Fabricated pile foundation construction platform and pile foundation construction method

By designing a prefabricated pile foundation construction platform that uses fixed plates, rotating buckles and fixed pins, the problem of inconvenient operation of the existing platform is solved, rapid assembly and disassembly is achieved, and construction efficiency and platform stability are improved.

CN119352904AActive Publication Date: 2025-01-24山东航空港建设工程集团有限公司
View PDF 11 Cites 0 Cited by

Patent Information

Application Number
CN202411904917.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-01-24
Estimated Expiration
2044-12-23

AI Technical Summary

Technical Problem

The existing pile foundation construction platform is inconvenient to operate during assembly and disassembly, which affects workers' quick completion of construction tasks.

Method used

A prefabricated pile foundation construction platform is designed, which adopts an assembly structure of fixed plates, rotating buckles and fixed pins. Through the rotation of the rotating buckles and the insertion of the fixed pins, the main beams can be quickly assembled and disassembled, and the main beams are installed on the platform frame. A leveling mechanism and pile position adjustment mechanism are installed at the bottom to improve the stability and flexibility of the platform.

Benefits of technology

The rapid assembly and disassembly of the pile foundation construction platform improved the operating efficiency of the workers, avoided the collision damage during the transportation of the main beam, and ensured the horizontal position of the platform and the pile spacing spacing through the leveling mechanism and the pile position adjustment mechanism. Accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119352904A_ABST
    Figure CN119352904A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building engineering, and discloses an assembly type pile foundation construction platform and a pile foundation construction method. The platform frame is composed of four main beams, a plurality of platform plates are assembled in the main beams, pile position grooves are formed in the platform plates, pile position adjusting mechanisms are installed at the bottoms of the platform plates, assembling mechanisms are installed on the outer side of the platform frame, and leveling mechanisms are installed at the four corners of the bottom of the platform frame. The fixing pins are inserted into the two vertical main beams, then the rotating buckles are rotated, the rotating buckles rotate with the fixing plates as connecting points, the positions of the fixing pins can be fixed through the rotating buckles, the two vertical main beams can be assembled and fixed, and then the multiple platform plates are installed between the multiple main beams in an inserted mode. And meanwhile, the construction platform can be conveniently and rapidly assembled by a working group, and later disassembly by a worker can be facilitated by adopting the mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction engineering, and in particular to an assembled pile foundation construction platform and a pile foundation construction method. Background Art

[0002] Pile foundation construction is mainly used in water conservancy projects to improve the bearing capacity of the foundation and ensure the stability of buildings or structures. According to different geological conditions and engineering requirements, pile foundation construction can adopt a variety of technologies and methods. During pile foundation construction, it is necessary to first build a pile foundation construction platform. The pile foundation construction platform is a platform that uses piles as a supporting structure. It is usually used on the basis of structures such as buildings or bridges. It is a plane structure built to support the main structure. Then the drilling machine is operated on the pile foundation construction platform to drill holes in the ground and then grouting is performed to form a pile foundation.

[0003] The construction platform is used to support the pile foundation construction and transfer the load through the interaction between the pile and the soil. However, the existing pile foundation construction platform is generally an integral structure or assembled by bolts. During the assembly, it is necessary to use other tools to operate it, which makes the operation process extremely inconvenient, making it difficult for workers to quickly assemble the pile foundation construction platform and disassemble it later.

[0004] To this end, the present invention provides an assembled pile foundation construction platform and a pile foundation construction method. Summary of the invention

[0005] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.

[0006] The present invention provides an assembled pile foundation construction platform and a pile foundation construction method, comprising a platform frame; the platform frame is composed of four groups of main beams, a plurality of platform plates are assembled inside the main beams, a pile position groove is provided inside the platform plate, a sealing plate is clamped and installed on the top of the pile position groove, a pile position adjustment mechanism is installed on the bottom of the platform plate, an assembly mechanism is installed on the outer side of the platform frame, and a leveling mechanism is installed at the four corners of the bottom of the platform frame; In order to realize the splicing and assembly of the main beams, the assembly mechanism includes a fixed plate, a rotating clip and a fixing pin. The outer surface of the platform frame is fixedly installed with a fixed plate, the front side of the fixed plate is rotatably installed with a rotating clip, and fixing pins are installed vertically through the interior of the two groups of main beams.

