Intelligent automatic digging device for expanded head of deep foundation pit

By designing an intelligent automatic excavation device for the deep foundation pit enlargement head, the problem of difficulty in expanding the bottom space of the anchor hole and discharging waste residue in the existing technology has been solved, and an efficient construction process has been achieved.

CN119333050APending Publication Date: 2025-01-21XIAN ZHUOLI SCI & TECH DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411500701.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-01-21

AI Technical Summary

Technical Problem

The prior art is difficult to effectively expand the bottom space of the anchor hole and discharge excavation waste slag, which affects construction efficiency.

Method used

An intelligent automatic excavation device with an expansion head for deep foundation pits is designed, including a base plate, an outer probe tube and an inner probe tube. The outer probe tube is driven by a driving motor to rotate, and combined with an expansion mechanism and an adjustment cylinder, the space at the bottom of the anchor hole is expanded and expanded. Automatic discharge of waste residue.

Benefits of technology

It achieves rapid and efficient expansion of the space at the bottom of the anchor hole, simplifies construction difficulty, and improves construction efficiency by automatically discharging waste residue.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119333050A_ABST
    Figure CN119333050A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent automatic digging device for an expanded head of a deep foundation pit, and belongs to the technical field of building equipment.The intelligent automatic digging device for the expanded head of the deep foundation pit comprises a base plate, an outer probing cylinder and an inner probing cylinder, the base plate is fixedly arranged on the ground, the inner probing cylinder is fixedly connected to the base plate, the outer probing cylinder is rotationally connected to the inner probing cylinder, and the outer probing cylinder is rotationally connected to the inner probing cylinder; a drill bit is fixedly connected to the bottom of the outer probing barrel, an expansion mechanism is arranged on the lower portion of the outer probing barrel, an adjusting barrel is slidably connected to the outer probing barrel, a driving motor is fixedly connected to the base plate, and the driving motor can drive the outer probing barrel to rotate. The space at the bottom of the anchor hole can be conveniently enlarged, waste residues generated by excavating the anchor hole can be conveniently discharged, and the construction efficiency is effectively improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction equipment, and in particular relates to an intelligent automatic digging device for a deep foundation pit enlargement head. Background Art

[0002] ‌Deep foundation pit enlarged head‌ is an anchor cable construction method specially designed to solve the problem of insufficient anchoring force of anchor cables in deep foundation pit support, especially in soft soil areas in the south. This method can significantly reduce the length of the anchor section and reduce engineering interference in adjacent areas through the use of enlarged head anchor cables, while saving engineering costs. The main difference between enlarged head anchor cables and ordinary tension anchor cables is that the force point of the enlarged head anchor cable is located at the front end of the anchor body, and the force is transmitted to the anchor body through the pressure plate located at the top of the anchor section, so that the anchor body is stressed as a whole, thereby giving full play to the role of the anchor body. This design not only improves the safety of the project, but also reduces the creep of the anchor cable and improves the performance of the project.

[0003] If you want to use the enlarged head anchor cable construction method, you need to expand the space at the bottom of the anchor hole when digging the anchor hole for installing the anchor cable. Traditional drilling equipment is difficult to complete this operation. In addition, when expanding the space at the bottom of the anchor hole, it is also very difficult to discharge the excavated waste, which greatly affects the construction efficiency. Summary of the invention

[0004] The technical problem to be solved by the present invention is to overcome the shortcomings of the above-mentioned prior art and provide an intelligent automatic excavation device for a deep foundation pit enlargement head. The present invention can conveniently expand the space at the bottom of the anchor hole to facilitate the installation of the enlarged head anchor cable, and can conveniently discharge the waste slag generated by excavating the anchor hole, thereby effectively improving the construction efficiency.

[0005] The technical solution adopted to solve the above technical problems is: an intelligent automatic excavation device for a deep foundation pit enlargement head, comprising a base plate, an outer probe tube and an inner probe tube, wherein the base plate is fixedly arranged on the ground, the inner probe tube is fixedly connected to the base plate, the outer probe tube is rotatably connected to the inner probe tube, a drill bit is fixedly connected to the bottom of the outer probe tube, an expansion mechanism is arranged at the lower part of the outer probe tube, an adjustment tube is slidably connected to the outer probe tube, a drive motor is fixedly connected to the base plate, and the drive motor can drive the outer probe tube to rotate; The adjusting tube can drive the expansion mechanism by vertically sliding on the outer probe tube; The expansion mechanism can be extended or contracted.

