Submersible retracting and releasing method and drilling ship

By concentrated the equipment in the storage tank of the submersible and storage system, and the use of mobile devices and hanging parts to achieve the efficient distribution and recycling of the submersible, solve the complexity and maintenance difficulties of existing systems, improve operational efficiency and efficiency and efficiency and efficiency and efficiency and Equipment life is suitable for large -depth operational tasks.

CN119370266AActive Publication Date: 2025-01-28GUANGZHOU MARINE GEOLOGICAL SURVEY

Patent Information

Application Number
CN202411449029.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2025-01-28
Estimated Expiration
2044-10-17

AI Technical Summary

Technical Problem

The existing submersible storage and storage systems have complex installation, high maintenance costs, lack of operation flexibility, and dispersed equipment layout, making it difficult to meet the needs of large-depth operation tasks.

Method used

The setting method of a submersible is designed. By concentrating the storage, traction parts, and the first suspension of the storage tank, the preset space is placed and stored in the preset space, and the submersible device and the hanging parts are used to realize the submersibles through the mobilization device and the hanging parts to achieve the submersible heater. Efficient distribution and recycling.

Benefits of technology

Realize the compact layout of the equipment, reduce the difficulty of space waste and maintenance, shorten the working cycle of the submersible distribution, improve the laying efficiency, and extend the service life of the equipment. It is suitable for high -frequency and long -term deep -sea operations. Essence

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119370266A_ABST
    Figure CN119370266A_ABST
Patent Text Reader

Abstract

The invention discloses a submersible retracting and releasing method and a drilling ship. The submersible retracting and releasing method comprises the steps that a submersible is taken out of a containing space, a mooring rope is connected with the submersible, and the submersible is lifted and released through a first lifting piece; and the submersible is recycled, the mooring rope is separated from the submersible, and the submersible is moved into the containing space. The drilling ship is used for realizing the submersible retracting and releasing method. The drilling ship comprises a storage cabin, a cable storage part, a traction part and a first lifting part are arranged in the storage cabin, a mooring rope is arranged on the cable storage part, one end of the mooring rope is sequentially wound around the traction part and the first lifting part, and a containing space is reserved in the storage cabin and used for containing a submersible. The submersible retracting and releasing method provided by the invention can meet the requirement of the submersible for executing a large-depth operation task.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of submersible recovery and deployment, and in particular to a submersible recovery and deployment method and a drilling vessel. Background Art

[0002] Remotely operated vehicles (ROVs) are important operating equipment for ocean drilling ships and are also important vehicles for deep-sea scientific research and underwater operations. By carrying various professional operating tools, submersibles can provide strong support for ocean drilling ships in performing deep-sea underwater wellhead operations, operational protection, and seabed monitoring. Submersibles are deployed and recovered on ocean drilling ships through a retractable system.

[0003] In the related art, the retractable system includes a hydraulic winch, a gantry and a transmission unit. The hydraulic winch can store and retract the cable. However, the hydraulic winch has problems such as complex installation, high maintenance cost, and lack of flexibility in operation. In addition, the hydraulic winch, gantry and transmission unit are usually installed in different independent compartments. This decentralized equipment layout not only increases the complexity of the retractable system, but also reduces the space utilization rate and increases the difficulty of maintenance of the retractable system. When a submersible performs operations, it has the characteristics of short operation preparation cycle, high operation frequency and long operation task cycle. Therefore, the above decentralized equipment layout is difficult to meet the needs of submersibles in performing deep-depth operations. Summary of the invention

[0004] In order to solve at least one of the above technical problems, the present application provides a submersible recovery and deployment method and a drilling ship, and the technical solution adopted is as follows.

[0005] The present application provides a submersible retrieval and release method, the submersible retrieval and release method is used for retrieval and release of a submersible on a drilling ship, the drilling ship comprises a storage cabin, a cable storage member, a traction member and a first lifting member are arranged in the storage cabin, a cable is arranged on the cable storage member, one end of the cable is wound around the traction member and the first lifting member in sequence, an accommodating space is reserved in the storage cabin, and the accommodating space is used to accommodate the submersible;

[0006] The submersible retrieval method comprises the following steps:

[0007] Taking the submersible out of the accommodating space, connecting the cable to the submersible, and using the first lifting member to lift and deploy the submersible;

[0008] The submersible is recovered, the cable is separated from the submersible, and the submersible is moved into the accommodating space.

