Building management method, device and system
The MR device integrated with BMS via a relay server addresses inefficiencies in BIM-based management by providing interactive, real-time data visualization and control, enhancing operational efficiency and user experience.
Patent Information
- Application Number
- CN202310797382.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-30
- Publication Date
- 2024-12-31
AI Technical Summary
Existing building management systems using BIM models are inefficient and cumbersome for operation and maintenance personnel, as they rely on two-dimensional displays and provide only static structural data, lacking interactive and real-time operational capabilities.
A mixed reality (MR) device connected to a building management system (BMS) via a relay server, allowing real-time data display and interactive control of building systems, including static and operational data visualization and two-way communication for modifying system operations.
Enhances user interaction and visibility, enabling efficient management and remote control of building systems, improving operational efficiency and user experience by integrating digital and physical environments.
Smart Images

Figure CN119228586A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of information technology, and in particular, relates to a building management method, device and system. Background Art
[0002] With the development of building information modeling (BIM) technology and the government's vigorous promotion, the trend of combining BIM with building operation and maintenance management is becoming more and more obvious, bringing new technical support for building operation and maintenance management. On the basis of viewing two-dimensional drawings, operation and maintenance personnel can understand the structure of the building system and locate the position of each system component by observing the three-dimensional BIM building model.
[0003] However, it is still very troublesome for operation and maintenance personnel to manage the building system through BIM models. For example, operators still need to observe the building model through two-dimensional screen devices. At the same time, operation and maintenance personnel can only call the static structural data of the building system through the BIM model, which makes the management of the building system inefficient. Summary of the invention
[0004] The embodiments of the present application provide a building management method, device and system, which can solve the problems of low efficiency and poor experience in building management.
[0005] In a first aspect, an embodiment of the present application provides a building management method, which is applied to a mixed reality (MR) device in a building management system, wherein the building management system further includes a relay server and a building management system (BMS), and the mixed reality device is connected to the BMS through the relay server, and the method includes:
[0006] Reading data of a building system from a database and displaying the data in a mixed reality environment, the data including static data and / or operational data of the building system;
[0007] Based on the instructions imposed by the user on the building system, control information is sent to the BMS through the relay server, and the control information is used to modify the operating data of the building system.
[0008] In conjunction with the first aspect, in some implementations of the first aspect, the method further includes:
[0009] Load the model of the building system and display it in the mixed reality scene.
[0010] In a second aspect, an embodiment of the present application provides a building management system, the building management system comprising:
[0011] A mixed reality device is used to load a model of a building system and display the model in a mixed reality scene; a control instruction is sent to a building equipment management system BMS through a relay server, and the control instruction is used to modify the operating data of the building system;
[0012] The BMS is used to receive the control instruction from the mixed reality device through the relay server; and modify the operating data of the building system based on the control instruction.
[0013] In conjunction with the second aspect, in certain implementations of the second aspect, the operation data of the building system includes one or more of the following data:
[0014] Variable air volume (VAV) operation data, air handling unit (AHU) host data, real-time temperature field.
[0015] In a third aspect, an embodiment of the present application provides a building management device, including:
[0016] A processing module, configured to read data of a building system from a database and display the data in a mixed reality environment, wherein the data includes static data and / or operation data of the building system;
[0017] The transceiver module is used to send control instructions to the BMS through the relay server based on the instructions applied by the user to the model, and the control instructions are used to modify the operating data of the building system.
[0018] In a fourth aspect, an embodiment of the present application provides a building management device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method as described in any one of the first aspects when executing the computer program.
[0019] In a fifth aspect, an embodiment of the present application provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps in the method described in any one of the first aspects are implemented.
[0020] In a sixth aspect, an embodiment of the present application provides a computer program product, which, when executed on a mixed reality device, enables the mixed reality device to execute the building management method described in any one of the first aspects above.
[0021] It can be understood that the beneficial effects of the second to sixth aspects mentioned above can be found in the relevant description of the first aspect mentioned above, and will not be repeated here.
