A pipe clamp device and method for fixing multiple pipes at a movable arm of a ballast cleaner
By using a combination of first and second pipe clamps at the ballast cleaning machine boom, the problem of unreasonable pipe layout was solved, enabling reasonable arrangement and convenient disassembly of multiple pipes, thus improving the maintenance efficiency of the ballast cleaning machine.
Patent Information
- Application Number
- CN202411664755.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-20
- Publication Date
- 2025-10-24
- Estimated Expiration
- 2044-11-20
AI Technical Summary
The limited space at the traditional ballast clearing boom for pipe layout leads to unreasonable pipe installation, complex maintenance, and difficulty in disassembly.
The system employs a combination structure of a first pipe clamp and a second pipe clamp. The first pipe clamp has at least one or two layers, with adjacent first pipe clamps fixed together. The first pipe clamp and the second pipe clamp are spaced 70°-120° apart. The second pipe clamp is located outside the centerline of the boom length direction and is used to fix multiple pipes. The staggered arrangement avoids pipe overlap and adapts to the needs of pipes with different diameters.
The ability to rationally arrange multiple pipelines within a limited space simplifies the disassembly and maintenance of pipelines, improves space utilization and pipeline identification capabilities, and reduces boom weight.
Smart Images

Figure CN119288019B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of ballast cleaning machine, in particular to a pipe clamp device and method for fixing multiple pipes at the movable arm of a ballast cleaning machine. BACKGROUND
[0002] The statements in this section merely provide background information related to the present application and do not necessarily constitute the prior art.
[0003] The main structure of the conventional excavator is improved to form a ballast cleaning machine. The function of the ballast cleaning machine is to excavate and screen the dirty ballast in the range of 30-40 cm deep from the bottom of the rail sleeper, and then backfill the qualified ballast on the track and supplement part of the new ballast to form a clean ballast bed. In order to realize this function, the ballast cleaning machine needs to be equipped with more rotating tool motors, chain tool motors and gear shifting tool motors than the conventional excavator, which requires several sets of pipes to be equipped on the movable arm. However, the movable arm of the conventional excavator is already arranged with quick-change, crushing and hydraulic pipe cutting, and these pipes are arranged on the outer side of the movable arm by pipe clamps. The arrangement space at the movable arm is limited, and with the increase of the pipes, the problem is that the increased pipes cannot be reasonably arranged. The existing treatment method is to fix the two adjacent pipes on the movable arm by pipe clamps, and the pipe clamps can only fix two pipes at most. However, each pipe not only has an oil inlet pipe but also has an oil return pipe, and the number of pipes is relatively large. In this way, one layer of pipes is arranged outside the already arranged pipes, and this installation method has the problem of inconvenient disassembly, that is, if the inner pipe needs to be replaced due to a problem, the outer pipe needs to be removed first, and then the inner pipe can be removed, which makes the maintenance of the ballast cleaning machine more complex.
[0004] In addition, some pipes are thin and some pipes are thick, and all the pipes are laid on the outer side of the movable arm, which causes the layout to be relatively chaotic. SUMMARY
[0005] In view of the deficiencies of the prior art, the purpose of the present application is to provide a pipe clamp device for fixing multiple pipes at the movable arm of a ballast cleaning machine, which can fix multiple pipes at the movable arm and facilitate the disassembly of the pipes.
[0006] In order to achieve the above-mentioned purpose, the present application is realized by the following technical solutions:
[0007] A pipe clamp device for fixing multiple pipes at the movable arm of a ballast cleaning machine, comprising a first pipe clamp and a second pipe clamp, at least one layer of the first pipe clamp is arranged outward from the outer side of the movable arm, when the first pipe clamp is arranged with two or more layers, the adjacent two first pipe clamps are fixedly connected, the first pipe clamp is fixed to the surface of the movable arm, the outer end of the first pipe clamp is connected with the second pipe clamp so that the second pipe clamp is located outward from the center line of the length direction of the movable arm, the first pipe clamp and the second pipe clamp are arranged with a spacing of 70°-120° to install part of the pipes by using the space outward from the movable arm, and the second pipe clamp is used for fixing at least two pipes.
