A construction engineering crack detection device
By designing a crack detection device for construction engineering including crack width measuring instrument, jamming plate, positioning mounting plate, docking assembly and sleeve, the problem of the detection probe in the prior art cannot be stuck and installed and the display screen cannot be rotated and adjusted, the one-handed use and versatility of the detection device are realized, and the detection efficiency and user experience are improved.
Patent Information
- Application Number
- CN202411483099.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2025-04-01
- Estimated Expiration
- 2044-10-23
AI Technical Summary
The existing crack detection device of the construction project cannot be fixed and installed on the detection probe, and cannot rotate and adjust the orientation angle of the display screen, which leads to inconvenience in use, consumes user's physical strength, and the connection wire is easily knotted, affecting the detection progress.
A crack detection device for construction engineering including a crack width measuring instrument, a clamping plate, a positioning plate, a docking assembly and a sleeve is designed. Through the design of the docking assembly and sleeve, the clamping installation of the detection probe and the rotation adjustment of the display screen are realized, adapting to the wear of different arms, and the combination of card parts and assembly blocks is realized.
The one-handed use function of the detection device is realized, which reduces the user's physical energy consumption, avoids the problem of knotting the connection wire, improves the efficiency and comfort of the detection, and enhances the versatility of the detection device.
Smart Images

Figure CN119268626B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering, and in particular to a construction engineering crack detection device. Background Art
[0002] Crack width gauges are mainly used for crack depth and width detection in bridges, tunnels, walls, concrete pavements, metal surfaces, etc.; however, existing crack detection devices require one hand to hold the detection probe and the other hand to hold the detector, and cannot be worn and crack detected with one hand. When the buttons on the detector need to be operated, the detection probe needs to be placed on the ground before operation, which is inconvenient for users to operate and view the detector.
[0003] Existing crack detection devices for construction projects cannot fix the detection probe for installation, and cannot rotate and adjust the orientation angle of the display screen during use, which is inconvenient for users to observe the detection data in time. Traditional detectors require users to frequently check the head of the device, which can easily cause neck pain in the long run and consume a lot of physical strength of the user. The connecting wires between the detection probe and the detector are scattered and easily tangled, which interferes with the normal progress of crack detection and affects the progress of crack detection. It is impossible to achieve different combination use functions of the detection device by changing the installation order between the structures. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a construction project crack detection device, which solves the problems that the existing construction project crack detection devices cannot fix the detection probe for installation and cannot rotate and adjust the orientation angle of the display screen during use, which is inconvenient for users to observe the detection data in time. Traditional detectors require users to check the head of the film frequently, which can easily cause neck pain in the long run and consume a lot of physical strength of the user. The connecting wires between the detection probe and the detector are scattered and easily tangled, which interferes with the normal progress of crack detection and affects the progress of crack detection. It is impossible to realize the different combination use functions of the detection device by changing the installation order between the structures.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a construction engineering crack detection device, comprising a crack width gauge, the crack width gauge having a display screen and a card plate arranged at the rear end of the crack width gauge, and the upper and lower ends of the crack width gauge are fixedly connected with positioning plates, and a detection probe is arranged in the middle of the rear end of the crack width gauge;
[0006] A docking assembly, the docking assembly has a central through hole for facilitating the long screw to penetrate the interior of the assembly block, and a positioning winding rod arranged at the front end of the docking assembly, and a sleeve is movably installed at the bottom of the docking assembly, the docking assembly is installed on the positioning mounting plate at the rear end of the crack width gauge through the sleeve and the first clamp, the positioning winding rod comprises: a notch disk, the notch disk has a clamping groove, and a spiral pipe spirally wound on the surface of the positioning winding rod, the spiral pipe is wound and installed with the positioning winding rod through the clamping groove opened on the side of the notch disk;
[0007] The sleeve comprises: an arc-shaped wall rail having an outer embedding groove, the sleeve having a central rod cavity, and a limiting piece arranged on the outer side of the arc-shaped wall rail, and the arc-shaped wall rail is installed on the outer side of the sleeve.
