Technology for vertically transporting construction waste through elevator shaft

By setting up the construction waste transportation structure in the building's body, the technology of vertical transportation of construction waste was used to solve the problem of unable to hang the basement garbage of the tower crane, and to achieve efficient, safe and practical waste treatment methods.

CN119330190AActive Publication Date: 2025-01-21NO 9 CONSTR ENG CO GUIZHOU CONSTR ENG GRP +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411507008.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-28
Publication Date
2025-01-21
Estimated Expiration
2044-10-28

AI Technical Summary

Technical Problem

During construction, tower cranes cannot lift construction waste in the basement. The existing treatment methods have problems such as quality hazards, time-consuming and labor-intensive, increasing construction costs and affecting progress.

Method used

The use of elevator well trail vertical transportation construction waste technology, through the establishment of building waste transportation structures in the building's body, including staircase assembly and enhanced structures, using improving machines, steel wire ropes, mechanical speed limit pulleys and electric protection automatic door groups and other components , Implement the trash can move up and down in the stairs well.

Benefits of technology

It improves construction efficiency and reduces manpower consumption. Garbage transportation is carried out in a closed space to reduce dust. It has promotion and application value and is more practical.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure HDA0005104274520000011
    Figure HDA0005104274520000011
  • Figure HDA0005104274520000012
    Figure HDA0005104274520000012
  • Figure HDA0005104274520000021
    Figure HDA0005104274520000021
Patent Text Reader

Abstract

The invention provides a technology for vertically transporting construction waste through an elevator shaft, and relates to the technical field of building engineering construction.The technology comprises a building body, a construction waste transporting structure is arranged in the building body, the construction waste transporting structure comprises a stairwell assembly, and the stairwell assembly comprises a plurality of main beam bodies and secondary beam bodies; the construction waste transportation structure is arranged, so that a worker can control an elevator body of the lifting structure to be started, and the elevator body drives a steel wire rope to drive a garbage can to move up and down in the stairwell assembly through a winch and a mechanical speed limiting pulley; compared with the mode that garbage is transported layer by layer through a basement lane, the construction efficiency can be effectively improved, the device can also be used as a small building material transporting device, manpower consumption is reduced, raised dust can be reduced by transporting the garbage in a closed space, and the device has application and popularization value and is practical.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building engineering construction, and more specifically, particularly relates to a technology for vertically transporting construction waste using an elevator shaft. Background Art

[0002] In the design and construction of modern buildings, the basement, as an important component, is basically set in the building structure. The basement is usually a relatively closed space. Its unique location and structural characteristics make it face many challenges in the treatment of construction waste. Among them, tower cranes cannot lift construction waste in the basement due to their working range and structural limitations. In the previous construction process, there are two main methods of basement waste treatment. One is to leave a slab hole. By reserving a hole on the floor slab, the construction waste in the basement is lifted to the upper floor. However, this method will leave quality risks and may affect the structural stability and safety of the building. Another method is to use the basement driveway for transportation, that is, to transport the construction waste out through the basement driveway, but this method is time-consuming and labor-intensive, which not only increases the construction cost, but also affects the construction progress. It is not practical enough and needs to be improved. Summary of the invention

[0003] In order to solve the above technical problems, the present invention provides a technology for vertically transporting construction waste using an elevator shaft to solve the above problems.

[0004] A technology for vertically transporting construction waste using an elevator shaft, comprising:

[0005] The building includes a construction waste transportation structure provided inside the building body

[0006] The construction waste transportation structure includes a stairwell assembly, which includes a plurality of main beam bodies and secondary beam bodies, each of the main beam bodies is arranged horizontally, and each of the secondary beam bodies is arranged vertically, and the inner side of the overall shape after the combination of each main beam body and the secondary beam body is a square hollow area, and four or more main beam embedded bolts are arranged between the upper end of each main beam body and the building body, and cross arms are arranged on the lower end of each main beam body and the side walls at both ends of the secondary beam body, and U-shaped bolts are arranged on the side walls of each cross arm, and the bolts of each U-shaped bolt are partially exposed outside the cross arm and are fixed to the building body with nuts, and the opening direction of each U-shaped bolt is upward, and a fixed protective plate is arranged on the upper end of the hollow area formed after the combination of each main beam body and the secondary beam body.