[0022] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0023] By displaying the data of the building system in the MR device, it is more convenient and more visible than the existing technology;
[0024] By building a relay server, the communication between the MR device and the BMS is realized, and based on the communication between them, the management system of this application realizes the two-way influence of the digital reality and the real world in the concept of digital twins. Building operation and maintenance personnel can directly modify the operating parameters of the specified equipment through the control function in the platform, and then judge whether the system operation status is good based on the actual operation performance of the building system. Users in the building can also use the remote control function to adjust the operation of the building system to achieve a more comfortable indoor environment, which greatly improves the convenience of managing the building system. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0026] Figure 1 is a schematic diagram of a building management system provided by an embodiment of the present application;
[0027] Figure 2 It is a flowchart of a building management method provided by an embodiment of the present application;
[0028] Figure 3 It is a schematic diagram of a visualized building model provided in an embodiment of the present application;
[0029] Figure 4 This is an example diagram of an application of displaying a user position and an alarm position through an MR device provided by an embodiment of the present application;
[0030] Figure 5 This is an example diagram of providing navigation instructions to a user through an MR device provided in an embodiment of the present application;
[0031] Figure 6 This is an example diagram of a VAV data visualization function of a building equipment provided in an embodiment of the present application;
[0032] Figure 7 An example diagram of a building system temperature field visualization function provided by an embodiment of the present application is shown;
[0033] Figure 8A data structure for representing the spatiotemporal correlation between data points provided by an embodiment of the present application is shown;
[0034] Fig. 9 A prediction model for indoor temperature provided in an embodiment of the present application is shown;
[0035] Fig.10 A flow chart of working area temperature optimization provided by an embodiment of the present application is shown;
[0036] Fig.11 A temperature control interface diagram provided by an embodiment of the present application is shown;
[0037] Fig.12 A schematic diagram of displaying a fault location in a building model provided by an embodiment of the present application is shown;
[0038] Fig.13 is a schematic diagram of a mixed reality device according to an embodiment of the present invention;
[0039] Fig.14 is a schematic diagram of another mixed reality device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0040] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0041] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.
[0042] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0043] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.
[0044] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0045] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.
[0046] See also Figure 1 , Figure 1 is a schematic diagram of a building management system provided in an embodiment of the present application. It should be noted that: Figure 1 The building management system shown is only an example, and the management system protected by this application does not necessarily include Figure 1 All modules or components shown may also include only Figure 1 Some modules or components shown in (for example, in one implementation, the building management system may only include: MR device 111, BMS 121, relay server 131), and may also include Figure 1 This application does not limit other necessary modules or components.
[0047] like Figure 1As shown, the building management system includes a mixed reality application layer 110, wherein the mixed reality layer 110 includes a mixed reality MR device 111. MR device is a wearable device (such as wearable glasses) that applies mixed reality technology, and MR technology is a technology that integrates the physical world with the digital world. The development of MR technology has solved many problems encountered by the industry. The MR device in this application may include modules such as a processor, a memory, a display unit, and an input unit, which are not limited in this application. It should be understood that this application does not limit the specific type and model of the MR device. In some scenarios, the MR device here can also be replaced by an augmented reality (AR) device or a virtual reality (VR) device, or other devices that can achieve the integration of the physical world and the digital world. MR devices can not only allow users to see virtual objects in the real world, but also allow users to manipulate virtual objects. Applying MR devices to the building management system allows users to observe the structure of building equipment more clearly, and conveniently allow users to manipulate the operating data of the building system. For specific solutions, please refer to the description in the subsequent method 200.
[0048] The management system further includes a local device layer 120, wherein the local device layer 120 includes a building equipment management system BMS121, and BMS121 is a system for implementing comprehensive management of building equipment monitoring systems and public safety systems.
[0049] The management system also includes a cloud server layer 130, wherein the cloud server layer 130 includes a relay server 131, which can also be called a remote control server. The relay server 131 is, for example, powered by the message queuing telemetry transport protocol (MQTT). The MR device 111 is connected to the BMS 121 via the relay server 131, that is, the MR device 111 can communicate bidirectionally with the BMS 121 via the relay server 131. Through this function, users (such as operation and maintenance personnel or users) can directly modify the operating data of the building system (specified equipment within) through the control function of the MR device 111. For specific solutions, please refer to Figure 2 The method 200 shown:
[0050] S210 , the MR device reads the data of the building system from the database and displays the data in a mixed reality environment.