[0009] In some embodiments of the present application, a first moving device is arranged in the accommodating space, a first preset position is further arranged in the storage compartment, and the first preset position is communicated with the accommodating space, and taking the submersible out of the accommodating space includes:

[0010] Move the submersible from the accommodating space to the first preset position by the first moving device, and connect the cable wound around the first lifting member to the submersible;

[0011] Recovering the submersible, separating the cable from the submersible, and moving the submersible into the accommodation space comprises:

[0012] The submersible is recovered to the first preset position, the cable is separated from the submersible, and the submersible is moved from the first preset position to the accommodating space by the first moving device.

[0013] In some embodiments of the present application, a second mobile device is further arranged in the storage compartment, the submersible includes a main body and a repeater connected to each other, the repeater is arranged above the main body, a support frame is arranged on the first mobile device, and after the cable is separated from the submersible, the submersible retrieval method further includes:

[0014] Separating the main body from the repeater, and moving the repeater onto the support frame by using the second moving device;

[0015] Before connecting the cable wound around the first lifting member to the submersible, the submersible retrieval method further includes:

[0016] The repeater is moved to above the main body by the second moving device, and the repeater is connected to the main body.

[0017] In certain embodiments of the present application, the first moving device includes a telescopic member and a translation member, the telescopic member is connected to the translation member, and the telescopic member is used to drive the translation member to move by its own telescopic movement, the translation member is used to place the submersible, and the support frame is arranged on the translation member.

[0018] In certain embodiments of the present application, the second moving device includes a guide rail and a second lifting member, the guide rail is installed above the accommodating space, and the second lifting member is movably installed on the guide rail.

[0019] In some embodiments of the present application, the cable storage member and the traction member are both electric winches, the first lifting member is an A-type hanger, and a stabilizer is provided on the A-type hanger. The first lifting member can lift the submersible and move it between the second preset position and the third preset position, the second preset position is provided in the storage compartment, the third preset position is provided outside the storage compartment, and the second preset position and the third preset position are both connected to the first preset position. After the first moving device moves the submersible from the accommodating space to the first preset position, the submersible retrieval method further includes:

[0020] The cable wound around the first lifting member passes through the stopper to be connected to the submersible, and the top of the submersible is in close contact with the stopper, and the first lifting member swings outboard from the second preset position to the third preset position;

[0021] lowering the cable;

[0022] Recovering the submersible to the first preset position includes:

[0023] Recover the cable and make the top of the submersible close to the stopper, and the first lifting member swings inward from the third preset position to the second preset position;

[0024] The submersible is placed at the first preset position.

[0025] In certain embodiments of the present application, a first steering mechanism and a second steering mechanism are further arranged in the storage compartment, the traction member and the cable storage member are arranged at intervals in the vertical direction, the cable is connected to the traction member from the cable storage member through the first steering mechanism, and the cable is connected to the first lifting member from the traction member through the second steering mechanism.

[0026] In certain embodiments of the present application, the first steering mechanism includes a first guide pulley and a second guide pulley, the traction member and the second guide pulley are arranged above the cable storage member and the first guide pulley, the cable is connected to the second guide pulley after being turned from the cable storage member and through the first guide pulley, the cable is connected to the traction member after being turned through the second guide pulley, and the second steering mechanism includes a third guide pulley, and the third guide pulley is arranged above the traction member.

[0027] In some embodiments of the present application, a cable cleaning and drying device is further arranged in the storage compartment, the cable is connected to the first guide pulley from the cable storage member through the cable cleaning and drying device, and the submersible retracting and releasing method further includes:

[0028] When releasing or retrieving the cable, the cable is cleaned by the cable cleaning and drying device.

[0029] The present application also provides a drilling vessel, which is used to implement the above-mentioned submersible recovery and deployment method.

