Maintenance structure for pipeline below road
By setting up tunnel structure and maintenance well design below the road, the problem of low leakage treatment efficiency of the raw water replenishment pipeline of the coking plant is solved, and efficient maintenance without excavating the road is achieved, ensuring that the pipeline maintenance is completed while the vehicle is passing through.
Patent Information
- Application Number
- CN202411686941.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-25
- Publication Date
- 2025-01-03
AI Technical Summary
The raw water replenishment pipeline of the coking plant is prone to leakage at the connection, resulting in the need to excavate the road surface for treatment every time, which is inefficient and affects vehicle passage.
A pipeline maintenance structure under the road is designed, including pavement structure, tunnel structure, support structure and at least one second inspection well, allowing maintenance personnel to enter the first inspection well through the second inspection well for maintenance at the pipeline connection, avoiding opening. The need to dig a road.
It realizes efficient pipeline maintenance without affecting the passage of road vehicles, improves processing efficiency and reduces damage to the road.
Smart Images

Figure CN119243770A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of road structures, and in particular to a pipeline maintenance structure under a road. Background Art
[0002] The raw water replenishment pipeline of the coking plant is buried underground. When leakage occurs at the connection of the raw water replenishment pipeline, the road surface needs to be excavated, and the leaking point needs to be treated after excavation. After the leaking point is treated, the excavated area needs to be filled and the road surface needs to be restored.
[0003] However, since trucks loaded with goods often pass by the road surface of the coking plant, the raw water replenishment pipeline is prone to leakage. Every time a leak is dealt with, the road surface needs to be excavated, which not only has low treatment efficiency but also affects the passage of vehicles. Summary of the invention
[0004] The embodiment of the present application solves the current technical problem that the road surface needs to be excavated every time a leak is to be handled by providing a pipeline maintenance structure under the road.
[0005] An embodiment of the present application provides a pipeline inspection structure under a road, which includes: a pavement structure; a tunnel structure, which is located under the pavement structure and is used to accommodate pipelines and allow people to pass through; a supporting structure, which is located under the tunnel structure and is provided with a first inspection well; wherein the first inspection well corresponds to the connection point of the pipeline; and at least one second inspection well, which is located on the side of the pavement structure and passes through the supporting structure.
[0006] In one possible implementation, the tunnel structure includes two supporting walls and multiple beams; the two supporting walls are arranged in parallel to form a maintenance passage for personnel to pass through; the multiple beams are arranged at intervals, perpendicular to the two supporting walls, and both ends of each of the beams are connected to the two supporting walls to support the pavement structure.
[0007] In a possible implementation manner, two ends of each of the cross beams are respectively inserted into the two supporting walls.
[0008] In a possible implementation, the support structure includes a soil base structure and a plurality of reinforcement pipe columns; the plurality of reinforcement pipe column arrays are disposed in the soil base structure.
[0009] In a possible implementation, a reinforcement ring is provided on the inner wall of the first inspection shaft, and the reinforcement ring presses the support structure.
[0010] In a possible implementation manner, a drainage structure is provided at the bottom of the at least one second inspection shaft.
[0011] In a possible implementation, the pipeline maintenance structure under the road further includes: a waterproof layer arranged at the bottom of the pavement structure.
[0012] In a possible implementation, the pipeline inspection structure under the road further includes: a ventilation device, which is arranged inside the tunnel structure and is used to ventilate the first inspection shaft and the at least one second inspection shaft.
[0013] In a possible implementation, the pipeline inspection structure under the road further includes: a lighting device, which is installed at the bottom of the road surface structure and is used to illuminate the interior of the tunnel structure and the first inspection shaft.
[0014] In a possible implementation, the pipeline maintenance structure under the road further includes: a manhole cover, wherein the manhole cover is installed at the wellhead of the at least one second maintenance well.
