along the Y direction by the first conveying mechanism 10 and conveys the stacking sheets to the second lifting conveying component 44 in turn along the Y direction, the X1 direction and the Y direction. The second lifting conveying component 44 delivers the unqualified stacking sheets to the maintenance station where they are removed manually and by equipment for maintenance. It should be understood that the conveying directions and paths in the figure are only schematically displayed and are not specific restrictions thereon. The conveying direction and path design of the conveying component can be designed according to the actual conveying requirements of the equipment, and must meet the requirement of transporting the second type of unqualified stacking sheets from the second inspection station N to the maintenance station.

[0125] An optional working process of the stack repair device of this embodiment is: the first conveying mechanism 10 will convey the stack in a step-by-step manner along the Y direction to the second inspection station N through the material box for the second type of inspection, and convey the stack that fails the second type of inspection to the fifth conveying assembly 45; the fifth conveying assembly 45 will convey the received stack that fails the second type of inspection to the inspection station along the Y direction, X1 direction and Y direction in sequence for inspection; the stack that fails the second type of inspection is placed on the second lifting conveying assembly 44 after passing the inspection, and is conveyed to the second conveying assembly 42 by the second lifting conveying assembly 44; the second conveying assembly 42 receives the stack that passes the inspection of the unqualified stack and conveys the qualified stack along the X2 direction to the first lifting conveying assembly 43, and the first lifting conveying assembly 43 conveys the qualified stack to the picking range of the first handling mechanism 30.

[0126] The qualified stacks after repair of the second type of unqualified stacks are directly transported to the picking range of the first transport mechanism 30 by the second transport mechanism 40, so that the first transport mechanism 30 can directly send them to the next process without entering the inspection mechanism for re-inspection, thereby effectively improving production efficiency.

[0127] In one possible implementation, see Figure 1-Figure 7 , the lamination repair device further includes a second transport mechanism 70; the first conveying mechanism 10 includes a third conveying assembly 11 and a fourth conveying assembly 12;

[0128] The third conveying assembly 11 is configured to receive the magazine containing the stacked sheets and convey the magazine and the stacked sheets to the second inspection station for a second type of inspection;

[0129] The second conveying mechanism 70 is configured to pick up the qualified second-type laminates in the material box and convey the qualified second-type laminates to the fourth conveying assembly 12;

[0130] The fourth conveying assembly 12 is configured to receive the laminates of the second type that have passed the inspection and transported by the second conveying mechanism 70 and transport the laminates of the second type that have passed the inspection to the first inspection station for the first type inspection;

[0131] The third conveying assembly 11 is further configured to convey the material box containing the second type of laminated sheets that have passed the inspection taken away by the second transport mechanism 70 to the material box recovery process or to convey the material box containing the second type of laminated sheets that have failed the inspection to the second conveying mechanism 40 .

[0132] Specifically, the second conveying mechanism 70 can be arranged between the discharge end of the third conveying component 11 and the feed end of the fourth conveying component 12, so as to facilitate picking up the second type of qualified stacks in the material box from the third conveying component 11, and placing the stacks on the fourth conveying component 12, which are then transported by the fourth conveying component 12 to the first inspection station for further inspection.

[0133] Specifically, the third conveying assembly 11 conveys the material box containing the second type of unqualified stacking sheets to the feeding end of the fifth conveying assembly 45, and the fifth conveying assembly 45 conveys the unqualified stacking sheets to the maintenance station.

[0134] Specifically, the conveying height of the fifth conveying assembly 45 is slightly lower than that of the third conveying assembly 11 , and the conveying height of the fifth conveying assembly 45 is consistent with that of the second conveying assembly 42 , so as to match subsequent manual labor or equipment and facilitate the placement of stacked sheets.

[0135] Through the cooperation of the second transport mechanism 70, the third conveying assembly 11 and the fourth conveying assembly 12, the transportation of stacked sheets with different test results after the second type of detection is realized, and the circulation of empty material boxes is realized at the same time. The overall structure is compact and occupies little space, providing a stacking maintenance device with two types of detection.