[0051] Exemplarily, the MR device can read and display data of the building system, which includes static data and / or operation data of the building system. A possible implementation is described below in an exemplary manner.
[0052] Optionally, before the MR device reads and displays the data of the building system, the MR device loads the model of the building system based on the model data of the building system. It should be noted that the building system here refers to the building system to be managed in the embodiment of the present application, and the building system is only a general term, which can represent one or more rooms, a building, or a building complex. Its meaning depends on the specific application scenario and is not limited in the present application.
[0053] The model of the building system is a digital model that is completely consistent with the size of the building system in the real world. For example, the BIM model of the building system is first obtained, then exported as a model in NWC format, and then the texture and details of the model are adjusted, and then the model in NWC format is exported to FBX format, and the model in FBX format is imported into the MR device 111. In this way, the texture material and other characteristics of the model can be retained, the richness of the model data is improved, and the problem of texture material loss caused by directly exporting the BIM model to the FBX format model is avoided.
[0054] Further, the generated digital model is corresponded to the building system in the real world, and the correspondence here refers to completely overlapping the digital model with the building system in the real world. As an example, the three-dimensional grid information of the building system is first obtained. The MR device can directly obtain the three-dimensional grid information by scanning the building environment, or it can obtain the three-dimensional grid information from the storage. For example, if it is the first time to come to the current building system, the building environment can be scanned by the depth camera of the MR device to generate the three-dimensional grid information of the building system. After the three-dimensional grid information of the building system is generated for the first time, the MR device can store the three-dimensional grid information. If it is not the first time to come to the building system, the three-dimensional grid information can be read directly from the storage. The environmental grid scanning result can directly reflect the spatial relationship between the MR device and the surrounding geometry (i.e., the device or device in the building system), so as to judge the user's position in the real world, and assist the spatial anchor program to determine the digital model to achieve model positioning in the real world. In some scenarios, such as when you first start the platform, you need to manually adjust the model position until the model completely overlaps with the actual building system. Then, after saving the position through the spatial anchor point, you only need to start the program near the saved position of the spatial anchor point, and the digital model will automatically complete the positioning, thereby increasing work efficiency and improving user experience. Through the above solution, the digital model of the building system can be visualized in a mixed reality environment through MR devices. After completing the spatial positioning of the model, the user can clearly see the building system model in the real building, and the size and position of the model are exactly the same as the actual one. At the same time, users can also use this function to see building structures or devices that are out of sight or blocked from view. Please refer to Figure 3 , Figure 3 This is an application case provided by the embodiment of the present application in a practical environment, such as Figure 3 As shown in the figure, users can observe the air conditioning system hidden in the ceiling of the office through MR equipment. Through this function, it can easily help users (such as operation and maintenance personnel) understand the composition of various functional systems (such as electromechanical systems) in the building system, and at the same time, they can see electromechanical pipelines and equipment that cannot be directly seen by the naked eye, assisting operation and maintenance work and improving work efficiency.
[0055] Compared with the traditional two-dimensional drawings or two-dimensional interface display methods, the present application runs the digital model of the building system in the MR device, which is more convenient and has strong visibility than the existing technology. For example, for the three-dimensional model directly generated by BIM technology, most engineers and building operation and maintenance personnel can only browse with the help of two-dimensional screen devices such as smart phones and smart tablets, which cannot provide real spatial perception and good interactive experience. By directly loading the digital model of the building system through the MR device, the structure of the building system can be displayed to the user more conveniently and intuitively. In addition, the spatial positioning of the digital model mostly uses QR code scanning or mobile hotspots (wireless fidelity, WIFI), radio frequency identification (radiofrequency identification, RFID) signal perception methods. The former requires posting QR codes in the building to affect the beauty of the building, and the latter has low positioning accuracy and the indoor WIFI signal is relatively unstable. In the solution of the present application, the three-dimensional model of the building system can be displayed quickly and stably without relying on network signals.