[0030] The embodiments of the present application have at least the following beneficial effects: multiple devices such as cable storage parts, traction parts, first lifting parts and submersibles can be placed in the same storage compartment, with a compact structure; the preset space in the storage compartment can be used to place and store the submersible, and provide an operating space for the submersible's cable connection or cable release operation. When launching or recovering the stored submersible, there is no need to take out or place the submersible from other compartments; this can not only save space on the drilling ship, but also shorten the distance between the various devices, making it easier to control at the same time, thereby shortening the time required to deploy the submersible, that is, shortening the operation preparation cycle for deploying the submersible, and improving the deployment efficiency; at the same time, since there is no need for cross-compartment connection between the various devices, it is beneficial to the maintenance of the various devices, that is, it can extend the service life of the various devices, so that the various devices can be suitable for operations with high operation frequency and long operation task cycle. Therefore, the submersible collection and release method provided by the present application can meet the needs of the submersible to perform deep operation tasks. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The aspects and advantages described and / or attached in the embodiments of the present application will become apparent and easy to understand in conjunction with the following drawings. It should be noted that the embodiments embodied in the following drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0032] Figure 1 A side view of the storage compartment when the submersible provided in the embodiment of the present application is placed in the accommodation space;

[0033] Figure 2 A flow chart of a method for retracting and deploying a submersible provided in an embodiment of the present application;

[0034] Figure 3 A side view of the storage compartment when the submersible is lifted by the first lifting member provided in an embodiment of the present application;

[0035] Figure 4 A top view of a storage compartment provided in an embodiment of the present application;

[0036] Figure 5 A side view of the storage compartment when the first lifting member provided in the embodiment of the present application is swinging;

[0037] Figure 6 A rear view of the storage compartment provided in an embodiment of the present application.

[0038] Figure numerals: storage compartment 100; cable storage member 210, cable 211, cable arranger 220, cable cleaning and drying device 230, first guide pulley 241, second guide pulley 242, traction member 250, third guide pulley 260, cable tensioning and compensating device 270; first lifting member 310, stabilizer 311, driving mechanism 320; submersible 400, main body 410, repeater 420; telescopic member 510, translation member 520, support frame 521; guide rail 610, second lifting member 620; bracket 700. DETAILED DESCRIPTION

[0039] Combine the following Figures 1 to 6 Embodiments of the present application are described in detail, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0040] In the description of the present application, it should be understood that if the terms "center", "middle", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "axial", "radial", "circumferential" and the like appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present application, unless otherwise specified, "multiple" means two or more.

[0041] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0042] In the embodiment of the present application, the positive direction of the X-axis is the left, and the negative direction of the X-axis is the right; the positive direction of the Y-axis is the front, and the negative direction of the Y-axis is the back; the positive direction of the Z-axis is the top, and the negative direction of the Z-axis is the bottom.

[0043] The embodiment of the present application provides a drilling vessel, which can be used to implement the following submersible recovery and deployment method. For example, the drilling vessel includes a storage compartment 100, see Figure 1 A cable storage member 210, a traction member 250 and a first lifting member 310 are arranged in the storage compartment 100. A cable 211 is arranged on the cable storage member 210. One end of the cable 211 is wound around the traction member 250 and the first lifting member 310 in sequence. An accommodation space is reserved in the storage compartment 100, and the accommodation space is used to accommodate the submersible 400. Optionally, the submersible 400 is an unmanned remotely operated vehicle (ROV). Optionally, the cable 211 can be an umbilical cable.

[0044] See also Figure 2 The embodiment of the present application further provides a submersible retrieval method, which is used to retrieve and release a submersible 400 on a drilling vessel. The submersible retrieval method comprises the following steps:

[0045] Step S110: taking the submersible 400 out of the accommodation space, connecting the cable 211 to the submersible 400, and using the first lifting member 310 to lift and deploy the submersible 400;

[0046] Step S120: Recover the submersible 400, separate the cable 211 from the submersible 400, and move the submersible 400 into the accommodation space.

[0047] The cable storage member 210, the traction member 250, the first lifting member 310 and the submersible 400 and other multiple devices can be placed in the same storage compartment 100, and the structure is compact; the preset space in the storage compartment 100 can be used to place and store the submersible 400, and provide an operating space for the cable connection or cable release operation of the submersible 400. When launching or recovering the storage submersible 400, there is no need to take out or place the submersible 400 from other compartments; this can not only save the space of the drilling ship, but also shorten the distance between the various devices, which is convenient for simultaneous management and control, thereby shortening the time required for deploying the submersible 400, that is, shortening the operation preparation cycle for deploying the submersible 400, and improving the deployment efficiency; at the same time, since there is no need for cross-compartment connection between the various devices, it is conducive to the maintenance of the various devices, that is, the service life of the various devices can be extended, so that the various devices can be suitable for operations with high operation frequency and long operation task cycle. Therefore, the submersible collection and release method provided in the present application can meet the needs of the submersible 400 to perform deep operation tasks.

