Surveying device for building planning
By designing an automatic balance adjustment mechanism in the surveying device and automatically adjusting the support plate on muddy or wet ground using float balls and elastic elements, the instability problem caused by unevenness of the surveying and mapping brackets on such ground in the prior art is solved. Ensure the horizontal installation and measurement accuracy of the surveying and mapping instruments.
Patent Information
- Application Number
- CN202411441762.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-16
- Publication Date
- 2025-01-17
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing surveying and mapping brackets are prone to sink into the ground when used on muddy or wet ground, resulting in imbalance and affecting surveying and mapping results.
A survey device including an upper support disc, a connecting rod, a middle support disc and a balance adjustment mechanism is designed. The balance adjustment mechanism uses float ball, guide groove, guide column, elastic band and buffer spring to automatically use buoyancy and elastic action through components such as float ball, guide groove, guide column, elastic band and buffer spring. Adjust the support plate to a horizontal state to ensure the horizontal installation of the surveying and mapping instruments.
Automatically adjust to horizontal state on muddy or wet ground to ensure the stability and measurement accuracy of the surveying and mapping instruments, and avoid inaccurate surveying and mapping caused by uneven ground.
Smart Images

Figure CN119321755A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of surveying devices, and in particular to a surveying device used for building planning. Background Art
[0002] During the construction planning process, on-site surveying and investigation are required. Commonly used surveying instruments include levels, etc. These instruments are usually placed on brackets.
[0003] For example, the patent with application number 202211322565.2 discloses a portable engineering surveying and mapping device, which belongs to the technical field of surveying and mapping equipment, and effectively solves the problem of inconvenience in carrying surveying and mapping devices. The technical scheme includes a surveying instrument back box and a bracket back box. A surveying instrument is arranged in the surveying instrument back box, and a bracket cooperating with the surveying instrument is arranged in the bracket back box. Protective covers are arranged on both sides of the surveying instrument, and the protective covers are connected with opening and closing components. A connecting piece is movably matched between the surveying instrument back box and the surveying instrument, and the opening and closing components are fixedly connected to the connecting piece. A connecting plate cooperating with the bottom of the surveying instrument is arranged on the top of the bracket back box, and a through hole cooperating with the bracket is arranged at the bottom of the bracket back box. The beneficial effects of the present invention are: providing a portable engineering surveying and mapping device that is easy to carry and highly safe.
[0004] The patent with application number 202321782583.9 discloses a surveying and mapping auxiliary surveying bracket, including a first supporting leg and a second supporting leg, a measuring instrument is arranged on the top of the first supporting leg, the other end of the first supporting leg is fixedly connected to the second supporting leg, the bottom end of the second supporting leg is fixedly connected to the supporting rod, one end of the second supporting leg is rotatably connected to the second compensation plate, the opposite side of the second compensation plate is provided with the first compensation plate, and the first compensation plate is rotatably connected to the second supporting leg, the other two ends of the second supporting leg are provided with an adjustment mechanism, one end of the adjustment mechanism is rotatably connected to the third compensation plate, when surveying and mapping on soft land, the first compensation plate, the second compensation plate and the third compensation plate can be horizontally unfolded and laid on the ground, and the contact area between the second supporting leg and the ground is increased by the first compensation plate, the second compensation plate and the third compensation plate, so that the supporting rod will not sink into the ground, thereby ensuring the normal use of the measuring instrument.
[0005] The patent with application number 202322794436.X discloses a surveying and mapping instrument bracket, including a supporting circular plate, the top of the supporting circular plate is fixedly connected to a universal tube, the inside of the universal tube is rotatably connected to a universal ball, the top of the universal ball is fixedly connected to a connecting column, the top of the connecting column is fixedly connected to a placement plate, the top of the placement plate is provided with a first slide groove, the inside of the first slide groove is slidably connected to a slider, the number of the sliders is two, and the facing surfaces of the sliders are fixedly connected to fixing clamps, when the user installs the surveying instrument, the connecting column can be rotated to drive the universal ball to adjust the angle in the universal tube, when adjusted to a suitable angle, the user can place the surveying instrument on the placement plate and pull the fixing clamp inward, so as to clamp and fix surveying instruments of different sizes, thereby facilitating the user to quickly install the surveying instrument and improving work efficiency.