[0007] Preferably, in order to limit the rotational position of the rotating buckle, a second limiting block is installed on the side of the rotating buckle, and a first limiting block is installed on the fixing plate near the top of the second limiting block.

[0008] Preferably, in order to prevent the main beam from being damaged by collision during transportation, a fixing groove is provided on the top of the main beam, a buffer rod is installed at the bottom of the platform frame, and a buffer block is installed at the bottom end of the buffer rod.

[0009] Preferably, in order to adjust the horizontal use position of the platform frame, the leveling mechanism includes a hydraulic rod and a support foot, the hydraulic rods are installed at the four corners of the bottom of the platform frame, and the moving end of the hydraulic rod is installed with a support foot.

[0010] Preferably, a level is fixedly mounted on the outer surface of the platform frame.

[0011] Preferably, in order to achieve the function of auxiliary support and fixation for the platform frame, a fixing plate is fixedly installed on the outer side of the supporting foot, and a plurality of groups of ground nails are installed on the bottom of the fixing plate.

[0012] Preferably, the ground nails are distributed in a circular pattern on the bottom of the fixing plate.

[0013] Preferably, a support rod is installed on the top of the fixing plate, and the top of one end of the ground nail is connected to the bottom of the platform frame.

[0014] Preferably, in order to adjust the spacing between the two groups of pile positions, the pile position adjustment mechanism includes a double-arm telescopic structure and a pile position frame, the double-arm telescopic structure is fixedly installed on the bottom of the platform plate, the pile position frames are installed on the movable ends on both sides of the double-arm telescopic structure, and the pile position frame moves to the inside of the platform plate.

[0015] An assembled pile foundation construction platform and pile foundation construction method according to the above-mentioned method include the following steps: Preferably, the three groups of main beams are spliced ​​in an N shape, multiple groups of platform plates are assembled between the three groups of main beams by plugging inside the three groups of main beams, and then the last group of main beams is assembled on the side where the three groups of main beams are missing, and the main beams are fixed and assembled by using rotating clips and fixing pins.

[0016] Preferably, the four groups of hydraulic rods respectively drive one group of supporting legs to move, and the horizontal position of the platform frame is adjusted in conjunction with a level meter.

[0017] Preferably, by removing the sealing plates at the corresponding positions inside the pile position slots, the double-arm telescopic structure drives the two groups of pile position frames to move along the insides of the two groups of pile position slots at the same time, so that the device can find the pile position points according to the settings.

[0018] Preferably, a drilling machine is used to drill into the foundation through the interior of the pile frame to form pile holes, and bored piles are cast in each pile hole.

[0019] 1. The beneficial effects of the present invention are as follows: the assembled pile foundation construction platform and pile foundation construction method described in the present invention are used in combination with a fixing plate, a rotating buckle and a fixing pin. The fixing pin is inserted into the inside of two vertical sets of main beams, and then the rotating buckle is rotated to make the rotating buckle rotate with the fixing plate as the connection point. The position of the fixing pin can be fixed by the rotating buckle, and the two vertical sets of main beams can be assembled and fixed. Then, multiple sets of platform plates can be plugged and installed between the multiple sets of main beams, which can facilitate the work group to quickly assemble the construction platform. At the same time, this method can facilitate the workers to disassemble it later.

[0020] 2. The assembled pile foundation construction platform and pile foundation construction method described in the present invention can be stacked and transported by stacking multiple groups of main beams through fixed grooves, buffer rods and buffer blocks, so that the buffer blocks at the bottom ends of the buffer rods are stuck in the fixed grooves at the tops of another group of main beams. The buffer rods themselves undergo elastic deformation for buffering, and collision between the two groups of main beams during transportation can be avoided, thereby avoiding collision damage to the main beams during transportation.

