Slotting-free construction method for lintel pipeline of secondary structure distribution box
Through the method of setting up grooves on the side of the prefabricated beams and the heating board, the construction method of free grooves in the construction of the secondary structure distribution box pipeline is realized, and the overall prefabricated beam grooves in the existing technology affect the overall overall overall influence of the grooves. The problem of sexual and intensity improves structural safety and construction quality, and reduces construction costs and the generation of construction waste.
Patent Information
- Application Number
- CN202411501422.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-25
- Publication Date
- 2025-01-21
AI Technical Summary
In the existing secondary structure distribution box pipeline construction methods, prefabricated lintels affect integrity and strength, reduce structural safety, and generate a large amount of construction waste during construction, increasing costs.
A groove-free construction method is adopted. Grooves are provided on the sides of the prefabricated lintels, and insulation boards are attached inside the grooves. The insulation boards are then put back after the pipelines are grooved, thereby reducing the need for opening the prefabricated lintels. Amount of slots.
The amount of grooves for prefabricated lintels is reduced, structural safety and construction quality are improved, construction costs and the generation of construction waste are reduced, and construction efficiency is improved.
Smart Images

Figure CN119332873A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to building construction, in particular to a construction method for secondary structure distribution box lintel pipelines without grooving. Background Art
[0002] In the construction of secondary structure distribution box pipelines, in order to ensure the stability of the masonry wall, the common practice is to set a prefabricated concrete lintel under the masonry wall, and then groove and chisel the lintel. The grooving of the prefabricated lintel affects the integrity of the prefabricated lintel, causes certain damage to the strength of the lintel, reduces the safety of the structure to a certain extent, increases the difficulty coefficient of edge closing, and the plastering at the groove is prone to hollowing and cracking, resulting in quality problems. This type of construction method not only affects the structural safety and visual quality, but also generates a large amount of construction waste in the later stage, adding additional costs to the construction. Summary of the invention
[0003] The present invention aims to solve the above technical problems, thereby providing a construction method for secondary structure distribution box lintel pipelines without grooving, reducing the amount of grooving, improving structural safety, and improving construction quality.
[0004] The present invention solves the technical problem and adopts the following technical solution: A construction method for a secondary structure distribution box lintel pipeline without slotting, comprising the following steps: S1. Formwork to make prefabricated lintels The sides of the precast lintel are provided with grooves; S2. Build the wall, place the prefabricated lintel at the specified position, with the groove facing the reserved hole of the distribution box, and install the insulation board in the groove; S3, pipeline grooving Take out the insulation board and groove the pipeline; S4. After the slotting is completed, put the insulation board back; S5. Finishing the surface with plastering.
[0005] Compared with the prior art, the present invention using the above technical solution has the following beneficial effects: 1) Reduce the problem of excessive slotting of prefabricated lintels, improve structural safety and visual quality, and improve construction quality; 2) Reduce workload, improve construction efficiency and reduce construction costs; 3) It reduces the later repair work, reduces the generation of construction waste and saves resources.
[0006] Further, the optimization scheme of the present invention is: The thickness of the prefabricated lintel is smaller than the thickness of the wall.
[0007] The length of the groove is adapted to the width of the reserved hole of the distribution box.
[0008] The thermal insulation board is an extruded polystyrene board.
[0009] The outer side surface of the insulation board is flush with the outer wall surface of the wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] Figure 1 It is a front view of an embodiment of the present invention; Figure 2 for Figure 1 Top view of the .
[0011] In the figure: prefabricated lintel 1; wall 2; extruded polystyrene board 3; reserved hole 4 for distribution box. DETAILED DESCRIPTION
[0012] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0013] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0014] See also Figure 1 , Figure 2 This embodiment provides a construction method for a secondary structure distribution box lintel pipeline without grooving, which is carried out in the following steps: S1. Formwork to make prefabricated lintels The formwork is supported and the concrete precast lintel 1 is poured. The thickness of the precast lintel 1 is less than the thickness of the wall 2. A groove is provided on the side of the precast lintel 1. The length of the groove is adapted to the width of the reserved hole 4 of the distribution box.
[0015] S2. Build a wall 2 using blocks. Reserve a hole 4 for the distribution box on the wall 2. Place a prefabricated lintel 1 at a specified position. The groove faces the hole 4 for the distribution box. An insulation board is pasted in the groove. The insulation board uses an extruded polystyrene board 3. The outer side of the extruded polystyrene board 3 is flush with the outer wall surface of the wall 2.
[0016] S3, pipeline grooving Before the pipeline is grooved, the extruded polystyrene board 3 is first taken out from the groove of the prefabricated lintel 1, and then the pipeline is grooved.
[0017] S4. After the grooving is completed, put back the extruded polystyrene board 3 and place the extruded polystyrene board 3 in the groove of the prefabricated lintel 1.
[0018] S5. Finishing the surface with plastering.
[0019] This construction method reduces the problem of excessive grooving of prefabricated lintels, reduces later repair work, reduces the generation of construction waste, and achieves the effects of improving construction efficiency, ensuring construction quality and saving resources.
[0020] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.
Claims
1. A construction method for a secondary structure distribution box lintel pipeline without slotting, comprising the following steps: S1. Formwork to make prefabricated lintels The sides of the precast lintel are provided with grooves; S2. Build the wall, place the prefabricated lintel at the specified position, with the groove facing the reserved hole of the distribution box, and install the insulation board in the groove; S3, pipeline grooving Take out the insulation board and groove the pipeline; S4. After the slotting is completed, put the insulation board back; S5. Finishing the surface with plastering.
2. The construction method for the secondary structure distribution box lintel pipeline without slotting according to claim 1 is characterized in that: The thickness of the prefabricated lintel is smaller than the thickness of the wall.
3. The construction method for the secondary structure distribution box lintel pipeline without slotting according to claim 1 is characterized in that: The length of the groove is adapted to the width of the reserved hole of the distribution box.
4. The construction method for the secondary structure distribution box lintel pipeline without slotting according to claim 1 is characterized in that: The thermal insulation board is an extruded polystyrene board.
5. The construction method for secondary structure distribution box lintel pipeline without slotting according to claim 1 is characterized in that: The outer side surface of the insulation board is flush with the outer wall surface of the wall.