[0006] However, the above-mentioned surveying and mapping brackets and similar brackets are mostly used on hard ground. After being adjusted to a horizontal state, they can be used continuously. However, if used on muddy ground or wetland, after the surveying and mapping bracket is adjusted to a horizontal state, the bottom of the surveying and mapping bracket slowly sinks into the mud, which will cause the surveying and mapping bracket to be unbalanced again, and then cause the surveying and mapping instruments on the bracket to be unbalanced, affecting the surveying and mapping results. Summary of the invention
[0007] The purpose of the present invention is to provide a surveying device for building planning to solve the above technical problems.
[0008] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0009] A surveying device for building planning comprises an upper support plate for placing surveying instruments, a middle support plate is arranged below the upper support plate, a plurality of connecting rods are arranged between the edge of the upper support plate and the edge of the middle support plate, the upper ends of the connecting rods are fixedly connected to the upper support plate, the lower ends of the connecting rods are fixedly connected to the middle support plate, and a balance adjustment mechanism is installed on the middle support plate.
[0010] Preferably, the balance adjustment mechanism comprises a spherical and transparent outer shell, the bottom of the outer shell is detachably connected to the top surface of the middle support plate, a floating ball is arranged in the outer shell, and the outer shell is filled with water.
[0011] Preferably, the balance adjustment mechanism further comprises a plurality of guide grooves, wherein the guide grooves are provided on the middle support plate, and the plurality of guide grooves are arranged in a circular array around the center of the middle support plate.
[0012] Preferably, the balance adjustment mechanism also includes a guide column, which is located in the guide groove, and an elastic band is fixedly sleeved on the guide column, and the edge of the elastic band is fixedly connected to the inner wall of the guide groove, and two limit rings are sleeved on the guide column, and the limit rings are fixedly connected to the guide column, and the two limit rings are respectively located on the upper and lower sides of the middle support plate, and a first adjusting rod is penetrated through the guide column, and the first adjusting rod is slidably connected to the guide column, and a limit block is arranged above the guide column, and the limit block is fixedly connected to the first adjusting rod, and a buffer spring is arranged between the limit block and the guide column, and the buffer spring is sleeved on the first adjusting rod, and the upper end of the buffer spring is fixedly connected to the limit block, and the lower end of the buffer spring is fixedly connected to the guide column.
[0013] Preferably, the balance adjustment mechanism further includes a mounting seat, a mounting seat is arranged above the first adjustment rod, a top end of the first adjustment rod is fixedly connected to the mounting seat, a ball is movably embedded in the top of the mounting seat, and the ball rests on the inner wall of the shell.
[0014] Preferably, the balance adjustment mechanism also includes a plurality of second adjustment rods, which are arranged in a central annular array around the middle support plate, the lower end of the first adjustment rod extends to below the middle support plate, the lower end of the first adjustment rod is fixedly connected to one end of the second adjustment rod, the other end of the second adjustment rod is fixedly connected to the support column, a silicone sheet is fixedly provided on the top of the support column, the silicone sheet is against the bottom surface of the middle support plate, and a plurality of water seepage holes are opened on the middle support plate, and the water seepage holes are located above the silicone sheet.
[0015] Preferably, the balance adjustment mechanism further includes a plurality of water storage barrels, wherein the water storage barrels are located below the support columns, and the tops of the water storage barrels are fixedly connected to the middle support plate via brackets.
[0016] Preferably, a lower support plate is provided below the water storage barrel, and the bottom of the water storage barrel is fixedly connected to the lower support plate.
[0017] Preferably, a plurality of support rods are arranged below the lower support plate, and the tops of the support rods are connected to the lower support plate via hinges.
[0018] Preferably, a pointed tip is fixedly provided at the lower end of the support rod.
