Hyperbolic aluminum plate suspended ceiling for ultra-large space and construction method of hyperbolic aluminum plate suspended ceiling
By using support keels and adjustable hyperbolic honeycomb aluminum plates in the hyperbolic aluminum ceiling in the super-large space, combined with equipment belts and three-dimensional modeling technology, the problems of high risk coefficient and difficulty during construction are solved, and the accuracy of the ceiling is achieved Installation and curvature adjustment improve construction safety and efficiency.
Patent Information
- Application Number
- CN202411207666.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2024-12-31
AI Technical Summary
In the construction of hyperbolic aluminum plate ceilings with super large spaces, there are problems such as high hazard coefficient, difficult construction process, and unavailability of the total station.
Use interval-distributed supporting keels and adjustable hyperbolic honeycomb aluminum plates to model ceilings through measurement points and three-dimensional modeling software on the equipment belt, set up a full-house scaffolding, and install hyperbolic honeycomb aluminum plates at the bottom of the supporting keel to adjust its curvature. To meet design requirements.
It reduces the risk and difficulty of construction, realizes accurate positioning of the ceiling and fine-tuning of curvature, meets design requirements, controls scaffolding loads, and properly handles the impact of cross-operation.
Smart Images

Figure CN119221654A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building decoration engineering, in particular to a hyperbolic aluminum plate ceiling for a super large space and a construction method thereof. Background Art
[0002] In today's architectural decoration field, the design and construction requirements for super-large spaces are increasing. Super-large spaces can not only provide a spacious and comfortable environment, but also show the grandeur and unique charm of the building. As an innovative decoration solution, hyperbolic aluminum plate ceilings are gradually becoming a popular choice for large public buildings and high-end commercial spaces, such as airport terminals, high-speed rail stations, conference and exhibition centers and other super-large space venues, especially for projects that have high requirements for ceiling decoration effects and need to show unique artistic and modern sense.
[0003] The hyperbolic aluminum ceiling creates a very modern and artistic atmosphere for the super large space with its beautiful curve shape, excellent metal texture and good durability. However, due to the large space and high height of the construction site, and the need to use a large amount of materials for splicing, it involves multiple units in the same area, a large number of machines working at the same time, and many high-altitude operations with high risk factors, which is the most difficult part of the interior construction. And due to the restrictions on load requirements, although the full-hall scaffolding is convenient for large-scale construction, the large volume generates a large load, and when constructing high-speed railway stations and other large buildings, the total station positioning cannot be used normally on the scaffolding due to vibration.
[0004] Therefore, the present invention proposes a hyperbolic aluminum plate ceiling for a super large space and a construction method thereof. Summary of the invention
[0005] The purpose of the present invention is to overcome the defects of the prior art, provide a hyperbolic aluminum plate ceiling for ultra-large space and a construction method thereof, and solve the problems of high risk factor, difficult construction process and inability to use total station in the existing hyperbolic aluminum plate construction process.
[0006] The present invention provides a hyperbolic aluminum plate ceiling for an extra-large space, and its technical solution is as follows: it comprises: a plurality of supporting keels spaced apart on a roof structure, the bottoms of the plurality of supporting keels having different heights, and the bottom heights being adapted to a designed curvature of the ceiling; a plurality of hyperbolic honeycomb aluminum plates adjustably arranged at the bottoms of the supporting keels, the hyperbolic honeycomb aluminum plates being arranged along the entire length of the ceiling, and an arc formed by splicing the plurality of hyperbolic honeycomb aluminum plates being adapted to a designed curvature of the ceiling; and an equipment belt adjustably arranged at the bottoms of the supporting keels for positioning the ceiling, the equipment belt being provided with measuring points, and the equipment belt being arranged along the entire length of the ceiling.
[0007] Furthermore, each of the supporting keels includes: a first vertical keel fixed on the roof structure at left and right intervals; a transverse keel fixed on the first vertical keel at upper and lower intervals; a second vertical keel fixed on the lowest transverse keel at left and right intervals; and diagonal braces arranged on both sides of each of the second vertical keels, one end of the two diagonal braces being fixedly connected to the lower end of the second vertical keel, and the other end being fixedly connected to the corresponding transverse keel.