[0021] 3. The assembled pile foundation construction platform and pile foundation construction method described in the present invention are used in combination with hydraulic rods, supporting legs and a spirit level. Four groups of hydraulic rods respectively drive one group of supporting legs to move, so that the horizontal use position of the platform frame can be adjusted. The spirit level can assist workers in adjusting the level of the platform frame.

[0022] 4. The assembled pile foundation construction platform and pile foundation construction method described in the present invention are used in combination with a fixed plate, ground nails and support rods. When the device is placed on the ground with a drilled hole, the ground nails at the bottom of the fixed plate will be inserted into the soil, which can assist in fixing the device. At the same time, as the moving end of the hydraulic rod moves to apply force to the support legs, the ground nails will be better inserted into the soil. The support rods can facilitate workers to set up protective nets to prevent workers from falling when working on the surface of the device, thereby improving the safety of the device. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 is a stereogram of an embodiment of the present invention; Figure 2 is a three-dimensional diagram of the bottom of an embodiment of the present invention; Figure 3 It is a partial structural schematic diagram of the present invention; Figure 4 yes Figure 3 A partial enlarged view of the middle part; Figure 5 It is a schematic diagram of the platform plate assembly and deployment in the present invention.

[0024] Description of reference numerals: 1. Platform frame; 101. Main beam; 1011. Fixed groove; 1012. Buffer rod; 1013. Buffer block; 102. Platform plate; 103. Pile groove; 104. Closing plate; 2. Leveling mechanism; 201. Hydraulic rod; 202. Support foot; 3. Fixed plate; 301. Ground nail; 302. Support rod; 4. Pile adjustment mechanism; 401. Double-arm telescopic structure; 402. Pile frame; 5. Assembly mechanism; 501. Fixed plate; 5011. Limit block 1; 502. Rotating buckle; 5021. Limit block 2; 503. Fixing pin; 6. Level meter. DETAILED DESCRIPTION

[0025] The subject matter described herein will now be discussed with reference to example embodiments. It should be understood that the discussion of these embodiments is only to enable those skilled in the art to better understand and implement the subject matter described herein, and the functions and arrangements of the elements discussed may be changed without departing from the scope of protection of the contents of this specification. Each example may omit, replace or add various processes or components as needed. In addition, the features described relative to some examples may also be combined in other examples.

[0026] Embodiment 1 The following is a further detailed description of the technical solution of the present invention in conjunction with the accompanying drawings and specific embodiments. Figures 1 to 5 , this application provides an assembled pile foundation construction platform and pile foundation construction method, please refer to Figure 1 , Figure 2 , Figure 3 and Figure 5 , including a platform frame 1; the platform frame 1 is composed of four groups of main beams 101, and multiple groups of platform plates 102 are assembled inside the main beams 101. The inner wall of the main beam 101 is provided with a rectangular slot corresponding to the plug-in installation of the platform plate 102, and the inside of the platform plate 102 is provided with a pile position groove 103, and the top of the pile position groove 103 is clamped and installed with a sealing plate 104, and the bottom of the platform plate 102 is installed with a pile position adjustment mechanism 4, and the outer side of the platform frame 1 is installed with an assembly mechanism 5, and the four corners of the bottom of the platform frame 1 are installed with a leveling mechanism 2; The assembly mechanism 5 includes a fixed plate 501, a rotating buckle 502 and a fixed pin 503. The fixed plate 501 is fixedly installed on the outer surface of the platform frame 1. The fixed plate 501 is connected to the rotating buckle 502 through a coil spring structure. The rotating buckle 502 is rotatably installed on the front of the fixed plate 501. The rotating buckle 502 is an existing spring buckle. The two groups of main beams 101 are vertically penetrated by the fixing pin 503. The insertion end of the fixing pin 503 is rectangular, and a rectangular slot corresponding to the insertion end of the fixing pin 503 is provided in the main beam 101.