[0007] Preferably, a lifting structure is provided at the upper end of the building body, and the lifting structure includes a hoist body and a mechanical speed limiting pulley, hoist embedded bolts, a winch and anchor bolts. The hoist embedded bolts are threadedly installed between the hoist body and the building body, and the anchor bolts are threadedly installed between the winch and the fixed protective plate. A steel wire rope is provided on the hoist body, and the steel wire rope is adapted to the winch and the mechanical speed limiting pulley. A plurality of electric protective automatic door groups are hinged inside the square hollow area formed by the combination of each main beam body and secondary beam body through a single-axis hinge. Each of the electric protective automatic door groups is made of steel plate, and a circular hole is provided at the center of each of the electric protective automatic door groups.

[0008] Preferably, each of the steel wire ropes can slide through the circular hole, and each of the lower end of the electric protection automatic door group is provided with a two-link switch mechanism, and each of the two-link switch mechanisms includes a group of gears and a group of connecting rod bodies, and each of the connecting rod bodies is fixedly installed at the upper end of the gear, and the end of each connecting rod body is rotatably installed with the door body of the electric protection automatic door group. A trash can is provided inside the hollow area of ​​the square, and pull rings are fixedly installed at the four corners of the upper end of the trash can. The pull ring on the upper end of the trash can is fixedly installed with the steel wire rope, and the horizontal angle formed by the connection between the steel wire rope and the pull ring on the upper end of the trash can is between 45° and 60°.

[0009] Preferably, the center of gravity of the steel wire rope and the trash bin after being combined is in an overlapping state, a lower opening door assembly is provided at the lower end of the trash bin, an angle limiter is provided between the lower opening door assembly and the trash bin, a lower opening door bolt is provided between the lower opening door assembly and the lower end of the trash bin, a lifting ring is provided at the opening of the stairwell assembly, a swing door is rotatably installed at the lower end of the lifting ring, a plurality of wall connecting chains are fixedly installed inside the stairwell assembly, a guide rod is fixedly installed between each of the wall connecting chains, and a wall connecting chain is fixedly installed on the side wall of the trash bin close to the guide rod.

[0010] Preferably, a guide chain is provided on the side wall of the trash bin, and the guide chain and the wall chain are adapted to the guide rod. A roller holder is provided on the surface of the guide chain, and a plurality of roller bodies are fixedly installed on the inner side of each roller holder, and each of the roller bodies is fitted with the surface of the guide rod in a surrounding state. An electric push rod is fixedly installed inside the trash bin, and the output shaft direction of the electric push rod is toward the inside of the trash bin.

[0011] Preferably, a push plate is fixedly mounted on the inner wall of the trash bin, the push plate is fixedly mounted on the output shaft of the electric push rod, the push plate is slidably mounted on the trash bin, and the push plate is slidably mounted on the lower opening door assembly.

[0012] Compared with the prior art, the present invention has the following beneficial effects:

[0013] In the present invention, by setting up a construction waste transportation structure, the staff can control the start-up of the hoist body of the lifting structure, so that the hoist body drives the wire rope through the winch and the mechanical speed limiting pulley to drive the garbage bin to move up and down inside the stairwell assembly. Compared with the method of transporting garbage layer by layer through the basement driveway, it can effectively improve the construction efficiency, and can also be used as a small-scale construction material transportation device to reduce manpower consumption. Garbage transportation in a closed space can reduce dust, has promotion and application value, and is more practical.

[0014] In the present invention, a guide rod is arranged inside the stairwell assembly, so that when the staff operates the hoist body of the lifting structure to start and drive the garbage bin to move up and down inside the stairwell assembly, the movement of the garbage bin will drive the roller body on the guide chain to slide on the guide rod, thereby reducing the shaking and tilting amplitude of the garbage bin, preventing it from getting stuck, and improving reliability.

