Construction method for ecological greening system of slope terrace
The construction method of the ecological complex green system of the slope field, including cracks closed, guided rack auxiliary slurry wall, prefabricated board gear, drainage ditch and grass seed jet and other steps to solve the low greening rate and low greening rate in abandoned mines and The problem of low reclamation utilization rate has achieved efficient slope reinforcement and ecological resume green effects.
Patent Information
- Application Number
- CN202510000592.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-02
- Publication Date
- 2025-01-28
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology has problems such as low greening rate, low greening effect, and low reclamation utilization rate in the ecological restoration of abandoned mines, which is difficult to effectively solve the problems of mountain slope reinforcement and ecological re-greening.
The construction method of the ecological complex green system of the slope field, including cracks closed pressure grouting repair, guided rack auxiliary slurry wall masonry, prefabricated board block anchor grout injection, prefabricated prefabricated drainage ditch construction, local slope surface reinforcement reinforcement Steps such as hanging nets and grass seed soil to form a stable terraced structure and ecological green.
It improves the construction efficiency and line fluency of the slope, enhance the stability and greening effect of the slope, solve the problem of low greening rate and low reclamation utilization rate in traditional construction methods, and have good technical benefits.
Smart Images

Figure CN119373111A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of civil engineering, and in particular to a construction method for an ecological greening system for slope terraces. Background Art
[0002] At present, the abandoned mines and small mining areas in towns and villages that remain in suburban areas have a small restoration area and a low restoration rate. Land reclamation and greening of abandoned mines is an important measure to ease the contradiction between people and land, rationally utilize land resources, and optimize the ecological environment, which is of great significance. Ecological restoration is the secondary utilization of abandoned mines. The main greening methods for exposed slopes of mines include fish scale pit planting and vegetation trough greening. Fish scale pit planting has uneven greening surface and is not suitable for smooth slopes. The utilization efficiency and economic benefits of reclamation are not high; the greening of vegetation troughs is difficult to construct, and slope weathering and steel corrosion may cause local collapse, which poses a safety hazard. It is not suitable for locations such as roads and houses where human activities are frequent. In view of the above situation, it can be seen that the current ecological restoration needs to solve the problems of low greening rate, unclear greening effect, and low reclamation utilization rate.
[0003] In view of this, a construction method for a slope terrace ecological restoration system is urgently needed to solve the problems of slope reinforcement and ecological restoration in mountainous areas. Summary of the invention
[0004] The purpose of the present invention is to provide a construction method for an ecological greening system for slope terraces in view of the above-mentioned problems existing in the prior art.
[0005] In order to achieve the above-mentioned invention object, the present invention adopts the following technical scheme: The construction method of the slope terrace ecological greening system includes the following construction steps: S00, Crack sealing pressure grouting repair: For cracks on the surface of the planned terraced fields on the mountain, closed plate pressure grouting repair is adopted; S10, guide frame assisted masonry mortar-built retaining wall: In the case of block stone raw materials, use mountain blocks to build mortar-laid retaining walls; After the mountain is arranged into terraces, guide frames are used to assist in the construction of mortar-laid retaining walls to form terrace steps; S20, precast slab retaining wall anchor grouting: When mortar-laid retaining walls cannot be used, prefabricated retaining walls are used in conjunction with anchor grouting to form terraced steps; Pour the concrete foundation at the proposed step and embed the precast bottom beam of the precast panel retaining wall in the concrete foundation; Splicing the prefabricated panels of the prefabricated panel retaining wall, as well as the prefabricated side beam a, the prefabricated side beam b and the prefabricated top beam; The grouting anchor rods are anchored on the prefabricated panels by anchors and grouting and prestressing are performed. Thus, the prefabricated panel retaining wall cooperates with the anchor rod grouting to form terrace steps. S30. Construction of prefabricated drainage ditches: dig drainage ditch grooves at the foot of the slope, pour cement concrete foundation and lay gravel, and install prefabricated drainage ditches on the gravel; S40, local slope reinforcement and hanging net: laying geonet on the slope of the terraced field, and fixing it with a geonet fixing frame; S50, grass seed soil spraying: Use the spraying environment impact control device to spray the slope terrace surface.
[0006] Furthermore, in step S00, the specific steps are: Strip the topsoil on both sides of the crack and clean the site surface; Cover the cracks with steel plates through anchor bolts; Use grouting pipes to seal and fill cracks with pressure grouting; Carry out topsoil recovery and land leveling.
