Power transmission and transformation project life cycle carbon emission accounting method and device and medium
By formulating the carbon emissions accounting method of the life cycle of transmission and transformation engineering, the problem of inaccurate carbon emissions and accounting boundaries in existing technologies and irregular data collection were solved. Conventional summary.
Patent Information
- Application Number
- CN202411242759.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2025-01-28
AI Technical Summary
The lack of effective carbon emission accounting methods for the whole life cycle of power transmission and transformation projects in the prior art has led to unclear carbon emission accounting boundaries, irregular data collection order, and immature carbon emission summary model.
Put forward a carbon emission accounting method for the life cycle of transformation and transformation, including specifying the carbon emissions accounting object and determining the accounting boundary model, identifying the type of emission sources and the type of greenhouse gas, collecting activity data in the principle of priority, accounting for carbon emissions data, and summarizing the total sum of them. Carbon emissions.
The systematic accounting of carbon emissions of the entire life cycle of the transmission and transformation engineering is realized, the sequence of accounting boundaries and data collection are clarified, and the authority of data and the accuracy of accounting are improved.
Smart Images

Figure CN119377525A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of carbon emission accounting for power systems, and more specifically, to a method, device and medium for carbon emission accounting during the life cycle of a power transmission and transformation project. Background Art
[0002] Carbon emissions refer to the general term for greenhouse gas emissions of the research object. Accurate measurement of carbon emissions is the basis for achieving the "dual carbon" goal. Accurate and detailed carbon emissions data can provide an important basis for the formulation of relevant policies for the power system and for conducting evaluation and assessment work. As the main source of global carbon emissions, the energy industry needs to focus on carbon emission accounting technology. Among them, carbon emission accounting in the power sector is the top priority. According to data released by the International Energy Agency in 2020, the growth rate of carbon emissions involving electricity is the fastest among all industrial sectors.
[0003] The life cycle assessment method is a method for quantitatively analyzing the environmental impact caused by the product production process. After determining the accounting object and accounting boundary, the calculation is completed by collecting data on the entire life cycle of the product and calculating the data by characterization. Among them, carbon emissions are one of the environmental impacts analyzed by the life cycle method.
[0004] In addition, there are currently no relevant standards for the accounting of carbon emissions from power transmission and transformation on the grid side of the power system, and the technology is not perfect. The determination of carbon emission objects for different projects, the definition of accounting boundaries, the formulation of data collection sequence principles, and the engineering carbon emissions summary model are not yet mature. Power transmission and transformation projects in the power system urgently need to solve the problem of carbon emissions accounting throughout the life cycle and propose a guiding carbon emissions accounting method. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a method, device and medium for calculating carbon emissions during the life cycle of a power transmission and transformation project.
[0006] According to one aspect of the present invention, a method for calculating carbon emissions during the life cycle of a power transmission and transformation project is provided, comprising:
[0007] Specify the carbon emission accounting objects in the life cycle of power transmission and transformation projects, and determine the accounting boundary model for each carbon emission accounting object;
[0008] According to the accounting boundary model, determine the emission sources and greenhouse gas types of each carbon emission accounting object;
[0009] Collect activity data of each carbon emission accounting object according to emission sources and greenhouse gases;
[0010] Calculate the carbon emission data of each carbon emission accounting object based on the activity data of each carbon emission accounting object and the corresponding carbon emission factor;
[0011] The total carbon emissions of power transmission and transformation projects are summarized based on the carbon emission data of each carbon emission accounting object.
[0012] Optionally, specify the carbon emission accounting objects in the declaration cycle of the power transmission and transformation project, including:
[0013] Divide different activities within each phase of the power transmission and transformation project life cycle;
[0014] The carbon emission accounting objects are determined based on the impact of different activities on the carbon emissions of power transmission and transformation projects and the independence of the activities.
[0015] Optionally, the carbon emission accounting objects include the design stage, material stage, construction stage, operation and maintenance stage, and demolition and recycling stage.
[0016] Optionally, the accounting boundary models of each carbon emission accounting object include: design phase time boundary model, design phase space boundary model, material acquisition phase time boundary model, material acquisition phase space boundary model, construction phase time boundary model, construction phase space boundary model, operation and maintenance phase time boundary model, operation and maintenance phase space boundary model, demolition phase time boundary model, demolition phase space boundary model.
[0017] Optionally, the design phase time boundary model is:
[0018] t 研究_启 ≤t 设计 ≤t 施工图_终
[0019] In the formula, t 研究_启 is the starting time point of the feasibility study in the design phase, t 设计 is the time point of the design phase, t 施工图_终 It is the end time point of construction drawing design in the design phase;
[0020] The spatial boundary model in the design phase is:
[0021]
[0022] In the formula, 设计 represents the set of design phase spaces, They are respectively the survey equipment to-and-from site transportation space element in the design phase, the instrument to-and-from site transportation space element, the engineering measurement space element, the geotechnical engineering investigation space element, the geotechnical engineering design and detection and monitoring space element, the hydrogeological survey space element, the engineering hydro-meteorological survey space element and the engineering geophysical exploration space element, and {} represents a set of space elements.