[0015] In the present invention, when the construction waste inside the garbage bin is not suitable for unloading through the lower opening door assembly, the electric push rod is turned on to cause the electric push rod to drive the push plate to retract, so that the push plate can push the garbage inside the garbage bin out of the garbage bin to transport the construction waste out, thereby most of the construction waste inside the garbage bin can be transported out at one time, thereby improving practicality.

[0016] In the present invention, since the garbage bin is made of closed railings, a guide rod is arranged inside the stairwell assembly to prevent the garbage bin from tilting significantly during movement. At the same time, since a lower door assembly is arranged below the garbage bin and a lifting ring and a swing door are arranged at the opening of the stairwell assembly, it can greatly facilitate the staff to unload construction waste, provide a variety of options, and improve practicality.

[0017] In the present invention, a mechanical speed limiting pulley is used as a speed limiting device. Since the winch is provided with safety limiters such as a lifting height limiter, an overload limiter, and a travel limiter, emergency braking can be performed in the event of sudden accidents such as power outages. At the same time, manual control can be adopted to lower the garbage bin to the bottom layer, thereby improving protection, avoiding accidents, and increasing safety.

[0018] In the present invention, by opening a circular hole on the electric protection automatic door group, it is possible to avoid affecting the setting of the electric protection automatic door group and causing the movement of the garbage bin inside the stairwell assembly. At the same time, since a distance sensor is provided on the electric protection automatic door group, when the garbage bin moves to the electric protection automatic door group inside the stairwell assembly, the electric protection automatic door group can open automatically, thereby improving the convenience of operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the planar structure of the present invention;

[0020] Figure 2 is a plan cross-sectional view of the building body of the present invention;

[0021] Figure 3 It is a plane cross-sectional view of the main beam embedded bolts of the present invention;

[0022] Figure 4 It is a schematic diagram of the plan view structure of the main beam body of the present invention;

[0023] Figure 5 It is a plan view of the connection between the U-shaped bolt of the present invention and the main beam body;

[0024] Figure 6 is a plan view of the connection between the U-bolt and the secondary beam of the present invention;

[0025] Figure 7 is a cross-sectional view of a stairwell assembly of the present invention;

[0026] Figure 8 is a plan view of the trash bin of the present invention;

[0027] Fig. 9 It is a schematic diagram of the planar structure of the two-link switch mechanism of the present invention;

[0028] Fig.10 is a plan view of the guide rod of the present invention;

[0029] Fig.11 is a plan view of the roller body of the present invention;

[0030] Fig.12 It is a schematic diagram of the plan view structure of the garbage bin of the present invention;

[0031] Fig.13 is a plan view of a bottom-opening door bolt of the present invention;

[0032] Fig.14 is a plan view of the hoist body of the present invention;

[0033] Fig.15 It is a plan cross-sectional view of a garbage bin of the present invention.

[0034] In the figure, the correspondence between the component names and the figure numbers is: 1. Hoist body; 2. Guide rod; 3. Main beam body; 4. Stairwell assembly; 5. Wire rope; 6. Trash can; 7. Main beam embedded bolts; 8. Secondary beam body; 9. Cross arm; 10. U-shaped bolt; 11. Electric protective automatic door group; 12. Gear; 13. Connecting rod body; 14. Guide chain; 15. Wall chain; 16. Roller body; 17. Roller fixer; 18. Lifting ring; 19. Angle limiter; 20. Lower door assembly; 21. Lower door bolt; 22. Mechanical speed limiting pulley; 23. Hoist embedded bolts; 24. Winch; 25. Anchor bolt; 26. Fixed protective plate; 27. Building body; 28. Electric push rod; 29. ​​Push plate. DETAILED DESCRIPTION

[0035] The following embodiments of the present invention are described in further detail in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0036] See also Figure 1 - Figure 8 The present invention provides a technology for vertically transporting construction waste using an elevator shaft, comprising a building body 27:

