New vehicle development A-state vehicle type order production reporting process management method, device and equipment
By creating and reviewing production demand application forms, generating temporary batch production license order data, and obtaining relevant information based on the production preparation management system, the problem of inefficient management of the production reporting process of A-state model orders is solved, and the processing of A-state model orders is realized. Systematic management and improvement of production efficiency.
Patent Information
- Application Number
- CN202411385077.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2025-01-21
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology cannot effectively manage the order reporting process of A-state models, resulting in inefficient orders and the inability to achieve closed-loop management and rapid prediction and disposal of the entire process.
By creating and reviewing the production demand application form for A-state models, creating temporary batch production license order data to generate final production orders, and obtaining vehicle information and production order information based on the production preparation management system, the system for A-state model orders is implemented. management.
It has realized the online information process, risk control and analysis of A-state model production orders, and improved the efficiency of order production reporting and production efficiency.
Smart Images

Figure CN119338401A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of vehicle development and design, and specifically to a method, device and equipment for managing the production process of a new vehicle development A-state vehicle model order. Background Art
[0002] A-status commercial vehicles refer to special commercial vehicles whose BOM (Bill of Materials) vehicle model data is in A-status. Currently, the review and approval of A-status vehicles is based on the review and approval of OA (Office Automation) applets of various departments. There are problems that cannot be tracked and risk warnings cannot be issued. The access to orders and the tracking of the order production process also rely entirely on telephone and meeting communications. It is impossible to form a closed-loop management of the entire process, and it is impossible to quickly predict and deal with problems, which affects the efficiency of order achievement. Therefore, how to achieve effective management of order reporting and production of A-status vehicles has become an urgent problem that needs to be solved. Summary of the invention
[0003] The present application provides a method, device and equipment for managing the production process of an order for a status A vehicle model during new vehicle development. By monitoring and managing the review and access of orders for status A vehicles and the production process information, online information flow, risk control and analysis of production orders for status A vehicles are realized, thereby achieving effective management of the production order for status A vehicles and improving production efficiency.
[0004] In a first aspect, an embodiment of the present application provides a method for managing a production process of a new car development A-state model order, the method comprising:
[0005] Create a production demand application form for the A-status vehicle model and forward the created production demand application form to the management department for review and processing;
[0006] Create temporary mass production license order data for A-status models to generate final production orders and submit them to the SCF system for scheduling;
[0007] Based on the production preparation management system, vehicle information, production order information, production order scheduling calculation, and production order corresponding production progress information are obtained to achieve systematic management of A-state vehicle orders.
[0008] In combination with the first aspect, in one implementation, creating a production demand application form for a vehicle model in status A and forwarding the created production demand application form to a management department for review and processing specifically includes:
[0009] Through the OA system, marketing personnel create a production demand application form for the A-status model, while R&D personnel enter the EBOM submission date and production personnel enter the MBOM submission date;
[0010] Forward the production demand application form to the manufacturing management department for review and processing.
[0011] In conjunction with the first aspect, in one implementation, forwarding the production demand application form to the management department for review and processing specifically includes:
[0012] The manufacturing management department reviews the production demand application form and based on the review results:
[0013] If the audit is passed, the audit conclusion will be saved and approved by the relevant personnel;
[0014] If the review fails, the marketing staff will create a production demand application form for the A status vehicle model again.
[0015] In combination with the first aspect, in one implementation, the step of creating temporary mass production permission order data for a vehicle in status A to generate a final production order and submitting it to the SCF system for scheduling specifically includes:
[0016] Through the SCF system, the manufacturing manager creates temporary mass production license order data for the A-status vehicle model and feeds the created temporary mass production license order data back to the marketing staff;
[0017] Based on the temporary mass production license order data, marketing personnel submit the final production order in the SCF system and schedule it through the SCF system.
[0018] In combination with the first aspect, in one implementation, after the marketing personnel submits the final production order in the SCF system and schedules it through the SCF system, the method further includes:
[0019] Generate tracking information for production orders of vehicles in status A to achieve production tracking of vehicles in status A.