[0007] Furthermore, in step S00, anchor holes are provided at the four corners of the steel plate, and the anchors pass through the anchor holes to fix the steel plate at the crack and seal the crack surface, and a grouting pipe is provided near the crack next to the steel plate, and the crack is sealed by pressure grouting through the grouting pipe.
[0008] Furthermore, in step S10, the guide frame includes a plurality of transverse rods, a vertical rod connecting all the transverse rods, and a counterweight base disposed at the bottom of each vertical rod.
[0009] Furthermore, in step S10, the transverse rod and the vertical rod are connected and fixed by a connecting plate and a fixing ring, and bolt holes are provided on the connecting plate and the transverse rod. The two ends of the transverse rod are respectively connected to the upper and lower connecting plates, and the ends of the transverse rod are fixed by bolts, so that each unit segment of the guide frame can rotate freely as a linear reference for the slope terrace mortar-laid retaining wall.
[0010] Furthermore, in step S20, the prefabricated panel retaining wall includes a prefabricated panel, a prefabricated side beam a, a prefabricated side beam b, a prefabricated top beam and a prefabricated bottom beam. The top and right sides of the prefabricated panels are provided with prefabricated panel grooves, the left and bottom sides are provided with prefabricated panel protrusions, the prefabricated side beam a and the prefabricated bottom beam are also provided with prefabricated panel grooves, the prefabricated side beam b and the prefabricated top beam are also provided with prefabricated panel protrusions, and two adjacent prefabricated panels can be spliced and connected to the prefabricated side beam a, the prefabricated side beam b, the prefabricated top beam and the prefabricated bottom beam through the prefabricated panel protrusions and the prefabricated panel grooves.
[0011] Furthermore, in step S30, the prefabricated assembled drainage ditch is in an inverted trapezoidal shape, and ear blocks are provided at both ends of the upper part, and ear block bolt holes are provided on the ear blocks. A drainage ditch protrusion is provided on the front side of the cross-section of the prefabricated assembled drainage ditch, and a drainage ditch groove is provided on the back side. Two adjacent prefabricated assembled drainage ditches are butt-jointed through the drainage ditch protrusion and the drainage ditch groove, and are fixedly connected at the ear blocks with ear block fixing bolts.
[0012] Furthermore, in step S30, a drainage ditch is excavated at the foot of the slope, a cement concrete foundation is poured and crushed stone is laid, a plurality of prefabricated assembled drainage ditches are connected and laid on the crushed stone to form a drainage ditch, and the overall drainage ditch is fixed on the construction road surface and ancillary facilities.
[0013] Furthermore, in step S40, pin holes are provided on the geonet fixing frame, and the geonet fixing frame is fixed to the original soil layer by pins through the pin holes. A geonet is provided along the slope between the two gravity retaining walls, and the geonet fixing frame fixes the geonet to the original soil on the slope.
[0014] Furthermore, in step S50, the spraying environmental impact control device includes a spraying storage cart, a rotating base arranged on the spraying storage cart, a sprayer vertical rod arranged on the rotating base, a spraying sleeve connected to the sprayer vertical rod through a hinge ring, a counterweight rod arranged at the tail of the spraying sleeve, a spraying pipe telescopically connected to the other end of the spraying sleeve, a sprayer bottom plate and a flexible retaining ring arranged at the end of the spraying pipe, the flexible retaining ring is connected to the sprayer bottom plate through a sprayer frame, and the spraying pipe is connected to the sprayer discharge port of the sprayer bottom plate, and the rotating base also serves as a spraying substrate pump discharge port.