[0006] Through the above technical scheme, when digging the anchor hole, the base plate is fixed on the ground, the drill bit on the outer probe tube is aligned with the digging location, the drive motor is started, the drive motor drives the outer probe tube to rotate, and the rotation of the outer probe tube drives the drill bit to rotate, thereby starting the digging of the anchor hole. When the excavation depth of the anchor hole is reached, the adjustment tube slides vertically on the outer probe tube to drive the expansion mechanism to extend, and the outer probe tube continues to rotate. After the expansion mechanism extends, it rotates with the outer probe tube, so that the bottom of the anchor hole is gradually expanded, and the waste slag generated during the excavation of the anchor hole can be discharged through the inner probe tube, so that the anchor hole with the enlarged bottom can be easily excavated, thereby improving the construction efficiency of the enlarged head anchor cable construction method.

[0007] Furthermore, a driven gear is fixedly connected to the top of the outer probe tube, and a driving gear is fixedly connected to the bottom of the driving motor shaft, and the driving gear is meshed with the driven gear.

[0008] Through the above technical solution, since a driven gear is fixedly connected to the top of the outer probe tube and a driving gear is fixedly connected to the bottom of the driving motor shaft, the driving gear is meshed with the driven gear, and the outer probe tube is rotatably connected to the inner probe tube, so that the rotation of the driving motor can drive the outer probe tube to rotate.

[0009] Furthermore, the expansion mechanism includes an adjustment component, an expansion component and an elastic enclosure, the adjustment component is slidably connected to the outer probe tube, the expansion component is hinged on the adjustment component, and the elastic enclosure is fixedly connected to the expansion component.

[0010] Through the above technical solution, since the adjustment component is slidably connected to the outer probe tube and the expansion component is hinged on the adjustment component, the adjustment component slides on the outer probe tube to drive the expansion component to extend or contract.

[0011] Furthermore, the adjustment assembly includes an upper adjustment disk and a lower adjustment disk, the outer probe penetrates the upper adjustment disk and the lower adjustment disk, and the upper adjustment disk and the lower adjustment disk are fixedly connected by an arc rod.

[0012] Through the above technical solution, since the outer probe tube passes through the upper adjustment plate and the lower adjustment plate, the upper adjustment plate and the lower adjustment plate are fixedly connected by the arc rod, so that the upper adjustment plate slides on the outer probe tube and can drive the lower adjustment plate to slide on the outer probe tube at the same time.

[0013] Furthermore, there are multiple expansion components, and the expansion components are equidistantly arranged on the adjustment component. The expansion component includes an arc scraper, a main rod and a support rod. The arc scraper is hinged at the top of the main rod. A base plate is fixedly connected above the drill bit on the outer probe tube. The bottom of the main rod is hinged to the base plate, the top of the support rod is hinged to the main rod, and the bottom of the support rod is hinged to the lower adjustment plate.

[0014] Through the above technical scheme, since the arc scraper is hinged at the top of the main rod, a base plate is fixedly connected above the drill bit on the outer probe tube, the bottom of the main rod is hinged to the base plate, the top of the support rod is hinged to the main rod, and the bottom of the support rod is hinged to the lower adjustment plate, the lower adjustment plate slides on the outer probe tube to drive the support rod to extend or contract, and the extension or contraction of the support rod can drive the main rod to extend or contract, and the arc scraper can extend or contract with the main rod.

[0015] Furthermore, the main rod is provided with a through slot, and the elastic enclosure is fixedly connected to the plurality of main rods via the through slot, and the elastic enclosure can be extended or contracted along with the main rods.

[0016] Through the above technical scheme, since the elastic enclosure can extend or contract with the main rod, after the main rod is extended, the arc scraper extends with the main rod. At this time, the outer probe rotates and the arc scraper rotates accordingly. The arc scraper can excavate the inner wall of the bottom of the anchor hole. The main rod can also excavate the inner wall of the bottom of the anchor hole at the same time, thereby expanding the space at the bottom of the anchor hole, and the waste slag generated during the excavation process can be collected by the elastic enclosure.

[0017] Furthermore, a telescopic assembly is fixedly connected to the top of the adjusting cylinder, and the top of the adjusting cylinder can be clamped with the upper adjusting disk.