[0037] Including a construction waste transportation structure provided inside the building body 27;

[0038] The construction waste transportation structure includes a stairwell assembly 4, which includes a plurality of main beam bodies 3 and secondary beam bodies 8, each of which is arranged horizontally, and each of which is arranged vertically. The inner side of the overall shape after the combination of each main beam body 3 and the secondary beam body 8 is a square hollow area, and four or more main beam embedded bolts 7 are arranged between the upper end of each main beam body 3 and the building body 27, and a cross arm 9 is arranged on the lower end of each main beam body 3 and the side walls of both ends of the secondary beam body 8, and a U-shaped bolt 10 is arranged on the side wall of each cross arm 9, and the bolts of each U-shaped bolt 10 are partially exposed outside the cross arm 9 and are fixed to the building body 27 with a nut, and the opening direction of each U-shaped bolt 10 is upward. In terms of direction, a fixed protective plate 26 is provided at the upper end of the hollow area of ​​the combined shape of each main beam body 3 and the secondary beam body 8, and a lifting structure is provided at the upper end of the building body 27. By setting up a construction waste transportation structure, the staff can control the hoist body 1 of the lifting structure to start, so that the hoist body 1 drives the wire rope 5 through the winch 24 and the mechanical speed limiting pulley 22 to drive the garbage bin 6 to move up and down inside the stairwell assembly 4. Compared with the method of transporting garbage layer by layer through the basement driveway, it can effectively improve the construction efficiency, and can also be used as a small-scale building material transportation device to reduce manpower consumption. Garbage transportation in a closed space can reduce dust, has promotion and application value, and is more practical.

[0039] The lifting structure includes a hoist body 1 and a mechanical speed limiting pulley 22, a hoist embedded bolt 23, a winch 24 and an anchor bolt 25. The hoist embedded bolt 23 is threadedly installed between the hoist body 1 and the building body 27, and the anchor bolt 25 is threadedly installed between the winch 24 and the fixed protective plate 26. A wire rope 5 is provided on the hoist body 1, and the wire rope 5 is adapted to the winch 24 and the mechanical speed limiting pulley 22. By using the mechanical speed limiting pulley 22 as a speed limiting device, since the winch 24 is internally provided with a lifting height limiter, an overload limiter, a stroke limiter and other safety limiters, emergency braking can be performed in the event of sudden accidents such as power outages. At the same time, manual control can be adopted to lower the garbage bin 6 to the bottom layer, thereby improving protection, avoiding accidents and increasing safety. At the same time, a fence can be set on the outside of the fixed protective plate 26 to further improve the protection effect.

[0040] Each square hollow area formed by the combination of the main beam body 3 and the secondary beam body 8 is hinged with multiple electric protection automatic door groups 11 through single-axis hinges. Each electric protection automatic door group 11 is made of steel plates. A circular hole is provided at the center of each electric protection automatic door group 11. By providing a circular hole on the electric protection automatic door group 11, it is possible to avoid affecting the setting of the electric protection automatic door group 11 and causing the movement of the garbage bin 6 inside the stairwell assembly 4. At the same time, since a distance sensor is provided on the electric protection automatic door group 11, when the garbage bin 6 moves to the electric protection automatic door group 11 inside the stairwell assembly 4, the electric protection automatic door group 11 can open automatically, thereby improving the convenience of operation.

[0041] Each steel wire rope 5 can slide through the circular hole, and a two-link switch mechanism is provided at the lower end of each electric protection automatic door group 11. Each two-link switch mechanism includes a group of gears 12 and a group of connecting rod bodies 13. Each connecting rod body 13 is fixedly installed at the upper end of the gear 12, and the end of each connecting rod body 13 is rotatably installed with the door body of the electric protection automatic door group 11. A trash bin 6 is provided inside the hollow area of ​​the square grid, and pull rings are fixedly installed at the four corners of the upper end of the trash bin 6. The pull ring at the upper end of the trash bin 6 is fixedly installed with the steel wire rope 5, and the horizontal angle formed by the connection between the steel wire rope 5 and the pull ring at the upper end of the trash bin 6 is between 45° and 60°.