[0008] Furthermore, it also includes a first connecting rod and a second connecting rod arranged at the lower end of the second vertical keel, the first connecting rod is transversely fixed to the lower end of the second vertical keel, and the corresponding two diagonal braces are fixed on the first connecting rod; the second connecting rod can be adjusted up and down and is located below the first connecting rod, and the two ends of the second connecting rod are fixedly connected to the corresponding hyperbolic honeycomb aluminum plate.
[0009] Furthermore, it also includes two adjustment bolts and two hanging weights arranged between two adjacent second vertical keels, the adjustment bolts are located below the transverse keels, the hanging weights are arranged on the adjustment bolts and can be adjusted up and down, and the corresponding ends of the hyperbolic honeycomb aluminum panels are fixedly connected to the corresponding hanging weights.
[0010] The present invention also provides a construction method for a hyperbolic aluminum plate ceiling for an ultra-large space, which specifically includes the following steps: arranging measurement points on the equipment belt, modeling the ceiling with three-dimensional modeling software, and calculating the coordinate information of the measurement points on the equipment belt; popping up control lines on the roof structure according to the coordinate information of the measurement points; installing the supporting keel on the roof structure according to the control lines; installing the equipment belt at the bottom of the supporting keel, and adjusting it according to the coordinate information of the equipment belt; and installing the hyperbolic honeycomb aluminum plate at the bottom of the supporting keel.
[0011] Furthermore, the steps of installing the supporting keels are as follows: providing a plurality of first vertical keels, and installing the first vertical keels on the roof structure according to the control line; providing a plurality of transverse keels, and installing the transverse keels on the first vertical keels; providing a plurality of second vertical keels, and fixing the second vertical keels at intervals on the corresponding transverse keels; providing a plurality of diagonal braces, and fixing one end of the diagonal brace on the lower end of the second vertical keel, and fixing the other end on the corresponding transverse keel.
[0012] Furthermore, when installing the diagonal brace, the first connecting rod is provided, and the lower end of the second vertical keel and the corresponding end of the diagonal brace are fixed on the first connecting rod; then a second connecting rod is provided and installed below the first connecting rod.
[0013] Furthermore, after installing the diagonal brace, an adjusting bolt and a hanging code are provided, the adjusting bolt is installed below the transverse keel, and the hanging code is installed on the adjusting bolt; a first equipment belt and a second equipment belt are provided, the first equipment belt is installed below the second connecting rod, and the two ends of the second equipment belt are fixedly installed on the corresponding hanging codes; by adjusting the height of the second connecting rod and the hanging code, the first equipment belt and the second equipment belt are adjusted to reach the designed position.
[0014] Furthermore, the steps of installing the hyperbolic honeycomb aluminum panel are as follows: fixedly connecting one end of the hyperbolic honeycomb aluminum panel to the end corresponding to the second connecting rod; fixedly connecting the other end of the hyperbolic honeycomb aluminum panel to the corresponding hanging code; and fine-tuning the height of both ends of the hyperbolic honeycomb aluminum panel to ensure that the curvature of the hyperbolic honeycomb aluminum panel is the same as the designed curvature.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] By setting the equipment belt and the measuring points on the equipment belt, the ceiling is modeled using 3D modeling software, and the coordinates of the measuring points and other data are measured to obtain the shape of the entire ceiling.
[0017] Before installing the suspended ceiling, set up full-floor scaffolding under the suspended ceiling in different areas from high to low, from inside to outside, and from difficult to easy, control the load of the full-floor scaffolding, and properly handle the impact of cross-operation.
[0018] By adjustably arranging both ends of the hyperbolic honeycomb aluminum panel on the supporting keel, after the ceiling is assembled, the curvature of the hyperbolic honeycomb aluminum panel can be fine-tuned to meet the design requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 The present invention is a schematic diagram of the installation nodes of the hyperbolic honeycomb aluminum plate used for the hyperbolic aluminum plate ceiling of a super large space.