[0018] With the above technical solution, since the top of the adjusting tube can be clamped with the upper adjusting disk, when the adjusting tube slides on the outer probe tube, it can drive the upper adjusting disk to slide on the outer probe tube, that is, drive the adjusting assembly to slide on the outer probe tube.

[0019] Furthermore, a connecting block is symmetrically fixedly connected to the top of the adjusting cylinder, elastic balls are arranged on both sides of the connecting block, and a rectangular groove and a circular groove are correspondingly arranged on the bottom of the upper adjusting plate, the circular grooves are symmetrically arranged on both sides of the rectangular groove, the connecting block can be clamped in the rectangular groove, and the elastic ball can be clamped in the circular groove.

[0020] Through the above technical scheme, since the top of the adjusting cylinder is symmetrically fixedly connected with a connecting block, elastic balls are arranged on both sides of the connecting block, and a rectangular groove and a circular groove are correspondingly arranged on the bottom of the upper adjusting disk, and the circular grooves are symmetrically arranged on both sides of the rectangular groove, the connecting block can be clamped in the rectangular groove, so that when the adjusting cylinder slides vertically upward on the outer probe tube, after the top of the adjusting cylinder contacts the upper adjusting disk, the connecting block is clamped in the rectangular groove, and the elastic ball is clamped in the circular groove, so that the top of the adjusting cylinder is clamped with the upper adjusting disk. At this time, the vertical sliding of the adjusting cylinder on the outer probe tube can drive the upper adjusting disk to slide vertically on the outer probe tube, that is, drive the lower adjusting disk to slide vertically on the outer probe tube; When the adjusting cylinder descends and drives the lower adjusting disk to descend to the lowest position, the adjusting cylinder continues to descend, the top of the adjusting cylinder can be released from the clamping connection with the upper adjusting disk, and the adjusting cylinder can continue to descend.

[0021] Furthermore, the telescopic assembly includes a rotating disk and an electric telescopic rod, the top of the electric telescopic rod is fixed to the rotating disk, the bottom of the electric telescopic rod is fixedly connected to the adjustment cylinder, and the rotating disk is rotatably connected to the bottom of the base plate.

[0022] Through the above technical solution, since the top of the electric telescopic rod is fixed to the rotating disk and the bottom of the electric telescopic rod is fixedly connected to the adjusting tube, the extension and retraction of the electric telescopic rod can drive the adjusting tube to slide vertically on the outer probe tube, and the connecting rod connecting the electric telescopic rod and the adjusting tube passes through the driven gear, and the rotating disk is rotatably connected to the bottom of the base plate, so that when the driving motor drives the outer probe tube to rotate, the adjusting tube can rotate accordingly.

[0023] Furthermore, a first grid is provided at the lower part of the outer probe tube, the bottom of the drill bit is hollowed out, the inner probe tube passes through the substrate, the inner probe tube includes a second grid, a filter screen and a joint, the second grid and the first grid are arranged at the same height, the filter screen is fixedly connected to the bottom of the inner probe tube, and a joint is fixedly connected to the top of the inner probe tube, and the joint is arranged above the substrate.

[0024] According to the above technical solution, since a first grid is provided at the lower part of the outer probe tube, a second grid is provided on the inner probe tube, and the second grid and the first grid are provided at the same height, the waste residue generated by excavation after the expansion mechanism is deployed can enter the inner probe tube through the first grid and the second grid; During excavation, the first grid on the outer probe rotates with the outer probe, so that when the waste residue passes through the first grid and the second grid, the mutual rotation of the first grid and the second grid grinds and crushes the waste residue, thereby reducing the volume and weight of the waste residue and facilitating discharge; Since the bottom of the drill bit is hollowed out, the filter screen is fixedly connected to the bottom of the inner probe tube, so that the waste residue produced by the drill bit can enter the inner probe tube through the filter screen; Since a joint is fixedly connected to the top of the inner probe tube, the inner probe tube can be connected to a dust suction pipe to suck out the waste residue entering the inner probe tube, thereby facilitating the discharge of the waste residue generated by excavation.