[0015] The technical solution provided in the embodiments of the present application has at least the following technical effects: The embodiment of the present application provides a pipeline maintenance structure under the road, which includes a pavement structure, a tunnel structure, a support structure and at least one second maintenance well. The tunnel structure is located under the pavement structure and is used to accommodate pipelines and for personnel to pass through. The support structure is located under the tunnel structure and is provided with a first maintenance well, and the first maintenance well corresponds to the connection of the pipeline. At least one second maintenance well is located beside the pavement structure and runs through the support structure. When the pipeline needs to be repaired, the maintenance personnel enter the second maintenance well and enter the first maintenance well from the inside of the tunnel structure at the same time. The location of the first maintenance well corresponds to the connection of the pipeline, and the maintenance personnel in the first maintenance well can repair the connection of the pipeline; when the pipeline is repaired, the maintenance personnel come out of the first maintenance well and return to the pavement through the tunnel structure and the second maintenance well. Therefore, when the pipeline located in the tunnel structure leaks or other situations that require repair, there is no need to excavate the road. The maintenance personnel can directly enter the pipeline maintenance structure under the road to repair the pipeline, and the vehicle traffic on the pavement structure will not be affected during the repair. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0017] Figure 1 A schematic diagram of a pipeline maintenance structure under a road provided in an embodiment of the present application; Figure 2 A schematic diagram of a road surface structure and a tunnel structure provided in an embodiment of the present application; Figure 3 A schematic diagram of a support structure provided in an embodiment of the present application.
[0018] Description of reference numerals: 10-pavement structure; 11-waterproof layer; 20-tunnel structure; 21-supporting wall; 22-beam; 30-supporting structure; 31-soil foundation structure; 32-reinforcement pipe column; 40-first inspection well; 41-reinforcement ring; 50-second inspection well; 51-drainage structure; 60-ventilation device; 70-lighting device; 80-well cover; 90-baffle. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0020] In the description of the embodiments of the present application, it should be noted that the orientation or positional relationship indicated by the terms "upper", "lower", "inside", "outside", etc. is based on the orientation or positional relationship shown in the accompanying drawings, and is only for the convenience of describing the embodiments of the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. The terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance. In addition, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0021] The present application embodiment provides a pipeline maintenance structure under the road, such as Figures 1 to 3 As shown, the pipeline maintenance structure under the road includes a pavement structure 10, a tunnel structure 20, a support structure 30 and at least one second maintenance shaft 50.
[0022] The tunnel structure 20 is located below the pavement structure 10 and is used to accommodate pipes and allow personnel to pass through. The support structure 30 is located below the tunnel structure 20 and is provided with a first inspection well 40; wherein the first inspection well 40 corresponds to the connection point of the pipe. At least one second inspection well 50 is located beside the pavement structure 10 and passes through the support structure 30.
[0023] For example, in Figure 1 In the pipeline maintenance structure under the road shown, two second maintenance wells 50 are respectively located on both sides of the road surface structure 10, and maintenance personnel can enter any second maintenance well 50 according to actual conditions.
[0024] When it is necessary to inspect the pipeline located in the tunnel structure 20, the maintenance personnel enter the second inspection well 50, and simultaneously enter the first inspection well 40 from the inside of the tunnel structure 20. The location of the first inspection well 40 corresponds to the connection of the pipeline, and the maintenance personnel located in the first inspection well 40 can inspect the connection of the pipeline; when the pipeline is inspected, the maintenance personnel come out of the first inspection well 40 and return to the road surface through the tunnel structure 20 and the second inspection well 50. Therefore, when the pipeline located in the tunnel structure 20 leaks or other situations require inspection, there is no need to dig the road. The maintenance personnel can directly enter the pipeline inspection structure under the road to inspect the pipeline, and the vehicle traffic on the road surface structure 10 will not be affected during the inspection.
[0025] like Figure 1 and Figure 2 As shown, in the embodiment of the present application, the tunnel structure 20 includes two supporting walls 21 and a plurality of beams 22 .
[0026] The two supporting walls 21 are arranged in parallel, and a maintenance passage for personnel to pass through is formed between the two supporting walls 21. For example, the supporting wall 21 can be formed by brickwork, such as Figure 2 As shown, of course, the supporting wall 21 can also be formed by pouring concrete.
[0027] A plurality of cross beams 22 are arranged at intervals, perpendicular to the two supporting walls 21, and both ends of each cross beam 22 are connected to the two supporting walls 21 to support the pavement structure 10. Through the above structure, the plurality of cross beams 22 disperse and transfer the load formed by the pavement structure 10 to the two supporting walls 21, and together with the two supporting walls 21 form a stable frame structure to ensure the safety of personnel inside the tunnel. The cross beam 22 may be a steel beam or a reinforced concrete beam.