[0136] In one possible implementation, see Figure 1-Figure 7 The stacking repair device further includes a third lifting and conveying assembly 13, the third lifting and conveying assembly 13 includes a third driving member 131 and a third conveying member 132, the driving end of the third driving member 131 is connected to the third conveying member 132, and the third driving member 131 is configured to drive the third conveying member 132 to move alternately to the fifth position, the sixth position or the seventh position;

[0137] The fifth position is close to the discharge end of the third conveying assembly 11, and the third conveying member 132 at the fifth position is configured to receive and temporarily store the material box conveyed by the third conveying assembly 11, which takes away the second type of qualified laminated sheets or the material box containing the second type of unqualified laminated sheets;

[0138] The height of the sixth position is consistent with the height of the conveying surface of the second conveying mechanism 40 , and the third conveying member 132 located at the sixth position is configured to convey the temporarily stored material box containing the second type of unqualified stacked sheets to the second conveying mechanism 40 ;

[0139] The height of the seventh position is lower than that of the sixth position, and the third conveying member 132 at the seventh position is configured to convey the temporarily stored material box with the second type of qualified stacked sheets removed to the material box recovery process.

[0140] Specifically, the third driving member 131 can adopt a linear module, and the third driving member 131 drives the third conveying member 132 to vertically rise and fall along the Z direction, so that the third conveying member 132 moves alternately to the fifth position, the sixth position or the seventh position; the third conveying member 132 can adopt multiple groups of pulley assemblies with different conveying directions to realize the conveying of empty material boxes or material boxes containing second-type unqualified stacked sheets to the corresponding process.

[0141] By setting up the third lifting and conveying assembly 13, it is possible to convey the empty material boxes or the material boxes of the second type of unqualified stacked sheets received at the discharge end of the third conveying assembly 11 to the next process corresponding to different height positions, thereby providing a lifting and conveying assembly with a compact structure that is convenient for the circulation of unqualified stacked sheets and empty material boxes.

[0142] In one possible implementation, see Figure 1-Figure 8 The first lifting and conveying assembly 43, the second lifting and conveying assembly 44 and the third lifting and conveying assembly 13 can all be adopted as follows Figure 8 The lifting and conveying component structure shown in the figure includes a lifting and conveying component including a lifting drive module 81, a mounting seat 82, a first pulley assembly 831 and a second pulley assembly 832. The driving end of the lifting drive module 81 is connected to the mounting seat 82. The lifting drive module 81 can drive the mounting seat 82 to move up and down along the Z direction to various height positions, thereby moving each lifting and conveying component to a corresponding position; the first pulley assembly 831 and the second pulley assembly 832 are installed on the mounting seat 82. The belt conveying directions of the first pulley assembly 831 and the second pulley assembly 832 are different, and can be set according to the direction of the actual docking conveying component, so as to realize receiving or conveying stacks or material boxes at each corresponding position.

[0143] In one possible implementation, participation Figure 1-Figure 8 The second conveying mechanism 40 is also configured to convey the material box of the qualified stacking sheets after the inspection of the second type of unqualified stacking sheets taken away by the first conveying mechanism 30 to the material box recovery process.

[0144] Specifically, the first conveying member 432 of the first lifting conveying assembly 43 receives at a first position a material box containing qualified stacks after inspection conveyed by the second conveying assembly 42 and delivers it to the picking range of the first conveying mechanism 30; the first conveying mechanism 30 takes away the qualified stacks in the material box; the first driving member 431 drives the first conveying member 432 to the second position to convey the empty material box with the stacks taken away to the third conveying mechanism 50, and the third conveying mechanism 50 conveys the empty material box to the material box recovery process.

[0145] By providing the second conveying mechanism 40 , the material boxes flowing from the third conveying assembly 11 can be recovered, which is beneficial to the reuse of the material boxes.

[0146] For further information, see Figure 1-Figure 8 The present application provides a re-inspection bagging device, which includes a bagging mechanism and a stacking repair device as described above, wherein:

[0147] The bagging mechanism is located at the next process, and is configured to receive qualified stacked sheets conveyed by the first conveying mechanism 30 and bag the stacked sheets.

[0148] Specifically, the bagging mechanism is located at M, and the first conveying component 31 can pick up the qualified stacking sheets after the first type of inspection conveyed by the first conveying mechanism 10 and place them on the bagging mechanism for bagging, or the first conveying component 31 picks up the qualified stacking sheets after inspection placed by the second conveying component 32 on the transfer mechanism 60, and conveys the qualified stacking sheets to the bagging mechanism for bagging, thereby realizing multi-party feeding of the bagging mechanism.