[0008] Preferably, the first clamping component includes an annular frame, the rear end of the annular frame is fixedly connected to an annular hook, and the annular hook is installed at the rear end of the crack width gauge through the annular frame and a positioning plate. When the monitoring device is not in use, the stacking installation order of the first clamping component and the second clamping component on the crack width gauge can be swapped to expand the contact area between the bottom of the crack width gauge and the ground when it is placed statically, so as to facilitate stable placement and prevent tipping.
[0009] Preferably, a second clamp is installed on the upper end of the first clamp, and the second clamp includes a limiting plate. An auxiliary support ring is fixedly connected to the rear end of the limiting plate. The auxiliary support ring is installed on the annular hook at the rear end of the crack width gauge through the limiting plate and short screws. The cross-section of the second clamp is the same as the cross-section of the first clamp. The first clamp and the second clamp are stacked on each other and installed on the positioning plate at the rear end of the crack width gauge. The short screws are used to block the upper end of the limiting plate, so as to realize simple installation and convenient disassembly of the first clamp and the second clamp on the crack width gauge.
[0010] Preferably, the docking assembly includes an assembly block, a card cavity is opened on the outer side of the assembly block, a bearing is installed on the upper end of the assembly block, a long screw is installed in the middle of the assembly block, and the assembly block is assembled and installed with the annular frame through the card cavity and the annular hook.
[0011] Preferably, an elastic band is installed on the inner side of the outer groove of the arc-shaped wall rail, and a Velcro is connected to the free end of the elastic band. A central support rod is installed at the position of the bearing corresponding to the upper end of the assembly block, wherein the docking components are symmetrically arranged at both ends of the central support rod.
[0012] Preferably, the long screw passes through the assembly block and is threadedly connected to the central support rod, and the central support rod is rotatably installed with the assembly block through the assembly block and the bearing, so that the crack width gauge can follow the rotation of the central support rod and change the direction of the display screen on the surface of the crack width gauge, which is not only convenient for users to operate and observe at the same time, but also can provide bystanders with a convenient deflection viewing function.
[0013] Preferably, the outer side of the sleeve is fixedly connected with a perforated plate in a linear array, the elastic band is installed on the inner side of the perforated plate on the sleeve through the outer groove of the arc wall rail, and the sleeve is installed between the two groups of assembly blocks through the central support rod, wherein the sleeve and the central support rod are tightly mounted.
[0014] Preferably, a straight rod is fixedly connected to the upper end of the spiral tube, and the detection probe is installed on the spiral tube through the straight rod. The detection probe is used to detect cracks, and the notch disk is installed with the spiral tube through a slot.
[0015] Preferably, the lower end of the spiral pipe is connected to the crack width gauge, the lower end of the positioning rod is threadedly connected to the crack width gauge through an external rotating screw sleeve, and the positioning rod is installed at the lower end of the spiral pipe, the spiral pipe and the positioning rod are integrally installed on the inner side of the annular hook, the detection probe corresponds to the clamping plate, and the spiral pipe is stored and protected at the rear end of the crack width gauge through the positioning rod, combined with the two groups of annular hooks to provide surrounding protection for the spiral pipe, thereby preventing the spiral pipe from being damaged by the outside world.
[0016] The present invention provides a construction engineering crack detection device, which has the following beneficial effects:
[0017] The construction project crack detection device places the inner side of the arc-shaped wall rail corresponding to the user's left arm, and uses three sets of Velcro to stick to each other to install the crack width gauge on the user's arm as a whole. Then, by opening the crack width gauge, the spiral pipe spirally wound on the surface of the positioning winding rod is removed with the right hand, and the straight rod at the lower end of the detection probe is held in the left hand. The detection probe is used to detect the area to be detected, and the detection work of the detection device on the construction project cracks is completed, so that the one-handed use function of the detection device is realized, and the user's right hand is freed for auxiliary operations.
[0018] The construction engineering crack detection device conveniently isolates the central support rod from the user's arm through the sleeve, thereby preventing the central support rod from rotating between the two sets of docking components and rubbing against the user's arm. The curved wall rail prevents the user's arm from being restrained during the tightening and tensioning of the elastic band, thereby improving the wearer's comfort.
