Monitoring information processing method, display method and device for water construction site

By setting up multiple working nodes and monitoring equipment in the water construction site, using terminal equipment to display monitoring information, and switching monitoring status according to risk probability, the problem of high data transmission and processing pressure is solved, and monitoring and management efficiency and information security are improved.

CN119338261BActive Publication Date: 2025-04-01NORTHWEST ENGINEERING CORPORATION LIMITED
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411870831.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-18
Publication Date
2025-04-01
Estimated Expiration
2044-12-18

AI Technical Summary

Technical Problem

Due to the complex environment and the large number of monitoring objects at the water construction site, the data transmission and processing pressure is high, which affects the monitoring and management efficiency.

Method used

By setting up multiple working nodes and monitoring equipment in the water construction site, monitoring information of each working node is obtained through array arrangement, and summarize and process it in the monitoring center. The monitoring information is displayed using the graphical user interface of the terminal device, and the monitoring status of the working node is switched according to the risk probability of abnormal working nodes, thereby controlling the range of data transmission and processing.

Benefits of technology

It effectively reduces the pressure of data transmission and processing, improves monitoring and management efficiency, and improves information security through permission control, which can promptly warning and reduce abnormal occurrence.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119338261B_ABST
    Figure CN119338261B_ABST
Patent Text Reader

Abstract

The present disclosure provides a monitoring information processing method, display method and device for a water construction site, and relates to the field of information monitoring technology. The monitoring information processing method includes: obtaining monitoring information of each working node in the water construction site; when the first working node is in a regular monitoring state, sending the first monitoring information of the first working node to the first terminal device, and prohibiting the first terminal device from viewing the monitoring information of other working nodes; when an abnormal working node is detected within the first relevant range, determining the risk probability of the first working node according to the abnormal working node; if the risk probability of the first working node reaches the first threshold, switching the first working node to a risk warning state, sending risk warning information to the first terminal device, and allowing the first terminal device to view the second monitoring information of the second working node. The present disclosure reduces the pressure of data transmission and processing, and improves the efficiency of monitoring and management.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of information monitoring technology, and in particular to a monitoring information processing method for a water construction site, a monitoring information display method for a water construction site, a monitoring information processing device for a water construction site, a monitoring information display device for a water construction site, and electronic equipment. Background Art

[0002] The construction site environment on the water is complex, and in order to detect abnormal conditions and deal with them in time, the site needs to be monitored. However, in large construction sites, there are many objects that need to be monitored, and there are also many related sensors and monitoring indicators, which brings very high data transmission and processing pressure to the monitoring system, affecting the efficiency of monitoring and management. Summary of the invention

[0003] The present invention provides a monitoring information processing method for a water construction site, a monitoring information display method for a water construction site, a monitoring information processing device for a water construction site, a monitoring information display device for a water construction site and electronic equipment, so as to at least to some extent solve the problems of high pressure on data transmission and processing and low monitoring and management efficiency.

[0004] According to a first aspect of the present disclosure, a method for processing monitoring information of an above-water construction site is provided, the method comprising: acquiring monitoring information of each working node in the above-water construction site; the above-water construction site comprises a plurality of working nodes arranged in an array, and is provided with a monitoring device for collecting monitoring information; when a first working node in the above-water construction site is in a regular monitoring state, first monitoring information of the first working node is sent to a first terminal device associated with the first working node, so that the first terminal device displays the first monitoring information in an information monitoring interface, and prohibits the first terminal device from viewing the monitoring information of other working nodes; when an abnormal working node is detected within a first relevant range of the first working node, determining a risk probability of the first working node according to the abnormal working node; if the risk probability of the first working node reaches a first threshold, switching the first working node to a risk warning state, sending risk warning information to the first terminal device, and allowing the first terminal device to view second monitoring information of a second working node; the second working node includes the abnormal working node.

[0005] According to a second aspect of the present disclosure, a method for displaying monitoring information of an above-water construction site is provided, the method comprising: displaying an information monitoring interface of the above-water construction site through a graphical user interface of a first terminal device; the above-water construction site comprises a plurality of working nodes arranged in an array; when a first working node in the above-water construction site is in a regular monitoring state, obtaining first monitoring information of the first working node, and displaying the first monitoring information in the information monitoring interface; the first working node is a working node associated with the first terminal device; when the first working node is in a risk warning state, receiving risk warning information, and obtaining permission to view second monitoring information of a second working node; wherein the risk warning information is information sent to the first terminal device by the monitoring center when it is determined that the risk probability of the first working node reaches a first threshold based on an abnormal working node in the above-water construction site; the abnormal working node is within a first related range of the first working node, and the second working node includes the abnormal working node.

[0006] According to a third aspect of the present disclosure, a monitoring information processing device for a water construction site is provided, the device comprising: an information acquisition module, configured to acquire monitoring information of each working node in the water construction site; the water construction site comprises a plurality of working nodes arranged in an array, and is provided with a monitoring device for collecting monitoring information; a conventional monitoring processing module, configured to, when a first working node in the water construction site is in a conventional monitoring state, send first monitoring information of the first working node to a first terminal device associated with the first working node, so that the first terminal device displays the first monitoring information in an information monitoring interface, and prohibits the first terminal device from viewing monitoring information of other working nodes; a risk probability determination module, configured to, when an abnormal working node is detected to exist within a first relevant range of the first working node, determine the risk probability of the first working node according to the abnormal working node; a risk warning processing module, configured to, if the risk probability of the first working node reaches a first threshold, switch the first working node to a risk warning state, send risk warning information to the first terminal device, and allow the first terminal device to view second monitoring information of a second working node; the second working node includes the abnormal working node.

[0007] According to a fourth aspect of the present disclosure, a monitoring information display device for a water construction site is provided, the device comprising: an information monitoring interface display module, configured to display an information monitoring interface of the water construction site through a graphical user interface of a first terminal device; the water construction site comprises a plurality of working nodes arranged in an array; a conventional monitoring module, configured to obtain first monitoring information of the first working node in the water construction site when the first working node is in a conventional monitoring state, and to display the first monitoring information in the information monitoring interface; the first working node is a working node associated with the first terminal device; a risk warning module, configured to receive risk warning information when the first working node is in a risk warning state, and to obtain permission to view second monitoring information of a second working node; wherein the risk warning information is information sent to the first terminal device by the monitoring center when it is determined that the risk probability of the first working node reaches a first threshold based on an abnormal working node in the water construction site; the abnormal working node is within a first related range of the first working node, and the second working node includes the abnormal working node.

[0008] According to a fifth aspect of the present disclosure, a computer program product is provided, including a computer program, wherein when the computer program is executed by a processor, the method of the first or second aspect and possible implementation manners thereof are implemented.

[0009] According to a sixth aspect of the present disclosure, an electronic device is provided, comprising: a processor; and a memory for storing executable instructions of the processor; wherein the processor is configured to execute the method of the first or second aspect and its possible implementation method by executing the executable instructions.