[0008] The pipe clamp device for fixing multiple pipes at the movable arm of a ballast cleaning machine as described above, when the first pipe clamp is arranged with two or more layers, the adjacent two first pipe clamps are arranged in a staggered manner, the first pipe clamp in the upper layer is arranged close to the second pipe clamp, the pipe is prevented from being accumulated at the middle position of the movable arm, the fixing of the pipe by the second pipe clamp from the outside is facilitated, and the pipe on the inside is not interfered.
[0009] The pipe clamp device for fixing multiple pipes at the movable arm of a ballast cleaning machine as described above, when the first pipe clamp is arranged with two or more layers, the length of the first pipe clamp in the upper layer is smaller than the length of the first pipe clamp in the lower layer, the structure of the first pipe clamp in the upper layer is the same as or different from the structure of the first pipe clamp in the lower layer, the first pipe clamp in the upper layer can be used for fixing a pipe with a smaller diameter, the first pipe clamp in the lower layer can be used for fixing a pipe with a larger diameter, and when the structures of the first pipe clamps are the same, the same specification pipe is fixed by the first pipe clamp.
[0010] The pipe clamp device for fixing multiple pipes at the movable arm of a ballast cleaning machine as described above, the first pipe clamp in the lower layer comprises a first pipe seat, the first pipe seat is connected with the second pipe clamp, the first pipe seat supports a partition, both sides of the partition are provided with support rings for the pipe to pass through, a first cover plate is fixedly connected with the partition, the side of the first cover plate covers the support ring, the support ring is fixedly connected with the first pipe seat, and the length of the support ring is smaller than the width of the first pipe seat.
[0011] The support ring is an integral ring, or part of the support ring is fixed to the first cover plate and part of the support ring is fixed to the first pipe seat.
[0012] The pipe clamp device for fixing multiple pipes at the movable arm of a ballast cleaning machine as described above, the first pipe clamp in the upper layer comprises a support plate, the support plate is detachably connected with the first pipe clamp in the lower layer, the support plate supports a third cover plate and is fixedly connected with the third cover plate.
[0013] The pipe clamp device for fixing multiple pipes at the movable arm of a ballast cleaning machine as described above, a pad is arranged at the top of the first pipe clamp in the lower layer, the pad supports the support plate, a fastener passes through the support plate, the pad and the first pipe clamp in the lower layer to be detachably connected, and at least one first recess is arranged on the side of the third cover plate facing the support plate to cooperate with the pipe.
[0014] The first pipe clamp located at the lower layer is connected with the second pipe clamp.
[0015] The pipe clamp device for fixing multiple pipes at the movable arm of the ballast cleaning machine, the width of the support plate near one side of the second pipe clamp is smaller than the width of the other side, and the width of the third cover plate is smaller than or equal to the width of the narrower side of the support plate.
[0016] The pipe clamp device for fixing multiple pipes at the movable arm of the ballast cleaning machine, the second pipe clamp comprises a second pipe seat, a second cover plate is arranged on the outer side of the first pipe clamp away from the first pipe clamp, the inner side of the second cover plate is provided with multiple second recesses for fixing corresponding pipes, and a fastener connects the second cover plate and the second pipe seat.
[0017] The pipe clamp device for fixing multiple pipes at the movable arm of the ballast cleaning machine, the first pipe clamp is connected with the second pipe clamp perpendicularly.
[0018] In the second aspect, the application further provides a fixing method for multiple pipes at the movable arm of the ballast cleaning machine, and the fixing method comprises the following contents of the pipe clamp device for fixing multiple pipes at the movable arm of the ballast cleaning machine.
[0019] The first pipe clamp is fixed on the outer side of the movable arm, the first pipe clamp is connected with the second pipe clamp, the second pipe clamp is arranged on the outer side of the center line in the length direction of the movable arm, and the first pipe clamp is sequentially provided with at least one layer, so that part of the pipes are fixed through the first pipe clamp.
[0020] The second pipe clamp is arranged on the side of the first pipe clamp and utilizes the space on the outer side of the movable arm to fix part of the pipes.
[0021] The beneficial effects of the application are as follows.