[0020] In combination with the first aspect, in one implementation, the production preparation management system acquires vehicle information, production order information, production order scheduling calculation, and production progress information corresponding to the production order to achieve systematic management of the A-state vehicle model order, specifically including:
[0021] Based on the production preparation management system, the manufacturing management department obtains vehicle information, production order information, production order scheduling calculation, production order corresponding production progress information, and production order corresponding production quality information from the OA system to achieve systematic management of production orders for A-state models.
[0022] In combination with the first aspect, in one implementation,
[0023] The production progress information corresponding to the production order is obtained from the MES system;
[0024] The production quality information corresponding to the production order is obtained from the QMS system.
[0025] In a second aspect, an embodiment of the present application provides a new car development A-state model order production process management device, the new car development A-state model order production process management device comprising:
[0026] The initiation module is used to create a production demand application form for the A-state vehicle model and forward the created production demand application form to the management department for review and processing;
[0027] A creation module is used to create temporary mass production license order data for A-status models to generate final production orders and submit them to the SCF system for scheduling;
[0028] The acquisition module is used to obtain vehicle information, production order information, production order scheduling calculation, and production progress information corresponding to the production order based on the production preparation management system, so as to realize the systematic management of A-state vehicle model orders.
[0029] In conjunction with the second aspect, in one implementation, creating a production demand application form for a vehicle model in status A and forwarding the created production demand application form to a management department for review and processing specifically includes:
[0030] Through the OA system, marketing personnel create a production demand application form for the A-status model, while R&D personnel enter the EBOM submission date and production personnel enter the MBOM submission date;
[0031] Forward the production demand application form to the manufacturing management department for review and processing.
[0032] In a third aspect, an embodiment of the present application provides a new car development A-state vehicle model order production process management device, the new car development A-state vehicle model order production process management device comprising a processor, a memory, and a new car development A-state vehicle model order production process management program stored in the memory and executable by the processor, wherein when the new car development A-state vehicle model order production process management program is executed by the processor, the steps of the new car development A-state vehicle model order production process management method described above are implemented.
[0033] The beneficial effects brought by the technical solution provided in the embodiments of the present application include:
[0034] By creating a production demand application form for A-status vehicle models and forwarding the created production demand application form to the management department for review and processing, and then creating temporary mass production license order data for A-status vehicle models to generate the final production order and submit it to the SCF system for scheduling, and then based on the production preparation management system to obtain vehicle information, production order information, production order scheduling calculation, production order corresponding production progress information, to achieve systematic management of A-status vehicle model orders, for A-status vehicle model order planning management, through the monitoring and management of A-status vehicle model order review access and production process information, to achieve A-status vehicle model production order online information flow, risk control and analysis, to achieve effective management of A-status vehicle order reporting, improve production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 A flowchart of the method for managing the order submission process for A-status vehicle models for this new vehicle application;
[0036] Figure 2 A schematic diagram of the functional modules of the A-state model order production process management device for the new car development application;
[0037] Figure 3 This is a schematic diagram of the hardware structure of the A-state model order production process management equipment for new car development application. DETAILED DESCRIPTION
[0038] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0039] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.
[0040] On the first aspect, an embodiment of the present application provides a method for managing the production process of an A-status vehicle order for new car development. For the order planning management of the A-status vehicle, by conducting A-status vehicle order review and access and production process information monitoring management, online information flow, risk control and analysis of A-status vehicle production orders are realized.
[0041] It should be noted that in the design and manufacturing process of the vehicle, the stage status numbers are: "P"-concept, "T"-trial production, "S"-engineering, "A"-preparation, "B"-completion, and "D"-production, among which P, T, and S belong to the design status, and A, B, and D belong to the process status.
[0042] Therefore, the A state indicates the preparation state, that is, the model has not been fully put into production, and is still in the trial production and changeable new car stage. The state at this time is called the A state, which can be understood as a trial production model that has not yet been put into mass production, that is, a model in the production preparation stage. The corresponding model to the A state is the D state model, that is, the production model. Both the A state and the D state express the state of a model. The A state model can be changed and continuously optimized, and the D state model is the confirmed model.