[0010] The technical solution disclosed in this disclosure has the following beneficial effects:

[0011] On the one hand, for the first terminal device, in the normal monitoring state, it is only allowed to view the first monitoring information of the associated first working node, and in the risk warning state, it is allowed to view the second monitoring information of the second working node. In this way, the scope of monitoring information that can be viewed by each terminal device in the normal monitoring state is limited, and only the monitoring information of the associated working node is provided for each terminal device, which reduces the pressure of data transmission and processing, improves the efficiency of monitoring and management, and improves information security by controlling the authority to view monitoring information. On the other hand, when there is an abnormal working node within the first relevant range of the first working node, the risk probability of the first working node being abnormal is predicted, and when the risk probability reaches the first threshold, the risk warning information is sent to the first terminal device, so that the staff can issue a warning before the abnormality actually occurs in the first working node, which is conducive to reducing the occurrence of abnormalities and reducing the impact of abnormal situations. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 A schematic diagram showing a system architecture in this exemplary embodiment.

[0013] Figure 2 A flow chart showing a method for processing monitoring information of an above-water construction site in this exemplary embodiment.

[0014] Figure 3 A flow chart for determining risk probability in this exemplary embodiment is shown.

[0015] Figure 4 Another flow chart for determining risk probability in this exemplary embodiment is shown.

[0016] Figure 5 A flow chart of sending second monitoring information in this exemplary embodiment is shown.

[0017] Figure 6 A flow chart showing a method for displaying monitoring information of an above-water construction site in this exemplary embodiment.

[0018] Fig. 7A A schematic diagram showing an information monitoring interface in this exemplary embodiment.

[0019] Figure 7B A schematic diagram showing another information monitoring interface in this exemplary embodiment.

[0020] Figure 8 A schematic structural diagram of a monitoring information processing device for a water construction site in this exemplary embodiment is shown.

[0021] Fig. 9 A schematic structural diagram of a monitoring information display device for a water construction site in this exemplary embodiment is shown.

[0022] Fig.10 A schematic structural diagram of an electronic device in this exemplary embodiment is shown. DETAILED DESCRIPTION

[0023] Exemplary embodiments of the present disclosure will be described more fully hereinafter with reference to the accompanying drawings.

[0024] The accompanying drawings are schematic diagrams of the present disclosure and are not necessarily drawn to scale. Some of the block diagrams shown in the accompanying drawings may be functional entities and do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software form, or in hardware modules or integrated circuits, or in networks, processors or microcontrollers. The embodiments can be implemented in various forms and should not be construed as being limited to the examples set forth herein. The features, structures or characteristics described in the present disclosure may be combined in one or more embodiments in any suitable manner. In the description below, many specific details are provided to provide a full description of the embodiments of the present disclosure. However, those skilled in the art should appreciate that one or more specific details may be omitted when implementing the technical solution of the present disclosure, or one or more specific details may be replaced by other methods, components, devices, steps, etc.

[0025] The environment of the water construction site is complex. Factors such as weather, water flow, organisms, and external ships may affect the site and may cause abnormal conditions or even endanger construction safety. In order to detect abnormal conditions in a timely manner and deal with them, the site needs to be monitored. However, in large construction sites, there are a large number of objects that need to be monitored. For example, at the construction site of offshore photovoltaics, both the deployed and deployed photovoltaic units need to be monitored, and the number is very large. In addition, there are many related sensors and monitoring indicators. For example, sensors for monitoring the external environment and multiple performance indicators of the objects to be monitored are set up to generate a large amount of monitoring information in real time. As a result, the monitoring system is subjected to very high data transmission and processing pressure. In severe cases, data transmission and processing delays are caused, affecting monitoring efficiency and may result in the inability to detect abnormalities in a timely manner.

[0026] In view of the above problems, an exemplary embodiment of the present disclosure provides a monitoring information processing method and a monitoring information display method for a water construction site, which can reduce the pressure of data transmission and processing during the monitoring process of the water construction site and improve the monitoring and management efficiency.

[0027] Figure 1 The system architecture of this exemplary embodiment is shown. The system architecture 100 may include a monitoring device 110, a monitoring center 120, and a terminal device 130. The monitoring device 110 is set in the water construction site and may include sensors for monitoring the external environment and the performance indicators of the working node itself. For example, each working node in the water construction site may be equipped with a certain number and type of sensors for collecting monitoring information of each working node, such as Figure 1It is shown that each photovoltaic unit in the construction site of offshore photovoltaic can be equipped with a monitoring device 110 to realize refined monitoring based on working nodes. The monitoring center 120 is the central part of the entire system architecture 100, which is used to summarize, store and process the monitoring information collected by the monitoring device 110, and can also perform authority control on the terminal device 130. The monitoring center 120 can be deployed at a construction command site on land, which may include one or more components in a server, a database, a monitoring center terminal, and a monitoring large screen. The terminal device 130 refers to a mobile phone, a tablet computer, a personal computer and other devices used by relevant staff, which is installed with a monitoring application so that the staff can remotely monitor the status of the on-site working nodes through the terminal device 130. In particular, when the staff carries the terminal device 130 with them, they can view the monitoring information of the working node at any time and immediately obtain relevant information when an abnormality occurs. Wireless or wired communication links are deployed between the monitoring device 110 and the monitoring center 120, and between the monitoring center 120 and the terminal device 130 to realize data transmission. In addition, a communication link may also be deployed between the monitoring device 110 and the terminal device 130 , so that the monitoring device 110 and the terminal device 130 can communicate directly.

[0028] In one implementation, the monitoring information processing method of the water construction site may be executed by the monitoring center 120 , and the monitoring information display method may be executed by the terminal device 130 .

[0029] In one embodiment, the monitoring information processing method of the water construction site can refer to Figure 2 As shown, the following steps S210 to S240 are included:

[0030] Step S210, obtaining monitoring information of each working node in the water construction site; the water construction site includes a plurality of working nodes arranged in an array and is provided with monitoring equipment for collecting monitoring information;

[0031] Step S220, when the first working node in the water construction site is in a regular monitoring state, sending the first monitoring information of the first working node to a first terminal device associated with the first working node, so that the first terminal device displays the first monitoring information in the information monitoring interface, and prohibiting the first terminal device from viewing the monitoring information of other working nodes;

[0032] Step S230, when it is detected that there is an abnormal working node within the first relevant range of the first working node, determine the risk probability of the first working node according to the abnormal working node;

[0033] Step S240, if the risk probability of the first working node reaches the first threshold, the first working node is switched to a risk warning state, risk warning information is sent to the first terminal device, and the first terminal device is allowed to view the second monitoring information of the second working node; the second working node includes an abnormal working node.