[0042] The center of gravity of the wire rope 5 and the garbage bin 6 after being combined is in an overlapping state, a lower opening door assembly 20 is provided at the lower end of the garbage bin 6, an angle limiter 19 is provided between the lower opening door assembly 20 and the garbage bin 6, a lower opening door bolt 21 is provided between the lower opening door assembly 20 and the lower end of the garbage bin 6, a lifting ring 18 is provided at the opening of the stairwell assembly 4, a swing door is rotatably installed at the lower end of the lifting ring 18, and the garbage bin 6 is made of closed guardrails. Since the garbage bin 6 is made of closed guardrails, a guide rod 2 is provided inside the stairwell assembly 4 to avoid the garbage bin 6 from tilting significantly during movement. At the same time, since the lower opening door assembly 20 is provided below the garbage bin 6 and the lifting ring 18 and the swing door are provided at the opening of the stairwell assembly 4, it can greatly facilitate the staff to unload construction waste, provide a variety of options, and improve practicality.

[0043] A plurality of wall-connecting chains 15 are fixedly installed inside the stairwell assembly 4, and a guide rod 2 is fixedly installed between each wall-connecting chain 15. A wall-connecting chain 15 is fixedly installed on the side wall of the trash bin 6 close to the guide rod 2. A guide chain 14 is provided on the side wall of the trash bin 6. The guide chain 14 and the wall-connecting chain 15 are adapted to the guide rod 2. A roller holder 17 is provided on the surface of the guide chain 14. A plurality of roller bodies 16 are fixedly installed on the inner side of each roller holder 17. Each roller body 16 is fitted with the surface of the guide rod 2 in a surrounding state. The roller body 16 is made of polyethylene plastic pipe. By arranging the guide rod 2 inside the stairwell assembly 4, when the staff operates the hoist body 1 of the lifting structure to start and drive the trash bin 6 to move up and down inside the stairwell assembly 4, the movement of the trash bin 6 will drive the roller body 16 on the guide chain 14 to slide on the guide rod 2, thereby reducing the shaking and tilting amplitude of the trash bin 6, preventing it from getting stuck, and improving reliability.

[0044] An electric push rod 28 is fixedly installed inside the trash bin 6, and the output shaft direction of the electric push rod 28 is toward the inside of the trash bin 6. A push plate 29 is fixedly installed on the inner wall of the trash bin 6. The push plate 29 and the output shaft of the electric push rod 28 are fixedly installed. The push plate 29 is slidably installed with the trash bin 6, and the push plate 29 is slidably installed with the lower door assembly 20. When the construction waste inside the trash bin 6 is not suitable for unloading through the lower door assembly 20, the electric push rod 28 is turned on, so that the electric push rod 28 drives the push plate 29 to retract, so that the push plate 29 can push the garbage inside the trash bin 6 out of the trash bin 6 and transport the construction waste out, so that most of the construction waste inside the trash bin 6 can be transported out at one time, thereby improving practicality.

[0045] Working principle:

[0046] In the first step, when using, the staff can first operate the hoist body 1 of the lifting structure to start, so that the hoist body 1 drives the wire rope 5 through the winch 24 and the mechanical speed limiting pulley 22 to drive the garbage bin 6 to move up and down inside the stairwell assembly 4. At the same time, the movement of the garbage bin 6 will drive the roller body 16 on the guide chain 14 to slide on the guide rod 2. When the garbage bin 6 moves to the garbage collection and transfer position, the staff can close the lifting structure at this time, and then the staff fills the garbage bin 6 with construction waste. After the construction waste is loaded, the staff can stop working. The personnel opens the electric protection automatic door group 11, so that the gear 12 and the connecting rod body 13 on the two-link switch mechanism of the electric protection automatic door group 11 drive the electric protection automatic door group 11 (the electric protection automatic door group 11 is the existing technology, mainly composed of a door body, a two-link switch mechanism, a motor, and a distance sensor) to open, and then the lifting structure can be controlled to start again, driving the garbage bin 6 to move slowly to the unloading position under the stairwell assembly 4, and then the staff can open the lower door bolt 21 of the lower door assembly 20, so that the construction waste can fall directly from under the garbage bin 6.