[0020] Figure 2 The invention is used for the hyperbolic aluminum plate ceiling of a super large space Figure 1 Enlarged view of part A in the middle.
[0021] Figure 3 The invention is used for the hyperbolic aluminum plate ceiling of a super large space Figure 1 Enlarged view of part B in the middle.
[0022] Figure 4 The diagram is a schematic diagram of the installation of the first vertical keel of the hyperbolic aluminum plate ceiling for a super large space according to the present invention.
[0023] Figure 5The figure is a schematic diagram of the installation of the transverse keel of the hyperbolic aluminum plate ceiling for a super large space according to the present invention.
[0024] Figure 6 The diagram is a schematic diagram of the installation of the second vertical keel of the hyperbolic aluminum plate ceiling for super large space according to the present invention.
[0025] Figure 7 The diagram is a schematic diagram of the installation of the second equipment belt used for the hyperbolic aluminum plate ceiling in a super large space according to the present invention.
[0026] Figure 8 The first device belt installation schematic diagram of the hyperbolic aluminum plate ceiling for ultra-large space of the present invention.
[0027] Fig. 9 The diagram is a schematic diagram of the installation of the hyperbolic honeycomb aluminum panel used for the hyperbolic aluminum panel ceiling of a super large space according to the present invention.
[0028] Fig.10 The figure is a schematic diagram of the control lines of the hyperbolic aluminum plate ceiling used in a super large space according to the present invention.
[0029] Legend: 1. First vertical keel; 2. Horizontal keel; 3. Angle steel; 4. Diagonal brace; 5. Second vertical keel; 6. Hyperbolic honeycomb aluminum plate; 7. First connecting rod; 8. Second connecting rod; 9. Adjustment bolt; 10. First equipment belt; 11. Lamp; 12. First installation angle code; 13. Second equipment belt; 14. Second installation angle code; 15. Clamp; 16. Hanging code. DETAILED DESCRIPTION
[0030] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0031] See also Figure 1 , the present invention provides a hyperbolic aluminum plate ceiling for super large space and a construction method thereof. The problems of high risk factor, difficult construction process and inability to use total station in the existing hyperbolic aluminum plate during construction are solved. By setting the equipment belt and the measuring points on the equipment belt, the ceiling is modeled using three-dimensional model software, and the coordinates and other data of the measuring points are measured to obtain the shape of the entire ceiling. Before installing the ceiling, a full-floor scaffold is set up under the ceiling from high to low, from inside to outside, and from difficult to easy, the load of the full-floor scaffold is controlled, and the impact of cross-operation is properly handled. By adjustably setting the two ends of the hyperbolic honeycomb aluminum plate on the supporting keel, after the ceiling is assembled, the curvature of the hyperbolic honeycomb aluminum plate can be fine-tuned to meet the design requirements.
[0032] The hyperbolic aluminum plate ceiling for a super large space and the construction method thereof of the present invention are described below in conjunction with the accompanying drawings.
[0033] See also Figure 1, showing the schematic diagram of the installation nodes of the hyperbolic honeycomb aluminum plate used for the hyperbolic aluminum plate ceiling of a super large space in the present invention. Figure 1 , a hyperbolic aluminum plate ceiling for a super large space and a construction method thereof are described in the present invention.
[0034] like Figure 1 As shown, a hyperbolic aluminum plate ceiling for a super large space of the present invention comprises: a plurality of supporting keels spaced apart on the roof structure, the bottom heights of the plurality of supporting keels being different, and the bottom heights being adapted to the designed curvature of the ceiling; a plurality of hyperbolic honeycomb aluminum plates 6 being adjustably arranged at the bottom of the supporting keels, the hyperbolic honeycomb aluminum plates 6 being arranged along the entire length of the ceiling, and the arc formed by splicing the plurality of hyperbolic honeycomb aluminum plates 6 being adapted to the designed curvature of the ceiling; an equipment belt for positioning the ceiling being adjustably arranged at the bottom of the supporting keels, the equipment belt being arranged with measuring points, and the equipment belt being arranged along the entire length of the ceiling. By setting measuring points on the equipment belt, a ceiling model is drawn on a three-dimensional software, and the coordinates, elevation, distance, angle and other detailed data of the measuring points are measured through the measuring function, and the coordinates of the supporting keels are calculated based on the coordinates of the measuring points.