[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention adopts crack sealing plate pressure grouting to repair cracks, which solves the problem that slope cracks affect structural stability; adopts guide frame assisted mortar masonry retaining wall rapid masonry technology, which improves the construction efficiency and linear smoothness of terraced slope masonry; adopts anchor rod-side wall post-grouting prefabricated plate retaining wall technology, which improves the construction efficiency of prefabricated assembled retaining wall under the condition that gravity retaining wall cannot be built; adopts prefabricated assembled drainage ditch technology, which improves the installation and construction efficiency of prefabricated assembled drainage ditch; adopts local slope reinforcement hanging net spraying technology, adopts integral stainless steel frame or pressure edge anchoring, and fixes the slope hanging net; adopts spraying environmental impact control technology and spraying environmental impact control device, which solves the problem of dust affecting the environment during traditional spraying construction; 2. In summary, the structure and construction method involved in the present invention can solve the problem of terraced slope masonry construction and have good technical benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the crack sealing plate pressure grouting repair technology; Figure 2 It is a schematic diagram of the steel plate structure; Figure 3 is a schematic diagram of the guide frame structure; Figure 4 yes Figure 3Enlarged image of the middle circle; Figure 5 is a schematic diagram of the guide frame viewed from the front; Figure 6 yes Figure 5 Enlarged image of the middle circle; Figure 7 This is a schematic diagram of the guide frame construction; Figure 8 This is a schematic diagram of the anchor-side wall post-grouting precast slab retaining wall structure; Fig. 9 It is a schematic diagram of the structure of the prefabricated panel and its components; Fig.10 It is a schematic diagram of the prefabricated panel structure; Fig.11 This is the cross-sectional view of the anchor-side wall post-grouting precast slab retaining wall construction; Fig.12 It is a schematic diagram of the prefabricated drainage ditch structure; Fig.13 It is a schematic diagram of the connection of prefabricated and assembled drainage ditch; Fig.14 It is a schematic diagram of the front structure of the prefabricated drainage ditch; Fig.15 It is a schematic diagram of the back structure of the prefabricated drainage ditch; Fig.16 This is a structural diagram of the local slope reinforcement net spraying technology; Fig.17 It is a schematic diagram of the cross-sectional structure of the local slope reinforcement net spraying technology; Fig.18 yes Fig.17 Enlarged image of the middle circle; Fig.19 This is a schematic diagram of the geonet fixing bracket structure; Fig. 20 yes Fig.19 Enlarge the image in the circle; Fig.21 It is a construction diagram of the spraying environmental impact control technology; Fig. 22 It is a schematic diagram of the structure on the back of the sprayer of the spraying environment impact control device; Fig.23 It is a schematic diagram of the front structure of the sprayer of the spraying environment impact control device; Fig.24 This is a schematic diagram of the structure of the spraying vehicle; Fig.25 It is a construction flow chart of the present invention.
[0017] In the figure, 1, crack; 2, steel plate; 3, anchor bolt; 4, grouting pipe; 5, anchor bolt hole; 6, transverse rod; 7, vertical rod; 8, counterweight base; 9, bolt; 10, fixing ring; 11, bolt hole; 12, connecting plate; 13, anchor; 14, grouting anchor rod; 15, prefabricated top beam; 16, concrete foundation; 17, anchor rod hole; 18, prefabricated board; 19, prefabricated board notch; 20, prefabricated board protrusion; 21, prefabricated side beam b; 22, prefabricated bottom beam; 23, prefabricated assembled drainage ditch; 24, ear block; 25, ear block bolt hole; 26. Ear block fixing bolts; 27. Drain ditch protrusions; 28. Drain ditch grooves; 29. Cement concrete foundation; 30. Gravel; 31. Geonet; 32. Geonet fixing frame; 33. Gravity retaining wall; 34. Pins; 35. Original soil; 36. Flexible retaining ring; 37. Sprinkler bottom plate; 38. Sprinkler pipe; 39. Sprinkler outlet; 40. Sprinkler frame; 41. Sprinkler sleeve; 42. Articulated ring; 43. Counterweight rod; 44. Rotating base; 45. Sprinkler storage cart; 46. Prefabricated side beam a; 47. Sprinkler vertical rod. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.
[0019] Those skilled in the art should understand that, in the disclosure of the present invention, the orientation or position relationship indicated by terms such as "longitudinal", "lateral", "up", "down", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" are based on the orientation or position relationship shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the above terms should not be understood as limiting the present invention.
[0020] like Fig.25 As shown, the construction method of the slope terrace ecological greening system includes the following construction steps: S00, Crack 1 closed pressure grouting repair: For crack 1 that appears on the proposed terraced surface of the mountain, closed plate pressure grouting repair is adopted; Strip the topsoil on both sides of crack 1 and clean the site surface; Cover the crack 1 with the steel plate 2 through the anchor bolts 3; Fill the crack 1 by pressure grouting through the grouting pipe 4; Carry out topsoil recovery and land leveling; In this embodiment, if Figure 1-2 As shown, anchor holes 5 are provided at the four corners of the steel plate 2, and the anchor bolts 3 pass through the anchor holes 5 to fix the steel plate 2 at the crack 1 and seal the surface of the crack 1, and a grouting pipe 4 is provided near the crack 1 next to the steel plate 2, and the crack 1 is closed by pressure grouting through the grouting pipe 4.