[0027] Please refer to Figure 4A second limiting block 5021 is installed on the side of the rotating buckle 502, and a first limiting block 5011 is installed on the fixing plate 501 near the top of the second limiting block 5021, and the first limiting block 5011 and the second limiting block 5021 are relatively limited and fitted.

[0028] Specifically, before the construction of the assembled pile foundation of the water conservancy project, it is necessary to splice the three sets of main beams 101, and the assembly mechanism 5 is used to fix the main beams 101, by inserting the fixing pins 503 into the inside of the two vertical sets of main beams 101, and then rotating the rotating buckle 502, so that the rotating buckle 502 is rotated with the fixing plate 501 as the connection point, and the rotation direction of the rotating buckle 502 is perpendicular to the fixing pin 503, and then the rotating buckle 502 will be stuck on the fixing pin 503, and the position of the fixing pin 503 can be fixed by rotating the buckle 502, so that the two vertical sets of main beams 101 can be assembled and fixed, and this method can be used to facilitate the work The author disassembled it later. When the worker rotated the rotating buckle 502, its rotation position could be limited by the limit block 2 5021 and the limit block 1 5011. Then, multiple sets of platform plates 102 were assembled between the three sets of main beams 101 by plugging. The last set of main beams 101 was fixed on one side of the notch of the three sets of main beams 101 in the same way. Then, the sealing plate 104 at the corresponding position to be drilled was taken out, so that the drilling machine could drill the foundation through the pile position groove 103 later. The pile position adjustment mechanism 4 is used to adjust the distance between the two sets of pile positions, and the leveling mechanism 2 is used to adjust the horizontal use position of the platform frame 1.

[0029] Please refer to Figure 3 A fixing groove 1011 is provided at the top of the main beam 101, and a buffer rod 1012 is installed at the bottom of the platform frame 1. The buffer rod 1012 is composed of a telescopic rod and a spring. A spring is wound around the outer side of the telescopic rod, and a buffer block 1013 is installed at the bottom end of the buffer rod 1012.

[0030] Specifically, in order to prevent the main beam 101 of the prefabricated pile foundation construction of the water conservancy project from being damaged by collision during transportation, multiple groups of main beams 101 are stacked and the buffer block 1013 at the bottom of the buffer rod 1012 is stuck in the fixed groove 1011 at the top of another group of main beams 101. The multiple groups of main beams 101 can be stacked and transported. The vibration generated during transportation will be buffered by the elastic deformation of the buffer rod 1012 itself. The buffer rod 1012 can prevent the two groups of main beams 101 from colliding during transportation, thereby preventing the main beam 101 from being damaged by collision during transportation.

[0031] Please refer to Figure 3 The leveling mechanism 2 includes a hydraulic rod 201 and a support leg 202 . The hydraulic rod 201 is installed at the four corners of the bottom of the platform frame 1 , and the support leg 202 is installed at the movable end of the hydraulic rod 201 .

[0032] Please refer to Figure 1 A level 6 is fixedly installed on the outer surface of the platform frame 1.

[0033] Specifically, in order to adjust the horizontal use position of the platform frame 1 for the prefabricated pile foundation construction of a water conservancy project, the change in the internal hydraulic pressure of the hydraulic rod 201 can prompt its telescopic end to drive the support legs 202 to move. By using four groups of hydraulic rods 201 to drive one group of support legs 202 to move respectively, the horizontal use position of the platform frame 1 can be adjusted, and the spirit level 6 can assist workers in adjusting the level of the platform frame 1.

[0034] Please refer to Figure 3 A fixing plate 3 is fixedly installed on the outer side of the supporting foot 202, and a plurality of groups of ground nails 301 are installed on the bottom of the fixing plate 3.

[0035] Please refer to Figure 3 The ground nails 301 are distributed in a circle at the bottom of the fixed plate 3 .

[0036] Please refer to Figure 3 A support rod 302 is installed on the top of the fixed plate 3, and the top of one end of the ground nail 301 is connected to the bottom of the platform frame 1.