[0035] In a specific embodiment, the thickness of the hyperbolic honeycomb aluminum plate 6 is 25 mm.
[0036] In a specific embodiment, each of the supporting keels includes: a first vertical keel 1 fixed on the roof structure at left and right intervals; a transverse keel 2 fixed on the first vertical keel 1 at upper and lower intervals; a second vertical keel 5 fixed on the lowest transverse keel 2 at left and right intervals; and a diagonal brace 4 provided on both sides of each of the second vertical keels 5, one end of the two diagonal braces 4 being fixedly connected to the lower end of the second vertical keel 5, and the other end being fixedly connected to the corresponding transverse keel 2.
[0037] In a specific embodiment, the first vertical keel 1, the second vertical keel 5 and the transverse keel 2 are all hot-dip galvanized square tubes, with a length and width of 50 mm and a thickness of 5 mm.
[0038] In a specific embodiment, a clamp 15 is provided at the connection between the first vertical keel 1 and the transverse keel 2 , and the first vertical keel 1 and the transverse keel 2 are fixed by the clamp 15 .
[0039] Specifically, an angle steel 3 is provided at the connection between the bottom transverse keel 2 and the first vertical keel 1 , and the bottom transverse keel 2 and the first vertical keel 1 are further fixed by the angle steel 3 .
[0040] In a specific embodiment, it also includes a first connecting rod 7 and a second connecting rod 8 arranged at the lower end of the second vertical keel 5, the first connecting rod 7 is transversely fixed to the lower end of the second vertical keel 5, and the corresponding two diagonal braces 4 are fixed on the first connecting rod 7; the second connecting rod 8 can be adjusted up and down and is located below the first connecting rod 7, and the two ends of the second connecting rod 8 are fixedly connected to the corresponding hyperbolic honeycomb aluminum panel 6.
[0041] In a specific embodiment, the two ends of the hyperbolic honeycomb aluminum plate 6 are provided with extensions, and the extension at one end is fixedly connected to the second connecting rod 8 by screws.
[0042] In a specific embodiment, at least two first installation angle codes 12 are provided between the first connecting rod 7 and the second connecting rod 8. The first connecting rod 7 and the second connecting rod 8 are fixedly connected to the first installation angle codes 12 by bolts. The first installation angle codes 12 are made of aluminum alloy.
[0043] Specifically, a long hole is formed on the first mounting angle bracket 12, and the bolt passes through the long hole and is fixedly connected to the first connecting rod 7 and the second connecting rod 8. Before the bolt is tightened, the second connecting rod 8 can be moved up and down to adjust its height, and the bolt is tightened after adjustment.
[0044] In a specific embodiment, it also includes two adjusting bolts 9 and two hanging weights 16 arranged between two adjacent second vertical keels 5, the adjusting bolts 9 are located below the transverse keel 2, the hanging weights 16 are arranged on the adjusting bolts 9 so as to be adjustable up and down, and the extension portion at one end of the hyperbolic honeycomb aluminum panel 6 is fixedly connected to the corresponding hanging weight 16 by a screw.
[0045] In a specific embodiment, the hanging code 16 has a vertical portion and two horizontal portions fixed at the upper and lower ends of the vertical portion, the horizontal portion at the lower end is fixedly connected to the corresponding end of the hyperbolic honeycomb aluminum plate 6, the horizontal portion at the upper end is fixed to the adjusting bolt 9 through a nut, and the height of the hanging code 16 is adjusted by turning the nut, and finally the hanging code 16 adjusts the height of one end of the hyperbolic honeycomb aluminum plate 6.
[0046] In a specific embodiment, a second installation angle code 14 is provided between the hanging code 16 and the transverse keel 2, the second installation angle code 14 is fixed to the transverse keel 2 by screws, the hanging code 16 is fixed to the second installation angle code 14 by nuts, and the second installation angle code 14 is made of aluminum alloy.