[0021] S10, guide frame assisted masonry mortar-built retaining wall: In the case of block stone raw materials, use mountain blocks to build mortar-laid retaining walls; After the mountain is arranged into terraces, guide frames are used to assist in the construction of mortar-laid retaining walls to form terrace steps; In this embodiment, if Figure 3-7 As shown, the guide frame includes a plurality of transverse rods 6, a vertical rod 7 connecting all the transverse rods 6, and a counterweight base 8 arranged at the bottom of each vertical rod 7. The transverse rods 6 and the vertical rods 7 are connected and fixed by a connecting plate 12 and a fixing ring 10, and bolt holes 11 are provided on the connecting plate 12 and the transverse rods 6. The two ends of the transverse rods 6 are respectively connected to the upper and lower connecting plates 12, and the ends of the transverse rods 6 are fixed by bolts 9, so that each unit segment of the guide frame can rotate freely as a linear reference for the slope terrace mortar-laid retaining wall.
[0022] S20, precast slab retaining wall anchor grouting: When mortar-laid retaining walls cannot be used, prefabricated retaining walls are used in conjunction with anchor grouting to form terraced steps; Cast a concrete foundation 16 at the proposed step, and embed the prefabricated bottom beam 22 of the prefabricated panel retaining wall in the concrete foundation 16; Splice the precast panels 18 of the precast panel retaining wall, as well as the precast side beams a46, the precast side beams b21 and the precast top beams 15; The grouting anchor rod 14 is anchored on the prefabricated plate 18 by the anchor 13 and grouting and prestressing are performed, so that the prefabricated plate retaining wall cooperates with the anchor rod grouting to form a terrace step; In this embodiment, if Figure 8-11 As shown, the prefabricated panel retaining wall includes a prefabricated panel 18, a prefabricated side beam a46, a prefabricated side beam b21, a prefabricated top beam 15 and a prefabricated bottom beam 22. The prefabricated panel 18 is provided with a prefabricated panel groove 19 on the top and right side, and a prefabricated panel protrusion 20 on the left and bottom. The prefabricated side beam a46 and the prefabricated bottom beam 22 are also provided with a prefabricated panel groove 19, and the prefabricated side beam b21 and the prefabricated top beam 15 are also provided with a prefabricated panel protrusion 20. Two adjacent prefabricated panels 18 can be spliced and connected to the prefabricated side beam a46, the prefabricated side beam b21, the prefabricated top beam 15 and the prefabricated bottom beam 22 through the prefabricated panel protrusion 20 and the prefabricated panel groove 19.
[0023] S30, construction of prefabricated drainage ditch 23: digging drainage ditch grooves at the foot of the slope, pouring cement concrete foundation 29 and laying crushed stone 30, and installing prefabricated drainage ditch 23 on the crushed stone 30; In this embodiment, if Figure 12-15 As shown, the prefabricated assembled drainage ditch 23 is in an inverted trapezoidal shape, and ear blocks 24 are provided at both ends of the upper part, and ear block bolt holes 25 are provided on the ear blocks 24. A drainage ditch protrusion 27 is provided at the front of the cross section of the prefabricated assembled drainage ditch 23, and a drainage ditch groove 28 is provided at the back. Two adjacent prefabricated assembled drainage ditches 23 are connected by docking through the drainage ditch protrusion 27 and the drainage ditch groove 28, and are fixedly connected at the ear blocks 24 by ear block fixing bolts 26.
[0024] Preferably, during construction, drainage ditches are excavated at the foot of the slope, a cement concrete foundation 29 is poured and crushed stone 30 is laid, a plurality of prefabricated assembled drainage ditches 23 are connected and laid on the crushed stone 30 to form a drainage ditch, and the overall drainage ditch is fixed on the construction road surface and ancillary facilities.
[0025] S40, local slope reinforcement and hanging net: laying a geonet 31 on the slope of the terraced field, and fixing it with a geonet fixing frame 32; In this embodiment, if Figure 16-19 As shown, the geonet fixing frame 32 is provided with pin holes, and the geonet fixing frame 32 is fixed to the original soil 35 by pins 34 through the pin holes. A geonet 31 is provided along the slope between two gravity retaining walls 33, and the geonet fixing frame 32 fixes the geonet 31 to the original soil 35 on the slope.