[0023] Optionally, the time boundary model of the material acquisition stage is:
[0024] min{t 生产设备_启 ,t 材料生产制造_启}≤t 物料获取 ≤max{t 运输设备_终 ,t 运输材料_终}
[0025] In the formula, t 生产设备_启 is the starting time point of the production equipment in the material acquisition phase, t 材料生产制造_启 is the starting time of material production in the material acquisition phase, t 运输设备_终 is the end time point of equipment transportation to the construction site during the material acquisition phase, t 运输材料_终 is the end time point of material transportation to the construction site in the material acquisition phase, t 物料获取 is the time point of the material acquisition stage, min{} and max{} represent the minimum and maximum values of the elements in the collection respectively;
[0026] The spatial boundary model of the material acquisition stage is:
[0027]
[0028] In the formula, 物料获取 Represents the spatial set of material acquisition stages, They are the equipment and raw materials production space elements, material and raw materials production space elements, equipment and raw materials transportation space elements, material and raw materials transportation space elements, production equipment production and manufacturing space elements, material production and manufacturing space elements, production equipment transportation space elements and material transportation space elements in the material acquisition stage.
[0029] Optionally, the construction phase time boundary model is:
[0030] t 开工 ≤t 施工 ≤t 竣工
[0031] In the formula, t 开工 is the start time of the project in the construction phase, t 施工 is the time point of the construction phase, t 竣工 The time point for project completion acceptance during the construction phase;
[0032] The spatial boundary model during the construction phase is:
[0033]
[0034] In the formula, 施工 Represents the debugging stage space collection, Ω 调试They are the mechanical equipment transportation space elements, the sub-item engineering space elements, the measures space elements and the debugging engineering space elements in the construction phase.
[0035] Optionally, the time boundary model of the operation and maintenance phase is:
[0036] t 竣工 ≤t 运维 ≤t 拆除
[0037] In the formula, t 运维 is the time point of the operation and maintenance phase, t 拆除 The time when the project was demolished;
[0038] The spatial boundary model in the operation and maintenance phase is:
[0039]
[0040] In the formula, 运维 represents the space set of operation and maintenance stages, Ω 线损 ,Ω 六氟化硫逸散 , Ω 建筑能耗 They are the line loss operation and maintenance space elements in the operation and maintenance stage, the sulfur hexafluoride emission (substation project) operation and maintenance space elements, the maintenance project sub-item operation and maintenance space elements, the maintenance project measures project operation and maintenance space elements, the technical transformation project sub-item operation and maintenance space elements, the technical transformation project measures project operation and maintenance space elements and the building energy consumption operation and maintenance space elements.
[0041] Optionally, the demolition phase time boundary model is:
[0042] t 拆除 ≤t 拆除 ≤t 回收
[0043] In the formula, t 拆除 is the time point of the demolition phase, t 回收 The point in time when recycling is completed for on-site waste;
[0044] The spatial boundary model of the demolition stage is:
[0045]
[0046] In the formula, 拆除 represents the space set of operation and maintenance stages, Ω 回收再利用 They are the spatial elements of the sub-projects in the demolition phase, the spatial elements of transporting on-site waste to the recycling station, the spatial elements of transporting on-site waste to the disposal point, and the spatial elements of waste recycling and reuse.
[0047] Optionally, collect activity data for each carbon emission accounting object based on emission sources and greenhouse gases, including:
[0048] According to the emission sources and greenhouse gases, the activity data of each carbon emission accounting object are collected according to the preset priority principle, where the priority principle is: field data, actual measurement values, calculated values; empirical emission data of the same process / equipment; relevant database data; relevant literature, estimated values from the experience of experts in the industry; relevant data within the province; relevant data within the region; domestic relevant data; and foreign relevant data.
[0049] Optionally, the carbon emission data of each carbon emission accounting object includes:
[0050] Carbon emissions during the design phase include the cumulative carbon emissions from the transportation of survey equipment to and from the site and the energy consumption of survey equipment during on-site exploration. The transportation of survey equipment to and from the site includes road transportation, rail transportation, and water transportation. On-site exploration carbon emissions include the cumulative carbon emissions generated by mapping, exploration, drilling, sampling, experimentation, testing, inspection, and monitoring operations:
[0051] Carbon emissions during the material acquisition phase include the cumulative carbon emissions from the production and transportation of all equipment, main materials, and building materials;
[0052] Carbon emissions during the construction phase include the cumulative carbon emissions from the transportation of construction machinery and equipment, construction installation, and commissioning;
[0053] Carbon emissions during the operation and maintenance phase include indirect carbon emissions corresponding to the operation loss of engineering equipment, sulfur hexafluoride emissions from engineering equipment, engineering maintenance, and the accumulation of carbon emissions from engineering technology transformation;
[0054] Carbon emissions during the demolition phase include the accumulation of engineering demolition, transportation of demolished materials, sulfur hexafluoride emissions, and carbon emission reductions from recycled materials.