[0047] In the second step, when the height of the stairwell assembly 4 is greater than two floors or ten meters, a layer of electric protection automatic door group 11 and a manual normally closed protection door can be laid in the stairwell assembly 4. When the staff controls the hoist body 1 of the lifting structure to start, the hoist body 1 drives the wire rope 5 through the winch 24 and the mechanical speed limiting pulley 22 to drive the garbage bin 6 to move up and down inside the stairwell assembly 4. At this time, when the garbage bin 6 drops to one meter above the electric protection automatic door group 11, the sensor inside the electric protection automatic door group 11 will detect the garbage bin 6, so that the electric protection automatic door group 11 will open automatically. When the garbage bin 6 moves below the electric protection automatic door group 11, the electric protection automatic door group 11 will close automatically. If the garbage bin 6 needs to stop at the manual normally closed protection door, the staff manually controls the manual normally closed protection door to close, and controls the garbage bin 6 to stay above the manual normally closed protection door, thereby providing multiple protections.

[0048] The third step, when the construction waste inside the garbage bin 6 is not suitable for unloading through the lower opening door assembly 20, the staff can control the hoist body 1 of the lifting structure to start, so that the hoist body 1 drives the wire rope 5 through the winch 24 and the mechanical speed limiting pulley 22 to drive the garbage bin 6 to move inside the stairwell assembly 4, when the garbage bin 6 moves to about half a meter of the electric protection automatic door group 11, the staff can manually close the electric protection automatic door group 11, and open the lifting structure again to move the garbage bin 6 to the door body of the electric protection automatic door group 11, and open the swing door of the stairwell assembly 4, open the electric push rod 28, so that the electric push rod 28 drives the push plate 29 to retract, so that the push plate 29 can push the garbage inside the garbage bin 6 out of the garbage bin 6 to transport the construction waste out.

[0049] The embodiments of the present invention are given for the purpose of illustration and description, and are not intended to be exhaustive or to limit the invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

Claims

1. A technology for vertically transporting construction waste using an elevator shaft, comprising a building body (27), characterized in that: The building body (27) is provided with a construction waste transport structure inside. The construction waste transport structure comprises a stairwell assembly (4), wherein the stairwell assembly (4) comprises a plurality of main beam bodies (3) and secondary beam bodies (8), each of the main beam bodies (3) being arranged horizontally, each of the secondary beam bodies (8) being arranged vertically, the inner side of the overall shape after the combination of each of the main beam bodies (3) and the secondary beam bodies (8) being a square hollow area, four or more main beam pre-embedded bolts (7) being arranged between the upper end of each of the main beam bodies (3) and the building body (27), and each of the main beam bodies (3) and the secondary beam bodies (8) being arranged vertically. A cross arm (9) is provided on the lower end of the main beam body (3) and the side walls at both ends of the secondary beam body (8), and a U-shaped bolt (10) is provided on the side wall of each cross arm (9). The bolt of each U-shaped bolt (10) is partially exposed outside the cross arm (9) and is fixed to the building body (27) with a nut. The opening direction of each U-shaped bolt (10) is upwardly oriented. A fixed protective plate (26) is provided at the upper end of the hollow area of ​​the shape after the main beam body (3) and the secondary beam body (8) are combined.

2. A technology for vertically transporting construction waste using an elevator shaft as claimed in claim 1, characterized in that: A lifting structure is provided at the upper end of the building body (27), and the lifting structure comprises a hoist body (1) and a mechanical speed limiting pulley (22), a hoist embedded bolt (23), a winch (24) and an anchor bolt (25). The hoist embedded bolt (23) is threadedly installed between the hoist body (1) and the building body (27), and the anchor bolt (25) is threadedly installed between the winch (24) and the fixed protective plate (26). A steel wire rope (5) is provided on the hoist body (1), and the steel wire rope (5) is compatible with the winch (24) and the mechanical speed limiting pulley (22).