[0034] based on Figure 2 The method, on the one hand, for the first terminal device, in the normal monitoring state, it is only allowed to view the first monitoring information of the associated first working node, and in the risk warning state, it is allowed to view the second monitoring information of the second working node. In this way, the scope of monitoring information that can be viewed by each terminal device in the normal monitoring state is limited, and only the monitoring information of the associated working node is provided for each terminal device, which reduces the pressure of data transmission and processing, improves the efficiency of monitoring and management, and improves information security by controlling the authority to view monitoring information. On the other hand, when there is an abnormal working node within the first relevant range of the first working node, the risk probability of the abnormality of the first working node is predicted, and when the risk probability reaches the first threshold, the risk warning information is sent to the first terminal device, so that the staff can issue a warning before the abnormality actually occurs in the first working node, which is conducive to reducing the occurrence of abnormalities and reducing the impact of abnormal situations.

[0035] Below Figure 2 Provide detailed instructions for each step.

[0036] refer to Figure 2 In step S210, monitoring information of each working node in the water construction site is obtained; the water construction site includes a plurality of working nodes arranged in an array and is provided with monitoring equipment for collecting monitoring information.

[0037] Among them, a working node refers to a construction unit at a water construction site. For example, at an offshore photovoltaic construction site, a working node may include one or more pile-based photovoltaic units. Generally, a working node has a corresponding responsible staff member, and the terminal device used by the staff member is associated with the working node. For example, a terminal device can be bound to a working node in a monitoring center so that the terminal device obtains the authority to view the monitoring information of the corresponding working node, which is a regular monitoring authority.

[0038] At the water construction site, the working nodes can be arranged in an array. The present disclosure does not limit the specific form of the array, such as a rectangular array. The monitoring equipment at the water construction site may include monitoring equipment for the entire area, or may include monitoring equipment for a single working node. For example, each monitoring node is provided with a monitoring device for monitoring its own performance indicators. The monitoring equipment collects the monitoring information of the working node in real time and sends it to the monitoring center.

[0039] Continue to refer Figure 2 In step S220, when the first working node in the water construction site is in a normal monitoring state, the first monitoring information of the first working node is sent to a first terminal device associated with the first working node, so that the first terminal device displays the first monitoring information in the information monitoring interface, and prohibits the first terminal device from viewing the monitoring information of other working nodes.

[0040] Among them, the first working node can be any one or more working nodes in the water construction site. The first terminal device is a terminal device associated with the first working node, that is, a terminal device used by the staff corresponding to the first working node. The normal monitoring state refers to the state in which the first working node is normal and has no abnormal risk. The first monitoring information is the monitoring information of the first working node, and may further refer to the monitoring information of the first working node under the normal monitoring state. The first monitoring information may include monitoring information of one or more dimensions, such as monitoring information on temperature, humidity, pressure, light, voltage, current, power, force, etc.

[0041] In the normal monitoring state, the first terminal device only has the authority to view the first working node, and cannot view the monitoring information of other working nodes. In this way, the monitoring center does not need to send the monitoring information of other working nodes to the first terminal device. This reduces the pressure of data transmission between the monitoring center and the terminal device, and reduces the pressure of data processing between the monitoring center and the terminal device.

[0042] Continue to refer Figure 2 In step S230, when it is monitored that there is an abnormal working node within the first relevant range of the first working node, the risk probability of the first working node is determined according to the abnormal working node.

[0043] In this exemplary embodiment, the abnormality of the working node may include but is not limited to the following situations: the monitoring information of the working node exceeds the normal range; the working node fails, resulting in the inability to perform normal work or construction.

[0044] Each working node may have a related range, which indicates the range that the working node can influence or the range that is affected. The first related range refers to the related range of the first working node, which can be understood as the first working node and other working nodes within the first related range can influence each other, or the first working node and other working nodes within the first related range can be affected by the same or similar external factors (such as environmental factors). Therefore, if it is monitored that there is an abnormal working node within the first related range of the first working node, the first working node may be affected by the abnormal working node, or the factors that cause the abnormal working node to be abnormal may affect the first working node. In other words, the first working node has the possibility of abnormality, and the risk probability of its abnormality can be predicted or evaluated.

[0045] In one embodiment, reference Figure 3 As shown, the above-mentioned determination of the risk probability of the first working node according to the abnormal working node may include the following steps S310 and S320:

[0046] Step S310, obtaining abnormal information of the abnormal working node;

[0047] Step S320, using the risk prediction model to process the abnormal prediction input information to obtain the risk probability of the first working node; the abnormal prediction input information at least includes abnormal information, the first working node and the location information of the abnormal working node.

[0048] Among them, the abnormal information may include but is not limited to: the identification of the abnormal working node, the time when the abnormality occurred, the monitoring indicator where the abnormality occurred, the value of the monitoring information where the abnormality occurred, the type of abnormality (such as the value is too high, the value is too low, etc.), the fault code, and the fault level.

[0049] The risk prediction model can be any type of machine learning model, such as a neural network model, etc. It can be a pre-trained model, or a model that has been fully trained for the risk prediction and assessment scenario of water construction sites. For example, relevant training data sets for water construction sites can be obtained, and the risk prediction model can be trained using the data sets. When the training meets the standards, the model can be put into use.

[0050] Abnormal prediction input information refers to information input into the risk prediction model, which at least includes abnormal information, location information of the first working node and the abnormal working node (such as the location number of the first working node and the location number of the abnormal working node, or array information of the first working node and the abnormal working node, etc.), and of course, may also include the first monitoring information of the first working node, monitoring information of other related working nodes, etc. The abnormal prediction input information is input into the risk prediction model, and the risk prediction model outputs the risk probability of the first working node.

[0051] In one embodiment, the risk prediction model includes a first risk prediction model and a second risk prediction model. The first risk prediction model is a model that predicts the risk probability of a working node within a certain range (which may be a working node at the center of the range). The second risk prediction model is a model that predicts the risk probability of all working nodes within a certain range.

[0052] refer to Figure 4 As shown, the above-mentioned use of the risk prediction model to process the abnormal prediction input information to obtain the risk probability of the first working node may include the following steps S410 to S430:

[0053] Step S410, inputting the abnormal information, the array information within the first relevant range, and the current monitoring information of each working node within the first relevant range into the first risk prediction model, and outputting the first risk probability of the first working node through the first risk prediction model;

[0054] Step S420, inputting the abnormal information, the array information within the second relevant range of the abnormal working node, and the current monitoring information of each working node within the second relevant range into the second risk prediction model, outputting the risk probability of each working node within the second relevant range through the second risk prediction model, and taking the risk probability of the first working node as the second risk probability of the first working node;

[0055] Step S430: combining the first risk probability and the second risk probability to obtain a final risk probability of the first working node.