[0022] 1) In the application, the first pipe clamp and the second pipe clamp are arranged, the first pipe clamp and the second pipe clamp are connected, the first pipe clamp is provided with one layer or more than two layers, the second pipe clamp is connected with the first pipe clamp and is arranged at a certain angle, so that the second pipe clamp does not interfere with the installation of the first pipe clamp, part of the pipes can be fixed by utilizing the space on the outer side of the movable arm, so that the pipes are not simply stacked layer by layer, more pipes can be arranged separately in the limited space, and when the pipes are maintained, the corresponding pipes can be easily found and removed or replaced.
[0023] 2) In the application, the second pipe clamp is arranged on the outer side of the center line in the length direction of the movable arm relative to the first pipe clamp, so that the pipes are not accumulated at the middle position of the movable arm, the pipes can be fixed through the second pipe clamp from the outer side, and the pipes on the inner side are not interfered, so that when the oil inlet pipe and the oil return pipe are arranged, the oil inlet pipe and the oil return pipe can be arranged on the two sides of the outer side of the movable arm, and the overall arrangement is more reasonable.
[0024] 3) The first pipe clamp in the application is provided with multiple layers, which realizes the arrangement of more than 5 pipes in a small space. By changing the structure of the first pipe clamp of adjacent two layers, the installation of pipes with different diameters can be realized. The misplacement of the first pipe clamp of adjacent two layers is beneficial to ensure balance and facilitate the identification of pipes in a small space.
[0025] 4) The structure of the first pipe clamp and the second pipe clamp in the application is reasonable, and each cover plate is reasonably arranged. On the premise of ensuring strength, the quality is effectively reduced, which is conducive to controlling the weight of the boom. BRIEF DESCRIPTION OF DRAWINGS
[0026] The drawings accompanying the specification of this application form a part of this application and serve to further illustrate the application. The schematic embodiments of the application and their descriptions are used to explain the application and do not constitute an improper limitation on the application.
[0027] Figure 1 is a schematic view of the pipe clamp device for fixing multiple pipes at the boom of the ballast cleaning machine according to one or more embodiments of the application when there is only one layer of first pipe clamp.
[0028] Figure 2 is a schematic view of the pipe clamp device for fixing multiple pipes at the boom of the ballast cleaning machine according to one or more embodiments of the application when there are two layers of first pipe clamp.
[0029] Figure 3 is a schematic view of the pipe clamp device for fixing multiple pipes at the boom of the ballast cleaning machine according to one or more embodiments of the application when in use.
[0030] In the drawings, the mutual distance or size is exaggerated to show the position of each part, and the schematic view is only illustrative.
[0031] Wherein: 1. first pipe clamp, 1-1. first pipe seat, 1-2. support ring, 1-3. first cover plate, 1-4. partition, 1-5. cushion block, 1-6. support plate, 1-7. third cover plate, 1-8. counterbore;
[0032] 2. second pipe clamp, 2-1. second pipe seat, 2-2. second cover plate;
[0033] 3. pipe, 4. fastener. DETAILED DESCRIPTION
[0034] It should be noted that the following detailed description is exemplary and is intended to provide further explanation of the application. Unless otherwise specified, all technical and scientific terms used in the application have the same meaning as generally understood by those skilled in the art to which the application belongs.
[0035] It is to be understood that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments in accordance with the present application. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and / or "comprising," when used in this specification, specify the presence of stated features, steps, operations, elements, components, and / or groups thereof, but do not preclude the presence or addition of one or more other features, steps, operations, elements, components, and / or groups thereof.
[0036] As introduced in the background, the existing technology has the problem that the space outside the boom is limited and more pipelines are layered to make the pipelines not easy to be disassembled. In order to solve the above technical problem, the present application provides a pipe clamp device for fixing multiple pipelines at the boom of a ballast cleaner.