[0047] In a specific embodiment, the equipment belt includes a first equipment belt 10 and a second equipment belt 13 . The first equipment belt 10 is arranged below the second connecting rod 8 , and both ends of the second equipment belt 13 are fixedly connected to the corresponding hanging codes 16 .
[0048] In a specific embodiment, a lamp 11 is fixedly mounted on the ground of the second connecting rod 8 , a lampshade for protecting the lamp 11 is disposed on the second connecting rod 8 , and the first equipment belt 10 is fixedly mounted on the lampshade by screws.
[0049] In a specific embodiment, the first equipment belt 10 and the second equipment belt 13 are hyperbolic aluminum veneers with a thickness of 3 mm, and the curvature thereof is the same as the design curvature of the suspended ceiling.
[0050] The present invention also provides a construction method for a hyperbolic aluminum plate ceiling for an ultra-large space, which specifically includes the following steps: arranging measurement points on the equipment belt, modeling the ceiling with three-dimensional modeling software, and calculating the coordinate information of the measurement points on the equipment belt; popping up control lines on the roof structure according to the coordinate information of the measurement points; installing the supporting keel on the roof structure according to the control lines; installing the equipment belt at the bottom of the supporting keel, and adjusting it according to the coordinate information of the equipment belt; installing the hyperbolic honeycomb aluminum plate 6 at the bottom of the supporting keel.
[0051] In a specific embodiment, the steps of installing the supporting keel are as follows: providing a plurality of first vertical keels 1, and installing the first vertical keels 1 on the roof structure according to the control line; providing a plurality of transverse keels 2, and installing the transverse keels 2 on the first vertical keels 1; providing a plurality of second vertical keels 5, and fixing the second vertical keels 5 on the corresponding transverse keels 2 at intervals; providing a plurality of diagonal braces 4, and fixing one end of the diagonal brace 4 on the lower end of the second vertical keel 5, and fixing the other end on the corresponding transverse keel 2.
[0052] In a specific embodiment, when installing the diagonal brace 4, the first connecting rod 7 is provided, and the lower end of the second vertical keel 5 and the corresponding end of the diagonal brace 4 are fixed on the first connecting rod 7; then the second connecting rod 8 is provided and installed below the first connecting rod 7.
[0053] In a specific embodiment, after installing the diagonal brace 4, an adjusting bolt 9 and a hanging code 16 are provided, the adjusting bolt 9 is installed below the transverse keel 2, and the hanging code 16 is installed on the adjusting bolt 9; a first equipment belt 10 and a second equipment belt 13 are provided, the first equipment belt 10 is installed below the second connecting rod 8, and the two ends of the second equipment belt 13 are fixedly installed on the corresponding hanging codes 16; by adjusting the height of the second connecting rod 8 and the hanging code 16, the first equipment belt 10 and the second equipment belt 13 are adjusted to reach the designed position.
[0054] In a specific embodiment, the steps of installing the hyperbolic honeycomb aluminum panel 6 are as follows: fix one end of the hyperbolic honeycomb aluminum panel 6 to the end corresponding to the second connecting rod 8; fix the other end of the hyperbolic honeycomb aluminum panel 6 to the corresponding hanging code 16; fine-tune the height of both ends of the hyperbolic honeycomb aluminum panel 6 to ensure that the curvature of the hyperbolic honeycomb aluminum panel 6 is the same as the designed curvature.
[0055] The construction process of the hyperbolic aluminum plate ceiling for a super large space of the present invention is described in detail below.
[0056] Build a 3D model, lay out measurement points on the equipment belt, and use the measurement function of the 3D modeling software to obtain detailed information such as coordinates, elevation, distance, angle, etc. of the measurement points. Find the location of the corresponding measurement points on the roof structure on site, and use measuring instruments for precise measurement and positioning. The overall ceiling shape is outlined by accurately positioning the equipment belt. Then measure the coordinates of the support points of the support keel, draw control lines on the roof structure, and mark them to facilitate the subsequent installation of the support keel.