[0043] In one embodiment, referring to Figure 1 , Figure 1 This is a flow chart of the management method for the order submission process of the A-state model for the new car development application. Figure 1 As shown in the figure, the management method of the order submission process for the new car development A-state model includes:
[0044] S1: Create a production demand application form for the A-status vehicle model and forward the created production demand application form to the management department for review and processing;
[0045] Furthermore, in one embodiment, a production demand application form for a vehicle in status A is created, and the created production demand application form is forwarded to a management department for review and processing, specifically including:
[0046] S101: Through the OA system, the marketing staff creates a production demand application form for the A-status vehicle model, while the R&D staff enters the EBOM submission date and the production staff enters the MBOM submission date;
[0047] EBOM, or Engineering BOM, is a detailed bill of materials generated by the engineering department after the product design is completed. It contains detailed information on all parts of the product, such as part number, material, quantity, weight, etc.; MBOM, or Manufacturing BOM, is a bill of materials used in the manufacturing process. It takes into account additional materials required in the manufacturing process, such as auxiliary materials, tools, fixtures, etc. MBOM is a key input to the manufacturing execution system. It guides the material flow, production scheduling and cost control in the manufacturing process. MBOM ensures that all necessary materials in the manufacturing process are properly managed, thereby improving production efficiency.
[0048] S102: Forward the production demand application form to the manufacturing management department for review and processing.
[0049] Specifically, marketing personnel initiate a production demand application form for A-state vehicle models (commercial vehicles) in the OA system. At the same time, R&D personnel enter the EBOM submission date, and production personnel enter the MBOM submission date. The initiated production demand application form is then reviewed by the manufacturing management department.
[0050] In this application, the production demand application form is forwarded to the management department for review and processing, including:
[0051] The manufacturing management department reviews the production demand application form and based on the review results:
[0052] If the audit is passed, the audit conclusion will be saved and approved by the relevant personnel;
[0053] If the review fails, the marketing staff will create a production demand application form for the A status vehicle model again.
[0054] Specifically, the manufacturing management department reviews the production demand application form. If the review is passed, the review conclusion is saved and passed through relevant personnel, such as marketing personnel or production personnel, to report production through email; if the review is not passed, the marketing personnel adjust the production demand application form, and then create a production demand application form for the A status vehicle model again.
[0055] S2: Create temporary mass production license order data for the A-status vehicle model to generate the final production order and submit it to the SCF (Supply Chain Finance) system for scheduling, that is, to create a schedule for production-related processes for subsequent production;
[0056] Furthermore, in one embodiment, temporary mass production permission order data for the A-status vehicle model is created to generate a final production order and submit it to the SCF system for scheduling, specifically including:
[0057] S201: The manufacturing manager creates temporary mass production license order data for the A-status vehicle model through the SCF system, and feeds the created temporary mass production license order data back to the marketing personnel;
[0058] S202: Based on the temporary mass production license order data, the marketing staff submits the final production order in the SCF system and schedules it through the SCF system.
[0059] Specifically, the manufacturing manager creates temporary mass production license order data for the A-status vehicle model in the SCF system and feeds it back to the marketing staff, who then submits the final production order to the SCF system for scheduling.
[0060] Furthermore, after the marketing personnel submit the final production order in the SCF system and schedule it through the SCF system, it also includes: generating tracking information for the production order of the A-status vehicle model to achieve production tracking of the A-status vehicle model.
[0061] S3: Based on the production preparation management system, vehicle information, production order information, production order scheduling calculation, and production order corresponding production progress information are obtained to achieve systematic management of A status vehicle orders.
[0062] Furthermore, in one embodiment, based on the production preparation management system, vehicle information, production order information, production order scheduling calculation, and production order corresponding production progress information are obtained to achieve systematic management of A-state vehicle model orders, specifically including:
[0063] Based on the production preparation management system, the manufacturing management department obtains vehicle information, production order information, production order scheduling calculation, production order corresponding production progress information, and production order corresponding production quality information from the OA system to achieve systematic management of production orders for A-state models.
[0064] Specifically, personnel in the manufacturing management department obtain vehicle information, production order information, production order scheduling calculation, production order corresponding production progress information, and production order corresponding production quality information in the production preparation management system to achieve systematic management and recording of production orders for A-state vehicle models.
[0065] It should be noted that the production progress information corresponding to the production order is obtained from the MES (a production information management system for the workshop execution layer of manufacturing enterprises) system; the production quality information corresponding to the production order is obtained from the QMS (Quality Management System) system.