[0037] Specifically, in order to achieve the auxiliary support and fixation effect on the platform frame 1 of the prefabricated pile foundation construction of the water conservancy project, when the worker places the device on the ground with a drilled hole, the ground nails 301 at the bottom of the fixed plate 3 will be inserted into the soil, which can assist in fixing the device and prevent it from moving. At the same time, as the hydraulic rod 201 moves the support leg 202 and the support leg 202 is subjected to force, the ground nails 301 will be better inserted into the soil, and the support rod 302 can facilitate the worker to set up a protective net to prevent the worker from falling when working on the surface of the device, thereby improving the safety performance of the device.

[0038] Please refer to Figure 2 The pile position adjustment mechanism 4 includes a double-arm telescopic structure 401 and a pile position frame 402. The double-arm telescopic structure 401 is fixedly installed at the bottom of the platform plate 102. The double-arm telescopic structure 401 is a bidirectional hydraulic rod. The pile position frames 402 are installed at the moving ends on both sides of the double-arm telescopic structure 401. The pile position frame 402 moves and is located inside the platform plate 102.

[0039] Specifically, in order to adjust the distance between pile positions in pile foundation construction, the double-arm telescopic structure 401 works, and the moving ends on both sides thereof respectively drive a group of pile position frames 402 to move, so that two groups of pile positions can be fixed at the same time, and the distance between the two groups of pile positions can be adjusted, and then the drilling machine drills holes in the foundation through the inside of the pile position frame 402.

[0040] An assembled pile foundation construction platform and pile foundation construction method according to the above, comprising the following steps: The three sets of main beams 101 are spliced ​​in an n-shape, and multiple sets of platform plates 102 are assembled between the three sets of main beams 101 by plugging inside the three sets of main beams 101. Then, the last set of main beams 101 is assembled on the missing side of the three sets of main beams 101. The main beams 101 are fixedly assembled by using rotating buckles 502 and fixing pins 503. The four groups of hydraulic rods 201 drive a group of supporting legs 202 to move respectively, and the horizontal position of the platform frame 1 is adjusted in conjunction with the level meter 6; By removing the sealing plate 104 at the corresponding position inside the pile position slot 103, the double-arm telescopic structure 401 drives the two groups of pile position frames 402 to move along the inside of the two groups of pile position slots 103 at the same time, so that the device can find the pile position according to the setting; A drilling machine is used to drill into the foundation through the pile frame 402 to form pile holes, and bored piles are cast in each pile hole.

[0041] Working principle: Before the construction of the prefabricated pile foundation of the water conservancy project, the three groups of main beams 101 are spliced, and then the fixing pin 503 is inserted into the inside of the two vertical groups of main beams 101, and then the rotating buckle 502 is rotated to make the rotating buckle 502 clamped on the fixing pin 503, and the two vertical groups of main beams 101 are assembled and fixed, and then multiple groups of platform plates 102 are assembled between the three groups of main beams 101 by plugging, and the last group of main beams 101 is fixed on one side of the notch of the three groups of main beams 101 in the same way, and then the sealing plate 104 at the corresponding drilling position is taken out, so that the double-arm telescopic structure 401 works to drive the two groups of pile position frames 402 to move along the inside of the two groups of pile position grooves 103 at the same time, so that the device finds the pile position according to the setting, and finally a drilling machine is used to drill into the foundation through the inside of the pile position frame 402 to form a pile hole, and bored cast-in-place piles are cast in each pile hole.

[0042] An example of the present specific implementation mode is described above, but the present embodiment is not limited to the above-mentioned specific implementation mode, which is merely illustrative and not restrictive. A person skilled in the art may make many forms inspired by the present embodiment, all of which are protected by the present embodiment.