[0025] The beneficial effects of the present invention are as follows: (1) In the present invention, the adjusting tube drives the lower adjusting plate to slide upward on the outer probe tube to drive the support rod to extend, and the extension of the support rod can drive the main rod to extend, and the arc scraper can extend with the main rod, and the outer probe tube continues to rotate, and the arc scraper rotates accordingly. The arc scraper can dig the inner wall of the bottom of the anchor hole, and the main rod can also dig the inner wall of the bottom of the anchor hole at the same time, thereby expanding the space at the bottom of the anchor hole, facilitating the construction of the enlarged head anchor cable construction method, and simplifying the construction difficulty; (2) In the present invention, the adjusting tube drives the lower adjusting plate to slide downward on the outer probe tube, which can drive the support rod to contract, and the contraction of the support rod can drive the main rod to contract, and the arc scraper can contract with the main rod. At this time, the elastic enclosure also contracts, so that the waste slag generated by excavation gathers toward the first grid. The first grid on the outer probe tube rotates with the outer probe tube, so that when the waste slag passes through the first grid and the second grid, the mutual rotation of the first grid and the second grid grinds the waste slag, thereby reducing the volume and weight of the waste slag, facilitating discharge, and improving work efficiency; (3) After the expansion of the bottom space of the anchor hole in the present invention is completed, the adjusting cylinder descends and drives the lower adjusting plate to descend to the lowest point, and then the adjusting cylinder continues to descend, and the top of the adjusting cylinder can be released from the upper adjusting plate. At this time, the expansion mechanism is in a contracted state, and the adjusting cylinder continues to descend until the adjusting cylinder descends to wrap the expansion mechanism, thereby providing comprehensive protection for the expansion mechanism, making it convenient to pull the entire device out of the anchor hole after the excavation is completed, which not only protects the device, but also simplifies the operation and improves the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of the intelligent automatic excavation device for the deep foundation pit enlargement head of the present invention; Figure 2 It is a schematic structural diagram of the cooperation between the outer probe tube and the driving motor of the intelligent automatic excavation device for the deep foundation pit enlargement head of the present invention; Figure 3 It is a schematic diagram of the structure of the outer probe tube of the intelligent automatic digging device for the deep foundation pit enlargement head of the present invention; Figure 4 It is a structural schematic diagram of the expansion mechanism of the intelligent automatic digging device for the deep foundation pit enlargement head of the present invention; Figure 5 It is a structural schematic diagram of the expansion mechanism and the outer probe tube of the deep foundation pit enlargement head intelligent automatic excavation device of the present invention when they cooperate; Figure 6 It is a schematic diagram of the internal structure of the expansion mechanism of the intelligent automatic excavation device for the deep foundation pit enlargement head of the present invention; Figure 7 It is a schematic diagram of the exploded structure of the expansion mechanism of the intelligent automatic excavation device for the deep foundation pit enlargement head of the present invention; Figure 8 It is a structural schematic diagram of the expansion assembly of the deep foundation pit enlargement head intelligent automatic digging device of the present invention; Fig. 9 It is a schematic diagram of the exploded structure of the expansion assembly of the deep foundation pit enlargement head intelligent automatic digging device of the present invention; Fig.10 It is a schematic structural diagram of the coordination between the adjusting cylinder and the adjusting assembly of the intelligent automatic digging device for the deep foundation pit enlargement head of the present invention; Fig.11 It is a structural schematic diagram of the adjustment cylinder and telescopic components of the intelligent automatic digging device for the deep foundation pit enlargement head of the present invention; Fig.12 It is a structural schematic diagram of the adjustment cylinder of the intelligent automatic digging device for the deep foundation pit enlargement head of the present invention; Fig.13 The invention discloses an intelligent automatic excavation device for a deep foundation pit enlargement head. Fig.12 A partial enlarged view of the middle A; Fig.14 It is a structural schematic diagram of the telescopic assembly of the deep foundation pit enlargement head intelligent automatic digging device of the present invention; Fig.15 It is a schematic structural diagram of the cooperation between the outer probe tube and the inner probe tube of the intelligent automatic excavation device for the deep foundation pit enlargement head of the present invention; Fig.16 The invention discloses an intelligent automatic excavation device for a deep foundation pit enlargement head. Fig.15 A partial enlarged view of point B in the middle; Fig.17 It is a structural schematic diagram of the inner probe tube of the intelligent automatic excavation device for the deep foundation pit enlargement head of the present invention from the first perspective; Fig.18 It is a structural schematic diagram of the second viewing angle of the inner probe tube of the intelligent automatic excavation device of the deep foundation pit enlargement head of the present invention.

