Cable installation equipment for galvanized iron tower

By designing a cable installation equipment for galvanized iron towers, the temporary support of the insulator string is achieved using elastic pulling ropes and tensioning units, the problem of overall slack in the insulator strings in the prior art is solved and the labor intensity of staff is reduced.

CN119340856BActive Publication Date: 2025-03-21QINGDAO YONGXIANGHE ENVIRONMENTAL PROTECTION TECH CO LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411884860.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-20
Publication Date
2025-03-21
Estimated Expiration
2044-12-20

AI Technical Summary

Technical Problem

During long-distance power transmission, as the number of insulators connected in series increases, the prior art is difficult to effectively support the remaining insulators, resulting in high labor intensity for staff.

Method used

Design a cable installation equipment for galvanized iron towers, using at least three elastic pulling ropes and related installation parts, sliding blocks, mounting blocks, fixing units and traction units. The temporary support of the cable and the slack of the insulator string are achieved through the elastic pulling ropes and tensioning units, reducing the labor intensity of the staff.

Benefits of technology

Through this equipment, it is possible to automatically support the remaining insulators when replacing damaged insulators, reduce the labor intensity of staff and improve replacement efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119340856B_ABST
    Figure CN119340856B_ABST
Patent Text Reader

Abstract

The present application relates to the technical field of cable installation equipment, and in particular to a cable installation equipment for a galvanized iron tower, comprising an elastic pulling rope, a plurality of elastic pulling ropes forming a supporting cavity, and sliding blocks are connected to both ends of the elastic pulling rope; a mounting portion, wherein two mounting portions are respectively located at both ends of the elastic pulling rope, the sliding blocks are slidably connected to the mounting portions, and the two mounting portions are respectively connected to a hanging member and a tensioning member; two mounting blocks, wherein the mounting blocks are slidably connected to the same elastic pulling rope, and a force strip is connected to the mounting blocks, and a fixing unit is connected to the mounting blocks for fixing the mounting blocks; a traction unit for driving the two mounting blocks to approach each other; a tensioning unit for tensioning the elastic pulling rope, the tensioning unit being connected to the elastic pulling rope, and the tensioning unit being connected to the mounting portion and being arranged close to the hanging member; the present application has the effect of supporting the remaining insulators while replacing the damaged insulators to reduce the labor intensity of the staff.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of cable installation equipment, and in particular to a cable installation equipment for a galvanized iron tower. Background Art

[0002] Long-distance power transmission refers to the process of transmitting electric energy from a power plant or power source to a load center or user over a long distance through a transmission line. In the process of long-distance power transmission, in order to reduce the loss of electric energy, ultra-high voltage transmission is often used. At the same time, in order to avoid the influence of various terrains along the route, multiple power towers will be set up along the transmission line as support points for the power transmission cables.

[0003] Among them, the power tower uses insulator strings to support and insulate the cables. However, as the service time increases, some insulators are damaged. At this time, the cables need to be temporarily separated from the insulator strings, and then new insulators are replaced. In the prior art, workers usually carry replacement tools to climb to the installation crossarm, and then one end of the rope is connected to the installation crossarm, and the other end of the rope is connected to the tensioner. The tensioner is then moved toward the cable end and fixed to the cable. The tensioner is pulled toward the installation crossarm by the rope. At this time, the connection points at both ends of the insulator are loose. The worker removes the old insulator and installs the new insulator. Finally, the rope is loosened and the tensioner is unlocked to complete the replacement of the insulator.

[0004] With respect to the above-mentioned related technologies, with the development of UHV technology, the number of insulators connected in series on an insulator string has gradually increased. When the insulators are replaced by the aforementioned method, the insulator string may become loose as a whole. Therefore, when replacing damaged insulators, the remaining insulators need to be supported to prevent them from falling. However, the insulators are heavy, and relying on manual support by the staff will result in a high labor intensity for the staff. Summary of the invention

[0005] In order to achieve the support of the remaining insulators while replacing the damaged insulators to reduce the labor intensity of the workers, the present application provides a cable installation device for a galvanized iron tower.