[0055] According to another aspect of the present invention, a device for calculating carbon emissions during the life cycle of a power transmission and transformation project is provided, comprising:
[0056] The first determination module is used to specify the carbon emission accounting objects in the life cycle stage of the power transmission and transformation project and determine the accounting boundary model of each carbon emission accounting object;
[0057] The second determination module is used to determine the emission sources and greenhouse gas types of each carbon emission accounting object according to the accounting boundary model;
[0058] The collection module is used to collect the activity data of each carbon emission accounting object according to the emission source and greenhouse gas;
[0059] An accounting module, used to calculate the carbon emission data of each carbon emission accounting object according to the activity data of each carbon emission accounting object and the corresponding carbon emission factor;
[0060] The summary module is used to summarize the total carbon emissions of power transmission and transformation projects based on the carbon emission data of each carbon emission accounting object.
[0061] According to another aspect of the present invention, a computer-readable storage medium is provided, wherein the storage medium stores a computer program, and the computer program is used to execute the method described in any one of the above aspects of the present invention.
[0062] According to another aspect of the present invention, an electronic device is provided, comprising: a processor; a memory for storing instructions executable by the processor; the processor is configured to read the executable instructions from the memory and execute the instructions to implement the method described in any one of the above aspects of the present invention.
[0063] Therefore, the present invention proposes a carbon emission accounting process for the life cycle of power system transmission and transformation projects; proposes the carbon emission accounting objects and accounting boundary requirements for the life cycle of power system transmission and transformation projects, and defines the carbon emission accounting boundaries from the time boundary and the space boundary; proposes the order principle for obtaining carbon emission data for the life cycle of power system transmission and transformation projects, and gives priority to collecting high-quality data to reduce uncertainty and improve the authority of data collection; proposes a carbon emission accounting stage division for the life cycle of power system transmission and transformation projects and a method for summarizing the carbon emissions of the projects, which provides a new method for selecting carbon emission sources for power system transmission and transformation projects, calculating carbon emissions at each stage, and summarizing the carbon emissions of the projects. BRIEF DESCRIPTION OF THE DRAWINGS
[0064] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:
[0065] Figure 1 It is a flow chart of a method for calculating carbon emissions during the life cycle of a power transmission and transformation project provided by an exemplary embodiment of the present invention;
[0066] Figure 2 This is a schematic diagram of the accounting boundary of the entire life cycle of a power transmission and transformation project provided by an exemplary embodiment of the present invention;
[0067] Figure 3 It is a schematic diagram of the structure of a device for calculating carbon emissions during the life cycle of a power transmission and transformation project provided by an exemplary embodiment of the present invention;
[0068] Figure 4 This is a structure of an electronic device provided by an exemplary embodiment of the present invention. DETAILED DESCRIPTION
[0069] Below, the exemplary embodiments according to the present invention will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments of the present invention, and it should be understood that the present invention is not limited to the exemplary embodiments described here.
[0070] It should be noted that the relative arrangement of components and steps, numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.
[0071] Those skilled in the art can understand that the terms "first" and "second" in the embodiments of the present invention are only used to distinguish different steps, devices or modules, etc., and neither represent any specific technical meaning nor indicate the necessary logical order between them.
[0072] It should also be understood that, in the embodiments of the present invention, “plurality” may refer to two or more than two, and “at least one” may refer to one, two or more than two.
[0073] It should also be understood that any component, data or structure mentioned in the embodiments of the present invention can generally be understood as one or more, unless explicitly limited or otherwise indicated in the context.
[0074] In addition, the term "and / or" in the present invention is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects before and after are in an "or" relationship.
[0075] It should also be understood that the description of the various embodiments of the present invention focuses on the differences between the various embodiments, and the same or similar aspects thereof can be referenced to each other, and for the sake of brevity, they will not be described one by one.
[0076] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.
[0077] The following description of at least one exemplary embodiment is merely illustrative in nature and is in no way intended to limit the invention, its application, or uses.
[0078] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.
[0079] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.