[0048] Optionally, in some embodiments, a first moving device is disposed in the accommodating space, and a first preset position is further disposed in the storage compartment 100 , and the first preset position is communicated with the accommodating space.

[0049] Optionally, the storage compartment 100 is provided with an opening to deploy and recover the submersible 400. Exemplarily, an opening is provided at the front side of the storage compartment 100. The first preset position is disposed near the opening, the first lifting member 310 is also disposed near the opening, and the accommodating space is disposed at a side of the first preset position away from the opening, that is, the accommodating space is disposed behind the first preset position and the first lifting member 310.

[0050] Optionally, in some embodiments, the step of “taking the submersible 400 out of the accommodation space” in step S110 includes the following steps:

[0051] Step S111 : The submersible 400 is moved from the accommodation space to a first preset position by a first moving device, and the cable 211 wound around the first lifting member 310 is connected to the submersible 400 .

[0052] Optionally, in some embodiments, the above step S120 includes the following steps:

[0053] Step S121: Recover the submersible 400 to the first preset position, separate the cable 211 from the submersible 400, and move the submersible 400 from the first preset position to the accommodation space by a first moving device.

[0054] Optionally, in some embodiments, a second moving device is also arranged in the storage compartment 100, see Figure 3 The submersible 400 includes a main body 410 and a repeater 420 connected to each other. The repeater 420 is disposed above the main body 410. A support frame 521 is disposed on the first mobile device. Optionally, the repeater 420 may be a TMS repeater 420.

[0055] It should be noted that the height of the submersible 400 formed by the connection between the main body 410 of the submersible 400 and the repeater 420 can be as high as 4.5m, which causes the center of gravity of the repeater 420 installed above to be too high. The drilling ship will inevitably shake during its voyage at sea, which will make the repeater 420 with a too high center of gravity easy to shake. The repeater 420 is connected to the main body 410 of the submersible 400 by the cable 211. Therefore, when the repeater 420 shakes, it will drag the cable 211 to continuously apply a reciprocating load to the main body 410 of the submersible 400, which will cause damage to the main body 410 of the submersible 400.

[0056] Therefore, when the submersible 400 is stored, the body 410 of the submersible 400 needs to be separated from the repeater 420. The repeater 420 itself has a relatively high center of gravity and is prone to shaking or tipping over. Therefore, a support frame 521 can be provided on the first mobile device to support the repeater 420 to prevent it from tipping over.

[0057] Optionally, in some embodiments, after “separating the cable 211 from the submersible 400” in step S121, step S121 in the submersible deployment method further includes the following steps:

[0058] Step S1212 : Separate the main body 410 from the repeater 420 , and move the repeater 420 onto the support frame 521 by using a second moving device.

[0059] It is understandable that the above step S1212 can be performed after "moving the submersible 400 from the first preset position to the accommodating space by the first moving device". This arrangement can prevent the first lifting member 310 and other devices from affecting the operation of the second moving device.

[0060] Optionally, in some embodiments, before the step of “connecting the cable 211 wound around the first lifting member 310 to the submersible 400” in step S111, step S111 in the submersible launching and retracting method further includes the following steps:

[0061] Step S1111 : Move the repeater 420 to above the main body 410 by using a second moving device, and connect the repeater 420 to the main body 410 .

[0062] It is understandable that after performing the above step S1111, the step S111 of "moving the submersible 400 from the accommodation space to the first preset position by the first moving device" can be performed. This can also prevent the first lifting member 310 and other devices from affecting the operation of the second moving device.

[0063] Optionally, in some embodiments, see Figure 4 The first moving device includes a telescopic member 510 and a translation member 520 , the telescopic member 510 is connected to the translation member 520 , and the telescopic member 510 is used to drive the translation member 520 to move through its own telescopic movement, the translation member 520 is used to place the submersible 400 , and the support frame 521 is set on the translation member 520 .