[0006] The present application provides a galvanized iron tower cable installation device that adopts the following technical solution:

[0007] A cable installation device for a galvanized iron tower, comprising

[0008] At least three elastic pulling ropes, wherein the plurality of elastic pulling ropes form a supporting cavity, and both ends of the elastic pulling ropes are connected to sliding blocks;

[0009] Two mounting parts, the two mounting parts are respectively located at two ends of the elastic pulling rope, the sliding block is slidably connected to the mounting parts, and the two mounting parts are respectively connected with a hanging part and a tightening part;

[0010] Two mounting blocks, the two mounting blocks are slidably connected to the same elastic pulling rope, and the mounting blocks are connected to a force-applying bar, the force-applying bar is provided with a yielding groove with an open end, and the mounting blocks are connected to a fixing unit, the fixing unit is connected to the elastic pulling rope and is used to fix the mounting blocks;

[0011] A traction unit for driving two mounting blocks to approach each other, wherein the traction unit is connected to the mounting blocks;

[0012] A tensioning unit is used to tension the elastic pulling rope, wherein the tensioning unit is connected to the elastic pulling rope, and the tensioning unit is connected to the mounting portion and is disposed close to the hanging member.

[0013] By adopting the above technical solution, the staff carries the cable installation equipment to climb to the installation crossarm, first connects the hanging part with the installation crossarm, then moves the other installation part connected with the tensioning part toward the cable side, and fixes the tensioning part with the cable, and at this time, applies force to the sliding block to make the sliding block move toward the side of the insulator until multiple elastic pulling ropes form a supporting space for accommodating the insulator string, and at this time, applies force to the elastic pulling rope through the tensioning unit to tension the elastic pulling rope to achieve temporary fixation of the cable, and then moves the installation block to the insulator outside the insulator to be replaced, and then fixes the installation block and the elastic pulling rope through the fixing unit, and at this time, applies force to the two installation blocks at the same time through the traction unit, and the two installation blocks approach each other while driving the force bar to move, and the force bar abuts against the insulator outside the insulator to be replaced, so that the outer insulator string is straightened, while the part of the insulator string to be replaced is loose. The tensioning device can be used to install the cable in the replacement area, and the tensioning device can be used to fix the cable. The ...

[0014] In a specific embodiment, the fixing unit comprises

[0015] A force applying screw, the force applying screw being threadedly connected to the mounting block;

[0016] A locking ring, a locking groove is provided on the mounting block, the locking ring is located in the locking groove, the elastic pulling rope passes through the hanging area of ​​the locking ring, and the force screw extends into the locking groove and is connected to the locking ring.

[0017] By adopting the above technical solution, after the mounting block is moved into place, the force screw is turned, and the force screw rotates while driving the locking ring to rotate. The locking ring twists and wraps the elastic pull rope, and gradually moves toward the top wall of the locking groove to achieve locking of the mounting block and the elastic pull rope. The designed fixing unit can realize the rotation of the locking ring and the movement toward the top wall of the locking groove through the force screw, and the winding and fixing of the elastic pull rope can be achieved while rotating through the locking ring.

[0018] In a specific possible implementation manner, a driving handle is connected to the extended section of the force screw away from the locking ring.

[0019] By adopting the above technical solution, the designed driving handle can facilitate driving the force screw to rotate.

[0020] In a specific embodiment, the traction unit includes

[0021] A winding wheel, the winding wheel is rotatably connected to the mounting block;

[0022] A pulling rope, one end of which is connected to the mounting block, and the other end of which is connected to the winding wheel;

[0023] A driving rod is connected to the winding wheel, and the driving rod and the winding wheel are eccentrically arranged.

[0024] By adopting the above technical solution, a traction unit is designed, which can drive the winding wheel to rotate through the driving rod, and the pulling rope can be tightened through the winding wheel, and then the two mounting blocks can be brought closer to each other through the pulling rope.

[0025] In a specific feasible implementation scheme, a sliding groove is provided in the winding wheel, a push-out spring is connected to the sliding groove, the driving rod extends into the sliding groove and is connected to the push-out spring, and a plurality of arc grooves are provided on the driving handle, the driving rod can move toward one side of the driving handle and be inserted into the arc groove.