[0066] For the new car development A-state vehicle model order reporting process management method of the present application, firstly, a production demand application form for the A-state vehicle model is created and reviewed and processed. After the review is passed, temporary batch production license order data for the A-state vehicle model is created, and a production order for the A-state vehicle model is reported for production. Then, the production order is scheduled, a production plan for the production order of the A-state vehicle model is created, the completion status of the production order of the A-state vehicle model is obtained, and the quality evaluation of the production order of the A-state vehicle model is performed.
[0067] This application can realize the planning innovation of A-status vehicle orders, connect to various systems to obtain ledger information, and the actual result ledger online data of the order is also captured from various systems. It supports the acquisition and order creation of A-status vehicle orders and vehicle information, supports receiving the planned production information of A-status vehicle orders in the SCF system, and creates corresponding production preparation plan management items, supports obtaining the actual production progress of A-status vehicle production preparation from the MES system, supports obtaining the quality evaluation results of A-status vehicles from the QMS system, and supports information query of historical A-status vehicle orders.
[0068] The method for managing the production process of an order for a state A vehicle model for new vehicle development in an embodiment of the present application creates a production demand application form for the state A vehicle model, and forwards the created production demand application form to the management department for review and processing, and then creates temporary batch production license order data for the state A vehicle model to generate a final production order and submit it to the SCF system for scheduling, and then obtains vehicle information, production order information, production order scheduling calculation, and production progress information corresponding to the production order based on the production preparation management system to achieve systematic management of orders for state A vehicles. For order planning management of state A vehicles, through monitoring and management of order review and access and production process information of state A vehicles, online information flow, risk control and analysis of production orders for state A vehicles are achieved, and effective management of order reporting for state A vehicles is achieved to improve production efficiency.
[0069] In a second aspect, an embodiment of the present application also provides a device for managing the production process of a new car development A-state model order.
[0070] In one embodiment, referring to Figure 2 , Figure 2 This is a functional module diagram of the A-state model order production process management device for the new car development application. Figure 2 As shown, the new car development A-state model order production process management device includes: an initiating module, a creating module, and an acquiring module.
[0071] The initiation module is used to create a production demand application form for A-status vehicles and forward the created production demand application form to the management department for review and processing; the creation module is used to create temporary mass production license order data for A-status vehicles to generate the final production order and submit it to the SCF system for scheduling; the acquisition module is used to obtain vehicle information, production order information, production order scheduling calculation, and production order corresponding production progress information based on the production preparation management system to achieve systematic management of A-status vehicle orders.
[0072] In this application, a production demand application form for the A-status vehicle model is created and forwarded to the management department for review and processing, including:
[0073] Through the OA system, marketing personnel create a production demand application form for the A-status model, while R&D personnel enter the EBOM submission date and production personnel enter the MBOM submission date;
[0074] Forward the production demand application form to the manufacturing management department for review and processing.
[0075] In this application, the production demand application form is forwarded to the management department for review and processing, including:
[0076] The manufacturing management department reviews the production demand application form and based on the review results:
[0077] If the audit is passed, the audit conclusion will be saved and approved by the relevant personnel;
[0078] If the review fails, the marketing staff will create a production demand application form for the A status vehicle model again.
[0079] In this application, temporary mass production license order data for A-status models is created to generate the final production order and submit it to the SCF system for scheduling, including:
[0080] Through the SCF system, the manufacturing manager creates temporary mass production license order data for the A-status vehicle model and feeds the created temporary mass production license order data back to the marketing staff;
[0081] Based on the temporary mass production license order data, marketing personnel submit the final production order in the SCF system and schedule it through the SCF system.
[0082] In this application, after the marketing staff submits the final production order in the SCF system and schedules it through the SCF system, it also includes:
[0083] Generate tracking information for production orders of vehicles in status A to achieve production tracking of vehicles in status A.
[0084] In this application, based on the production preparation management system, vehicle information, production order information, production order scheduling calculation, and production order corresponding production progress information are obtained to achieve systematic management of A status vehicle orders, including:
[0085] Based on the production preparation management system, the manufacturing management department obtains vehicle information, production order information, production order scheduling calculation, production order corresponding production progress information, and production order corresponding production quality information from the OA system to achieve systematic management of production orders for A-state models.
[0086] In this application, the production progress information corresponding to the production order is obtained from the MES system; the production quality information corresponding to the production order is obtained from the QMS system.