[0064] Optionally, a first placement position is provided on the translation member 520, and the first placement position is used to place at least part of the submersible 400, and the support frame 521 is provided behind the first placement position. When the submersible 400 is not in use and stored in the accommodating space, the body 410 of the submersible 400 can be placed on the first placement position, and the repeater 420 can be placed on the support frame 521; when the submersible 400 needs to be used, the repeater 420 can be installed on the body 410 of the submersible 400, that is, the entire submersible 400 is placed on the first placement position.

[0065] Optionally, the telescopic member 510 is a telescopic hydraulic cylinder, and the translation member 520 is a translation plate. Optionally, the telescopic hydraulic cylinder has a minimum stroke and a maximum stroke, and when the telescopic hydraulic cylinder is at the minimum stroke, the translation plate is placed in the accommodation space; when the telescopic hydraulic cylinder is at the maximum stroke, the translation plate can be extended to the first preset position, so that the submersible 400 can be moved to the first preset position.

[0066] See also Figure 3 The second moving device includes a guide rail 610 and a second lifting member 620 . The guide rail 610 is installed above the accommodating space, and the second lifting member 620 is movably installed on the guide rail 610 .

[0067] Optionally, the guide rail 610 may be arranged in the front-to-rear direction so that the second lifting member 620 on the guide rail 610 lifts the repeater 420 and places the repeater 420 on the support frame 521 .

[0068] Optionally, the second lifting member 620 is an electric hoist. Of course, the second lifting member 620 can also be a winch or other lifting members, which is not specifically limited here.

[0069] Optionally, in some embodiments, the cable storage member 210 and the traction member 250 are both electric winches, the first lifting member 310 is an A-type hanger, and the A-type hanger is provided with a stabilizer 311. The first lifting member 310 can lift the submersible 400 and move between a second preset position and a third preset position, the second preset position is set in the storage compartment 100, and the third preset position is set outside the storage compartment 100, and the second preset position and the third preset position are both connected to the first preset position.

[0070] Optionally, the second preset position is also set near the opening, and when the first lifting member 310 is located at the second preset position, the distance between the bottom surface of the stopper 311 and the deck surface of the storage compartment 100 is greater than the height of the submersible 400, so as to prevent the submersible 400 from colliding with the stopper 311 during movement. Optionally, when the first lifting member 310 is located at the second preset position, the first preset position may be located directly below the stopper 311.

[0071] It should be noted that, on the one hand, when working underwater, it is inevitable to involve some frequent acceleration and deceleration processes. Electric winches can directly adjust the speed through the frequency converter, and the speed change process is both agile and rapid; while hydraulic winches need to change speed through throttle valves or switch motors, which is bulky and inefficient. On the other hand, when maintaining electric winches, only the motor and electrical control cabinet need to be maintained; while the maintenance of hydraulic winches requires maintenance of both pipelines and hydraulic pumps, which is time-consuming, labor-intensive, and difficult to maintain.

[0072] Therefore, the use of electric winches for both the cable storage member 210 and the traction member 250 is not only conducive to shortening the operation cycle and increasing the operation frequency, but also convenient for maintenance and can extend the service life, which is conducive to the submersible 400 performing deep-depth operations.

[0073] Optionally, a driving mechanism 320 connected to the first lifting member 310 is further arranged in the storage compartment 100, and the driving mechanism 320 can be used to drive the first lifting member 310 to swing between the second preset position and the third preset position. Figure 5 A schematic diagram showing the swinging process of the first lifting member 310 is shown. Optionally, the driving mechanism 320 may be a high-power pump station.

[0074] The anti-sway device 311 can prevent the submersible 400 from swaying and causing damage when the first lifting member 310 lifts the submersible 400 and moves between the second preset position and the third preset position.

[0075] Optionally, in some embodiments, after “moving the submersible 400 from the accommodation space to the first preset position by the first moving device” in step S111, step S111 in the submersible folding and unfolding method further includes the following steps:

[0076] Step S1112: The cable 211 wound around the first lifting member 310 passes through the stopper 311 to connect with the submersible 400, and the top of the submersible 400 is close to the stopper 311, and the first lifting member 310 swings outboard from the second preset position to the third preset position; lower the cable 211.