[0026] By adopting the above technical solution, force is applied to the drive rod to make the winding wheel rotate. While the winding wheel rotates, the pulling rope is tightened until the mounting block moves to the appropriate area. At this time, the drive rod is released and inserted into the arc groove on the drive handle, completing the locking of the drive rod and realizing the locking of the force screw at the same time.

[0027] In a specific feasible implementation scheme, the mounting portion is provided with an adjustment groove for the sliding block to slide, and the sliding block is threadedly connected with a fixing bolt, the mounting portion is provided with a strip groove, the fixing bolt is arranged through the strip groove, and a clamping block is slidably connected to the fixing bolt, and the clamping block is located between the nut of the fixing bolt and the mounting portion.

[0028] By adopting the above technical solution, the designed fixing bolts and tightening blocks can fix the position of the sliding block, avoiding the possibility of the elastic pulling rope moving toward the side away from the insulator string during temporary support of the cable, thereby losing support for the insulator string.

[0029] In a specific possible implementation manner, the mounting block has a locking hook at one end close to the mounting portion, and the locking hook can be arranged through the adjustment slot and the strip slot.

[0030] By adopting the above technical solution, force is applied to the two mounting parts so that the mounting parts move closer to the mounting block until the locking hook passes through the sliding groove and the strip groove, and then force is applied to the sliding block so that the sliding block moves toward the locking hook until the sliding block locks the locking hook, and then the sliding block is fixed by the fixing unit, so that the two mounting parts can be stored.

[0031] In a specific embodiment, the tensioning unit comprises

[0032] A tensioning plate, wherein the elastic pulling rope passes through the sliding block and is connected to the tensioning plate, and the elastic pulling rope is slidably connected to the sliding block close to the hanging member;

[0033] A tensioning screw is threadedly connected to the tensioning plate, and the tensioning screw passes through the tensioning plate and is rotatably connected to the mounting portion.

[0034] By adopting the above technical solution, the designed tensioning unit can realize the tensioning of the elastic pulling rope through the cooperation of the tensioning screw and the tensioning plate, thereby realizing temporary support of the cable.

[0035] In a specific embodiment, the tension plate comprises

[0036] A driving block, wherein the driving block is threadedly connected to the tensioning screw;

[0037] A plurality of clamping rods, one end of each clamping rod is rotatably connected to the driving block, a clamping cavity for the elastic pulling rope to pass through is formed between two clamping rods, and one end of two adjacent clamping rods away from the driving block is bolted.

[0038] By adopting the above technical solution, the designed tensioning plate can cooperate with the tensioning screw through the driving block to realize the movement of the clamping rod, and the clamping rod can realize the clamping and fixing of different areas of the elastic pulling rope, thereby improving the adaptability to insulator strings of different lengths.

[0039] In a specific possible implementation manner, the mounting block is located above the insulator.

[0040] By adopting the above technical solution, the mounting block designed to be located above the insulator can provide an operating gap for the staff while supporting all the insulators on the insulator string.

[0041] In summary, the present application includes at least one of the following beneficial technical effects:

[0042] 1. The cable installation equipment for the galvanized iron tower is designed. The installation part can realize the installation of the hanging parts and the tensioning parts. The connection with the iron tower can be realized through the hanging parts. The cable can be fixed through the tensioning parts. The elastic pulling rope and the tensioning unit can realize temporary support of the cable and relaxation of the insulator string. The insulator string in the replacement area can be relaxed by the installation block, the force bar, the fixing unit and the traction unit. At this time, the insulator strings in other areas are in a taut state and supported by the supporting space formed by the elastic pulling rope. There is no need for manual support by the staff. The damaged insulators can be replaced while the remaining insulators are supported to reduce the labor intensity of the staff.

[0043] 2. The cable installation equipment of the galvanized iron tower is designed to apply force to the driving rod to make the winding wheel rotate. While the winding wheel rotates, the pulling rope is tightened until the installation block moves to the appropriate area. At this time, the driving rod is released to make the driving rod insert into the arc groove on the driving handle to complete the locking of the driving rod and realize the locking of the force screw at the same time.