[0087] Among them, the functional implementation of each module in the above-mentioned new car development A-state model order production process management device corresponds to the various steps in the above-mentioned new car development A-state model order production process management method embodiment, and its functions and implementation processes will not be repeated here one by one.
[0088] On the third aspect, an embodiment of the present application provides a new car development A-state model order production process management device, which can be a personal computer (PC), a laptop computer, a server, or other device with data processing capabilities.
[0089] Reference Figure 3 , Figure 3 This is a hardware structure diagram of a new car development A-state model order production process management device involved in the embodiment of the present application. In the embodiment of the present application, the new car development A-state model order production process management device may include a processor, a memory, a communication interface and a communication bus.
[0090] The communication bus may be of any type and is used to interconnect the processor, the memory, and the communication interface.
[0091] The communication interface includes input / output (I / O) interfaces, physical interfaces, and logical interfaces, which are used to interconnect devices within the new car development A-state model order reporting process management device, and interfaces used to interconnect the new car development A-state model order reporting process management device with other devices (such as other computing devices or user devices). The physical interface can be an Ethernet interface, a fiber optic interface, an ATM interface, etc.; the user device can be a display (Display), a keyboard (Keyboard), etc.
[0092] The memory can be various types of storage media, such as random access memory (RAM), read-only memory (ROM), non-volatile RAM (NVRAM), flash memory, optical storage, hard disk, programmable ROM (PROM), erasable PROM (EPROM), electrically erasable PROM (EEPROM), etc.
[0093] The processor may be a general-purpose processor, which may call the new car development A-state model order production process management program stored in the memory, and execute the new car development A-state model order production process management method provided in the embodiment of the present application. For example, the general-purpose processor may be a central processing unit (CPU). Among them, the method executed when the new car development A-state model order production process management program is called can refer to the various embodiments of the new car development A-state model order production process management method of the present application, which will not be repeated here.
[0094] Those skilled in the art will understand that Figure 3 The hardware structure shown in the figure does not constitute a limitation on the present application, and may include more or less components than shown in the figure, or combine certain components, or arrange the components differently.
[0095] In a fourth aspect, an embodiment of the present application also provides a computer-readable storage medium.
[0096] The computer-readable storage medium of the present application stores a new car development A-state vehicle model order production process management program, wherein when the new car development A-state vehicle model order production process management program is executed by the processor, the steps of the new car development A-state vehicle model order production process management method as described above are implemented.
[0097] Among them, the method implemented when the new car development A-state model order production process management program is executed can refer to the various embodiments of the new car development A-state model order production process management method of the present application, and will not be repeated here.
[0098] It should be noted that the serial numbers of the above-mentioned embodiments of the present application are only for description and do not represent the advantages or disadvantages of the embodiments.
[0099] The terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices. The terms "first", "second" and "third" are used to distinguish different objects, etc., and do not represent a sequence, nor do they limit "first", "second" and "third" to different types.
[0100] In the description of the embodiments of the present application, "exemplary", "for example" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary", "for example" or "for example" is intended to present related concepts in a specific way.
[0101] In the description of the embodiments of the present application, unless otherwise specified, “ / ” means or, for example, A / B can mean A or B; the “and / or” in the text is merely a description of the association relationship of associated objects, indicating that three relationships may exist, for example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, in the description of the embodiments of the present application, “multiple” refers to two or more than two.
[0102] In some processes described in the embodiments of the present application, multiple operations or steps that appear in a specific order are included, but it should be understood that these operations or steps may not be executed in the order in which they appear in the embodiments of the present application or in parallel, and the sequence number of the operation is only used to distinguish the different operations, and the sequence number itself does not represent any execution order. In addition, these processes may include more or fewer operations, and these operations or steps may be executed in sequence or in parallel, and these operations or steps may be combined.
[0103] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, disk, CD) as described above, and includes a number of instructions for a terminal device to execute the methods described in each embodiment of the present application.
[0104] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A method for managing the production process of a new car development A-state model order, characterized in that: The method for managing the production process of a new vehicle development A-state vehicle model order includes: Create a production demand application form for the A-status vehicle model and forward the created production demand application form to the management department for review and processing; Create temporary mass production license order data for A-status models to generate final production orders and submit them to the SCF system for scheduling; Based on the production preparation management system, vehicle information, production order information, production order scheduling calculation, and production order corresponding production progress information are obtained to achieve systematic management of A-state vehicle orders.