[0028] Furthermore, both ends of each cross beam 22 are respectively inserted into the two supporting walls 21, so that the ends of each cross beam 22 can be firmly and stably connected to the supporting walls 21. Specifically, slots or holes are reserved at the tops of the two supporting walls 21, and both ends of the cross beam 22 are inserted into the slots or holes reserved in the two supporting walls 21.
[0029] The tunnel structure 20 is not limited to the above-mentioned structural form. In other embodiments of the present application, the tunnel structure 20 can also be other structural forms. For example, the tunnel structure 20 includes a plurality of prefabricated concrete pipe galleries connected in sequence, and a through hole is opened at the wellhead of the first inspection shaft 40, and maintenance personnel can enter the first inspection shaft 40 through the through hole.
[0030] like Figure 3 As shown, in the embodiment of the present application, the support structure 30 includes a soil foundation structure 31 and a plurality of reinforcement pipe columns 32. A plurality of reinforcement pipe columns 32 are arranged in an array in the soil foundation structure 31. The reinforcement pipe columns 32 can enhance the bearing capacity and stability of the soil foundation structure 31, prevent the soil from deforming or collapsing due to excessive load, and make the support structure 30 have a good supporting capacity as a whole. Among them, the reinforcement pipe columns 32 can be formed by concrete pouring; specifically, first, a plurality of pouring holes are drilled on the soil foundation structure 31, and then concrete is poured in the plurality of pouring holes to form the reinforcement pipe columns 32.
[0031] The supporting structure 30 is not limited to the above-mentioned structural form. In other embodiments of the present application, the supporting structure 30 may also be other structural forms. For example, the supporting structure 30 is a reinforced concrete structure as a whole.
[0032] Continue to refer to Figure 1 The inner wall of the first inspection well 40 is provided with a reinforcement ring 41, and the reinforcement ring 41 compresses the support structure 30. For example, the reinforcement ring 41 can be a steel ring or a concrete structure. The reinforcement ring 41 compresses the support structure 30 through its own rigidity and close contact with the support structure 30, and this compressing effect helps to improve the overall stability of the support structure 30.
[0033] like Figure 1 As shown, in the embodiment of the present application, a drainage structure 51 is provided at the bottom of the second inspection well 50. When water on the pavement structure 10 flows into the second inspection well 50, the water is discharged from the drainage structure 51. Specifically, the drainage structure 51 is a drainage channel connected to the sewer pipe.
[0034] like Figure 1 and Figure 2As shown, the pipeline maintenance structure under the road provided by the embodiment of the present application also includes a waterproof layer 11 arranged at the bottom of the pavement structure 10. The material of the waterproof layer 11 can be polyethylene film, asphalt waterproof roll material, polymer waterproof coating, etc.
[0035] The waterproof layer 11 can prevent moisture from penetrating from under the pavement structure 10 into the tunnel structure 20 or the supporting structure 30, which is crucial for maintaining the stability of the pipeline maintenance structure under the road and extending its service life, because the penetration of moisture may cause problems such as soil softening, structural corrosion and reduced bearing capacity.
[0036] like Figure 1 As shown, the pipeline maintenance structure under the road provided by the embodiment of the present application further includes a ventilation device 60, which is arranged inside the tunnel structure 20 and is used to ventilate the first inspection well 40 and the two second inspection wells 50. The ventilation device 60 can effectively discharge harmful gases, moisture and odors inside the tunnel structure 20, and introduce fresh air, thereby improving the air quality inside the first inspection well 40 and the two second inspection wells 50; and by using the ventilation device 60 to ventilate the inside of the tunnel structure 20, the first inspection well 40 and the second inspection well 50, the temperature and humidity inside the pipeline maintenance structure under the road can be reduced, and the problems of structural corrosion, mold growth and the like caused by humidity and high temperature can be reduced. For example, the ventilation device 60 can be an axial flow fan.