[0077] For example, when deploying the submersible 400, the second lifting member 620 can be moved along the guide rail 610 to the top of the repeater 420, and the second lifting member 620 is connected to the repeater 420. Then, the repeater 420 is lifted to the top of the body 410 by the second lifting member 620, and the repeater 420 is fixedly connected to the body 410, and then the connection between the second lifting member 620 and the repeater 420 is released. Then, the cable 211 turned by the stopper 311 is fixedly connected to the repeater 420, and the preparation work before the deployment of the submersible 400 is completed.

[0078] Subsequently, the cable storage member 210 releases the cable, and the traction member 250 drags the cable 211 outboard until the first lifting member 310 is driven by the driving mechanism 320 to swing outboard from the initial position to the second preset position (still inboard) to increase the height of the stopper 311. It should be noted that the first lifting member 310 at the initial position is inclined toward the side close to the storage compartment 100, so when the first lifting member 310 swings outboard at a certain angle, the height of the stopper 311 can be increased (i.e., the distance between the bottom surface of the stopper 311 and the deck surface of the storage compartment 100 increases). In this way, sufficient space can be reserved for the lifting of the submersible 400, so that the first lifting member 310 can lift the submersible 400 and leave enough cable 211 margin, and it can also prevent the stopper 311 from being too low and colliding with the submersible 400.

[0079] Then, the submersible 400 is moved to the first preset position (i.e., directly below the stopper 311 of the first lifting member 310 at the second preset position) by the first moving device. Then, the cable 211 is lifted upward by the traction of the traction member 250 until the top of the submersible 400 is fixed against the stopper 311, at which time, the cable storage member 210 is in the cable-collecting state. Then, the first lifting member 310 is driven by the driving mechanism 320 to swing outboard from the second preset position to the third preset position, and the cable storage member 210 continues to release the cable until the submersible 400 reaches the preset operating depth.

[0080] Optionally, in some embodiments, the step of “recovering the submersible 400 to the first preset position” in step S121 further includes the following steps:

[0081] Step S1211: Recover the cable 211 and make the top of the submersible 400 close to the anti-sway device 311, and the first lifting member 310 swings inward from the third preset position to the second preset position; place the submersible 400 at the first preset position.

[0082] It is understandable that the submersible recovery operation process is the opposite of the deployment operation process, so I will not elaborate on it here.

[0083] Optionally, in some embodiments, a first steering mechanism and a second steering mechanism are further arranged in the storage compartment 100, and the traction member 250 and the cable storage member 210 are arranged at intervals in the vertical direction. The cable 211 is connected to the traction member 250 from the cable storage member 210 through the first steering mechanism, and the cable 211 is connected to the first lifting member 310 from the traction member 250 through the second steering mechanism.

[0084] Optionally, in some embodiments, see Figure 6The first steering mechanism includes a first guide pulley 241 and a second guide pulley 242. The traction member 250 and the second guide pulley 242 are arranged above the cable storage member 210 and the first guide pulley 241. The cable 211 is connected to the second guide pulley 242 after being diverted from the cable storage member 210 through the first guide pulley 241. The cable 211 is connected to the traction member 250 after being diverted through the second guide pulley 242. The second steering mechanism includes a third guide pulley 260. The third guide pulley 260 is arranged above the traction member 250.

[0085] Optionally, in some embodiments, see Figure 1 or Figure 3 A cable tension compensation device 270 is also arranged in the storage compartment 100, and the cable 211 is connected to the traction member 250 from the second guide pulley 242 through the cable tension compensation device 270. The cable tension compensation device 270 can apply a certain pre-tension to the cable 211 during the process of retracting and releasing the cable 211.

[0086] Exemplarily, a bracket 700 is arranged at the rear of the storage space in the storage compartment 100 to arrange the equipment vertically and improve space utilization. A second placement position is arranged at the bottom of the bracket 700, and the cable storage member 210 and the first guide pulley 241 are arranged at the second placement position, and the first guide pulley 241 is located on the right side of the cable storage member 210. The traction member 250 and the second guide pulley 242 are arranged on the bracket 700, and the second guide pulley 242 is located on the right side of the traction member 250, and the second guide pulley 242 is aligned with the first guide pulley 241 up and down, and the cable tension compensation device 270 is arranged at the upper rear of the traction member 250. The third guide pulley 260 is arranged at the upper front of the traction member 250, so that the third guide pulley 260 can lead the cable 211 from a high place, which can prevent the cable 211 from being too low and interfering with the operation of other equipment. Optionally, the driving mechanism 320 is also disposed on the bracket 700 , and the driving mechanism 320 is located on the left side of the traction member 250 .