[0037] Embodiment one
[0038] In a typical embodiment of the present application, referring to Figure 1 and Figure 2 , a pipe clamp device for fixing multiple pipelines at the boom of a ballast cleaner comprises a first pipe clamp 1 and a second pipe clamp 2. The first pipe clamp 1 is provided with at least one layer from the outside of the boom. When the first pipe clamp 1 is provided with two or more layers, the adjacent two first pipe clamps 1 are fixedly connected. The first pipe clamp 1 is fixed to the surface of the boom by welding. The first pipe clamp 1 is connected with the second pipe clamp 2. The first pipe clamp 1 and the second pipe clamp 2 are spaced apart by 70°-120° to utilize the space outside the boom to install part of the pipelines 3. The second pipe clamp 2 is used to fix at least two pipelines.
[0039] In this embodiment, the first pipe clamp 1 and the second pipe clamp 2 are connected perpendicularly. Of course, the angle between the first pipe clamp and the second pipe clamp can also be 80° or 100°, etc.
[0040] According to actual needs, the first pipe clamp 1 can be provided with one layer. The bottom of the first pipe clamp 1 is welded to the boom. The first pipe clamp 1 can be used to fix two pipelines. The outer end of the first pipe clamp 1 is connected with the second pipe clamp 2. The second pipe clamp is used to fix three pipelines.
[0041] Referring to Figure 1 , the first pipe clamp 1 comprises a first pipe seat 1-1. The first pipe seat 1-1 is connected with the second pipe clamp 2. The outer side of the first pipe seat 1-1 away from the boom supports a partition piece 1-4. The partition piece 1-4 can be a partition block. The partition piece can be welded to the first pipe seat. The two sides of the partition piece 1-4 are provided with support rings 1-2 for the pipelines to pass through. The inner diameter of the support ring is larger than the outer diameter of the pipeline. The two support rings 1-2 are arranged parallel to each other. A first cover plate 1-3 is fixedly connected with the partition piece. The side of the first cover plate 1-3 covers the support ring. The two sides of the first cover plate 1-3 are bent towards the direction of the boom to cooperate with the support ring. The support ring 1-2 and the first pipe seat 1-1 can be welded together.
[0042] In this embodiment, the length of the support ring 1 - 2 is smaller than the width of the first tube base 1 - 1 .
[0043] Of course, in other examples, the first tube base 1 - 1 may also be provided with two partitions 1 - 4 , and the two partitions 1 - 4 may separate the three support rings 1 - 2 .
[0044] It should be noted that when the first pipe clamp 1 is provided with two or more layers, the two adjacent first pipe clamps 1 are staggered, and the first cover plate 1-3 of the first pipe clamp of the lower layer (the first pipe clamp close to the boom) is set in the direction of the center line of the length direction of the boom, and the first pipe clamp located on the upper layer is set close to the second pipe clamp 2, and the second pipe clamp 2 is located on the outside of the center line of the length direction of the boom, so as to avoid the pipeline 3 from being accumulated in the middle position of the boom, and facilitate the fixation of the pipeline 3 from the outside through the second pipe clamp 2, and will not interfere with the pipeline on the inside. The staggered arrangement of the first pipe clamps is also conducive to the identification of the pipeline 3.
[0045] refer to Figure 2 As shown, when the first pipe clamps 1 are provided with two or more layers, the length of the first pipe clamps located in the upper layer is smaller than the length of the first pipe clamps located in the lower layer. The structure of the first pipe clamps located in the upper layer is the same as or different from that of the first pipe clamps located in the lower layer. The first pipe clamps located in the upper layer can be used to fix pipes with smaller diameters, and the first pipe clamps located in the lower layer can be used to fix pipes with larger diameters. When the first pipe clamp structures are the same, pipes of the same specifications are fixed by the first pipe clamps.
[0046] The first pipe clamp 1 located in the lower layer includes a first pipe seat 1-1, which is connected to the second pipe clamp 2. The first pipe seat 1-1 supports the partition. Support rings are provided on both sides of the partition 1-4 for the pipeline to pass through. The first cover plate 1-3 is detachably connected to the partition. The side of the first cover plate 1-3 covers the support ring 1-2, and the support ring 1-2 is fixedly connected to the first pipe seat 1-1.