[0027] : 1. base plate; 2. outer probe tube; 3. expansion mechanism; 4. adjustment tube; 5. drive motor; 6. inner probe tube; 21. driven gear; 22. drill bit; 23. first grille; 24. base plate; 31. adjustment assembly; 32. expansion assembly; 33. elastic enclosure; 311. upper adjustment plate; 312. lower adjustment plate; 321. arc scraper; 322. main rod; 323. support rod; 3221. through groove; 41. telescopic assembly; 42. connecting block; 411. rotating disk; 412. electric telescopic rod; 421. elastic ball; 51. drive gear; 61. second grille; 62. filter screen; 63. joint. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0029] like Figure 1 - Figure 3 As shown, the deep foundation pit enlargement head intelligent automatic excavation device comprises a base plate 1, an outer probe tube 2 and an inner probe tube 6, the base plate 1 is fixedly arranged on the ground, the inner probe tube 6 is fixedly connected to the base plate 1, the outer probe tube 2 is rotatably connected to the inner probe tube 6, a drill bit 22 is fixedly connected to the bottom of the outer probe tube 2, an expansion mechanism 3 is arranged at the lower part of the outer probe tube 2, an adjustment tube 4 is slidably connected to the outer probe tube 2, and a drive motor 5 is fixedly connected to the base plate 1, and the drive motor 5 can drive the outer probe tube 2 to rotate; The adjusting tube 4 slides vertically on the outer probe tube 2 to drive the expansion mechanism 3; The expansion mechanism 3 can be extended or contracted.

[0030] In this embodiment, when digging an anchor hole, the base plate 1 is fixed on the ground, the drill bit 22 on the outer probe tube 2 is aligned with the digging location, and the drive motor 5 is started. The drive motor 5 drives the outer probe tube 2 to rotate, and the rotation of the outer probe tube 2 drives the drill bit 22 to rotate, thereby starting the digging of the anchor hole. When the digging depth of the anchor hole is reached, the adjustment tube 4 slides vertically on the outer probe tube 2 to drive the expansion mechanism 3 to extend, and the outer probe tube 2 continues to rotate. After the expansion mechanism 3 extends, it rotates with the outer probe tube 2, so that the bottom of the anchor hole is gradually expanded, and the waste slag generated during the excavation of the anchor hole can be discharged through the inner probe tube 6, so that the anchor hole with an enlarged bottom can be easily excavated, thereby improving the construction efficiency of the enlarged head anchor cable construction method.

[0031] like Figure 2 - Figure 3 As shown, a driven gear 21 is fixedly connected to the top of the outer probe tube 2 , and a driving gear 51 is fixedly connected to the bottom of the rotating shaft of the driving motor 5 , and the driving gear 51 is meshed with the driven gear 21 .

[0032] In this embodiment, since a driven gear 21 is fixedly connected to the top of the outer probe tube 2, and a driving gear 51 is fixedly connected to the bottom of the rotating shaft of the driving motor 5, the driving gear 51 is meshed with the driven gear 21, and the outer probe tube 2 is rotatably connected to the inner probe tube 6, so that the rotation of the driving motor 5 can drive the outer probe tube 2 to rotate.

[0033] like Figure 3 - Fig. 9 As shown, the expansion mechanism 3 includes an adjustment component 31, an expansion component 32 and an elastic enclosure 33, the adjustment component 31 is slidably connected to the outer probe tube 2, the expansion component 32 is hinged on the adjustment component 31, and the elastic enclosure 33 is fixedly connected to the expansion component 32; The adjustment assembly 31 includes an upper adjustment disk 311 and a lower adjustment disk 312. The outer probe 2 passes through the upper adjustment disk 311 and the lower adjustment disk 312. The upper adjustment disk 311 and the lower adjustment disk 312 are fixedly connected by an arc rod. There are multiple expansion components 32, which are equidistantly arranged around the adjustment component 31. The expansion component 32 includes an arc scraper 321, a main rod 322 and a support rod 323. The arc scraper 321 is hinged at the top of the main rod 322. A base plate 24 is fixedly connected above the drill bit 22 on the outer probe tube 2. The bottom of the main rod 322 is hinged to the base plate 24. The top of the support rod 323 is hinged to the main rod 322. The bottom of the support rod 323 is hinged to the lower adjustment plate 312. A through slot 3221 is provided on the main rod 322 , and the elastic enclosure 33 is fixedly connected to the plurality of main rods 322 via the through slot 3221 . The elastic enclosure 33 can be extended or contracted along with the main rod 322 .