[0087] The various devices in the storage compartment 100 in the embodiment of the present application are compactly arranged and can operate in an orderly manner, which not only improves the space utilization of the drilling ship, but also facilitates the management and maintenance of multiple devices, thereby improving the deployment efficiency and extending the service life of each device, so that each device can be suitable for operations with short operation preparation cycle, high operation frequency and long operation task cycle.

[0088] It should be noted that, on the one hand, the cable 211 on the cable storage member 210 will accumulate a lot of dust and other pollutants when it is not used for a long time. If it is put into the sea without cleaning, it will cause seawater pollution. On the other hand, when the cable 211 is recovered from the seawater, seawater is attached to the cable 211. If the cable 211 is stored without cleaning, the seawater on the cable 211 will not only corrode the seawater, but also corrode the cable storage member 210, causing equipment damage.

[0089] Therefore, optionally, in some embodiments, see Figure 6 A cable cleaning and drying device 230 is also arranged in the storage compartment 100, and the cable 211 is connected to the first guide pulley 241 from the cable storage member 210 through the cable cleaning and drying device 230. Optionally, the cable cleaning and drying device 230 is also arranged in the second placement position.

[0090] Optionally, the cable cleaning and drying device 230 may include an air jet device, a spray device and a drying device. The cable 211 may be cleaned by the air jet device and the spray device, and the cable 211 may be dried by the drying device.

[0091] Optionally, in some embodiments, the submersible launching and retracting method further comprises the following steps:

[0092] Step 130: Clean the cable 211 by the cable cleaning and drying device 230 when releasing or retrieving the cable.

[0093] Optionally, in some embodiments, a cable arranger 220 is further arranged in the storage compartment 100, and the cable 211 is connected to the cable cleaning and drying device 230 from the cable storage member 210 through the cable arranger 220. Optionally, the cable arranger 220 is also arranged in the second placement position.

[0094] On the one hand, by providing the cable reel 220, the cable 211 can be neatly and orderly retracted and released. In other words, by providing the cable reel 220, when the cable 211 is retracted, the cable 211 can be neatly wound around the cable storage member 210 to avoid problems such as tangling of the cable 211; when the cable 211 is released, the cable 211 can be released in an orderly manner. On the other hand, by providing the cable reel 220, the inclination angle of the cable 211 can be controlled when the cable 211 is retracted and released. Optionally, the inclination angle can be 90°.

[0095] In the description of this specification, if the reference terms "one embodiment", "some examples", "some embodiments", "illustrative embodiment", "example", "specific example", or "some examples" appear, it means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0096] The above describes the implementation methods of the present application in detail in conjunction with the accompanying drawings, but the present application is not limited to the above implementation methods. Various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present application.

[0097] In the description of this application, if "," appears in the patent name, it means an "and" relationship, not an "or" relationship. For example, if the patent name is "a kind of A, a kind of B", it means that the content protected by this application is: the technical solution with the subject name A and the technical solution with the subject name B.

Claims

1. A method for deploying and retracting a submersible, characterized in that: The submersible retrieval method is used for retrieval of a submersible on a drilling vessel, wherein the drilling vessel comprises a storage compartment, wherein a cable storage member, a traction member and a first lifting member are arranged in the storage compartment, wherein a cable is arranged on the cable storage member, wherein one end of the cable is wound around the traction member and the first lifting member in sequence, wherein an accommodation space is reserved in the storage compartment, wherein the accommodation space is used for accommodating the submersible; The submersible retrieval method comprises the following steps: Taking the submersible out of the accommodating space, connecting the cable to the submersible, and using the first lifting member to lift and deploy the submersible; The submersible is recovered, the cable is separated from the submersible, and the submersible is moved into the accommodating space.