[0026] S50, grass seed soil spraying: Use the spraying environment impact control device to spray the slope terrace surface.
[0027] In this embodiment, if Figure 20-24 As shown, the spraying environment impact control device includes a spraying storage vehicle 45, a rotating base 44 arranged on the spraying storage vehicle 45, a sprayer vertical rod 47 arranged on the rotating base 44, a spraying sleeve 41 connected to the sprayer vertical rod 47 through a hinge ring 42, a counterweight rod 43 arranged at the tail of the spraying sleeve 41, a spraying pipe 38 telescopically connected to the other end of the spraying sleeve 41, a sprayer bottom plate 37 and a flexible retaining ring 36 (which can prevent the spraying substrate from diffusing) arranged at the end of the spraying pipe 38, the flexible retaining ring 36 is connected to the sprayer bottom plate 37 through a sprayer frame 40, and the spraying pipe 38 is connected to the sprayer discharge port 39 of the sprayer bottom plate 37, and the rotating base 44 also serves as a discharge port for pumping the spraying substrate.
[0028] The parts not described in detail in the present invention are prior art, so the present invention does not describe them in detail.
[0029] It is to be understood that the term "one" should be understood as "at least one" or "one or more", that is, in one embodiment, the number of an element may be one, while in another embodiment, the number of the element may be multiple, and the term "one" should not be understood as a limitation on the quantity.
[0030] Although more professional terms are used in this article, the possibility of using other terms is not excluded. These terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional restrictions is contrary to the spirit of the present invention.
[0031] The present invention is not limited to the above-mentioned optimal implementation mode. Anyone can derive other various forms of products under the inspiration of the present invention. However, no matter what changes are made in the shape or structure, all technical solutions that are the same or similar to the present invention fall within the protection scope of the present invention.
Claims
1. Construction method of slope terrace ecological greening system, characterized in that: The construction steps include: S00, Crack (1) closed pressure grouting repair: For cracks (1) on the proposed terraced surface of the mountain, closed plate pressure grouting repair is adopted; S10, guide frame assisted masonry mortar-built retaining wall: In the case of block stone raw materials, use mountain blocks to build mortar-laid retaining walls; After the mountain is arranged into terraces, guide frames are used to assist in the construction of mortar-laid retaining walls to form terrace steps; S20, precast slab retaining wall anchor grouting: When mortar-laid retaining walls cannot be used, prefabricated retaining walls are used in conjunction with anchor grouting to form terraced steps; Casting a concrete foundation (16) at the proposed step, and embedding a precast bottom beam (22) of the precast panel retaining wall in the concrete foundation (16); Splicing the prefabricated panels (18) of the prefabricated panel retaining wall, as well as the prefabricated side beams a (46), the prefabricated side beams b (21), and the prefabricated top beams (15); Anchoring the grouting anchor rod (14) on the prefabricated plate (18) by means of an anchor (13) and performing grouting and prestressing, so that the prefabricated plate retaining wall cooperates with the anchor rod grouting to form terrace steps; S30, construction of prefabricated drainage ditch (23): excavating a drainage ditch trench at the foot of the slope, pouring a cement concrete foundation (29) and laying crushed stones (30), and installing a prefabricated drainage ditch (23) on the crushed stones (30); S40, local slope reinforcement and hanging net: laying a geonet (31) on the slope of the side slope terrace, and fixing it with a geonet fixing frame (32); S50, grass seed soil spraying: Use the spraying environment impact control device to spray the slope terrace surface.
2. The method for constructing an ecological greening system for slope terraces according to claim 1, characterized in that: In step S00, the specific steps are: Remove the topsoil from both sides of the crack (1) and clean the site surface; Cover the crack (1) with a steel plate (2) through anchor bolts (3); Filling the crack (1) by pressure grouting through a grouting pipe (4); Carry out topsoil recovery and land leveling.
3. The method for constructing an ecological greening system for slope terraces according to claim 2, characterized in that: In step S00, anchor holes (5) are provided at the four corners of the steel plate (2), and the anchor bolts (3) pass through the anchor holes (5) to fix the steel plate (2) at the crack (1) and seal the surface of the crack (1), and a grouting pipe (4) is provided near the crack (1) next to the steel plate (2), and the crack (1) is sealed by pressure grouting through the grouting pipe (4).
4. The method for constructing an ecological greening system for slope terraces according to claim 1, characterized in that: In step S10, the guide frame comprises a plurality of transverse rods (6), a vertical rod (7) connecting all the transverse rods (6), and a counterweight base (8) arranged at the bottom of each of the vertical rods (7).