[0019] The beneficial effects of the present invention are:
[0020] The present invention can determine whether the upper support plate and the middle support plate are level by observing whether water flows out of the seepage hole, thereby determining whether the surveying and mapping instrument on the upper support plate is level. When water flows out of the seepage hole 12, the surveying and mapping is stopped. During the surveying and mapping process, when the support rod sinks due to muddy ground and the device tilts, the device can automatically adjust to a horizontal state. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic diagram of the structure of a survey device for building planning according to the present invention Figure 1 ;
[0022] Figure 2 A survey device for building planning according to the present invention Figure 1 A magnified schematic diagram of part A;
[0023] Figure 3 A schematic diagram of the structure of a survey device for building planning according to the present invention Figure 2 ;
[0024] Figure 4 A survey device for building planning according to the present invention Figure 3 A magnified schematic diagram of part B;
[0025] Attached to the drawing are the following symbols: 1. upper support plate; 2. connecting rod; 3. outer shell; 4. middle support plate; 5. support rod; 6. water storage barrel; 7. lower support plate; 8. pointed head; 9. float; 10. ball; 11. mounting seat; 12. water seepage hole; 13. first adjusting rod; 14. limit block; 15. buffer spring; 16. guide column; 17. guide groove; 18. elastic band; 19. limit ring; 20. second adjusting rod; 21. silicone sheet; 22. support column; 23. bracket; 24. hinge. DETAILED DESCRIPTION
[0026] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0027] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] Example 1
[0030] like Figure 1-4 As shown, a surveying device for building planning includes an upper support plate 1 for placing surveying instruments, a middle support plate 4 is arranged below the upper support plate 1, a plurality of connecting rods 2 are arranged between the edge of the upper support plate 1 and the edge of the middle support plate 4, the upper ends of the connecting rods 2 are fixedly connected to the upper support plate 1, and the lower ends of the connecting rods 2 are fixedly connected to the middle support plate 4, and a balance adjustment mechanism is installed on the middle support plate 4.
[0031] During surveying, surveying instruments such as a level are placed on the upper support plate 1 . Threaded holes can be provided on the surveying instrument and the upper support plate 1 , and the surveying instrument and the upper support plate 1 are connected by screws, thereby fixing the surveying instrument on the upper support plate 1 .
[0032] Example 2
[0033] like Figure 1-4 As shown, when other parts are the same as those in Example 1, the difference between this embodiment and Example 1 is that the balance adjustment mechanism includes a spherical and transparent shell 3, the bottom of the shell 3 is detachably connected to the top surface of the middle support plate 4, a float 9 is arranged in the shell 3, and the shell 3 is filled with water.
[0034] The balance adjustment mechanism also includes a plurality of guide grooves 17, which are provided on the middle support plate 4 and are arranged in a circular array around the center of the middle support plate 4. The balance adjustment mechanism also includes a guide column 16, which is located in the guide groove 17, and a fixed elastic band 18 is provided on the guide column 16, and the edge of the elastic band 18 is fixedly connected to the inner wall of the guide groove 17, and two limit rings 19 are provided on the guide column 16, and the limit rings 19 are fixedly connected to the guide column 16, and the two limit rings 19 are respectively located on the upper and lower sides of the middle support plate 4, and a first adjustment rod 13 is provided through the guide column 16, and the first adjustment rod 13 is slidably connected to the guide column 16, and a limit block 14 is provided above the guide column 16, and the limit block 14 is fixedly connected to the first adjustment rod 13, and a buffer spring 15 is provided between the limit block 14 and the guide column 16, and the buffer spring 15 is sleeved on the first adjustment rod 13, and the upper end of the buffer spring 15 is fixedly connected to the limit block 14, and the lower end of the buffer spring 15 is fixedly connected to the guide column 16. The balance adjustment mechanism also includes a mounting seat 11, a mounting seat 11 is arranged above the first adjustment rod 13, the top of the first adjustment rod 13 is fixedly connected to the mounting seat 11, a ball 10 is movably embedded in the top of the mounting seat 11, and the ball 10 is against the inner wall of the shell 3. The balance adjustment mechanism also includes a plurality of second adjustment rods 20, which are arranged in a circular array around the center of the middle support plate 4, the lower end of the first adjustment rod 13 extends to the bottom of the middle support plate 4, the lower end of the first adjustment rod 13 is fixedly connected to one end of the second adjustment rod 20, and the other end of the second adjustment rod 20 is fixedly connected to the support column 22, a silicone sheet 21 is fixedly arranged on the top of the support column 22, and the silicone sheet 21 is against the bottom surface of the middle support plate 4, and a plurality of water seepage holes 12 are opened on the middle support plate 4, and the water seepage holes 12 are located above the silicone sheet 21. The balance adjustment mechanism also includes a plurality of water storage barrels 6, the water storage barrels 6 are located below the support column 22, and the top of the water storage barrels 6 is fixedly connected to the middle support plate 4 through the bracket 23. A lower support plate 7 is provided below the water storage barrel 6, and the bottom of the water storage barrel 6 is fixedly connected to the lower support plate 7. A plurality of support rods 5 are provided below the lower support plate 7, and the tops of the support rods 5 are connected to the lower support plate 7 through hinges 24.