[0149] See also Figure 1-Figure 8 An optional working process of the re-inspection bagging device of the embodiment of the present application is:

[0150] The third conveying assembly 11 receives the material box containing the stacked sheets transported by the external conveying mechanism and conveys the material box and the stacked sheets to the second inspection station N for the second type of inspection;

[0151] For laminates that pass the second type of testing:

[0152] The second conveying mechanism 70 picks up the stack in the material box and conveys the stack to the fourth conveying assembly 12;

[0153] The fourth conveying assembly 12 receives the qualified stacks conveyed by the second conveying mechanism 70 and conveys the qualified stacks to the first inspection station for the first type of inspection:

[0154] If the stacked sheets are qualified after the first type of inspection, they are directly transported by the first transport assembly 31 to the bagging mechanism for bagging;

[0155] If the stack fails the first type of inspection, it is transported to the transfer mechanism 60 by the first transport assembly 31;

[0156] The second transport assembly 32 picks up the unqualified stacks on the transfer mechanism 60 and transports them to the first conveying member 432 located at the first position;

[0157] The first driving member 431 drives the first conveying member 432 to descend from the first position to the second position, and the first conveying member 432 conveys the unqualified laminate to the first conveying assembly 41 at the second position;

[0158] The first conveying assembly 41 conveys the unqualified laminate to the second conveying member 442 located at the third position;

[0159] The second driving member 441 drives the second conveying member 442 to rise from the third position to the fourth position, and the second conveying member 442 conveys the unqualified stacking sheets to the maintenance station at the fourth position, and the stacking sheets are taken away manually or by equipment for maintenance;

[0160] The second conveying member 442 continues to receive the qualified laminates after inspection at the fourth position, and directly conveys the laminates to the second conveying assembly 42 at the fourth position;

[0161] The second conveying assembly 42 conveys the qualified stack after inspection back to the first conveying member 432 located at the first position, and the first conveying member 432 conveys the qualified stack to the picking range of the second handling assembly 32;

[0162] The second handling assembly 32 picks up the qualified stack and places the stack on the transfer mechanism 60;

[0163] The first transport assembly 31 picks up the qualified stacks on the transfer mechanism 60 and transports them to the bagging mechanism for bagging;

[0164] Among them, after the second conveying mechanism 70 takes away the qualified stacked sheets in the material box, the third conveying assembly 11 conveys the empty material box to the third conveying member 132 located at the fifth position; the third driving member 131 drives the third conveying member 132 to drop to the seventh position, and at the seventh position the third conveying member 132 conveys the empty material box to the material box recovery process.

[0165] See also Figure 1-Figure 8 Another optional working process of the re-inspection bagging device of the embodiment of the present application is:

[0166] The third conveying assembly 11 receives the material box containing the stacked sheets transported by the external conveying mechanism and conveys the material box and the stacked sheets to the second inspection station N for the second type of inspection;

[0167] For laminates that fail the second type of testing:

[0168] The third conveying assembly 11 conveys the material box containing the second type of unqualified laminated sheets to the third conveying member 132 located at the fifth position;

[0169] The third driving member 131 drives the third conveying member 132 to descend from the fifth position to the sixth position, and the third conveying member 132 conveys the material box containing the unqualified stacked sheets to the fifth conveying assembly 45 at the sixth position;

[0170] The fifth conveying assembly 45 conveys the material box containing the unqualified stacked sheets to the second conveying member 442 located at the fourth position. The second conveying member 442 conveys the material box containing the unqualified stacked sheets to the maintenance station at the fourth position, and the stacked sheets are taken away manually or by equipment for maintenance.

[0171] The second conveying member 442 continues to receive the qualified stacked sheets after inspection through the material box at the fourth position, and directly conveys the material box containing the qualified stacked sheets to the second conveying assembly 42 at the fourth position;

[0172] The second conveying assembly 42 conveys the box containing qualified stacked sheets back to the first conveying member 432 located at the first position, and the first conveying member 432 conveys the box containing qualified stacked sheets to the picking range of the second handling assembly 32;

[0173] The second handling assembly 32 picks up the qualified stacks in the material box and places the stacks on the transfer mechanism 60;

[0174] The first transport assembly 31 picks up the qualified stacks on the transfer mechanism 60 and transports them to the bagging mechanism for bagging;

[0175] Among them, after the second conveying component 32 takes away the qualified stacked sheets in the material box, the first driving member 431 drives the first conveying member 432 to drop to the second position, and at the second position, the first conveying member 432 conveys the empty material box to the third conveying mechanism 50, and the third conveying mechanism 50 conveys the empty material box to the material box recovery process.