5. The method for constructing an ecological greening system for slope terraces according to claim 4, characterized in that: In step S10, the transverse rod (6) and the vertical rod (7) are connected and fixed via a connecting plate (12) and a fixing ring (10), and bolt holes (11) are provided on the connecting plate (12) and the transverse rod (6). The two ends of the transverse rod (6) are respectively connected to the upper and lower connecting plates (12), and the ends of the transverse rod (6) are fixed via bolts (9), so that each unit segment of the guide frame can rotate freely as a linear reference for the slope terrace mortar-laid retaining wall.
6. The method for constructing an ecological greening system for slope terraces according to claim 1, characterized in that: In step S20, the prefabricated panel retaining wall comprises a prefabricated panel (18), a prefabricated side beam a (46), a prefabricated side beam b (21), a prefabricated top beam (15) and a prefabricated bottom beam (22); the prefabricated panel (18) is provided with a prefabricated panel notch (19) on the top and right side, and a prefabricated panel protrusion (20) on the left and bottom; the prefabricated side beam a (46) and the prefabricated bottom beam (22) are also provided with a prefabricated panel notch (19); the prefabricated side beam b (21) and the prefabricated top beam (15) are also provided with a prefabricated panel protrusion (20); two adjacent prefabricated panels (18) can be spliced and connected to the prefabricated side beam a (46), the prefabricated side beam b (21), the prefabricated top beam (15) and the prefabricated bottom beam (22) through the prefabricated panel protrusion (20) and the prefabricated panel notch (19).
7. The method for constructing an ecological greening system for slope terraces according to claim 1, characterized in that: In step S30, the prefabricated assembled drainage ditch (23) is in an inverted trapezoidal shape, and ear blocks (24) are provided at both ends of the upper part, and ear block bolt holes (25) are provided on the ear blocks (24). The front side of the cross section of the prefabricated assembled drainage ditch (23) is provided with a drainage ditch protrusion (27), and the back side is provided with a drainage ditch groove (28). Two adjacent prefabricated assembled drainage ditches (23) are butt-jointed through the drainage ditch protrusion (27) and the drainage ditch groove (28), and are fixedly connected at the ear blocks (24) using ear block fixing bolts (26).
8. The method for constructing an ecological greening system for slope terraces according to claim 7, characterized in that: In step S30, a drainage ditch is excavated at the foot of the slope, a cement concrete foundation (29) is poured and crushed stones (30) are laid, a plurality of the prefabricated assembled drainage ditches (23) are connected and laid on the crushed stones (30) to form a drainage ditch, and the entire drainage ditch is fixed on the construction road surface and ancillary facilities.
9. The method for constructing an ecological greening system for slope terraces according to claim 1, characterized in that: In step S40, the geonet fixing frame (32) is provided with pin holes, and the geonet fixing frame (32) is fixed to the original soil (35) layer by pins (34) through the pin holes. A geonet (31) is provided along the slope surface between the two gravity retaining walls (33), and the geonet fixing frame (32) fixes the geonet (31) to the original soil (35) on the slope surface.
10. The method for constructing an ecological greening system for slope terraces according to claim 1, characterized in that: In step S50, the spraying environment impact control device includes a spraying storage vehicle (45), a rotating base (44) arranged on the spraying storage vehicle (45), a sprayer vertical rod (47) arranged on the rotating base (44), a spraying sleeve (41) connected to the sprayer vertical rod (47) via a hinge ring (42), a counterweight rod (43) arranged at the tail of the spraying sleeve (41), a spraying pipe (38) telescopically connected to the other end of the spraying sleeve (41), a sprayer bottom plate (37) and a flexible retaining ring (36) arranged at the end of the spraying pipe (38), the flexible retaining ring (36) is connected to the sprayer bottom plate (37) via a sprayer frame (40), and the spraying pipe (38) is connected to the sprayer discharge port (39) of the sprayer bottom plate (37), and the rotating base (44) also serves as a spraying substrate pump discharge port.
Citation Information
Patent Citations
Abandoned mine platform field enclosure ecology restoration method
CN110424421A
Building assembly type drainage ditch forming device and construction method
CN119163119A
Leakage repair device for pressure-bearing reinforced concrete structure
CN203977368U
Safety guardrail for building construction
CN213539939U
Spray seeding vehicle
CN215345784U