[0056] Among them, the array information within the first relevant range may include the arrangement information of each working node within the first relevant range, such as the number of each working node within the first relevant range and its relative position and distance to the first working node. The current monitoring information refers to the monitoring information of each working node at the moment when the abnormal working node is monitored. The first working node may be located at the center of the first relevant range. The abnormal information, the array information within the first relevant range, and the current monitoring information of each working node within the first relevant range are input into the first risk prediction model. The first risk prediction model can predict the probability of an abnormality occurring in the first working node based on the information around the first working node, and output the first risk probability.

[0057] The second related range is the related range of the abnormal working node, which can be understood as the abnormal working node and other working nodes in the second related range can affect each other, or the abnormal working node and other working nodes in the second related range can be subject to the same or similar external influences. Therefore, when an abnormal working node is abnormal, it may affect other working nodes in the second related range, or the factors that cause the abnormal working node to be abnormal may affect other working nodes in the second related range.

[0058] The array information within the second relevant range may include the arrangement information of each working node within the second relevant range, such as the number of each working node within the second relevant range and its relative position and distance to the abnormal working node. The abnormal working node may be located at the center of the second relevant range. The abnormal information, the array information within the second relevant range, and the current monitoring information of each working node within the second relevant range are input into the second risk prediction model. The second risk prediction model may predict the risk probability of the surrounding working nodes based on the information of the abnormal working node and the surrounding working nodes, and output the risk probability of each working node within the second relevant range. The first working node is also within the second relevant range, so the risk probability of the first working node can be obtained from the output result of the second risk prediction model as the second risk probability of the first working node.

[0059] It can be seen that the first risk probability and the second risk probability are the probabilities obtained by evaluating and predicting the abnormal risk of the first working node from two aspects respectively. The former considers the situation where the first working node is affected by the surrounding working nodes, and the latter considers the situation where the abnormal working node affects other working nodes. The first risk probability and the second risk probability can be combined to obtain the final risk probability of the first working node. For example, the average value of the first risk probability and the second risk probability can be calculated as the final risk probability. Alternatively, when the first risk prediction model outputs the first risk probability, it can also output the confidence corresponding to the first risk probability. When the second risk prediction model outputs the risk probability of each working node within the second relevant range, it can also output the corresponding confidence, including the confidence corresponding to the second risk probability. According to the confidence corresponding to the first risk probability and the confidence corresponding to the second risk probability, the weighted average of the first risk probability and the second risk probability is calculated to obtain the final risk probability.

[0060] In one embodiment, before the abnormal information, array information within the first relevant range, and current monitoring information of each working node within the first relevant range are input into the first risk prediction model, the abnormal information, array information, and monitoring information of each working node within the second relevant range in the previous monitoring cycle can be input into the first risk prediction model, and when the first risk probability of the abnormal working node output by the first risk prediction model reaches a second threshold, it is determined that the first risk prediction model is available.

[0061] The monitoring period refers to the unit time for the monitoring equipment to collect or report monitoring information, or it may refer to the unit time for the monitoring center to process monitoring information. The duration of the monitoring period can be set according to specific needs, such as 10 seconds, 30 seconds, 1 minute, 5 minutes, etc. In the case that an abnormal working node is detected in the current monitoring period, the first risk prediction model can be verified based on the information in the previous monitoring period and the abnormal results that have occurred in the current monitoring period. Specifically, the abnormal information in the second relevant range in the previous monitoring cycle (referring to the abnormal information of the abnormal working node in the previous monitoring cycle, if there is no abnormal working node in the second relevant range in the previous monitoring cycle, the abnormal information here can be 0 or null value), array information, and monitoring information of each working node are input into the first risk prediction model. The first risk prediction model can predict the risk probability of the working node at the center position in the second relevant range (i.e., the abnormal working node that has an abnormality in the current monitoring cycle), and output the first risk probability of the working node, which means that the first risk prediction model predicts the probability of the working node being abnormal in the current monitoring cycle (i.e., the next cycle of the previous monitoring cycle). If the first risk probability reaches the second threshold, it means that the result predicted by the first risk prediction model is relatively accurate, indicating that the model is available. Among them, the second threshold can be set according to experience or specific circumstances, and can be equivalent to the first threshold. If the first risk probability does not reach the second threshold, it means that the result predicted by the first risk prediction model is inaccurate. Before further using the first risk prediction model, it can be trained, fine-tuned and optimized. To ensure the accuracy of subsequent risk prediction.

[0062] Continue to refer Figure 2 In step S240, if the risk probability of the first working node reaches the first threshold, the first working node is switched to a risk warning state, risk warning information is sent to the first terminal device, and the first terminal device is allowed to view the second monitoring information of the second working node; the second working node includes an abnormal working node.

[0063] Among them, the first threshold is a threshold for measuring whether the risk probability is too high, which can be set according to experience or specific circumstances. If the risk probability of the first working node reaches the first threshold, it means that the first working node has a high probability of an abnormality (such as an abnormality in the next monitoring cycle). At this time, the first working node is switched to a risk warning state, and the monitoring center sends a risk warning message to the first terminal device. The risk warning information is used to remind the staff that there is a risk in the first working node, which may include abnormal information of the abnormal working node where the abnormality currently occurs and related text prompt information. In the risk warning state, the first terminal device is allowed to view the second monitoring information of the second working node. The second working node includes an abnormal working node, and may also include other working nodes related to the first working node and the abnormal working node. The second monitoring information is the monitoring information of the second working node, such as the monitoring information of the second working node in the current monitoring cycle or the recent period of time. In other words, the staff of the first working node has the authority to view the second working node, and can judge and find out the abnormal problem by viewing the second monitoring information of the second working node, and then take disposal measures to prevent the first working node from being abnormal or damaged.

[0064] In one embodiment, reference Figure 5 As shown, the above-mentioned allowing the first terminal device to view the second monitoring information of the second working node may include the following steps S510 and S520:

[0065] Step S510, taking other working nodes in the risk warning state within the first relevant range as second working nodes, and / or taking other working nodes within the intersection of the first relevant range and the second relevant range of the abnormal working node as second working nodes;

[0066] Step S520: In response to the information viewing request of the first terminal device for the second working node, second monitoring information of the second working node is sent to the first terminal device.

[0067] Among them, in the case of abnormal working nodes, in addition to the first working node, other working nodes may also be affected and enter the risk warning state, and these working nodes have a high correlation with the first working node. Other working nodes in the risk warning state within the first relevant range can be used as second working nodes, so that the staff of the first working node can view the monitoring information of these working nodes. Other working nodes except the first working node in the intersection of the first relevant range and the second relevant range can also be used as second working nodes, so that the staff can view their monitoring information.

[0068] The staff can initiate an information viewing request for the second working node on the first terminal device. Since the staff has the authority to view the information at this time, the monitoring center responds to the information viewing request and can send the second monitoring information of the second working node to the first terminal device, so as to display the second monitoring information on the first terminal device. This is conducive to the staff to discover and deal with abnormal conditions in a timely manner.