[0176] The re-inspection and bagging equipment of the present application, the stack repair device transports the qualified stacks after the first type of repair to the bagging mechanism for bagging through the first transport mechanism 30, or sends the unqualified stacks to the second transport mechanism 40 through the first transport mechanism 30, and picks up the qualified stacks from the second transport mechanism 40 and sends them to the bagging mechanism, thereby realizing multi-party feeding to the bagging mechanism. The bagging mechanism does not need to stop and wait, and the stacks after repair do not need to enter the inspection mechanism for re-inspection, which effectively improves production efficiency.

[0177] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0178] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0179] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in this field can change, modify, replace and modify the above embodiments within the scope of the present application.

Claims

1. A lamination maintenance device, characterized in that: The stacking repair device comprises a first conveying mechanism, a first detection mechanism, a first handling mechanism and a second conveying mechanism, wherein: A first inspection station is provided on the first conveying mechanism, the first inspection mechanism is located at the first inspection station, and the first inspection mechanism is configured to perform a first type of inspection on the stacked sheets conveyed step by step by the first conveying mechanism to the first inspection station; The first conveying mechanism is further configured to convey the stacked sheets inspected at the first inspection station to the discharging station in a step-by-step manner; The first conveying mechanism is configured to pick up the stacks located at the unloading station and convey the stacks of the first type that pass the inspection to the next process or convey the stacks of the first type that fail the inspection to the second conveying mechanism; The second conveying mechanism is configured to receive unqualified stacks conveyed by the first conveying mechanism and convey the unqualified stacks to the repair station for repair, and the second conveying mechanism is also configured to receive qualified stacks after repair at the repair station and convey the qualified stacks to the picking range of the first conveying mechanism; The first conveying mechanism is further configured to pick up qualified stacks after inspection on the second conveying mechanism and convey the qualified stacks to the next process.

2. The lamination repair device according to claim 1, characterized in that: The second conveying mechanism includes a first conveying assembly and a second conveying assembly; The first conveying assembly is configured to receive unqualified stacks conveyed by the first conveying mechanism through a material box and convey the unqualified stacks to the maintenance station; The second conveying assembly is configured to receive qualified stacks after inspection at the inspection station through a material box and convey the qualified stacks to a picking range of the first transport mechanism.

3. The lamination repair device according to claim 2, characterized in that: The first conveying assembly and the second conveying assembly are arranged in the same vertical direction and in opposite conveying directions, the second conveying mechanism further comprises a first lifting conveying assembly, the first lifting conveying assembly comprises a first driving member and a first conveying member, the driving end of the first driving member is connected to the first conveying member, and the first driving member is configured to drive the first conveying member to move alternately to the first position or the second position; The first position is close to the discharge end of the second conveying assembly, and the first conveying member located at the first position is configured to receive and temporarily store unqualified stacks conveyed by the first conveying mechanism through a material box or to receive qualified stacks conveyed by the second conveying assembly after inspection and convey them to the picking range of the first conveying mechanism; The second position is close to a feeding end of the first conveying component, and the first conveying member located at the second position is configured to convey the temporarily stored unqualified stacks to the first conveying component.

4. The lamination repair device according to claim 3, characterized in that: The stack maintenance device also includes a third conveying mechanism; The first conveying member located at the second position is further configured to convey the material box from which the qualified stacked sheets are taken by the first transport mechanism to the third conveying mechanism; The third conveying mechanism is configured to receive the material box conveyed by the first conveying member and convey the material box to a material box recovery process.

5. The lamination repair device according to claim 2, characterized in that: The second conveying mechanism further includes a second lifting conveying assembly, the second lifting conveying assembly includes a second driving member and a second conveying member, the driving end of the second driving member is connected to the second conveying member, and the second driving member is configured to drive the second conveying member to move alternately to the third position or the fourth position; The third position is close to the discharge end of the first conveying component, and the second conveying member located at the third position is configured to receive and temporarily store unqualified stacks conveyed by the first conveying component; The fourth position is close to the feed end of the second conveying component, and the second conveying member located at the fourth position is configured to convey the temporarily stored unqualified stacks to the maintenance station or to receive qualified stacks after maintenance of unqualified stacks through a material box and convey the qualified stacks to the second conveying component.

6. The lamination repair device according to claim 1, characterized in that: The stack inspection device includes a transfer mechanism, and the first transport mechanism includes a first transport assembly and a second transport assembly; The first handling assembly is configured to pick up the stacks located at the unloading station and to carry the stacks of the first type that have passed the inspection to the next process or to carry the stacks of the first type that have failed the inspection to the receiving station; The transfer mechanism is configured to carry the first type of unqualified laminations at the receiving station or receive the qualified laminations after the unqualified laminations are repaired; The second transport assembly is configured to pick up unqualified stacks on the transfer mechanism and transport them to the second conveying mechanism, or pick up qualified stacks after inspection on the second conveying mechanism and transport them to the transfer mechanism located at the receiving station; The first transport assembly is also configured to pick up the qualified stacks after inspection on the transfer mechanism located at the receiving station and transport the qualified stacks to the next process.