[0019] The construction engineering crack detection device is installed on a positioning plate at the rear end of a crack width gauge by stacking a first clamp and a second clamp on each other, and uses a short screw to block the upper end of the limit plate, so that the first clamp and the second clamp can be easily installed and easily disassembled on the crack width gauge. When the monitoring device is not in use, the stacking installation sequence of the first clamp and the second clamp on the crack width gauge can be swapped to expand the contact area between the bottom of the crack width gauge and the ground when the crack width gauge is placed statically, so that it is convenient to place it stably and prevent it from tipping over. At the same time, during use, the detection device can be placed on a horizontal workbench as a whole for use, so as to realize multiple combined use functions of the detection device.
[0020] The construction project crack detection device expands the effective contact area between the elastic band and the sleeve through the arc-shaped wall rail, so that the Velcro fits more firmly on the user's arm without local deviation and shaking, and can be uniformly worn on arms of different thicknesses. A long screw passes through the assembly block and is threadedly connected to the central support rod. The central support rod can be rotated and adjusted with the assembly block through the assembly block and the bearing. The first clamp and the second clamp are installed in combination with the assembly block, so that the crack width gauge can follow the rotation of the central support rod and change the direction of the display screen on the surface of the crack width gauge. It is not only convenient for the user to operate and observe at the same time, but also can provide a convenient deflection viewing function for bystanders. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a schematic diagram of the external structure of a construction engineering crack detection device of the present invention;
[0022] Figure 2 It is an exploded schematic diagram of the local assembly structure of the sleeve and the crack width gauge of the present invention;
[0023] Figure 3 It is an exploded schematic diagram of the partial assembly structure of the first clamp and the crack width measuring instrument of the present invention;
[0024] Figure 4 It is a structural schematic diagram of the annular frame and the assembly block of the present invention;
[0025] Figure 5 It is a schematic diagram of the assembly structure of the assembly block and the sleeve of the present invention;
[0026] Figure 6 It is a schematic diagram of the structure of the sleeve and the arc-shaped wall rail of the present invention;
[0027] Figure 7 It is a schematic diagram of the structure of the detection probe and the crack width measuring instrument of the present invention;
[0028] Figure 8 It is a schematic diagram of the assembly structure of the spiral connecting pipe and the notched disk of the present invention.
[0029] In the figure: 1. Crack width gauge; 2. Clamping plate; 3. Positioning plate; 4. Positioning winding rod; 5. Detection probe; 6. First clamp; 61. Ring frame; 62. Ring hook; 7. Second clamp; 71. Limit plate; 72. Auxiliary support ring; 8. Sleeve; 9. Docking assembly; 91. Assembly block; 92. Clamping cavity; 93. Bearing; 94. Long screw; 10. Arc wall rail; 11. Velcro; 12. Central support rod; 13. Perforated plate; 14. Elastic band; 15. Notched disk; 16. Spiral pipe; 17. Straight rod. DETAILED DESCRIPTION
[0030] Example 1
[0031] like Figure 1 , Figure 2 , Figure 3 , Figure 6 and Figure 8 As shown, the present invention provides a technical solution: comprising a crack width gauge 1, the crack width gauge 1 having a display screen, and a card plate 2 arranged at the rear end of the crack width gauge 1, and the upper and lower ends of the crack width gauge 1 are fixedly connected with positioning plates 3, and a detection probe 5 is arranged in the middle of the rear end of the crack width gauge 1;
[0032] The docking assembly 9 has a central through hole for facilitating the long screw 94 to penetrate the interior of the assembly block 91, and a positioning winding rod 4 arranged at the front end of the docking assembly 9 for facilitating the spiral winding collection of the spiral pipe 16, and a sleeve 8 is movably installed at the bottom of the docking assembly 9, and the docking assembly 9 is installed on the positioning plate 3 at the rear end of the crack width gauge 1 through the sleeve 8 and the first clamp 6. The positioning winding rod 4 includes: a notched disk 15, the notched disk 15 has a card slot, and a spiral pipe 16 spirally wound on the surface of the positioning winding rod 4, and the spiral pipe 16 is wound and installed with the positioning winding rod 4 through the card slot opened on the side of the notched disk 15;
[0033] The sleeve 8 includes: an arc-shaped wall rail 10 having an outer embedding groove, the sleeve 8 having a central rod cavity, and a limiting piece arranged on the outer side of the arc-shaped wall rail 10 , and the arc-shaped wall rail 10 is installed on the outer side of the sleeve 8 .