[0069] In one embodiment, the monitoring information display method of the water construction site can refer to Figure 6 As shown, the following steps S610 to S630 are included:

[0070] Step S610, displaying an information monitoring interface of the water construction site through the graphical user interface of the first terminal device; the water construction site includes a plurality of working nodes arranged in an array;

[0071] Step S620, when the first working node in the water construction site is in a normal monitoring state, obtaining first monitoring information of the first working node, and displaying the first monitoring information in the information monitoring interface; the first working node is a working node associated with the first terminal device;

[0072] Step S630, when the first working node is in a risk warning state, receives risk warning information and obtains permission to view the second monitoring information of the second working node; wherein the risk warning information is information sent to the first terminal device by the monitoring center when it is determined that the risk probability of the first working node reaches a first threshold based on the abnormal working nodes in the water construction site; the abnormal working node is within the first relevant range of the first working node, and the second working node includes the abnormal working node.

[0073] Fig. 7A The information monitoring interface of the first working node in the normal monitoring state is shown, where working node B3 is the first working node, and the first terminal device only has the authority to view working node B3. The staff clicks working node B3 to enter the next level interface and see the first monitoring information. Other working nodes are grayed out. If the staff clicks other working nodes, it will prompt that they have no authority to view.

[0074] Figure 7B The information monitoring interface of the first working node in the risk warning state is shown, where working node B3 is the first working node, and other working nodes in the interface are all second working nodes and are no longer grayed out. The staff can click on working node B3 to view the first monitoring information, or click on other working nodes to view the corresponding second monitoring information.

[0075] In one implementation, when obtaining the permission to view the second monitoring information of the second working node, the monitoring information display method may further include the following steps:

[0076] In response to the information viewing operation for the second working node, according to the abnormal indicator indicated in the risk warning information, an information viewing request is sent to the monitoring center; the information viewing request is used to request second monitoring information of the second working node, and the second monitoring information includes monitoring information of the abnormal indicator;

[0077] The second monitoring information fed back by the monitoring center is received, and the second monitoring information is displayed in the information monitoring interface.

[0078] For example, in Figure 7B In the information monitoring interface shown, if the staff clicks on other tasks other than the working node B3, the click operation is an information viewing operation, which triggers the generation of an information viewing request and sends it to the monitoring center. The information viewing request may include abnormal indicators indicated in the risk warning information, that is, indicators of abnormalities occurring on abnormal working nodes. The monitoring center feeds back the second monitoring information under the abnormal indicators based on the information viewing request. For example, if the risk warning information indicates that the mechanical performance indicators of the abnormal working node are abnormal, the second monitoring information fed back by the monitoring center to the first terminal device may only include the mechanical performance indicator information of the second working node. In this way, the staff can focus on viewing the second monitoring information related to the abnormality without viewing other irrelevant monitoring information, which is conducive to the staff to find the cause of the abnormality or to make correct disposal. In addition, the data transmission and processing pressure of the second monitoring information is reduced, and information security is improved.

[0079] In one embodiment, the information monitoring interface can be integrated into an information management application for the water construction site, and the application can also implement one or more of the following functions:

[0080] Personnel information viewing: such as viewing staff information, including but not limited to basic personnel information (name, age, type of work, position, length of service, etc.), personnel attendance information, personnel reward and punishment information, physical examination information, etc. Different staff members can have different permissions and can only view information within their permissions. In addition, for the owner of the first terminal device, a QR code can be generated for himself as a credential for entering and exiting the site or office area.

[0081] Video surveillance: The first terminal device can be connected to the video surveillance system of the on-site digital platform, and synchronize the video surveillance images of the current site or office area from the on-site digital platform. It can also communicate with all or part of the cameras to obtain the surveillance images from the cameras. In addition, the first terminal device can also remotely control the camera, including but not limited to rotating the lens, adjusting the aperture, focal length, depth of field, etc.

[0082] Weather warning: Weather information can be obtained from the weather application of the first terminal device and analyzed. When the alarm conditions are met, an alarm can be issued in the information management application.

[0083] Vessel status monitoring: You can query the vessels currently in use and on standby at the site to understand the operating conditions of the water construction site and assist in the implementation of plans and arrangements.

[0084] Material status monitoring: The incoming, outgoing and inventory status of materials can be monitored and checked. The remaining materials and available time can be displayed, and timely alarms can be given when materials are insufficient.

[0085] Therefore, using information management applications to manage, monitor, and coordinate water construction sites will help improve the intelligence level of construction sites and increase the efficiency of business management and processing.

[0086] The exemplary embodiment of the present disclosure also provides a monitoring information processing device for a water construction site, referring to Figure 8 As shown, the monitoring information processing device 800 may include the following program modules:

[0087] The information acquisition module 810 is configured to acquire monitoring information of each working node in the water construction site; the water construction site includes a plurality of working nodes arranged in an array and is provided with monitoring equipment for collecting monitoring information;

[0088] The conventional monitoring processing module 820 is configured to, when the first working node in the water construction site is in the conventional monitoring state, send the first monitoring information of the first working node to the first terminal device associated with the first working node, so that the first terminal device displays the first monitoring information in the information monitoring interface, and prohibit the first terminal device from viewing the monitoring information of other working nodes;

[0089] The risk probability determination module 830 is configured to determine the risk probability of the first working node according to the abnormal working node when an abnormal working node is detected within a first relevant range of the first working node;

[0090] The risk warning processing module 840 is configured to switch the first working node to a risk warning state if the risk probability of the first working node reaches a first threshold, send risk warning information to the first terminal device, and allow the first terminal device to view the second monitoring information of the second working node; the second working node includes an abnormal working node.

[0091] In one embodiment, determining the risk probability of a first working node based on an abnormal working node includes: obtaining abnormal information of the abnormal working node; processing abnormal prediction input information using a risk prediction model to obtain the risk probability of the first working node; the abnormal prediction input information includes at least abnormal information, the first working node, and location information of the abnormal working node.

[0092] In one embodiment, the risk prediction model includes a first risk prediction model and a second risk prediction model; the risk prediction model is used to process the abnormal prediction input information to obtain the risk probability of the first working node, including: inputting the abnormal information, array information within a first relevant range, and current monitoring information of each working node within the first relevant range into the first risk prediction model, and outputting the first risk probability of the first working node through the first risk prediction model; inputting the abnormal information, array information within a second relevant range of the abnormal working node, and current monitoring information of each working node within the second relevant range into the second risk prediction model, and outputting the risk probability of each working node within the second relevant range through the second risk prediction model, and obtaining the second risk probability of the first working node therefrom; combining the first risk probability and the second risk probability to obtain the final risk probability of the first working node.