7. The lamination repair device according to claim 6, characterized in that: The transfer mechanism includes a first driving assembly, a first transfer platform and a second transfer platform, wherein the first transfer platform and the second transfer platform are respectively located at the receiving station and the temporary storage station; The first handling assembly is configured to place unqualified stacks on the first transfer platform located at the receiving station, and the second handling assembly is configured to pick up unqualified stacks on the first transfer platform located at the receiving station; The first driving component is configured to drive the first transfer platform and the second transfer platform to move synchronously, so that when the first transfer platform is separated from the receiving station, the second transfer platform moves from the temporary storage station to the receiving station, the second conveying component is configured to place the stacked sheets that have passed the inspection on the second transfer platform located at the receiving station, and the first conveying component is configured to pick up the stacked sheets that have passed the inspection on the second transfer platform located at the receiving station.

8. The lamination repair device according to any one of claims 1 to 7, characterized in that: The lamination maintenance device further comprises a second maintenance mechanism; The first conveying mechanism is provided with a second inspection station, the second inspection station is located in front of the first inspection station, the second inspection mechanism is located at the second inspection station, and the second inspection mechanism is configured to perform a second type of inspection on the stacked sheets conveyed step by step by the first conveying mechanism to the second inspection station; The first conveying mechanism is further configured to convey the laminates of the second type that pass the inspection to the first inspection station or convey the laminates of the second type that fail the inspection to the second conveying mechanism; The second conveying mechanism is configured to receive the second type of unqualified stacks conveyed by the first conveying mechanism and convey the unqualified stacks to the maintenance station for maintenance. The second conveying mechanism is also configured to receive qualified stacks after maintenance of the second type of unqualified stacks at the maintenance station and convey the qualified stacks to the picking range of the first handling mechanism.

9. The lamination repair device according to claim 8, characterized in that: The stack repair device further comprises a second transport mechanism; the first transport mechanism comprises a third transport assembly and a fourth transport assembly; The third conveying assembly is configured to receive a magazine containing stacked sheets and convey the magazine and stacked sheets to the second inspection station for a second type of inspection; The second conveying mechanism is configured to pick up the qualified second-type stacked sheets in the material box and convey the qualified second-type stacked sheets to the fourth conveying assembly; The fourth conveying assembly is configured to receive the laminates of the second type that have passed the inspection and transported by the second conveying mechanism and transport the laminates of the second type that have passed the inspection to the first inspection station for the first type of inspection; The third conveying assembly is further configured to convey the material box containing the second type of laminated sheets that have passed the second inspection taken away by the second transport mechanism to the material box recovery process or to convey the material box containing the second type of laminated sheets that have failed the second inspection to the second conveying mechanism.

10. The lamination repair device according to claim 9, characterized in that: The stack repair device further includes a third lifting and conveying assembly, the third lifting and conveying assembly includes a third driving member and a third conveying member, the driving end of the third driving member is connected to the third conveying member, and the third driving member is configured to drive the third conveying member to move alternately to the fifth position, the sixth position or the seventh position; The fifth position is close to the discharge end of the third conveying component, and the third conveying member located at the fifth position is configured to receive and temporarily store the material box conveyed by the third conveying component, which has taken away the second type of qualified stacking sheets or the material box containing the second type of unqualified stacking sheets; The height of the sixth position is consistent with the height of the conveying surface of the second conveying mechanism, and the third conveying member located at the sixth position is configured to convey the temporarily stored material box containing the second type of unqualified stacked sheets to the second conveying mechanism; The height of the seventh position is lower than that of the sixth position, and the third conveyor at the seventh position is configured to convey the temporarily stored material box with the second type of qualified stacked sheets removed to the material box recovery process.

11. The lamination repair device according to claim 9, characterized in that: The second conveying mechanism is further configured to convey the material box containing the qualified stacks after the first conveying mechanism takes away the second type of unqualified stacks to the material box recovery process.

12. A re-inspection bagging device, characterized in that: The re-inspection bagging equipment comprises a bagging mechanism and a stacking repair device as claimed in any one of claims 1 to 11, wherein: The bagging mechanism is located at the next process, and is configured to receive qualified stacked sheets transported by the first transporting mechanism and bag the stacked sheets.