[0056] On the other hand, users can directly interact with the model of the building system through the interactive functions in the MR device, or control some functions of the building system management system. For example, users can interact with the model based on the "eye tracking" and "gesture recognition" functions of the MR device, or send instructions to the BMS121. Users only need to "gaze" and make simple gestures to complete all tasks in the platform. Specific user interaction operation methods include but are not limited to the following:
[0057] 1. Eye tracking: Users can set "eye tracking" as the default object selection method. When users need to interact with an object (such as viewing the information of a device in the building system, moving a window, closing a window, etc.), they only need to look at the target object;
[0058] 2. Right-hand click: Within the field of vision, use the right index finger and thumb to complete the "pinch" action to activate the function of the currently selected target;
[0059] 3. Touch: You can use your hands to touch interactive device objects, such as buttons, and activate their functions.
[0060] Of course, in addition to the interaction methods introduced above, users can also interact with the platform in other ways, such as through physical buttons, voice input, text input, etc., which is not limited in this application.
[0061] Optionally, in a possible implementation, the MR device can display the user's current location or the location where an alarm occurs in the building system based on the user's instructions. Figure 4 , assuming Figure 4 It is a partial floor plan of the building system. Based on the user's instructions, the MR device can display the user's current location and the location of the alarm in the building system. The MR device can directly display the user's Figure 4 Floor plan shown.
[0062] Optionally, in a possible implementation, the MR device can display a navigation route map with the destination being a certain device or apparatus in the building system (such as an air handling unit (AHU) or a variable air volume (VAV) air conditioning system terminal device) based on the user's instructions. Figure 5 :Assuming the user selects the VAV in the building system as the destination, the MR device will automatically generate navigation instructions on the ground, such as Figure 5 As shown, users can quickly reach their destination based on the navigation instructions. Through this solution, users can be provided with clearer and more convenient navigation services, and this solution does not need to rely on the network (such as WIFI, global positioning system (GPS), etc.), so it is not affected by network factors, and high-precision navigation can still be completed in places with poor network such as basements and computer rooms.
[0063] Optionally, the building management system further includes a database layer 140. Figure 1 As shown, the present application stores data related to the building system in a dedicated database for access and use by the MR device 111 and other devices (such as an artificial intelligence (AI) server 132).
[0064] The database layer 140 includes a static database 141 and a dynamic database 142, wherein the static database mainly stores static data information related to the building system, such as the structural dimensions of the building system, thermal parameters of the building envelope, design parameters of the building system, location information of building equipment in the building, etc. These data information are mainly obtained from the three-dimensional model 112 of the building system. The dynamic database stores dynamic operation data information related to the building system, such as VAV operation data, AHU host data, real-time temperature field, etc. These data information are mainly collected by the local device layer 120 and sent to the dynamic database 142. For example, the local device layer 120 optionally also includes a data acquisition device 122, which is, for example, an Internet of Things (IoT) sensor, a gateway, and other devices. The data acquisition device 122 and the BMS 121 send their collected data to the dynamic database 142 respectively. It can be understood that the above example is illustrated by using two different databases to store the static data and dynamic data of the building system respectively, but the present application is not limited to this. For example, in some scenarios, the static data and dynamic data of the building system can also be stored in a hierarchical manner through one database, and the present application is not limited to this.
[0065] In a possible implementation, the MR device is connected to the database layer 140, so that the MR device 111 can extract data from the database layer 140 and display the data of the building system to the user. As an example, Figure 6 The example diagram of the VAV data visualization function of building equipment is shown. The user can send instructions to the MR device through the interaction method described above to open the VAV data panel. For example, based on the "eye tracking" function, the user looks at the VAV digital model and completes the "click" through gesture operation. After the MR device detects the user's operation, it reads the VAV real-time operation data from the dynamic database 142 and displays it as follows: Figure 6 The VAV data panel shown is directly and intuitively displayed in front of the user in the mixed reality environment. At the same time, the panel will track the user's head in real time to ensure that it does not leave the field of vision, thereby improving the user experience. This application does not limit the specific content displayed in the data panel. Figure 6 Just as an example, the following Figure 6 For example: VAVbox-72635 is the name of the VAV device, the device temperature is 25°C, the set temperature is 18°C, the air flow rate is 100.04, the valve opening (Valueopen) is 100, and the update time is 9:05:21. As another example, Figure 7The example diagram of the building system temperature field visualization function is shown. The user can send an instruction to the MR device to turn on the building system temperature field. The user can choose to view the temperature field of all areas or the temperature field of some areas. After the MR device detects the user's instruction, it reads the temperature field data of the building system from the dynamic database 142 and displays it as follows: Figure 7 Schematic diagram of the temperature field shown.