[0044] 3. The cable installation equipment for the galvanized iron tower is designed. The driving block can cooperate with the tensioning screw to realize the movement of the clamping rod. The clamping rod can realize the clamping and fixing of different areas of the elastic pulling rope, thereby improving the adaptability to insulator strings of different lengths. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 It is a structural schematic diagram of the cable installation equipment of the galvanized iron tower according to the embodiment of the present application.

[0046] Figure 2 yes Figure 1 Schematic diagram of the three-dimensional structure.

[0047] Figure 3 is Figure 2 Schematic diagram of part of the structure after adding a tensioning unit to the foundation.

[0048] Figure 4 yes Figure 3 Front view of .

[0049] Figure 5 is Figure 4 Schematic diagram of the three-dimensional structure after adding a locking hook to the foundation.

[0050] Figure 6 yes Figure 5 Schematic diagram of part of the structure after the middle section.

[0051] Figure 7 is Figure 5 On this basis, the structural schematic diagram of the fixing unit and the traction unit is further displayed.

[0052] Figure 8 yes Figure 7 A magnified schematic diagram of the middle part of the structure.

[0053] Explanation of the reference numerals: 1. elastic pulling rope; 2. sliding block; 3. mounting portion; 31. hanging part; 32. tensioning part; 33. adjusting groove; 34. strip groove; 4. mounting block; 41. force strip; 411. giving way groove; 42. locking groove; 5. fixing unit; 51. force screw; 52. locking ring; 53. driving handle; 531. arc groove; 6. traction unit; 61. winding wheel; 611. sliding groove; 62. pulling rope; 63. driving rod; 64. ejection spring; 65. fixing bolt; 66. tightening block; 7. tensioning unit; 71. tensioning plate; 711. driving block; 712. clamping rod; 72. tensioning screw; 8. locking hook. DETAILED DESCRIPTION

[0054] The following is combined with Figure 1-8 This application is described in further detail.

[0055] An embodiment of the present application discloses a cable installation device for a galvanized iron tower.

[0056] Reference Figure 1 and Figure 2A cable installation device for a galvanized iron tower includes an elastic pulling rope 1, a sliding block 2 and a mounting portion 3. The number of the elastic pulling ropes 1 is at least three, and at least three elastic pulling ropes 1 are tensioned to form a supporting cavity for supporting an insulator string. The number of the sliding blocks 2 is twice the number of the elastic pulling ropes 1, and the sliding block 2 is fixedly connected to one end of the elastic pulling rope 1. The number of the mounting portions 3 is two, and the two mounting portions 3 are respectively located at the two ends of the elastic pulling rope 1, and the sliding block 2 is slidably connected to the mounting portion 3 to form supporting cavities of different diameters. To adapt to insulators of different diameters, a mounting portion 3 is connected to a hanging piece 31, which is used to be connected to the mounting crossarm, and another mounting portion 3 is connected to a tensioning piece 32, which is used to be connected to the cable; in the present application, the number of elastic pull ropes 1 can be three, four, or five, as long as a supporting cavity for supporting the insulator string can be formed. In the present embodiment, the number of elastic pull ropes 1 is four, and the hanging piece 31 and the tensioning piece 32 both use the existing technology, which will not be described here.

[0057] Reference Figure 2 Specifically, the mounting portion 3 is provided with a plurality of adjustment grooves 33 for sliding the sliding block 2, and the mounting portion 3 is also provided with a plurality of strip grooves 34, the strip grooves 34 are connected with the adjustment grooves 33, a fixing bolt 65 is threadedly connected to the sliding block 2, and the screw section of the fixing bolt 65 is passed through the strip groove 34, a tightening block 66 is passed through and slidably connected to the fixing bolt 65, and the tightening block 66 is located between the mounting portion 3 and the nut of the fixing bolt 65. After the elastic pulling rope 1 forms a supporting cavity of suitable diameter, the position of the sliding block 2 can be fixed by screwing the fixing bolt 65 and cooperating with the tightening block 66.

[0058] Reference Figure 3 After the tensioning member 32 is fixed to the cable and the hanging member 31 is fixed to the installation crossarm, in order to achieve the tensioning of the elastic pull rope 1 to ensure the supporting reliability, the cable installation equipment of the galvanized iron tower also includes a tensioning unit 7, which is connected to the elastic pull rope 1, and the tensioning unit 7 is connected to the installation part 3 and is arranged close to the hanging member 31, for tensioning the elastic pull rope 1.