Claims

1. An assembled pile foundation construction platform, comprising a platform frame (1); characterized in that: The platform frame (1) is composed of four groups of main beams (101), a plurality of groups of platform plates (102) are assembled inside the main beams (101), a pile position groove (103) is provided inside the platform plate (102), a sealing plate (104) is mounted on the top of the pile position groove (103), a pile position adjustment mechanism (4) is mounted on the bottom of the platform plate (102), an assembly mechanism (5) is mounted on the outside of the platform frame (1), and leveling mechanisms (2) are mounted at the four corners of the bottom of the platform frame (1); The assembly mechanism (5) comprises a fixing plate (501), a rotating buckle (502) and a fixing pin (503); the fixing plate (501) is fixedly mounted on the outer surface of the platform frame (1); the rotating buckle (502) is rotatably mounted on the front surface of the fixing plate (501); and the fixing pin (503) is vertically penetrated inside the two sets of main beams (101).

2. The assembled pile foundation construction platform according to claim 1, characterized in that: A second limiting block (5021) is installed on the side of the rotating buckle (502), and a first limiting block (5011) is installed on the fixing plate (501) near the top of the second limiting block (5021).

3. The assembled pile foundation construction platform according to claim 1, characterized in that: A fixing groove (1011) is provided at the top of the main beam (101), a buffer rod (1012) is installed at the bottom of the platform frame (1), and a buffer block (1013) is installed at the bottom end of the buffer rod (1012).

4. The assembled pile foundation construction platform according to claim 1, characterized in that: The leveling mechanism (2) comprises a hydraulic rod (201) and a support foot (202); the hydraulic rod (201) is installed at the four corners of the bottom of the platform frame (1); and the support foot (202) is installed at the movable end of the hydraulic rod (201).

5. The assembled pile foundation construction platform according to claim 4, characterized in that: A level (6) is fixedly mounted on the outer surface of the platform frame (1).

6. The assembled pile foundation construction platform according to claim 4, characterized in that: A fixing plate (3) is fixedly mounted on the outer side of the supporting foot (202), and a plurality of groups of ground nails (301) are mounted on the bottom of the fixing plate (3).

7. The assembled pile foundation construction platform according to claim 6, characterized in that: The ground nails (301) are distributed in a circular pattern at the bottom of the fixing plate (3).

8. The assembled pile foundation construction platform according to claim 6, characterized in that: A support rod (302) is installed on the top of the fixing plate (3), and the top of one end of the ground nail (301) is connected to the bottom of the platform frame (1).

9. The assembled pile foundation construction platform according to claim 4, characterized in that: The pile position adjustment mechanism (4) comprises a double-arm telescopic structure (401) and a pile position frame (402); the double-arm telescopic structure (401) is fixedly mounted on the bottom of the platform plate (102); the pile position frames (402) are mounted on movable ends on both sides of the double-arm telescopic structure (401); and the pile position frames (402) are movable and located inside the platform plate (102).

10. A method for constructing an assembled pile foundation, using an assembled pile foundation construction platform according to any one of claims 4 to 9, characterized in that: The following steps are involved: S1. The three groups of main beams (101) are spliced ​​in an n-shape, and multiple groups of platform plates (102) are assembled between the three groups of main beams (101) by plugging inside the three groups of main beams (101), and then the last group of main beams (101) is assembled on the missing side of the three groups of main beams (101), and the main beams (101) are fixedly assembled by using rotating buckles (502) and fixing pins (503); S2, using the four groups of hydraulic rods (201) to drive one group of supporting legs (202) to move respectively, and adjusting the horizontal position of the platform frame (1) in conjunction with the level meter (6); S3, by removing the sealing plate (104) at the corresponding position inside the pile position slot (103), the double-arm telescopic structure (401) drives the two groups of pile position frames (402) to move along the inside of the two groups of pile position slots (103) at the same time, so that the device finds the pile position point according to the setting; S4. A drilling machine is used to drill into the foundation through the pile frame (402) to form pile holes, and bored piles are cast in each pile hole.

Citation Information

Patent Citations

  • Fabricated water operation ship and construction method thereof

    CN110130339A

  • Wharf pile foundation platform and construction method thereof

    CN112252352A

  • Fabricated high-pile wharf structure and construction method thereof

    CN115538375A

  • Double-shaft high-pressure jet grouting pile machine and jet grouting pile method

    CN116201105A

  • High pile beam slab structure and construction method

    CN118563822A