[0047] Specifically, the first pipe clamp located on the upper layer includes a support plate 1-6, the support plate 1-6 is fixedly connected to the first pipe clamp of the lower layer, the support plate supports the third cover plate 1-7 and is detachably connected to the third cover plate, a pad 1-5 is provided on the top of the first cover plate 1-3, the pad 1-5 is provided along the width direction of the top of the first cover plate, the pad is provided at the center position of the top of the first cover plate, the pad 1-5 supports the support plate 1-6, a fastener 4 such as a bolt passes through the support plate, the pad is fixedly connected or detachably connected to the first pipe clamp of the lower layer, and the third cover plate 1-7 is provided with at least one first recess on one side facing the support plate to cooperate with the pipeline, specifically two, a spacer block is provided between two adjacent first recesses, and the first recess is an arc-shaped recess;
[0048] It is easy to understand that when the first pipe clamp 1 is provided with multiple layers, the first pipe clamp in the lower layer is connected with the second pipe clamp, and in addition, when the support ring is a whole ring member, the pipe 3 is arranged through the first pipe clamp 1, and the support plate can be connected with the first pipe clamp in the lower layer during machining, and the end of the support plate is also connected with the second pipe clamp, so as to ensure the stability of the whole. Thus, after the upper pipe is supported by the upper first pipe clamp on site, the third cover plate 1-7 can be installed.
[0049] In other examples, because the pipe end cannot pass through the support ring, the support ring 1-2 is not a complete support ring, and a part (half ring) of the support ring is fixed to the first pipe seat 1-1, and the first pipe seat 1-1 is a flat plate. The other part of the support ring is fixed to the inner side of the first cover plate 1-3, and the first cover plate is buckled on the first pipe seat 1-1 to achieve buckling. The adjacent two layers of first pipe clamps 1 are installed on site. Thus, the first cover plate 1-3 is provided with a counterbore hole 1-8, and the top of the counterbore hole 1-8 is a threaded hole. After the screw passes through the counterbore hole and is connected with the partition piece 1-4, the gasket 1-5 and the support plate 1-6 are installed. The fastener such as a bolt passes through the support plate, the gasket and is inserted into the counterbore hole of the first cover plate.
[0050] It is easy to understand that the width of the support plate 1-6 near the side of the second pipe clamp is smaller than the width of the other side, and the width of the third cover plate 1-7 is smaller than or equal to the width of the narrower side of the support plate.
[0051] Reference Figure 1 and Figure 2 As shown in the drawings, the second pipe clamp includes a second pipe seat 2-1, and the second pipe seat 2-1 is a flat plate. The outer side of the second pipe seat 2-1 away from the first pipe clamp is provided with a second cover plate 2-2. The inner side of the second cover plate 2-2 is provided with multiple second recesses such as two or three to fix the corresponding pipe 3. The interval block is arranged between the adjacent two second recesses. The second recess is an arc-shaped recess. The fastener such as a bolt connects the second cover plate 2-2 and the second pipe seat 2-1.
[0052] The pipe clamp device provided by the embodiment is provided with a first pipe clamp and a second pipe clamp. The first pipe clamp and the second pipe clamp are connected. The first pipe clamp is provided with one layer or more than two layers. The second pipe clamp is connected with the first pipe clamp and is arranged at a certain angle. Thus, the second pipe clamp does not interfere with the installation of the first pipe clamp. In addition, the outer side space other than the outer side of the movable arm can be used to fix part of the pipe. Thus, the pipe is not simply stacked layer by layer. In the limited space, more pipes can be arranged separately. When the pipe is maintained, the corresponding pipe can be easily found and removed or replaced.
[0053] Embodiment two
[0054] The embodiment provides a fixing method for multiple pipes at a movable arm of a ballast cleaning machine. Reference is made to Figure 3As shown, comprising the following contents:
[0055] The first pipe clamp is fixed on the outer side of the boom, the first pipe clamp 1 is connected with the second pipe clamp 2, the second pipe clamp 2 is arranged on the outer side of the center line in the length direction of the boom, and the first pipe clamp 1 is sequentially provided with at least one layer, and part of the pipe 3 is fixed by the first pipe clamp;
[0056] The second pipe clamp 2 is arranged on the side of the first pipe clamp, and part of the pipe is installed by using the space on the outer side of the boom;
[0057] According to the number of pipes to be fixed, the single-layer first pipe clamp or the multi-layer first pipe clamp is selected, the single-layer first pipe clamp can realize the fixation of 5-6 pipes, and the multi-layer first pipe clamp can realize the fixation of 7-8 pipes.