[0066] Through the above solution, the relevant data of the building system (including static data and real-time operation data) can be visualized. Compared with traditional building visualization technology, this management system realizes more novel visualization and interaction methods. Compared with traditional building management solutions, it can improve the work efficiency of operation and maintenance personnel and enhance user experience.
[0067] S220, the MR device sends a control instruction to the BMS via the relay server. Correspondingly, the BMS receives the control instruction from the MR device via the relay server.
[0068] Exemplarily, the MR device sends control information to the BMS through the relay server based on the instructions applied by the user to the model of the building system, and the control information is used to modify the operating data of the building system.
[0069] For example, when the user calls Figure 6 In the data panel shown, the set temperature value in the panel is directly modified. After the modification is completed, the MR device recognizes the instruction for modifying the temperature applied by the user to the VAV model, and then the MR device sends a control instruction to the relay server based on the instruction. The control instruction is used to instruct to modify the set temperature of the VAV. After receiving the control instruction from the MR device, the relay server forwards the control instruction to the BMS.
[0070] S230, the BMS modifies the operating data of the building system based on the control instruction.
[0071] Exemplarily, the BMS receives the control instruction from the MR device through the relay server, and then modifies the operation data of the building system based on the control instruction. If combined with the example of part S220, the BMS modifies the set temperature of the VAV device based on the control instruction.
[0072] Based on the above scheme, by building a relay server, the communication between the MR device and the BMS is realized, and based on the communication between them, the management system of this application realizes the two-way influence of the digital reality and the real world in the concept of digital twin. Building operation and maintenance personnel can directly modify the operating parameters of the specified equipment through the control function in the platform, and then judge whether the system operation status is good based on the actual operation performance of the building system. Users in the building can also use the remote control function to adjust the operation of the building system to achieve a more comfortable indoor environment, which greatly improves the convenience of managing the building system.
[0073] Optionally, the cloud server layer 130 further includes an AI server 132 , which is connected to the dynamic database 142 and the MR device 111 , respectively.
[0074] In one possible implementation, the AI server 132 is used to predict the future operating data of the building system. Specifically, the AI server 132 can predict the future operating data of the building system based on the distribution of each device in the building system and the current operating data of the building system. It is understandable that the MR device 111 can obtain the operating data of the building system from the dynamic database 142 through the AI server 132, or directly obtain the operating data from the dynamic database 142, and this application is not limited. In one possible implementation, under normal operating conditions, the MR device 111 obtains the operating data from the dynamic database 142 through the AI server, and in an emergency communication scenario, the MR device 111 can directly obtain the operating data of the building system from the dynamic database 142, thereby improving efficiency.
[0075] This application does not limit the way in which the AI server predicts operating data. For ease of understanding, a possible example is given below:
[0076] For convenience, the following example uses the AI server to predict indoor temperature. As mentioned earlier, the three-dimensional model of the building system provides static data such as the physical layout, pipeline information, and measurement point location information of the air-conditioning system, while the local device layer provides real-time measurement point data and energy consumption data of the air-conditioning system. The time series measurement data of each sensor itself has a time series correlation. At the same time, the positions of different sensor measurement points are related. Therefore, the real-time measurement data of different sensor measurement points have a spatial-temporal dependency. This spatial-temporal dependency can be represented by an adjacency matrix. As an example, Figure 8 As shown, Figure 8 The adjacency matrix in is a data structure used to represent the spatiotemporal correlation between different data points.