2. The method for launching and retracting a submersible according to claim 1, characterized in that: A first moving device is arranged in the accommodating space, and a first preset position is also arranged in the storage compartment, and the first preset position is connected to the accommodating space. Taking the submersible out of the accommodating space includes: Move the submersible from the accommodating space to the first preset position by the first moving device, and connect the cable wound around the first lifting member to the submersible; Recovering the submersible, separating the cable from the submersible, and moving the submersible into the accommodation space comprises: The submersible is recovered to the first preset position, the cable is separated from the submersible, and the submersible is moved from the first preset position to the accommodating space by the first moving device.

3. The method for launching and retracting a submersible according to claim 2, characterized in that: A second moving device is also arranged in the storage compartment, the submersible includes a main body and a repeater connected to each other, the repeater is arranged above the main body, a support frame is arranged on the first moving device, and after the cable is separated from the submersible, the submersible retrieval method further includes: Separating the main body from the repeater, and moving the repeater onto the support frame by using the second moving device; Before connecting the cable wound around the first lifting member to the submersible, the submersible retrieval method further includes: The repeater is moved to above the main body by the second moving device, and the repeater is connected to the main body.

4. The method for launching and retracting a submersible according to claim 3, characterized in that: The first moving device includes a telescopic member and a translation member, the telescopic member is connected to the translation member, and the telescopic member is used to drive the translation member to move through its own telescopic movement, the translation member is used to place the submersible, and the support frame is arranged on the translation member.

5. The method for launching and retracting a submersible according to claim 3, characterized in that: The second moving device includes a guide rail and a second lifting member, the guide rail is installed above the accommodating space, and the second lifting member is movably installed on the guide rail.

6. The method for launching and retracting a submersible according to claim 3, characterized in that: The cable storage member and the traction member are both electric winches, the first lifting member is an A-type hanger, and the A-type hanger is provided with a sway stopper. The first lifting member can lift the submersible and move between the second preset position and the third preset position, the second preset position is provided in the storage compartment, the third preset position is provided outside the storage compartment, and the second preset position and the third preset position are both connected to the first preset position. After the first moving device moves the submersible from the accommodating space to the first preset position, the submersible retrieval method further includes: The cable wound around the first lifting member passes through the stopper to be connected to the submersible, and the top of the submersible is in close contact with the stopper, and the first lifting member swings outboard from the second preset position to the third preset position; lowering the cable; Recovering the submersible to the first preset position includes: Recover the cable and make the top of the submersible close to the anti-sway device, and the first lifting member swings inward from the third preset position to the second preset position; The submersible is placed at the first preset position.

7. The method for launching and retracting a submersible according to claim 1, characterized in that: A first steering mechanism and a second steering mechanism are also arranged in the storage compartment. The traction member and the cable storage member are arranged at intervals in the vertical direction. The cable is connected to the traction member from the cable storage member through the first steering mechanism. The cable is connected to the first lifting member from the traction member through the second steering mechanism.

8. The method for launching and retracting a submersible according to claim 7, characterized in that: The first steering mechanism comprises a first guide pulley and a second guide pulley, the traction member and the second guide pulley are arranged above the cable storage member and the first guide pulley, the cable is connected to the second guide pulley after being deflected from the cable storage member through the first guide pulley, the cable is connected to the traction member after being deflected through the second guide pulley, and the second steering mechanism comprises a third guide pulley, and the third guide pulley is arranged above the traction member.

9. The method for launching and retracting a submersible according to claim 8, characterized in that: The storage compartment is also provided with a cable cleaning and drying device, the cable is connected to the first guide pulley from the cable storage member through the cable cleaning and drying device, and the submersible retrieval method further includes: When releasing or retrieving the cable, the cable is cleaned by the cable cleaning and drying device.

10. A drilling vessel, characterized in that: The drilling vessel is used to implement the submersible recovery and deployment method described in any one of claims 1-9.

Citation Information

Patent Citations

  • Submersible laying and recovering device and method

    CN111959723A

  • Universal retracting and releasing device and method for small boat and submersible vehicle

    CN112356988A

  • Load testing device and method for marine A-type portal

    CN118706427A

  • Laying system

    CN216943468U

  • AU2012100144A4

Cited By

  • Anchor system laying device and method

    CN121626362A