[0093] In one embodiment, the monitoring information processing device 800 is also used to: before inputting the abnormal information, array information within the first relevant range, and current monitoring information of each working node within the first relevant range into the first risk prediction model, input the abnormal information, array information, and monitoring information of each working node within the second relevant range in the previous monitoring cycle into the first risk prediction model, and determine that the first risk prediction model is available when the first risk probability of the abnormal working node output by the first risk prediction model reaches a second threshold.

[0094] In one embodiment, the first terminal device is allowed to view the second monitoring information of the second working node, including: taking other working nodes in the first relevant range that are in a risk warning state as the second working nodes, and / or taking other working nodes in the intersection of the first relevant range and the second relevant range of the abnormal working node as the second working nodes; in response to the first terminal device's information viewing request for the second working node, sending the second monitoring information of the second working node to the first terminal device.

[0095] The exemplary embodiment of the present disclosure also provides a monitoring information display device for a water construction site, referring to Fig. 9 As shown, the monitoring information display device 900 may include the following program modules:

[0096] The information monitoring interface display module 910 is configured to display the information monitoring interface of the water construction site through the graphical user interface of the first terminal device; the water construction site includes a plurality of working nodes arranged in an array;

[0097] The conventional monitoring module 920 is configured to obtain first monitoring information of the first working node in the water construction site when the first working node is in a conventional monitoring state, and display the first monitoring information in the information monitoring interface; the first working node is a working node associated with the first terminal device;

[0098] The risk warning module 930 is configured to receive risk warning information and obtain permission to view second monitoring information of the second working node when the first working node is in a risk warning state; wherein the risk warning information is information sent to the first terminal device by the monitoring center when it is determined that the risk probability of the first working node reaches a first threshold based on the abnormal working node in the water construction site; the abnormal working node is within the first relevant range of the first working node, and the second working node includes the abnormal working node.

[0099] In one embodiment, the monitoring information display device 900 is also used for: when obtaining the permission to view the second monitoring information of the second working node, in response to the information viewing operation for the second working node, sending an information viewing request to the monitoring center according to the abnormal indicators indicated in the risk warning information; the information viewing request is used to request the second monitoring information of the second working node, the second monitoring information including the monitoring information of the abnormal indicators; receiving the second monitoring information fed back by the monitoring center, and displaying the second monitoring information in the information monitoring interface.

[0100] The specific details of each part of the above-mentioned device have been described in detail in the implementation method of the method part. The undisclosed details can be found in the implementation method of the method part, so they will not be repeated here.

[0101] It should be noted that, although several modules or units of the device for action execution are mentioned in the above detailed description, this division is not mandatory. In fact, according to the exemplary embodiments of the present disclosure, the features and functions of two or more modules or units described above can be embodied in one module or unit. Conversely, the features and functions of one module or unit described above can be further divided into multiple modules or units to be embodied.

[0102] The exemplary embodiments of the present disclosure also provide a computer program product, which includes a computer program, and the computer program implements the above method when executed by a processor.

[0103] In one embodiment, the computer program product may be a tangible product containing a computer program, such as a computer-readable storage medium storing a computer program. The readable storage medium may be a storage medium based on electrical, magnetic, optical, electromagnetic, infrared, or other signals, including but not limited to: random access memory (RAM), read-only memory (ROM), magnetic tape, floppy disk, flash memory (Flash), mechanical hard disk (HDD), solid state drive (SSD), and the like. Exemplarily, the computer program product may be implemented as a non-volatile storage medium storing a computer program, such as a read-only memory, a NAND flash memory (Nand Flash), and the like.

[0104] In one embodiment, the computer program product may be an intangible product including a computer program. Exemplarily, the computer program product may be implemented as a virtual digital product, such as a digital file storing an executable file, an installation package, etc. of the computer program.

[0105] The code of the computer program can be written in one or more programming languages. Programming languages ​​such as C language, Java, C++, etc. The program code can be executed completely on the user computing device, or partially on the user computing device, or as a separate software package, or partially on the user computing device and partially on the remote computing device, or completely on the remote computing device or server. In the case of a remote computing device, the remote computing device can be connected to the user computing device through any type of network, such as a local area network (LAN), a wide area network (WAN), etc., or can be connected to an external computing device (for example, through an Internet connection provided by an operator).

[0106] Computer programs can be carried or transmitted through electrical, magnetic, optical, electromagnetic, infrared, etc. Electronic devices can convert signals carrying computer programs into digital signals and then run the computer programs. When the computer program is executed on an electronic device, its code is used to enable the electronic device to execute (more specifically, to enable the processor of the electronic device to execute) the method steps of various exemplary embodiments of the present disclosure, such as the following steps: Step S210, obtaining monitoring information of each working node in the water construction site; the water construction site includes a plurality of working nodes arranged in an array, and is provided with a monitoring device for collecting monitoring information; Step S220, when the first working node in the water construction site is in a regular monitoring state, sending the first monitoring information of the first working node to a first terminal device associated with the first working node, so that the first terminal device displays the first monitoring information in the information monitoring interface, and prohibits the first terminal device from viewing the monitoring information of other working nodes; Step S230, when it is detected that there is an abnormal working node within a first related range of the first working node, determining the risk probability of the first working node according to the abnormal working node; Step S240, if the risk probability of the first working node reaches a first threshold, switching the first working node to a risk warning state, sending risk warning information to the first terminal device, and allowing the first terminal device to view the second monitoring information of the second working node; the second working node includes an abnormal working node.

[0107] Based on the execution of the above method by a computer program, on the one hand, for the first terminal device, in the normal monitoring state, it is only allowed to view the first monitoring information of the associated first working node, and in the risk warning state, it is allowed to view the second monitoring information of the second working node. In this way, the scope of monitoring information that can be viewed by each terminal device in the normal monitoring state is limited, and only the monitoring information of the associated working node is provided for each terminal device, which reduces the pressure of data transmission and processing, improves the efficiency of monitoring and management, and improves information security by controlling the authority to view monitoring information. On the other hand, when there is an abnormal working node within the first relevant range of the first working node, the risk probability of the first working node being abnormal is predicted, and when the risk probability reaches the first threshold, the risk warning information is sent to the first terminal device, so that the staff can issue a warning before the abnormality actually occurs in the first working node, which is conducive to reducing the occurrence of abnormalities and reducing the impact of abnormal situations.

[0108] The exemplary embodiments of the present disclosure also provide an electronic device. The electronic device may include a processor and a memory. The memory stores executable instructions of the processor, such as a computer program. The processor executes the method steps of various exemplary embodiments of the present disclosure by executing the executable instructions.

[0109] Reference below Fig.10 , the electronic device is exemplarily described in the form of a general-purpose computing device. It should be understood that Fig.10 The electronic device 1000 shown is merely an example and should not limit the functions and scope of use of the embodiments of the present disclosure.

[0110] like Fig.10 As shown, the electronic device 1000 may include: a processor 1010 , a memory 1020 , a bus 1030 , an I / O (input / output) interface 1040 , and a network adapter 1050 .