[0059] Reference Figure 3 Specifically, the tensioning unit 7 includes a tensioning plate 71 and a tensioning screw 72. The elastic pulling rope 1 passes through the sliding block 2 arranged near the hanging member 31, and the elastic pulling rope 1 is slidingly connected to the sliding block 2. The tensioning screw 72 is threadedly connected to the tensioning plate 71, and the tensioning screw 72 passes through the tensioning plate 71 and is rotatably connected to the mounting portion 3. By rotating the tensioning screw 72, the tensioning plate 71 can be moved toward the side away from the mounting portion 3.

[0060] Reference Figure 3In order to better adapt to insulator strings of different lengths, the tensioning plate 71 includes a driving block 711 and a plurality of clamping rods 712. The tensioning screw 72 is threadedly connected to the driving block 711. The plurality of clamping rods 712 are grouped in pairs. One end of the clamping rod 712 is rotatably connected to the driving block 711, and a V-shaped clamping cavity for the elastic pulling rope 1 to pass through is formed between the two clamping rods 712. The ends of the two adjacent clamping rods 712 away from the driving block 711 are connected by bolts to drive the two clamping rods 712 to approach each other and clamp and fix the elastic pulling rope 1.

[0061] Reference Figure 4 and Figure 5 In order to replace the insulator, the cable installation equipment of the galvanized iron tower also includes a mounting block 4, a fixing unit 5 and a pulling unit 6. There are two mounting blocks 4, and the two mounting blocks 4 are slidably connected to the same elastic pulling rope 1. A force bar 41 is welded and fixed on the mounting block 4. A clearance groove 411 is provided on the force bar 41. The clearance groove 411 is set away from the opening of one end of the mounting block 4 to facilitate insertion between two adjacent insulators. The fixing unit 5 is connected to the mounting block 4, and the fixing unit 5 is connected to the elastic pulling rope 1 for fixing the mounting block 4. The pulling unit 6 is connected to the mounting block 4, and the pulling unit 6 is used to drive the two mounting blocks 4 to approach each other.

[0062] Reference Figure 5 Specifically, when in use, keeping the mounting block 4 above the insulator can provide an operating gap for the staff while supporting all the insulators on the insulator string; at the same time, in order to facilitate the carrying and storage of the cable installation equipment, a locking hook 8 is formed at one end of the mounting block 4 close to the mounting portion 3, and the locking hook 8 is arranged through the adjustment groove 33 and the strip groove 34. When stored, the two mounting portions 3 approach each other until the locking hook 8 passes through the adjustment groove 33 and the strip groove 34, and then force is applied to the sliding block 2 to lock the locking hook 8 on the mounting portion 3 through the sliding block 2.

[0063] Reference Figure 6The locking ring 52 is arranged in the locking groove 42, and the elastic pulling rope 1 passes through the locking ring 52, and the force screw 51 extends into the locking groove 42 and is welded and fixed with the locking ring 52. In order to facilitate driving the force screw 51 to rotate, a driving handle 53 is welded and fixed to the extending section of the force screw 51 away from the locking ring 52; after the mounting block 4 is moved into place, the force screw 51 is twisted, and the force screw 51 rotates while driving the locking ring 52 to rotate, and the locking ring 52 twists and wraps the elastic pulling rope 1, and gradually moves toward the top wall side of the locking groove 42, so as to realize the locking of the mounting block 4 and the elastic pulling rope 1; the rotation of the locking ring 52 and the movement toward the top wall side of the locking groove 42 can be realized by the force screw 51, and the winding and fixing of the elastic pulling rope 1 can be realized while rotating by the locking ring 52.

[0064] Reference Figure 6 and Figure 7 Specifically, the traction unit 6 includes a winding wheel 61, a pulling rope 62 and a driving rod 63. The winding wheel 61 is rotatably connected to the mounting block 4. One end of the pulling rope 62 is screwed to a mounting block 4, and the other end is connected to the winding wheel 61. The driving rod 63 is connected to the winding wheel 61, and the driving rod 63 is eccentrically arranged to the winding wheel 61. By applying force to the driving rod 63, the winding wheel 61 can be driven to rotate to complete the tightening of the pulling rope 62, thereby realizing the mutual approach of the two mounting blocks 4.