[0058] In some examples, on the opposite sides of the same position on the outer side of the boom, one side is provided with the pipe clamp device with only the single-layer first pipe clamp, and the other side is provided with the pipe clamp device with the two-layer first pipe clamp.
[0059] The above only describes the preferred embodiments of the present application and is not used to limit the present application. For those skilled in the art, the present application can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A pipe clamp device for fixing a plurality of pipes at a movable arm of a ballast cleaner, characterized in that, The first pipe clamp and the second pipe clamp are arranged on the outer side of the movable arm, the first pipe clamp is arranged with two layers from the outer side of the movable arm, the adjacent two layers of the first pipe clamp are fixedly connected, the lower layer of the first pipe clamp is fixed to the surface of the movable arm, the outer end of the lower layer of the first pipe clamp is connected with the second pipe clamp so that the second pipe clamp is located on the outer side of the center line in the length direction of the movable arm, the lower layer of the first pipe clamp is arranged with the second pipe clamp at an interval of 70°-120° to install part of the pipe line by using the space on the outer side of the movable arm, and the second pipe clamp is used for fixing at least two pipe lines. The adjacent two first pipe clamps are arranged in a staggered manner, and the first pipe clamp arranged on the upper layer is arranged close to the second pipe clamp. The length of the first pipe clamp arranged on the upper layer is smaller than the length of the first pipe clamp arranged on the lower layer. The first pipe clamp arranged on the lower layer comprises a first pipe seat connected with the second pipe clamp, a support ring arranged on both sides of a partition for the pipe line to pass through, and a first cover plate fixedly connected with the partition and covering the support ring. The support ring is an integral ring, or part of the support ring is fixed to the first cover plate and part of the support ring is fixed to the first pipe seat. The first pipe clamp arranged on the upper layer comprises a support plate detachably connected with the first pipe clamp arranged on the lower layer, the support plate supports a third cover plate and is fixedly connected with the third cover plate. A pad is arranged on the top of the first pipe clamp arranged on the lower layer, the pad supports the support plate, and a fastener is arranged to detachably connect the support plate, the pad and the first pipe clamp arranged on the lower layer, and at least one first recess is arranged on the side of the third cover plate facing the support plate to cooperate with the pipe line. The first pipe clamp arranged on the lower layer is connected with the second pipe clamp, the width of the side of the support plate close to the second pipe clamp is smaller than the width of the other side, and the width of the third cover plate is smaller than or equal to the width of the narrower side of the support plate.
2. A pipe clamp device for fixing a plurality of pipes at a movable arm of a ballast cleaner according to claim 1, characterized in that The second pipe clamp comprises a second pipe seat, a second cover plate is arranged on the outer side of the second pipe seat away from the first pipe clamp, and a plurality of second recesses are arranged on the inner side of the second cover plate to fix the corresponding pipe line.
3. The pipe clamp device for fixing a plurality of pipes at the movable arm of a ballast cleaner according to claim 1, characterized in that, The first pipe clamp and the second pipe clamp are connected perpendicularly.
4. A method for fixing a plurality of pipes at a movable arm of a ballast cleaner, characterized in that, The pipe clamp device for fixing a plurality of pipe lines on the movable arm of a ballast cleaning machine comprises the following contents: A first pipe clamp is arranged on the outer side of the movable arm, the first pipe clamp is connected with a second pipe clamp, the second pipe clamp is arranged on the outer side of the center line in the length direction of the movable arm, and the first pipe clamp is arranged with at least one layer in sequence to fix part of the pipe line. The second pipe clamp is arranged on the side of the first pipe clamp to install part of the pipe line by using the space on the outer side of the movable arm.
Citation Information
Patent Citations
Pressure increasing type automatic locating steel pipe clamp
CN104878797A
Pipe clamp device and pipeline system
CN219827960U