[0037] Continue to refer to Figure 1 In the embodiment of the present application, two second inspection wells 50 are respectively located on both sides of the pavement structure 10, and the ventilation device 60 is located above the first inspection well 40, and the air inlet side and the air outlet side of the ventilation device 60 are respectively facing the two second inspection wells 50; the tunnel structure 20 also includes a baffle 90, which is located on the air inlet side of the ventilation device 60 and connected to one of the crossbeams 22; the baffle 90 extends downwardly at an angle, and the baffle 90 gradually approaches the ventilation device 60 from top to bottom. When the ventilation device 60 is turned on, the outside air enters from one of the second inspection wells 50, and the air inside the pipeline inspection structure under the road is discharged from the other second inspection well 50. The air entering from the outside will hit the baffle 90 and change direction. After changing direction, the air flows to the location of the first inspection well 40, and then bypasses the baffle 90 and is discharged through the other second inspection well 50. Therefore, from the air flow process described above, it can be seen that the baffle 90 changes the flow direction of the air, allowing fresh air from the outside to flow to the location of the first inspection shaft 40, thereby allowing the maintenance personnel located in the first inspection shaft 40 to breathe fresh air, further ensuring the safety of the maintenance personnel.
[0038] like Figure 1 and Figure 2As shown, the road pipeline maintenance structure provided by the embodiment of the present application also includes a lighting device 70, which is installed at the bottom of the road surface structure 10 and is used to illuminate the interior of the tunnel structure 20 and the first inspection shaft 40. The maintenance personnel turn on the lighting device 70 before entering the tunnel. The lighting device 70 can provide sufficient light so that the maintenance personnel can clearly see the interior of the tunnel structure 20 and the first inspection shaft 40, thereby ensuring the safety and accuracy of the maintenance work. For example, the lighting device 70 can be an LED lamp, a fluorescent lamp, etc.
[0039] like Figure 1 As shown, the under-road pipeline maintenance structure provided in the embodiment of the present application further includes a manhole cover 80 , which is installed at the wellhead of the second inspection well 50 .
[0040] The manhole cover 80 can close the wellhead of the second inspection well 50 to prevent people, vehicles and debris from falling into the second inspection well 50, thereby ensuring the safety of the road and smooth passage. In addition, the manhole cover 80 can also reduce the impact of the external environment, such as rain, snow, debris, etc., on the interior of the second inspection well 50.
[0041] The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other. Each embodiment focuses on the differences from other embodiments.
[0042] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit the present application. Although the present application has been described in detail with reference to the aforementioned embodiments, a person of ordinary skill in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the present application.
Claims
1. A pipeline maintenance structure under a road, characterized in that: include: Pavement structure; A tunnel structure, located below the road surface structure, for accommodating pipelines and allowing personnel to pass; A support structure, the support structure is located below the tunnel structure and is provided with a first inspection well; wherein the first inspection well corresponds to a connection point of the pipeline; as well as At least one second inspection well is provided, and the at least one second inspection well is located beside the pavement structure and penetrates the supporting structure.
2. The under-road pipeline inspection structure according to claim 1 is characterized in that: The tunnel structure includes two supporting walls and a plurality of beams; The two supporting walls are arranged in parallel to form an inspection passage for personnel to pass through; The multiple cross beams are arranged at intervals and are perpendicular to the two supporting walls, and both ends of each cross beam are connected to the two supporting walls to support the pavement structure.
3. The under-road pipeline inspection structure according to claim 2, characterized in that: Two ends of each of the cross beams are respectively inserted into the two supporting walls.
4. The under-road pipeline maintenance structure according to claim 1, characterized in that: The support structure includes a soil foundation structure and a plurality of reinforced pipe columns; The plurality of reinforcement pipe column arrays are disposed within the soil foundation structure.
5. The under-road pipeline inspection structure according to claim 1, characterized in that: The inner wall of the first inspection shaft is provided with a reinforcement ring, and the reinforcement ring presses the support structure.
6. The under-road pipeline maintenance structure according to claim 1, characterized in that: A drainage structure is provided at the bottom of the at least one second inspection shaft.
7. The under-road pipeline maintenance structure according to claim 1, characterized in that: Also includes: A waterproof layer is provided at the bottom of the pavement structure.
8. The under-road pipeline inspection structure according to claim 1, characterized in that: Also includes: A ventilation device is arranged inside the tunnel structure and is used to ventilate the first inspection shaft and the at least one second inspection shaft.
9. The under-road pipeline inspection structure according to claim 8, characterized in that: Also includes: A lighting device is installed at the bottom of the pavement structure and is used to illuminate the interior of the tunnel structure and the first inspection shaft.
10. The under-road pipeline inspection structure according to claim 1, characterized in that: Also includes: A manhole cover is installed at the wellhead of the at least one second inspection well.