[0034] In this embodiment, the upper adjustment plate 311 slides on the outer probe tube 2 to drive the lower adjustment plate 312 to slide on the outer probe tube 2 at the same time, and the lower adjustment plate 312 slides on the outer probe tube 2 to drive the support rod 323 to extend or contract, and the extension or contraction of the support rod 323 can drive the main rod 322 to extend or contract, and the arc scraper 321 can extend or contract with the main rod 322; After the main rod 322 is extended, the arc scraper 321 is extended with the main rod 322. At this time, the outer probe tube 2 rotates, and the arc scraper 321 rotates accordingly. The arc scraper 321 can dig the inner wall of the bottom of the anchor hole. The main rod 322 can also dig the inner wall of the bottom of the anchor hole at the same time, thereby expanding the space at the bottom of the anchor hole, and the waste slag generated during the excavation process can be collected by the elastic enclosure 33.

[0035] like Fig.10 - Fig.14 As shown, the top of the adjusting cylinder 4 is fixedly connected with a telescopic assembly 41, and the top of the adjusting cylinder 4 can be snap-fitted with the upper adjusting disk 311; The top of the adjusting cylinder 4 is symmetrically fixedly connected with a connecting block 42, and elastic balls 421 are arranged on both sides of the connecting block 42. A rectangular groove and a circular groove are correspondingly arranged at the bottom of the upper adjusting disk 311, and the circular grooves are symmetrically arranged on both sides of the rectangular groove. The connecting block 42 can be clamped in the rectangular groove, and the elastic balls 421 can be clamped in the circular groove. The telescopic assembly 41 includes a rotating disk 411 and an electric telescopic rod 412 . The top of the electric telescopic rod 412 is fixed to the rotating disk 411 , the bottom of the electric telescopic rod 412 is fixedly connected to the adjustment cylinder 4 , and the rotating disk 411 is rotatably connected to the bottom of the base plate 1 .

[0036] In this embodiment, the electric telescopic rod 412 can drive the adjustment tube 4 to slide vertically on the outer probe tube 2, and the connecting rod connecting the electric telescopic rod 412 and the adjustment tube 4 passes through the driven gear 21, and the rotating disk 411 is rotatably connected to the bottom of the base plate 1, so that when the driving motor 5 drives the outer probe tube 2 to rotate, the adjustment tube 4 can rotate accordingly; When the adjusting tube 4 slides vertically upward on the outer probe tube 2, after the top of the adjusting tube 4 contacts the upper adjusting disk 311, the connecting block 42 is clamped in the rectangular groove, and the elastic ball 421 is clamped in the circular groove, so that the top of the adjusting tube 4 is clamped with the upper adjusting disk 311. At this time, the vertical sliding of the adjusting tube 4 on the outer probe tube 2 can drive the upper adjusting disk 311 to slide vertically on the outer probe tube 2, that is, drive the lower adjusting disk 312 to slide vertically on the outer probe tube 2; When the adjusting cylinder 4 descends and drives the lower adjusting disk 312 to descend to the lowest point, the adjusting cylinder 4 continues to descend, the top of the adjusting cylinder 4 can be released from the clamping connection with the upper adjusting disk 311, and the adjusting cylinder 4 can continue to descend.

[0037] like Fig.15 - Fig.18As shown, a first grid 23 is provided at the lower part of the outer probe tube 2, the bottom of the drill bit 22 is hollowed out, the inner probe tube 6 passes through the substrate 1, the inner probe tube 6 includes a second grid 61, a filter screen 62 and a joint 63, the second grid 61 and the first grid 23 are arranged at the same height, the filter screen 62 is fixedly connected to the bottom of the inner probe tube 6, and a joint 63 is fixedly connected to the top of the inner probe tube 6, and the joint 63 is arranged above the substrate 1.

[0038] In this embodiment, since the first grid 23 is provided at the lower part of the outer probe tube 2, the second grid 61 is provided on the inner probe tube 6, and the second grid 61 and the first grid 23 are provided at the same height, the waste residue generated by excavation after the expansion mechanism 3 is deployed can enter the inner probe tube 6 through the first grid 23 and the second grid 61; During excavation, the first grid 23 on the outer probe tube 2 rotates with the outer probe tube 2, so that when the waste residue passes through the first grid 23 and the second grid 61, the mutual rotation of the first grid 23 and the second grid 61 grinds and crushes the waste residue, thereby reducing the volume and weight of the waste residue and facilitating discharge; Since the bottom of the drill bit 22 is hollowed out, the filter screen 62 is fixedly connected to the bottom of the inner probe tube 6, so that the waste residue produced by the drill bit 22 can enter the inner probe tube 6 through the filter screen 62; Since the top of the inner probe tube 6 is fixedly connected with a joint 63, the inner probe tube 6 can be connected to a dust suction pipe to suck out the waste residue entering the inner probe tube 6, thereby facilitating the discharge of the waste residue generated by excavation.