[0065] Reference Figure 7 and Figure 8 Furthermore, a sliding groove 611 is provided on the winding wheel 61, and a push-out spring 64 is welded and fixed in the sliding groove 611. The driving rod 63 extends into the sliding groove 611 and abuts against the push-out spring 64, and a plurality of arc grooves 531 are provided on the driving handle 53. Under the elastic force of the push-out spring 64, the driving rod 63 can move toward one side of the driving handle 53 and be inserted into the arc groove 531; force is applied to the driving rod 63 to rotate the winding wheel 61, and the pulling rope 62 is tightened while the winding wheel 61 rotates until the mounting block 4 moves to the appropriate area. At this time, the driving rod 63 is released, so that the driving rod 63 is inserted into the arc groove 531 on the driving handle 53, completing the locking of the driving rod 63 and realizing the locking of the force screw 51 at the same time.

[0066] The implementation principle of the cable installation device of a galvanized iron tower in the embodiment of the present application is as follows: the worker carries the cable installation device and climbs to the installation crossarm, first connects the hanging member 31 with the installation crossarm, then moves the other installation part 3 connected with the tensioning member 32 toward the cable side, and fixes the tensioning member 32 with the cable, and at this time, applies force to the sliding block 2, so that the sliding block 2 moves toward the insulator side, until the multiple elastic pulling ropes 1 form a supporting space for accommodating the insulator string, and at this time, the elastic pulling rope 1 is applied with force through the tensioning unit 7, The elastic pulling rope 1 is tensioned to achieve temporary fixation of the cable, and then the mounting block 4 is moved to the insulator outside the insulator that needs to be replaced. After the mounting block 4 is moved into place, the force screw 51 is twisted. The force screw 51 rotates while driving the locking ring 52 to rotate. The locking ring 52 twists and wraps the elastic pulling rope 1 and gradually moves toward the top wall of the locking groove 42 to achieve locking of the mounting block 4 and the elastic pulling rope 1. At this time, the traction unit 6 simultaneously applies force to the two mounting blocks 4, and the two mounting blocks 4 approach each other while driving the force screw 51. The force bar 41 moves, and the force bar 41 abuts against the insulator outside the insulator to be replaced, so that the outer insulator string is straightened, while the part of the insulator string to be replaced is relaxed, and the elastic pulling rope 1 in the replacement area is also relaxed at this time, which is convenient for the staff to operate. After the insulator is replaced, the elastic pulling rope 1 is driven to relax as a whole by the unlocking unit, and then the tensioning piece 32 is loosened; the installation of the hanging piece 31 and the tensioning piece 32 can be realized through the installation part 3, the connection with the iron tower can be realized through the hanging piece 31, the cable can be fixed through the tensioning piece 32, the cable can be temporarily supported by the elastic pulling rope 1 and the tensioning unit 7, and the relaxation of the insulator string can be realized by the elastic pulling rope 1 and the tensioning unit 7. The relaxation of the insulator string in the replacement area can be realized by the cooperation of the installation block 4, the force bar 41, the fixing unit 5 and the traction unit 6, and at this time, the insulator strings in other areas are in a taut state and supported by the supporting space formed by the elastic pulling rope 1, and the staff does not need to manually support it. The damaged insulator can be replaced while supporting the remaining insulators to reduce the labor intensity of the staff.

[0067] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A cable installation device for a galvanized iron tower, characterized in that: include At least three elastic pulling ropes (1), wherein the plurality of elastic pulling ropes (1) form a supporting cavity, and both ends of the elastic pulling ropes (1) are connected to sliding blocks (2); Two mounting parts (3), the two mounting parts (3) are respectively located at two ends of the elastic pulling rope (1), the sliding block (2) is slidably connected to the mounting parts (3), and the two mounting parts (3) are respectively connected to a hanging part (31) and a tightening part (32); Two mounting blocks (4), the two mounting blocks (4) are slidably connected to the same elastic pulling rope (1), and the mounting blocks (4) are connected to a force-applying bar (41), the force-applying bar (41) is provided with a clearance groove (411) with an open end, and the mounting blocks (4) are connected to a fixing unit (5), the fixing unit (5) is connected to the elastic pulling rope (1) and is used to fix the mounting blocks (4); A traction unit (6) for driving two mounting blocks (4) to move toward each other, the traction unit (6) being connected to the mounting blocks (4); A tensioning unit (7) for tensioning the elastic pulling rope (1), wherein the tensioning unit (7) is connected to the elastic pulling rope (1), and the tensioning unit (7) is connected to the mounting portion (3) and is disposed close to the hanging member (31).