[0035] When surveying muddy ground or wetland, rotate the support rod 5 to adjust the upper support plate 1 and the middle support plate 4 to a roughly horizontal position. At this time, the upper support plate 1 and the middle support plate 4 are still slightly tilted. Taking the clockwise tilt of the upper support plate 1 and the middle support plate 4 as an example, since there is water in the outer shell 3, the float 9 will move to the left side of the upper support plate 1 and the middle support plate 4 under the action of buoyancy. When the float 9 moves to the left side of the upper support plate 1 and the middle support plate 4, it will push the first adjustment rod 13 on the left side to move left. When the first adjustment rod 13 moves to the left, it drives the guide column 16 to move synchronously along the guide groove 17. At the same time, the ball 10 on the top of the first adjustment rod 13 slides to the left along the spherical inner wall of the outer shell 3, causing the first adjustment rod 13 to move down and compress the buffer spring 15.
[0036] During the downward movement of the first adjusting rod 13, the second adjusting rod 20 and the supporting column 22 drive the silicone sheet 21 to move downward synchronously, so that the silicone sheet 21 no longer blocks the water seepage hole 12 on the left, and the water in the outer shell 3 slowly seeps into the water storage barrel 6 on the left through the water seepage hole 12 on the left, thereby increasing the amount of water in the water storage barrel 6 on the left and making it heavier, so that the water storage barrel 6 on the left drives the device to tilt counterclockwise, and the upper support plate 1 and the middle support plate 4 that were originally tilted clockwise slowly return to the normal position.
[0037] When the upper support plate 1 and the middle support plate 4 are horizontal, the float 9 returns to the center of the middle support plate 4 and no longer pushes any first adjusting rod 13. Under the elastic force of the buffer spring 15, the ball 10 moves to the right along the inner wall of the shell 3 and resets, and the first adjusting rod 13 moves to the right and resets synchronously. When the first adjusting rod 13 moves to the right, it moves upward synchronously. The first adjusting rod 13 drives the silicone sheet 21 to move upward synchronously through the second adjusting rod 20 and the support column 22, so that the silicone sheet 21 blocks the water seepage hole 12 again, so that the water in the shell 3 no longer flows out through the water seepage hole 12.
[0038] By observing whether water flows out of the seepage hole 12, it can be determined whether the upper support plate 1 and the middle support plate 4 are level, thereby determining whether the surveying and mapping instrument on the upper support plate 1 is level. When water flows out of the seepage hole 12, the surveying and mapping is stopped.
[0039] During the surveying process, if the ground is muddy and the support rod 5 sinks, causing the device to tilt, the above process is repeated and the device can automatically adjust to a horizontal state.
[0040] Example 3
[0041] like Figure 1-4 As shown, when other parts are the same as those of embodiment 2, the difference between this embodiment and embodiment 2 is that a pointed head 8 is fixedly provided at the lower end of the support rod 5. By providing the pointed head 8, the support rod 5 can be more stably erected on the ground.
[0042] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A surveying device for building planning, characterized in that: The invention comprises an upper support plate (1) for placing a surveying and mapping instrument, a middle support plate (4) being arranged below the upper support plate (1), a plurality of connecting rods (2) being arranged between the edge of the upper support plate (1) and the edge of the middle support plate (4), the upper ends of the connecting rods (2) being fixedly connected to the upper support plate (1), and the lower ends of the connecting rods (2) being fixedly connected to the middle support plate (4), and a balance adjustment mechanism being installed on the middle support plate (4).