[0034] When in use, step 1: place the inner side of the arc-shaped wall rail 10 corresponding to the user's left arm, and use the three sets of Velcro 11 to stick to each other to install the crack width gauge 1 as a whole on the user's arm;
[0035] Step 2: Open the crack width gauge 1, use your right hand to remove the spiral pipe 16 that is spirally wound on the surface of the positioning winding rod 4, hold the straight rod 17 at the lower end of the detection probe 5 in your left hand, and use the detection probe 5 to detect the area to be detected, complete the detection work of the detection device on the cracks of the construction project, realize the one-handed use function of the detection device, and free up the user's right hand for auxiliary operations.
[0036] The sleeve 8 conveniently isolates the central support rod 12 from the user's arm to prevent the central support rod 12 from rubbing against the user's arm during rotation between the two sets of docking components 9. The arc-shaped wall rail 10 prevents the elastic band 14 from restraining the user's arm during tightening and tensioning, thereby improving the wearer's comfort.
[0037] Example 2
[0038] like Figure 1 , Figure 2 and Figure 3 As shown, the first clamping component 6 includes an annular frame 61, and an annular hook 62 is fixedly connected to the rear end of the annular frame 61. The annular hook 62 is installed at the rear end of the crack width gauge 1 through the annular frame 61 and the positioning plate 3; a second clamping component 7 is installed on the upper end of the first clamping component 6, and the second clamping component 7 includes a limiting plate 71, and an auxiliary support ring 72 is fixedly connected to the rear end of the limiting plate 71. The auxiliary support ring 72 is installed on the annular hook 62 at the rear end of the crack width gauge 1 through the limiting plate 71 and short screws. The cross-section of the second clamping component 7 is the same as the cross-section of the first clamping component 6.
[0039] When in use, the first clamp 6 and the second clamp 7 are stacked and installed on the positioning plate 3 at the rear end of the crack width gauge 1, and the upper end of the limit plate 71 is limited by short screws to achieve simple installation and convenient disassembly of the first clamp 6 and the second clamp 7 on the crack width gauge 1; when the monitoring device is not in use, the stacking installation order of the first clamp 6 and the second clamp 7 on the crack width gauge 1 can be swapped to expand the contact area between the bottom of the crack width gauge 1 and the ground when it is placed stationary, which is convenient for stable placement and prevents tipping. At the same time, during use, the detection device can be placed on a horizontal workbench as a whole for use, thereby realizing multiple combined use functions of the detection device.
[0040] Example 3
[0041] like Figure 1 , Figure 2 , Figure 4 , Figure 5 and Figure 6As shown, the sleeve 8 includes: an arc-shaped wall rail 10, which has an outer embedded groove, the sleeve 8 has a central rod cavity, and a limit plate arranged on the outer side of the arc-shaped wall rail 10, and the arc-shaped wall rail 10 is installed on the outer side of the sleeve 8; the docking component 9 includes an assembly block 91, a card cavity 92 is opened on the outer side of the assembly block 91, a bearing 93 is installed on the upper end of the assembly block 91, and a long screw 94 is installed in the middle of the assembly block 91. The assembly block 91 is assembled and installed with the annular frame 61 through the card cavity 92 and the annular hook 62; an elastic band 14 is installed on the inner side of the outer embedded groove of the arc-shaped wall rail 10, and a Velcro 11 is connected to the free end of the elastic band 14. A central support rod 12 is installed at the upper end of the assembly block 91 corresponding to the position of the bearing 93, wherein the docking component 9 is symmetrically arranged at both ends of the central support rod 12; the long screw 94 passes through the assembly block 91 and is threadedly connected to the central support rod 12, and the central support rod 12 is rotatably installed with the assembly block 91 through the assembly block 91 and the bearing 93.