2. The cable installation device for the galvanized iron tower according to claim 1, characterized in that: The fixing unit (5) comprises A force applying screw (51), wherein the force applying screw (51) is threadedly connected to the mounting block (4); A locking ring (52), a locking groove (42) is provided on the mounting block (4), the locking ring (52) is located in the locking groove (42), the elastic pulling rope (1) passes through the locking ring (52), and the force screw (51) extends into the locking groove (42) and is connected to the locking ring (52).

3. The cable installation device for the galvanized iron tower according to claim 2, characterized in that: The extended section of the force application screw (51) away from the locking ring (52) is connected to a driving handle (53).

4. The cable installation device for the galvanized iron tower according to claim 3, characterized in that: The traction unit (6) comprises A winding wheel (61), the winding wheel (61) being rotatably connected to the mounting block (4); A pulling rope (62), one end of the pulling rope (62) is connected to the mounting block (4), and the other end of the pulling rope (62) is connected to the winding wheel (61); A driving rod (63) is connected to the winding wheel (61), and the driving rod (63) and the winding wheel (61) are eccentrically arranged.

5. The cable installation device for the galvanized iron tower according to claim 4, characterized in that: The winding wheel (61) is provided with a sliding groove (611), and a push-out spring (64) is connected to the sliding groove (611). The driving rod (63) extends into the sliding groove (611) and is connected to the push-out spring (64). The driving handle (53) is provided with a plurality of arc grooves (531), and the driving rod (63) can move toward one side of the driving handle (53) and be inserted into the arc groove (531).

6. The cable installation device for a galvanized iron tower according to claim 1, characterized in that: The mounting portion (3) is provided with an adjustment groove (33) for the sliding block (2) to slide, and the sliding block (2) is threadedly connected with a fixing bolt (65), the mounting portion (3) is provided with a strip groove (34), the fixing bolt (65) is arranged through the strip groove (34), and the fixing bolt (65) is slidably connected with a clamping block (66), and the clamping block (66) is located between the nut of the fixing bolt (65) and the mounting portion (3).

7. The cable installation device for the galvanized iron tower according to claim 6, characterized in that: The mounting block (4) has a locking hook (8) at one end close to the mounting portion (3), and the locking hook (8) can be arranged through the adjustment groove (33) and the strip groove (34).

8. The cable installation device for a galvanized iron tower according to claim 6, characterized in that: The tensioning unit (7) comprises A tensioning plate (71), the elastic pulling rope (1) passes through the sliding block (2) and is connected to the tensioning plate (71), and the elastic pulling rope (1) is slidably connected to the sliding block (2) close to the hanging member (31); A tensioning screw (72), wherein the tensioning screw (72) is threadedly connected to the tensioning plate (71), and the tensioning screw (72) passes through the tensioning plate (71) and is rotationally connected to the mounting portion (3).

9. The cable installation device for a galvanized iron tower according to claim 8, characterized in that: The tensioning plate (71) comprises A driving block (711), wherein the driving block (711) is threadedly connected to the tensioning screw (72); A plurality of clamping rods (712), one end of each clamping rod (712) being rotatably connected to the driving block (711), and a clamping cavity for allowing the elastic pulling rope (1) to pass through is formed between two of the clamping rods (712), and one end of two adjacent clamping rods (712) away from the driving block (711) is bolted together.

10. The cable installation device for a galvanized iron tower according to claim 1, characterized in that: The mounting block (4) is located above the insulator.

Citation Information

Patent Citations

  • Live line replacing method high voltage transmission line strain insulator-string and device

    CN101022212A

  • Installation structure for duplex strain insulator string, and replacing operation method

    CN107171249A