2. A method for managing the production process of a new vehicle development A-state vehicle model order as claimed in claim 1, characterized in that: The step of creating a production demand application form for a vehicle in status A and forwarding the created production demand application form to the management department for review and processing specifically includes: Through the OA system, marketing personnel create a production demand application form for the A-status model, while R&D personnel enter the EBOM submission date and production personnel enter the MBOM submission date; Forward the production demand application form to the manufacturing management department for review and processing.
3. A method for managing the production process of a new vehicle development A-state vehicle model order as claimed in claim 2, characterized in that: The production demand application form is forwarded to the management department for review and processing, specifically including: The manufacturing management department reviews the production demand application form and based on the review results: If the audit is passed, the audit conclusion will be saved and approved by the relevant personnel; If the review fails, the marketing staff will create a production demand application form for the A status vehicle model again.
4. A method for managing the production process of a new vehicle development A-state vehicle model order as claimed in claim 1, characterized in that: The creation of temporary mass production license order data for A-status vehicles to generate a final production order and submit it to the SCF system for scheduling specifically includes: Through the SCF system, the manufacturing manager creates temporary mass production license order data for the A-status vehicle model and feeds the created temporary mass production license order data back to the marketing staff; Based on the temporary mass production license order data, marketing personnel submit the final production order in the SCF system and schedule it through the SCF system.
5. A method for managing the production process of a new vehicle development A-state vehicle model order as claimed in claim 4, characterized in that: After the marketing staff submits the final production order in the SCF system and schedules it through the SCF system, it also includes: Generate tracking information for production orders of vehicles in status A to achieve production tracking of vehicles in status A.
6. A method for managing the production process of a new vehicle development A-state vehicle model order as claimed in claim 1, characterized in that: The production preparation management system obtains vehicle information, production order information, production order scheduling calculation, and production order corresponding production progress information to achieve systematic management of A-state vehicle orders, specifically including: Based on the production preparation management system, the manufacturing management department obtains vehicle information, production order information, production order scheduling calculation, production order corresponding production progress information, and production order corresponding production quality information from the OA system to achieve systematic management of production orders for A-state models.
7. A method for managing the production process of a new vehicle development A-state vehicle model order as claimed in claim 6, characterized in that: The production progress information corresponding to the production order is obtained from the MES system; The production quality information corresponding to the production order is obtained from the QMS system.
8. A new car development A-state model order production process management device, characterized in that: The new car development A-state model order production reporting process management device comprises: The initiation module is used to create a production demand application form for the A-state vehicle model and forward the created production demand application form to the management department for review and processing; A creation module is used to create temporary mass production license order data for A-status models to generate final production orders and submit them to the SCF system for scheduling; The acquisition module is used to obtain vehicle information, production order information, production order scheduling calculation, and production progress information corresponding to the production order based on the production preparation management system, so as to realize the systematic management of A-state vehicle model orders.
9. A new car development A-state model order production process management device as claimed in claim 8, characterized in that: The step of creating a production demand application form for a vehicle in status A and forwarding the created production demand application form to the management department for review and processing specifically includes: Through the OA system, marketing personnel create a production demand application form for the A-status model, while R&D personnel enter the EBOM submission date and production personnel enter the MBOM submission date; Forward the production demand application form to the manufacturing management department for review and processing.
10. A new car development A-state model order production process management device, characterized in that: The new car development A-state vehicle model order production process management device includes a processor, a memory, and a new car development A-state vehicle model order production process management program stored in the memory and executable by the processor, wherein when the new car development A-state vehicle model order production process management program is executed by the processor, the steps of the new car development A-state vehicle model order production process management method as described in any one of claims 1 to 7 are implemented.
Citation Information
Patent Citations
Order splitting management method and system for bathroom cabinet customization system
CN107578142A
Intelligent factory research and development manufacturing cooperation system and method based on ETO production mode
CN113610377A
Novel finished automobile product maturity classification method and system
CN115952995A
Automobile production progress monitoring method, device and equipment and storage medium
CN116415789A
System online structured construction method, device and equipment for temporarily changing business
CN118469458A