[0042] When in use, the effective contact area between the elastic band 14 and the sleeve 8 is increased by the arc-shaped wall rail 10, so that the Velcro 11 fits more firmly on the user's arm without local deviation or shaking, and can be worn uniformly on arms of different thicknesses. The long screw 94 penetrates the assembly block 91 and is threadedly connected to the central support rod 12. The central support rod 12 can be rotated and adjusted with the assembly block 91 through the cooperation of the assembly block 91 and the bearing 93, and then installed in combination with the first clamp 6 and the second clamp 7 and the assembly block 91. This allows the crack width gauge 1 to follow the rotation of the central support rod 12 and change the direction of the display screen on the surface of the crack width gauge 1, which is not only convenient for the user to operate and observe at the same time, but also provides a convenient deflection viewing function for bystanders.
[0043] Example 4
[0044] like Figure 1 , Figure 2 , Figure 7 and Figure 8As shown, the positioning winding rod 4 includes: a notch disk 15, the notch disk 15 has a slot, and a spiral pipe 16 spirally wound on the surface of the positioning winding rod 4, the spiral pipe 16 is wound and installed with the positioning winding rod 4 through the slot opened on the side of the notch disk 15; the outer side of the sleeve 8 is fixedly connected with a perforated plate 13 in a linear array, the elastic band 14 is installed on the inner side of the perforated plate 13 on the sleeve 8 through the outer groove of the arc wall rail 10, and the sleeve 8 is installed between the two assembly blocks 91 through the central support rod 12, wherein the sleeve 8 and the central support rod 12 are tightly sleeved and installed ; A straight rod 17 is fixedly connected to the upper end of the spiral tube 16, and the detection probe 5 is installed on the spiral tube 16 through the straight rod 17. The detection probe 5 is used to detect cracks, and the notch disk 15 is limitedly installed with the spiral tube 16 through a slot; the lower end of the spiral tube 16 is connected to the crack width gauge 1, and the lower end of the positioning winding rod 4 is threadedly connected to the crack width gauge 1 through an external rotating screw sleeve, and the positioning winding rod 4 is installed at the lower end of the spiral tube 16, and the spiral tube 16 and the positioning winding rod 4 are installed on the inner side of the annular hook 62 as a whole, and the detection probe 5 corresponds to the clamping plate 2.
[0045] When in use, the spiral tube 16 is stored and protected at the rear end of the crack width gauge 1 by the positioning winding rod 4, and the two sets of annular hooks 62 are combined to provide surrounding protection for the spiral tube 16, which prevents the spiral tube 16 from being damaged by the outside world, and effectively provides a safe storage space for the spiral tube 16 and the detection probe 5, and avoids the messy entanglement of the spiral tube 16. The detection probe 5 is matched with the clamping plate 2 to fix the detection probe 5 in place, so that the monitoring device can be placed quietly and safely.
[0046] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention are implemented according to the conventional means in the field unless otherwise specified and limited.