[0039] Working principle: During operation, the base plate 1 is fixed on the ground, the drill bit 22 on the outer probe tube 2 is aligned with the excavation site, the drive motor 5 is started, the drive motor 5 drives the outer probe tube 2 to rotate, and the rotation of the outer probe tube 2 drives the drill bit 22 to rotate, thereby starting the excavation of the anchor hole; Since the bottom of the drill bit 22 is hollowed out, the filter screen 62 is fixedly connected to the bottom of the inner probe tube 6, so that the waste residue produced by the drill bit 22 can enter the inner probe tube 6 through the filter screen 62; When the excavation depth of the anchor hole is reached, the electric telescopic rod 412 is started to drive the adjusting cylinder 4 to slide vertically upward on the outer probe tube 2. After the top of the adjusting cylinder 4 contacts the upper adjusting disk 311, the connecting block 42 is clamped in the rectangular groove, and the elastic ball 421 is clamped in the circular groove, so that the top of the adjusting cylinder 4 is clamped with the upper adjusting disk 311. At this time, the vertical sliding of the adjusting cylinder 4 on the outer probe tube 2 can drive the upper adjusting disk 311 to slide vertically on the outer probe tube 2, that is, drive the lower adjusting disk 312 to slide vertically on the outer probe tube 2; The adjusting tube 4 drives the lower adjusting disk 312 to slide upward on the outer probe tube 2 to drive the support rod 323 to extend, and the extension of the support rod 323 can drive the main rod 322 to extend, and the arc scraper 321 can extend with the main rod 322, and the outer probe tube 2 continues to rotate, and the arc scraper 321 rotates accordingly, and the arc scraper 321 can dig the inner wall of the bottom of the anchor hole, and the main rod 322 can also dig the inner wall of the bottom of the anchor hole at the same time, so as to expand the bottom space of the anchor hole, and the waste residue generated during the excavation process can be collected by the elastic enclosure 33; The adjusting tube 4 drives the lower adjusting plate 312 to slide downward on the outer probe tube 2, which can drive the support rod 323 to contract, and the contraction of the support rod 323 can drive the main rod 322 to contract, and the arc scraper 321 can contract with the main rod 322. When the arc scraper 321 contracts, the waste residue produced by excavation can be pushed into the elastic enclosure 33. At this time, the elastic enclosure 33 also contracts accordingly, so that the waste residue produced by excavation gathers toward the first grid 23; The first grid 23 on the outer probe tube 2 rotates with the outer probe tube 2, so that when the waste residue passes through the first grid 23 and the second grid 61, the mutual rotation of the first grid 23 and the second grid 61 grinds the waste residue, thereby reducing the volume and weight of the waste residue and facilitating discharge; A joint 63 is fixedly connected to the top of the inner probe tube 6, so that the inner probe tube 6 can be connected to a dust suction pipe to suck out the waste residue entering the inner probe tube 6, so as to conveniently discharge the waste residue generated by excavation; After the expansion of the bottom space of the anchor hole is completed, the adjusting cylinder 4 descends and drives the lower adjusting disk 312 to descend to the lowest point. Then the adjusting cylinder 4 continues to descend, and the top of the adjusting cylinder 4 can be released from the upper adjusting disk 311. At this time, the expansion mechanism 3 is in a contracted state, and the adjusting cylinder 4 continues to descend until the adjusting cylinder 4 descends to wrap the expansion mechanism 3, thereby fully protecting the expansion mechanism 3, making it convenient to pull the entire device out of the anchor hole after the excavation is completed, thereby improving work efficiency.

[0040] The above description is only a preferred embodiment of the present invention and is not intended to limit the protection scope of the present invention.