3. A technology for vertically transporting construction waste using an elevator shaft as claimed in claim 2, characterized in that: A plurality of electric protection automatic door groups (11) are hingedly connected inside the square hollow area formed by the combination of each main beam body (3) and the secondary beam body (8) via a single-axis hinge. Each electric protection automatic door group (11) is made of a steel plate, and a circular hole is provided at the center of each electric protection automatic door group (11).

4. A technology for vertically transporting construction waste using an elevator shaft as claimed in claim 3, characterized in that: Each of the steel wire ropes (5) can slide through the circular hole, and each of the electric protective automatic door groups (11) is provided with a two-link switch mechanism at the lower end, and each of the two-link switch mechanisms includes a group of gears (12) and a group of link bodies (13), and each of the link bodies (13) is fixedly installed at the upper end of the gear (12).

5. A technology for vertically transporting construction waste using an elevator shaft as claimed in claim 4, characterized in that: The end of each connecting rod body (13) is rotatably mounted on the door body of the electric protective automatic door group (11); a trash bin (6) is provided inside the hollow area of ​​the square; pull rings are fixedly mounted at the four corners of the upper end of the trash bin (6); the pull rings at the upper end of the trash bin (6) are fixedly mounted on the steel wire rope (5); and the horizontal angle formed by the connection between the steel wire rope (5) and the pull ring at the upper end of the trash bin (6) is between 45° and 60°.

6. A technology for vertically transporting construction waste using an elevator shaft as claimed in claim 5, characterized in that: The center of gravity of the steel wire rope (5) and the garbage bin (6) after being combined is in an overlapping state, a lower opening door assembly (20) is provided at the lower end of the garbage bin (6), an angle limiter (19) is provided between the lower opening door assembly (20) and the garbage bin (6), a lower opening door bolt (21) is provided between the lower opening door assembly (20) and the lower end of the garbage bin (6), and a lifting ring (18) is provided at the opening of the stairwell assembly (4).

7. A technology for vertically transporting construction waste using an elevator shaft as claimed in claim 6, characterized in that: A swing door is rotatably mounted on the lower end of the hanging ring (18); a plurality of wall connecting chains (15) are fixedly mounted inside the stairwell assembly (4); a guide rod (2) is fixedly mounted between each of the wall connecting chains (15); and a wall connecting chain (15) is fixedly mounted on the side wall of the trash bin (6) close to the guide rod (2).

8. A technology for vertically transporting construction waste using an elevator shaft as claimed in claim 7, characterized in that: A guide chain (14) is provided on the side wall of the trash bin (6); the guide chain (14) and the wall-connecting chain (15) are matched with the guide rod (2); a roller holder (17) is provided on the surface of the guide chain (14); and a plurality of roller bodies (16) are fixedly mounted on the inner side of each roller holder (17).

9. A technology for vertically transporting construction waste using an elevator shaft as claimed in claim 8, characterized in that: Each of the roller bodies (16) is in a surrounding state and fits the surface of the guide rod (2). An electric push rod (28) is fixedly installed inside the trash bin (6), and the output shaft direction of the electric push rod (28) faces the inside of the trash bin (6).

10. A technology for vertically transporting construction waste using an elevator shaft as claimed in claim 9, characterized in that: A push plate (29) is fixedly mounted on the inner wall of the trash bin (6); the push plate (29) is fixedly mounted on the output shaft of the electric push rod (28); the push plate (29) is slidably mounted on the trash bin (6); and the push plate (29) is slidably mounted on the lower door assembly (20).

Citation Information

Patent Citations

  • Garbage transportation and treatment system

    CN113978958A

  • Garbage descending device for high-rise building

    CN219950343U

  • Lift shaft material transportation equipment

    CN221116788U