[0077] Fig. 9The present application shows a prediction model for indoor temperature. The model is based on machine learning methods of graph neural networks and recurrent neural networks. The central air conditioning system and the temperature distribution of the working area are modeled in the form of graph structure data. This technology can be used to predict the system operation status of the central air conditioning system at the next moment. Fig. 9 In the model shown, the input layer is the spatiotemporal correlation data (i.e. Figure 8 The output in the graph layer is then used to process the spatial relationship, and then the recurrent layer is used to process the time series. Finally, the fully-connected layer is used to output the result, which is the predicted indoor temperature field.
[0078] Based on the above scheme, the operation data of the building system at future moments can be predicted, so that the operation data can be optimized according to the preset strategy, or early warning of possible future failures can be given in advance. The following is an exemplary description of the application in these two scenarios with examples.
[0079] In the first example, an IoT temperature measurement point is added to the VAV workspace, and “human in the loop” temperature control is introduced. The indoor set temperature of the VAV terminal is reset based on the above-mentioned graph neural network model. This allows for more accurate temperature measurement. The temperature measurement points of traditional VAV terminals are installed near the ceiling, which is about 2 meters vertically away from the actual employee work area. This makes it difficult to measure the temperature distribution and thermal comfort of the workspace. In addition, the sensors on the VAV terminals do not cover all work areas, and the temperatures of some areas are not taken into account in the control logic.
[0080] Real-time system data is transmitted through Fig. 9 The graph neural network model shown in the figure obtains the workspace prediction value (i.e. Fig. 9 The output value of the model shown in the figure) is then used by the optimizer to optimize the indoor set point temperature of the VAV terminal using a genetic algorithm. The adjustment value of the indoor temperature set point considering the indoor spatial and temporal global thermal comfort can be expressed as:
[0081]
[0082] Among them, T IoT, and T Require, They represent the predicted value and required value of the temperature measuring point in the i-th working area respectively.
[0083] Based on the above scheme, the operating data of the building system can be adjusted intelligently to improve the comfort of users. For example, in the above example, the optimization control algorithm is used to improve the overall thermal comfort of the work area, thereby avoiding overcooling or overheating in local areas. Alternatively, personalized air supply can be achieved according to personal thermal comfort preferences, thereby improving indoor thermal comfort satisfaction.
[0084] In one possible implementation, the MR device can read and display the VAV temperature set point recommended by the optimization control algorithm, and the user and operation and maintenance personnel can use the remote control function to instruct the BMS121 to adjust the operating data of the building system. Alternatively, in another possible implementation, the AI server can also be connected to the BMS121, and the AI server can intelligently control the VAV temperature setting without manual intervention, which greatly improves efficiency.
[0085] In the second example, the AI server will predict the temperature distribution of the work area in real time, alerting users to areas that are too cold or too hot in advance, or predicting equipment that may fail in advance.
[0086] Fig.11 The figure shows a temperature prediction result window provided by an embodiment of the present application. The AI server can directly display the recommended set temperature and the VAV equipment for warning to the user. The user can modify the operating data of the building system based on the recommended value of the AI server and quickly locate the abnormal equipment. The user can use the MR device to visually observe the location of the abnormal equipment, such as Fig.12 As shown, the circular area is used to mark the location of the fault.
[0087] Based on the above scheme, the operation data of the building system can be automatically adjusted intelligently and fault warnings can be issued, thereby saving monitoring costs and improving building management efficiency. For example, in traditional building management schemes, the main function is usually to display the real-time operation data of the building, lacking the function of in-depth analysis and prediction of the operation data. Existing building operation fault prediction and optimization control are mostly based on expert experience and rules. When implemented, it takes a lot of manpower and time to customize and develop the designated building system. The solution of this application can reduce costs and increase efficiency, so it has strong practical value.
[0088] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0089] Corresponding to the building management method and system described in the above embodiments, Fig.13 A structural block diagram of a building management device provided in an embodiment of the present application is shown. For ease of explanation, only the parts related to the embodiment of the present application are shown.