Claims

1. An intelligent automatic excavation device for a deep foundation pit enlargement head, comprising a base plate (1), an outer probe tube (2) and an inner probe tube (6), characterized in that: The base plate (1) is fixedly arranged on the ground, the inner probe tube (6) is fixedly connected to the base plate (1), the outer probe tube (2) is rotatably connected to the inner probe tube (6), a drill bit (22) is fixedly connected to the bottom of the outer probe tube (2), an expansion mechanism (3) is arranged at the bottom of the outer probe tube (2), an adjustment tube (4) is slidably connected to the outer probe tube (2), and a drive motor (5) is fixedly connected to the base plate (1), and the drive motor (5) can drive the outer probe tube (2) to rotate; The adjusting tube (4) can drive the expansion mechanism (3) by vertically sliding on the outer probe tube (2); The expansion mechanism (3) is capable of extending or contracting.

2. According to claim 1, the intelligent automatic excavation device for deep foundation pit enlargement head is characterized in that: The top of the outer probe tube (2) is fixedly connected to a driven gear (21), and the bottom of the rotating shaft of the drive motor (5) is fixedly connected to a drive gear (51), and the drive gear (51) is meshed with the driven gear (21).

3. According to claim 1, the intelligent automatic excavation device for deep foundation pit enlargement head is characterized in that: The expansion mechanism (3) comprises an adjustment component (31), an expansion component (32) and an elastic enclosure (33); the adjustment component (31) is slidably connected to the outer probe tube (2); the expansion component (32) is hinged to the adjustment component (31); and the elastic enclosure (33) is fixedly connected to the expansion component (32).

4. According to claim 3, the intelligent automatic excavation device for deep foundation pit enlargement head is characterized in that: The adjustment assembly (31) comprises an upper adjustment disk (311) and a lower adjustment disk (312); the outer probe (2) penetrates the upper adjustment disk (311) and the lower adjustment disk (312); and the upper adjustment disk (311) and the lower adjustment disk (312) are fixedly connected via an arc rod.

5. According to claim 4, the intelligent automatic excavation device for deep foundation pit enlargement head is characterized in that: There are a plurality of expansion components (32), and the expansion components (32) are equidistantly arranged around the adjustment component (31). The expansion component (32) comprises an arc-shaped scraper (321), a main rod (322) and a support rod (323). The arc-shaped scraper (321) is hinged to the top of the main rod (322). A base plate (24) is fixedly connected above the drill bit (22) on the outer probe tube (2). The bottom of the main rod (322) is hinged to the base plate (24). The top of the support rod (323) is hinged to the main rod (322). The bottom of the support rod (323) is hinged to the lower adjustment plate (312).

6. The deep foundation pit enlargement head intelligent automatic excavation device according to claim 5 is characterized in that: The main rod (322) is provided with a through slot (3221), and the elastic enclosure (33) is fixedly connected to the plurality of main rods (322) via the through slot (3221); the elastic enclosure (33) can extend or contract along with the main rod (322).

7. The deep foundation pit enlargement head intelligent automatic excavation device according to claim 4 is characterized in that: The top of the adjusting cylinder (4) is fixedly connected with a telescopic assembly (41), and the top of the adjusting cylinder (4) can be snap-fitted with the upper adjusting disk (311).

8. The deep foundation pit enlargement head intelligent automatic excavation device according to claim 7 is characterized in that: The top of the adjusting cylinder (4) is symmetrically fixedly connected with a connecting block (42), and elastic balls (421) are arranged on both sides of the connecting block (42). The bottom of the upper adjusting disk (311) is correspondingly provided with a rectangular groove and a circular groove, and the circular grooves are symmetrically arranged on both sides of the rectangular groove. The connecting block (42) can be clamped in the rectangular groove, and the elastic balls (421) can be clamped in the circular groove.

9. The deep foundation pit enlargement head intelligent automatic excavation device according to claim 8 is characterized in that: The telescopic assembly (41) comprises a rotating disk (411) and an electric telescopic rod (412); the top of the electric telescopic rod (412) is fixed to the rotating disk (411); the bottom of the electric telescopic rod (412) is fixedly connected to the adjustment cylinder (4); and the rotating disk (411) is rotatably connected to the bottom of the base plate (1).

10. The deep foundation pit enlargement head intelligent automatic excavation device according to claim 1 is characterized in that: A first grid (23) is arranged at the lower part of the outer probe tube (2); the bottom of the drill bit (22) is hollowed out; the inner probe tube (6) passes through the base plate (1); the inner probe tube (6) comprises a second grid (61), a filter screen (62) and a joint (63); the second grid (61) and the first grid (23) are arranged at the same height; the filter screen (62) is fixedly connected to the bottom of the inner probe tube (6); the top of the inner probe tube (6) is fixedly connected to a joint (63); the joint (63) is arranged above the base plate (1).