[0057] Scaffolding should be erected under the roof structure to be constructed. The scaffolding should be installed in different areas in the order from high to low, from inside to outside, and from difficult to easy. The load of the scaffolding should be controlled and the impact of cross-operation should be properly handled.
[0058] During installation, the order is from point to line, and from line to surface.
[0059] The supporting keel is installed first, the first vertical keel 1 is installed according to the mark made on the roof structure, and then the transverse keel 2 is installed on the first vertical keel 1, and then other components of the supporting keel are installed.
[0060] Then, the first equipment belt 10 and the second equipment belt 13 are installed according to the coordinates of the measuring points. During installation, the height of the first equipment belt 10 is adjusted by the first installation angle code 12, and the height of the second equipment belt 13 is adjusted by the adjusting bolt 9.
[0061] After the equipment belt is installed, the hyperbolic honeycomb aluminum panel 6 is installed, and one end of the hyperbolic honeycomb aluminum panel 6 is fixed to the second connecting rod 8 by screws, and the other end of the hyperbolic honeycomb aluminum panel 6 is fixed to the corresponding hanging bracket 16 by screws. Then repeat the above steps to install other hyperbolic honeycomb aluminum panels 6.
[0062] After the installation of the hyperbolic honeycomb aluminum panel 6 is completed, observe the overall appearance of the hyperbolic honeycomb aluminum panel 6 from different angles, check the smoothness and continuity of its curved surface, and ensure that there is no obvious unevenness, distortion or deformation. Check whether the color of the surface of the hyperbolic honeycomb aluminum panel 6 is uniform, and whether there is color difference, fading or uneven gloss. For problems found during the inspection, such as uneven surface of the aluminum panel, uneven plate seams, loose connectors, etc., timely adjustments and repairs should be made. Finally, the installed ceiling should be measured and the unqualified parts should be rectified to ensure that the entire ceiling meets the acceptance standards.
[0063] The present invention is described in detail above in conjunction with the embodiments of the drawings, and those skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute limitations of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.
Claims
1. A hyperbolic aluminum plate ceiling for ultra-large spaces, characterized by: include: A plurality of supporting keels are spaced apart on the roof structure, the bottoms of the plurality of supporting keels have different heights, and the heights of the bottoms are adapted to the design curvature of the suspended ceiling; A plurality of hyperbolic honeycomb aluminum panels (6) are adjustably arranged at the bottom of the supporting keel, the hyperbolic honeycomb aluminum panels (6) are arranged along the entire length of the suspended ceiling, and the arc formed by splicing the plurality of hyperbolic honeycomb aluminum panels (6) is adapted to the designed curvature of the suspended ceiling; An equipment belt for positioning the suspended ceiling is adjustably arranged at the bottom of the supporting keel, wherein measuring points are arranged on the equipment belt, and the equipment belt is arranged along the entire length of the suspended ceiling.
2. The hyperbolic aluminum plate ceiling for a super large space according to claim 1, characterized in that: Each of the supporting keels comprises: First vertical keels (1) fixedly mounted on the roof structure at intervals on the left and right sides; A transverse keel (2) fixedly mounted on the first vertical keel (1) at intervals up and down; Second vertical keels (5) are fixedly mounted on the lowermost transverse keel (2) at intervals on the left and right sides; The diagonal braces (4) are arranged on both sides of each of the second vertical keels (5), one end of each of the diagonal braces (4) is fixedly connected to the lower end of the second vertical keel (5), and the other end is fixedly connected to the corresponding transverse keel (2).
3. The hyperbolic aluminum plate ceiling for a super large space according to claim 2, characterized in that: It also includes a first connecting rod (7) and a second connecting rod (8) arranged at the lower end of the second vertical keel (5), the first connecting rod (7) being transversely fixed to the lower end of the second vertical keel (5), and the corresponding two diagonal braces (4) being fixed on the first connecting rod (7); The second connecting rod (8) is located below the first connecting rod (7) in an adjustable manner, and both ends of the second connecting rod (8) are fixedly connected to the corresponding hyperbolic honeycomb aluminum plate (6).