[0090] Reference Figure 5 , the device may specifically include the following modules:
[0091] A processing module 1301 is used to read data of a building system from a database and display the data in a mixed reality environment, wherein the data includes static data and / or operation data of the building system;
[0092] The transceiver module 1302 is used to send a control instruction to the BMS through the relay server based on the instruction applied by the user to the model, and the control instruction is used to modify the operation data of the building system.
[0093] It should be noted that the information interaction, execution process, etc. between the above-mentioned devices / units are based on the same concept as the method embodiment of the present application. Their specific functions and technical effects can be found in the method and system embodiment section and will not be repeated here.
[0094] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0095] like Fig.14 As shown, an embodiment of the present application further provides a building management device 1400, which includes: at least one processor 1410, a memory 1420, and a computer program 1421 stored in the memory and executable on the at least one processor, and when the processor executes the computer program, the steps in any of the above-mentioned method embodiments are implemented.
[0096] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in the above-mentioned method embodiments can be implemented.
[0097] An embodiment of the present application provides a computer program product. When the computer program product runs on a mobile terminal, the mobile terminal can implement the steps in the above-mentioned method embodiments when executing the computer program product.
[0098] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, which can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may at least include: any entity or device that can carry the computer program code to the camera / terminal device, recording medium, computer memory, read-only memory (ROM), random access memory (RAM), electric carrier signal, telecommunication signal and software distribution medium. For example, a USB flash drive, a mobile hard disk, a magnetic disk or an optical disk. In some jurisdictions, according to legislation and patent practice, computer-readable media cannot be electric carrier signals and telecommunication signals.
[0099] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0100] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0101] In the embodiments provided in the present application, it should be understood that the disclosed devices / network equipment and methods can be implemented in other ways. For example, the device / network equipment embodiments described above are merely schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0102] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0103] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A construction management method, characterized in that: The building management method is applied to a mixed reality device in a building management system, the building management system further comprising a relay server and a building equipment management system, the mixed reality device is connected to the building equipment management system via the relay server, and the method comprises: Reading data of a building system from a database and displaying the data in a mixed reality environment, the data including static data and / or operational data of the building system; Based on the instructions imposed by the user on the building system, a control instruction is sent to the building equipment management system through the relay server, and the control instruction is used to modify the operation data.
2. The method according to claim 1, characterized in that The method further comprises: Based on user instructions, one or more of the following is displayed in the mixed reality environment: The user's location in the building system, the location of the equipment in the building system, and a navigation route map whose destination is the equipment in the building system.
3. The method according to claim 1 or 2, characterized in that: Receiving an alarm message from an artificial intelligence server, the alarm message being used to indicate an abnormal condition of one or more devices in the building system; The warning information is displayed.
4. A building management system, characterized in that: include: A mixed reality device is used to read data of a building system from a database and display the data in a mixed reality environment, wherein the data includes static data and / or operation data of the building system; based on instructions applied by a user to the building system, a control instruction is sent to a building equipment management system through a relay server, wherein the control instruction is used to modify the operation data; The building equipment management system is used to receive the control instruction from the mixed reality device through the relay server; The operating data of the building system is modified based on the control instruction.
5. The system according to claim 4, characterized in that The building equipment management system is also used to obtain first data in the operation data of the building system, and send the first data to the dynamic database in the database; The system further comprises: The data acquisition device is used to obtain second data from the operation data of the building system and send the second data to the dynamic database.
6. The system according to claim 4 or 5, characterized in that The system further comprises: An artificial intelligence server is used to predict the operating data of the building system after a first time based on the distribution of equipment in the building system and the operating data of the building system.
7. The system according to claim 6, characterized in that The artificial intelligence server is also used for: Based on a preset strategy, adjusting the operating data of the building system; and / or When it is determined that the operating data of the building system after the first time is abnormal, an alarm message is sent to the mixed reality device.
8. A building management device, characterized in that: include: A processing module, configured to read data of a building system from a database and display the data in a mixed reality environment, wherein the data includes static data and / or operation data of the building system; The transceiver module is used to send control instructions to the building equipment management system through the relay server based on the instructions applied by the user to the model, and the control instructions are used to modify the operating data of the building system.
9. A building management device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 3 is implemented.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 3 is implemented.