[0111] The memory 1020 may include a volatile memory, such as a RAM 1021, a cache unit 1022, and may also include a non-volatile memory, such as a ROM 1023. The memory 1020 may also include one or more program modules 1024, such program modules 1024 include but are not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or a combination thereof may include the implementation of a network environment. For example, the program module 1024 may include each module in the above-mentioned device.

[0112] The processor 1010 may include one or more processing units. For example, the processor 1010 may include an AP (Application Processor), a modem processor, a GPU (Graphics Processing Unit), an ISP (Image Signal Processor), a controller, an encoder, a decoder, a DSP (Digital Signal Processor), a baseband processor and / or an NPU (Neural-Network Processing Unit), etc.

[0113] The processor 1010 can be used to execute executable instructions stored in the memory 1020, which may include method steps of various exemplary embodiments of the present disclosure, such as performing the following steps: Step S210, obtaining monitoring information of each working node in the water construction site; the water construction site includes a plurality of working nodes arranged in an array, and is provided with a monitoring device for collecting monitoring information; Step S220, when the first working node in the water construction site is in a regular monitoring state, sending the first monitoring information of the first working node to a first terminal device associated with the first working node, so that the first terminal device displays the first monitoring information in the information monitoring interface, and prohibits the first terminal device from viewing the monitoring information of other working nodes; Step S230, when it is monitored that there is an abnormal working node within a first related range of the first working node, determining the risk probability of the first working node according to the abnormal working node; Step S240, if the risk probability of the first working node reaches a first threshold, switching the first working node to a risk warning state, sending risk warning information to the first terminal device, and allowing the first terminal device to view the second monitoring information of the second working node; the second working node includes an abnormal working node.

[0114] Based on the electronic device 1000 executing the above method, on the one hand, for the first terminal device, in the normal monitoring state, it is only allowed to view the first monitoring information of the associated first working node, and in the risk warning state, it is allowed to view the second monitoring information of the second working node. In this way, the scope of monitoring information that can be viewed by each terminal device in the normal monitoring state is limited, and only the monitoring information of the associated working node is provided for each terminal device, which reduces the pressure of data transmission and processing, improves the efficiency of monitoring and management, and improves information security by controlling the authority to view monitoring information. On the other hand, when there is an abnormal working node within the first relevant range of the first working node, the risk probability of the first working node being abnormal is predicted, and when the risk probability reaches the first threshold, the risk warning information is sent to the first terminal device, so that the staff can issue a warning before the abnormality actually occurs in the first working node, which is conducive to reducing the occurrence of abnormalities and reducing the impact of abnormal situations.

[0115] The bus 1030 is used to realize the connection between different components of the electronic device 1000, and may include a data bus, an address bus, and a control bus.

[0116] The electronic device 1000 can communicate with one or more external devices 1100 (eg, a keyboard, a mouse, an external controller, etc.) through the I / O interface 1040 .

[0117] The electronic device 1000 can communicate with one or more networks through the network adapter 1050. For example, the network adapter 1050 can provide mobile communication solutions such as 3G / 4G / 5G, or provide wireless communication solutions such as wireless LAN, Bluetooth, near field communication, etc. The network adapter 1050 can communicate with other modules of the electronic device 1000 through the bus 1030.

[0118] although Fig.10 Not shown, other hardware and / or software modules may also be provided in the electronic device 1000, including but not limited to: a display, a microcode, a device driver, a redundant processor, an external disk drive array, a tape drive, and a data backup storage system.

[0119] As can be seen from the above, the technical solution of the present disclosure can be implemented as a method, an apparatus, a system, a computer program product, a storage medium, an electronic device, etc. Those skilled in the art can understand that various aspects of the present disclosure can be specifically implemented in the following forms, namely: a complete hardware implementation, a complete software implementation (including firmware, microcode, etc.), or an implementation combining hardware and software, such as being respectively referred to as a "circuit", "module" or "system".

[0120] It should be understood that the present disclosure is not limited to the specific method steps or structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from the scope thereof. Those skilled in the art will easily think of other embodiments based on the specific embodiments provided by the present disclosure. Therefore, the specific embodiments provided by the present disclosure are only exemplary, and the scope and spirit of the present disclosure are indicated by the claims, and any variations, uses or adaptive changes of the present disclosure should be covered, which follow the general principles of the present disclosure and include common knowledge or customary technical means in the technical field that are not disclosed in the present disclosure.

Claims

1. A method for processing monitoring information of a water construction site, characterized in that: The method comprises: Acquiring monitoring information of each working node in the water construction site; the water construction site includes a plurality of working nodes arranged in an array and is provided with monitoring equipment for collecting monitoring information; When the first working node in the water construction site is in a regular monitoring state, first monitoring information of the first working node is sent to a first terminal device associated with the first working node, so that the first terminal device displays the first monitoring information in an information monitoring interface, and prohibits the first terminal device from viewing monitoring information of other working nodes; In a case where it is monitored that there is an abnormal working node within a first relevant range of the first working node, determining a risk probability of the first working node according to the abnormal working node; If the risk probability of the first working node reaches a first threshold, the first working node is switched to a risk warning state, risk warning information is sent to the first terminal device, and the first terminal device is allowed to view second monitoring information of a second working node; the second working node includes the abnormal working node; Wherein, determining the risk probability of the first working node according to the abnormal working node includes: obtaining abnormal information of the abnormal working node; processing abnormal prediction input information using a risk prediction model to obtain the risk probability of the first working node; the abnormal prediction input information includes at least the abnormal information, the first working node and the location information of the abnormal working node; The risk prediction model includes a first risk prediction model and a second risk prediction model; the use of the risk prediction model to process the abnormal prediction input information to obtain the risk probability of the first working node includes: inputting the abnormal information, the array information within the first relevant range, and the current monitoring information of each working node within the first relevant range into the first risk prediction model, and outputting the first risk probability of the first working node through the first risk prediction model; inputting the abnormal information, the array information within the second relevant range of the abnormal working node, and the current monitoring information of each working node within the second relevant range into the second risk prediction model, and outputting the risk probability of each working node within the second relevant range through the second risk prediction model, and taking the risk probability of the first working node within the second relevant range as the second risk probability of the first working node; combining the first risk probability and the second risk probability to obtain the final risk probability of the first working node; Among them, allowing the first terminal device to view the second monitoring information of the second working node includes: taking other working nodes in the first relevant range that are in risk warning status as the second working nodes, and / or taking other working nodes in the intersection of the first relevant range and the second relevant range of the abnormal working node as the second working nodes; in response to the information viewing request of the first terminal device for the second working node, sending the second monitoring information of the second working node to the first terminal device.