4. The hyperbolic aluminum plate ceiling for a super large space according to claim 2, characterized in that: It also includes two adjusting bolts (9) and two hanging weights (16) arranged between two adjacent second vertical keels (5), wherein the adjusting bolts (9) are located below the transverse keels (2), and the hanging weights (16) are arranged on the adjusting bolts (9) so as to be adjustable up and down, and the corresponding ends of the hyperbolic honeycomb aluminum panels (6) are fixedly connected to the corresponding hanging weights (16).
5. The hyperbolic aluminum plate ceiling for a super large space according to claim 4, characterized in that: The equipment belt comprises a first equipment belt (10) and a second equipment belt (13), wherein the first equipment belt (10) is arranged below the second connecting rod (8), and the two ends of the second equipment belt (13) are fixedly connected to the corresponding hanging brackets (16).
6. A construction method for a hyperbolic aluminum plate ceiling for a super large space according to claim 1, characterized in that: The specific steps include: Arrange measurement points on the equipment belt, model the ceiling using three-dimensional modeling software, and calculate coordinate information of the measurement points on the equipment belt; According to the coordinate information of the measuring point, the control line pops up on the roof structure; Installing the supporting keel on the roof structure according to the control line; Install the equipment belt at the bottom of the supporting keel and adjust it according to the coordinate information of the equipment belt; A hyperbolic honeycomb aluminum plate (6) is installed at the bottom of the supporting keel.
7. The construction method of the hyperbolic aluminum plate ceiling for a super large space according to claim 6 is characterized in that: The steps for installing the supporting keel are as follows: Providing a plurality of first vertical keels (1), and installing the first vertical keels (1) on the roof structure according to control lines; Providing a plurality of transverse keels (2), and installing the transverse keels (2) on the first vertical keel (1); Providing a plurality of second vertical keels (5), and fixing the second vertical keels (5) at intervals on the corresponding transverse keels (2); A plurality of diagonal braces (4) are provided, one end of each diagonal brace (4) is fixed to the lower end of the second vertical keel (5), and the other end is fixed to the corresponding transverse keel (2).
8. The construction method of the hyperbolic aluminum plate ceiling for a super large space according to claim 7 is characterized in that: When installing the diagonal brace (4), the first connecting rod (7) is provided, and the lower end of the second vertical keel (5) and the corresponding end of the diagonal brace (4) are fixed on the first connecting rod (7); Then, a second connecting rod (8) is provided, and the second connecting rod (8) is installed below the first connecting rod (7).
9. The construction method of the hyperbolic aluminum plate ceiling for a super large space according to claim 8, characterized in that: After installing the diagonal brace (4), providing an adjusting bolt (9) and a hanging weight (16), installing the adjusting bolt (9) below the transverse keel (2), and installing the hanging weight (16) on the adjusting bolt (9); Providing a first equipment belt (10) and a second equipment belt (13), installing the first equipment belt (10) below the second connecting rod (8), and fixing the two ends of the second equipment belt (13) on the corresponding hanging brackets (16); By adjusting the height of the second connecting rod (8) and the hanging weight (16), the first equipment belt (10) and the second equipment belt (13) are adjusted to reach the designed position.
10. The construction method of the hyperbolic aluminum plate ceiling for a super large space according to claim 9, characterized in that: The steps of installing the hyperbolic honeycomb aluminum plate (6) are as follows: Fixedly connecting one end of the hyperbolic honeycomb aluminum plate (6) to the corresponding end of the second connecting rod (8); The other end of the hyperbolic honeycomb aluminum plate (6) is fixedly connected to the corresponding hanging bracket (16); The heights of both ends of the hyperbolic honeycomb aluminum plate (6) are finely adjusted to ensure that the curvature of the hyperbolic honeycomb aluminum plate (6) is the same as the designed curvature.
Citation Information
Cited By
A factory-prefabricated hyperbolic honeycomb ceiling panel splicing device with inner and outer arched combined large panels.
CN224769647U