Claims
1. A construction engineering crack detection device, comprising a crack width gauge (1), the crack width gauge (1) having a display screen, and a clamping plate (2) arranged at the rear end of the crack width gauge (1), and the upper and lower ends of the crack width gauge (1) are fixedly connected to positioning plates (3), and a detection probe (5) is arranged in the middle of the rear end of the crack width gauge (1); A docking assembly (9), the docking assembly (9) having a central through hole and a positioning winding rod (4) arranged at the front end of the docking assembly (9), and a sleeve (8) movably mounted at the bottom of the docking assembly (9), the docking assembly (9) being mounted on a positioning mounting plate (3) at the rear end of the crack width gauge (1) through the sleeve (8) and the first clamp (6); The construction engineering crack detection device is characterized by: The positioning winding rod (4) comprises: a notched disk (15), the notched disk (15) having a slot, and a spiral pipe (16) spirally wound on the surface of the positioning winding rod (4), the spiral pipe (16) being wound and installed with the positioning winding rod (4) through the slot provided on the side of the notched disk (15); The sleeve (8) comprises: an arc-shaped wall rail (10), the arc-shaped wall rail (10) having an outer embedded groove, the sleeve (8) having a central rod cavity, and a limit plate arranged on the outer side of the arc-shaped wall rail (10), and the arc-shaped wall rail (10) is installed on the outer side of the sleeve (8); The docking assembly (9) comprises an assembly block (91), a central support rod (12) being installed at a position of the upper end of the assembly block (91) corresponding to the bearing (93), wherein the docking assembly (9) is symmetrically arranged at both ends of the central support rod (12), the detection probe (5) is installed on the spiral pipe (16) via a straight rod (17), the detection probe (5) is used to detect cracks, the lower end of the positioning winding rod (4) is threadedly connected to the crack width meter (1) via an external rotating screw sleeve, and the positioning winding rod (4) is installed at the lower end of the spiral pipe (16).
2. A construction engineering crack detection device according to claim 1, characterized in that: The first clamping member (6) comprises an annular frame (61), the rear end of the annular frame (61) being fixedly connected to an annular hook (62), the annular hook (62) being mounted on the rear end of the crack width gauge (1) through the cooperation of the annular frame (61) and a positioning plate (3), and the annular frame (61) being assembled and mounted with the crack width gauge (1) through the positioning plate (3).
3. A construction engineering crack detection device according to claim 2, characterized in that: A second clamping member (7) is mounted on the upper end of the first clamping member (6), the second clamping member (7) comprising a limiting plate (71), the rear end of the limiting plate (71) being fixedly connected to an auxiliary support ring (72), the auxiliary support ring (72) being mounted on the annular hook (62) at the rear end of the crack width gauge (1) through the limiting plate (71) and short screws, the cross section of the second clamping member (7) being the same as the cross section of the first clamping member (6), the limiting plate (71) being mounted on the annular frame (61) through a positioning plate (3) on the crack width gauge (1).
4. A construction engineering crack detection device according to claim 3, characterized in that: A clamping cavity (92) is provided on the outside of the assembly block (91), a bearing (93) is installed on the upper end of the assembly block (91), a long screw (94) is installed in the middle of the assembly block (91), and the assembly block (91) is assembled and installed with the annular frame (61) through the clamping cavity (92) and the annular clamping hook (62).
5. A construction engineering crack detection device according to claim 4, characterized in that: An elastic band (14) is installed on the inner side of the outer embedding groove of the arc-shaped wall rail (10), and a Velcro (11) is connected to the free end of the elastic band (14).
6. A construction engineering crack detection device according to claim 5, characterized in that: The long screw (94) passes through the assembly block (91) and is threadedly connected to the central support rod (12), and the central support rod (12) is rotatably mounted on the assembly block (91) through the cooperation of the assembly block (91) and the bearing (93).
7. A construction engineering crack detection device according to claim 6, characterized in that: The outer side of the sleeve (8) is fixedly connected with a perforated plate (13) in a linear array, and the elastic band (14) is installed on the inner side of the perforated plate (13) on the sleeve (8) through the outer groove of the arc-shaped wall rail (10). The sleeve (8) is installed between the two groups of assembly blocks (91) through the central support rod (12), wherein the sleeve (8) and the central support rod (12) are tightly mounted.
8. A construction engineering crack detection device according to claim 7, characterized in that: The upper end of the spiral pipe (16) is fixedly connected to a straight rod (17), and the notched plate (15) is installed in a limited position with the spiral pipe (16) through a clamping groove.
9. A construction engineering crack detection device according to claim 8, characterized in that: The lower end of the spiral tube (16) is connected to the crack width gauge (1), the spiral tube (16) and the positioning winding rod (4) are integrally mounted on the inner side of the annular hook (62), and the detection probe (5) is matched with the clamping plate (2).
Citation Information
Patent Citations
A concrete crack width detection device
CN220959986U
Portable measuring device for geological fracture detection
CN221123315U