2. The method according to claim 1, characterized in that Before inputting the abnormal information, the array information within the first relevant range, and the current monitoring information of each working node within the first relevant range into the first risk prediction model, the method further includes: The abnormal information, array information, and monitoring information of each working node within the second relevant range in the previous monitoring cycle are input into the first risk prediction model, and when the first risk probability of the abnormal working node output by the first risk prediction model reaches a second threshold, it is determined that the first risk prediction model is available.

3. A method for displaying monitoring information of a water construction site, characterized in that: The method comprises: Displaying an information monitoring interface of an on-water construction site through a graphical user interface of a first terminal device; the on-water construction site includes a plurality of working nodes arranged in an array; When a first working node in the water construction site is in a regular monitoring state, first monitoring information of the first working node is obtained, and the first monitoring information is displayed in the information monitoring interface; the first working node is a working node associated with the first terminal device; When the first working node is in a risk warning state, receiving risk warning information and obtaining permission to view second monitoring information of the second working node; wherein the risk warning information is information sent to the first terminal device by the monitoring center when it is determined that the risk probability of the first working node reaches a first threshold according to the abnormal working node in the water construction site; the abnormal working node is within a first relevant range of the first working node, and the second working node includes the abnormal working node; The monitoring center determines the risk probability of the first working node in the following manner: Obtain abnormal information of the abnormal working node; input the abnormal information, array information within the first relevant range, and current monitoring information of each working node within the first relevant range into a first risk prediction model, and output a first risk probability of the first working node through the first risk prediction model; input the abnormal information, array information within a second relevant range of the abnormal working node, and current monitoring information of each working node within the second relevant range into a second risk prediction model, and output the risk probability of each working node within the second relevant range through the second risk prediction model, and use the risk probability of the first working node within the second relevant range as the second risk probability of the first working node; combine the first risk probability and the second risk probability to obtain a final risk probability of the first working node; In the case of obtaining the permission to view the second monitoring information of the second working node, the method also includes: in response to the information viewing operation for the second working node, sending an information viewing request to the monitoring center according to the abnormal indicators indicated in the risk warning information; the information viewing request is used to request the second monitoring information of the second working node, and the second monitoring information includes the monitoring information of the abnormal indicators; receiving the second monitoring information fed back by the monitoring center, and displaying the second monitoring information in the information monitoring interface.

4. A monitoring information processing device for a water construction site, characterized in that: The device comprises: An information acquisition module is configured to acquire monitoring information of each working node in the water construction site; the water construction site includes a plurality of working nodes arranged in an array and is provided with monitoring equipment for collecting monitoring information; a conventional monitoring processing module, configured to, when a first working node in the water construction site is in a conventional monitoring state, send first monitoring information of the first working node to a first terminal device associated with the first working node, so that the first terminal device displays the first monitoring information in an information monitoring interface, and prohibit the first terminal device from viewing monitoring information of other working nodes; a risk probability determination module, configured to determine the risk probability of the first working node according to the abnormal working node when an abnormal working node is detected in a first relevant range of the first working node; a risk warning processing module, configured to switch the first working node to a risk warning state if the risk probability of the first working node reaches a first threshold, send risk warning information to the first terminal device, and allow the first terminal device to view second monitoring information of a second working node; the second working node includes the abnormal working node; Wherein, determining the risk probability of the first working node according to the abnormal working node includes: obtaining abnormal information of the abnormal working node; processing abnormal prediction input information using a risk prediction model to obtain the risk probability of the first working node; the abnormal prediction input information includes at least the abnormal information, the first working node and the location information of the abnormal working node; The risk prediction model includes a first risk prediction model and a second risk prediction model; the use of the risk prediction model to process the abnormal prediction input information to obtain the risk probability of the first working node includes: inputting the abnormal information, the array information within the first relevant range, and the current monitoring information of each working node within the first relevant range into the first risk prediction model, and outputting the first risk probability of the first working node through the first risk prediction model; inputting the abnormal information, the array information within the second relevant range of the abnormal working node, and the current monitoring information of each working node within the second relevant range into the second risk prediction model, and outputting the risk probability of each working node within the second relevant range through the second risk prediction model, and taking the risk probability of the first working node within the second relevant range as the second risk probability of the first working node; combining the first risk probability and the second risk probability to obtain the final risk probability of the first working node; Among them, allowing the first terminal device to view the second monitoring information of the second working node includes: taking other working nodes in the first relevant range that are in risk warning status as the second working nodes, and / or taking other working nodes in the intersection of the first relevant range and the second relevant range of the abnormal working node as the second working nodes; in response to the information viewing request of the first terminal device for the second working node, sending the second monitoring information of the second working node to the first terminal device.

5. A monitoring information display device for a water construction site, characterized in that: The device comprises: An information monitoring interface display module is configured to display an information monitoring interface of the water construction site through a graphical user interface of the first terminal device; the water construction site includes a plurality of working nodes arranged in an array; a conventional monitoring module, configured to obtain first monitoring information of a first working node in the water construction site when the first working node is in a conventional monitoring state, and display the first monitoring information in the information monitoring interface; the first working node is a working node associated with the first terminal device; The risk warning module is configured to receive risk warning information and obtain permission to view second monitoring information of the second working node when the first working node is in a risk warning state; wherein the risk warning information is information sent to the first terminal device by the monitoring center when the risk probability of the first working node is determined to reach a first threshold according to the abnormal working node in the water construction site; the abnormal working node is within a first relevant range of the first working node, and the second working node includes the abnormal working node; The monitoring center determines the risk probability of the first working node in the following manner: Obtain abnormal information of the abnormal working node; input the abnormal information, array information within the first relevant range, and current monitoring information of each working node within the first relevant range into a first risk prediction model, and output a first risk probability of the first working node through the first risk prediction model; input the abnormal information, array information within a second relevant range of the abnormal working node, and current monitoring information of each working node within the second relevant range into a second risk prediction model, and output the risk probability of each working node within the second relevant range through the second risk prediction model, and use the risk probability of the first working node within the second relevant range as the second risk probability of the first working node; combine the first risk probability and the second risk probability to obtain a final risk probability of the first working node; The device is also used to: upon obtaining the authority to view the second monitoring information of the second working node, in response to the information viewing operation on the second working node, send an information viewing request to the monitoring center according to the abnormal indicators indicated in the risk warning information; the information viewing request is used to request the second monitoring information of the second working node, the second monitoring information including the monitoring information of the abnormal indicators; receive the second monitoring information fed back by the monitoring center, and display the second monitoring information in the information monitoring interface.

6. An electronic device, characterized in that: include: processor; as well as A memory, configured to store executable instructions of the processor; The processor is configured to perform the method of any one of claims 1 to 3 by executing the executable instructions.

Citation Information

Patent Citations

  • Authority management method and terminal equipment

    CN112733098A

  • Intelligent water affair dynamic monitoring system and monitoring method based on digital twinning

    CN117610322A

  • Smart park monitoring method based on digital twinborn technology

    CN118427716A