2. A surveying device for building planning according to claim 1, characterized in that: The balance adjustment mechanism comprises a spherical and transparent outer shell (3), the bottom of the outer shell (3) is detachably connected to the top surface of the middle support plate (4), a floating ball (9) is arranged in the outer shell (3), and the outer shell (3) is filled with water.
3. A surveying device for building planning according to claim 2, characterized in that: The balance adjustment mechanism further comprises a plurality of guide grooves (17), wherein the guide grooves (17) are formed on the middle support plate (4), and the plurality of guide grooves (17) are arranged in a circular array around the center of the middle support plate (4).
4. A surveying device for building planning according to claim 3, characterized in that: The balance adjustment mechanism also includes a guide column (16), the guide column (16) is located in the guide groove (17), an elastic band (18) is fixedly sleeved on the guide column (16), the edge of the elastic band (18) is fixedly connected to the inner wall of the guide groove (17), two limiting rings (19) are sleeved on the guide column (16), the limiting rings (19) are fixedly connected to the guide column (16), the two limiting rings (19) are respectively located on the upper and lower sides of the middle support plate (4), and a first adjustment ring is provided through the guide column (16). The first adjusting rod (13) is slidably connected to a guide column (16); a limit block (14) is arranged above the guide column (16); the limit block (14) is fixedly connected to the first adjusting rod (13); a buffer spring (15) is arranged between the limit block (14) and the guide column (16); the buffer spring (15) is sleeved on the first adjusting rod (13); the upper end of the buffer spring (15) is fixedly connected to the limit block (14); and the lower end of the buffer spring (15) is fixedly connected to the guide column (16).
5. A surveying device for building planning according to claim 4, characterized in that: The balance adjustment mechanism also includes a mounting seat (11), the mounting seat (11) is arranged above the first adjustment rod (13), the top end of the first adjustment rod (13) is fixedly connected to the mounting seat (11), and a ball (10) is movably embedded in the top of the mounting seat (11), and the ball (10) is against the inner wall of the outer shell (3).
6. A surveying device for building planning according to claim 5, characterized in that: The balance adjustment mechanism further comprises a plurality of second adjustment rods (20), the plurality of second adjustment rods (20) being arranged in a central annular array around the middle support plate (4), the lower end of the first adjustment rod (13) extending below the middle support plate (4), the lower end of the first adjustment rod (13) being fixedly connected to one end of the second adjustment rod (20), the other end of the second adjustment rod (20) being fixedly connected to a support column (22), a silicone sheet (21) being fixedly provided on the top of the support column (22), the silicone sheet (21) being against the bottom surface of the middle support plate (4), the middle support plate (4) being provided with a plurality of water seepage holes (12), the water seepage holes (12) being located above the silicone sheet (21).
7. A surveying device for building planning according to claim 6, characterized in that: The balance adjustment mechanism further comprises a plurality of water storage barrels (6), wherein the water storage barrels (6) are located below the support columns (22), and the tops of the water storage barrels (6) are fixedly connected to the middle support plate (4) via brackets (23).
8. A surveying device for building planning according to claim 7, characterized in that: A lower support plate (7) is provided below the water storage barrel (6), and the bottom of the water storage barrel (6) is fixedly connected to the lower support plate (7).
9. A surveying device for building planning according to claim 8, characterized in that: A plurality of support rods (5) are arranged below the lower support plate (7), and the tops of the support rods (5) are connected to the lower support plate (7) via hinges (24).
10. A surveying device for building planning according to claim 9, characterized in that: The lower end of the support rod (5) is fixedly provided with a pointed head (8).
Citation Information
Patent Citations
A portable engineering surveying device
CN115363330B
Auxiliary surveying and mapping support for surveying and mapping measurement
CN220416871U
Surveying and mapping support of surveying and mapping instrument
CN220828703U
Cited By
Level gauge for surveying
CN119618159A