[0080] Embodiments of the present invention can be applied to electronic devices such as terminal devices, computer systems, servers, etc., which can operate with many other general or special computing system environments or configurations. Examples of well-known terminal devices, computing systems, environments and / or configurations suitable for use with electronic devices such as terminal devices, computer systems, servers, etc. include, but are not limited to: personal computer systems, server computer systems, thin clients, thick clients, handheld or laptop devices, microprocessor-based systems, set-top boxes, programmable consumer electronics, network personal computers, small computer systems, large computer systems, and distributed cloud computing technology environments including any of the above systems, etc.
[0081] Electronic devices such as terminal devices, computer systems, servers, etc. can be described in the general context of computer system executable instructions (such as program modules) executed by computer systems. Generally, program modules can include routines, programs, object programs, components, logic, data structures, etc., which perform specific tasks or implement specific abstract data types. Computer systems / servers can be implemented in a distributed cloud computing environment, where tasks are performed by remote processing devices linked through a communication network. In a distributed cloud computing environment, program modules can be located on local or remote computing system storage media including storage devices.
[0082] Exemplary Methods
[0083] Figure 1 1 is a flow chart of a method for calculating carbon emissions during the life cycle of a power transmission and transformation project provided by an exemplary embodiment of the present invention. This embodiment can be applied to electronic devices, such as Figure 1 As shown, the carbon emission accounting method 100 for the life cycle of a power transmission and transformation project includes the following steps:
[0084] Step 101, specifying carbon emission accounting objects in the life cycle stage of the power transmission and transformation project, and determining the accounting boundary model of each carbon emission accounting object;
[0085] Step 102, determining the emission sources and greenhouse gas types of each carbon emission accounting object according to the accounting boundary model;
[0086] Step 103, collecting activity data of each carbon emission accounting object according to emission sources and greenhouse gases;
[0087] Step 104, calculating the carbon emission data of each carbon emission accounting object according to the activity data of each carbon emission accounting object and the corresponding carbon emission factor;
[0088] Step 105 , summarizing the total carbon emissions of the power transmission and transformation project according to the carbon emission data of each carbon emission accounting object.
[0089] Specifically, the present invention specifies the carbon emission accounting process, accounting boundaries, accounting methods, data collection and other contents of the power system transmission and transformation project. Based on the "modularization" principle, the boundaries of the entire life cycle of the power system transmission and transformation are divided into the survey and design stage, the material acquisition stage, the construction and installation stage, the operation and maintenance stage, and the dismantling and recycling stage. The data collection principles for carbon emission activities of the transmission and transformation project are proposed, a carbon emission model for each stage is established, and a summary model for the project carbon emission accounting is proposed. The present invention provides a method for carbon emission accounting in the life cycle of a transmission and transformation project to solve the technical problem of the lack of carbon emission accounting methods in the life cycle of a power system. The steps are:
[0090] Step 1: Specify the carbon emission accounting object and determine the accounting boundary;
[0091] Step 2: Identify emission sources and types of greenhouse gases;
[0092] Step 3: Collect activity data based on the principle of priority;
[0093] Step 4: Select and obtain emission factor data;
[0094] Step 5: Calculate the carbon emission data of each emission source separately;
[0095] Step 6: Summarize and calculate the total carbon emissions of the project.
[0096] Furthermore, in step 1, the carbon emission accounting objects are specified to comply with the following principles:
[0097] Divide different activities within each phase of the power transmission and transformation project life cycle;
[0098] Select activities that have a significant impact on the carbon emissions of power transmission and transformation projects and should be kept independent of each other for measurement;
[0099] Activities that account for a small proportion of total life cycle carbon emissions, are technically impossible to quantify or the cost of quantification is too high may not be included in the accounting.
[0100] Further, in step 1, refer to Figure 2 As shown in the figure, the life cycle stages of power transmission and transformation projects include design stage, material stage, construction stage, operation and maintenance stage, and dismantling and recycling stage.
[0101] Among them, the equipment, main materials, and building materials used or replaced during the construction and operation and maintenance stages are all classified as the material acquisition stage. When the construction and operation and maintenance stages involve waste transportation, recycling, and waste disposal, the calculation method of the demolition stage shall be referred to.
[0102] Furthermore, in step 1, the design phase boundary is divided into time boundary and space boundary.
[0103] The time boundary of the design phase starts from the feasibility study to the construction drawing design. The time boundary model of the design phase is:
[0104] t 研究_启 ≤t 设计 ≤t 施工图_终
[0105] In the formula, t 研究_启 is the starting time point of the feasibility study in the design phase, t 设计 is the time point of the design phase, t 施工图_终 It is the end time point of construction drawing design in the design phase.
[0106] The spatial boundary of the design phase covers off-site activities from feasibility study to construction drawing design, including transportation of survey equipment and instruments to and from the site, engineering survey, geotechnical engineering investigation, geotechnical engineering design and testing monitoring, hydrogeological investigation, engineering hydrometeorological investigation, and engineering geophysical exploration. The spatial boundary model of the design phase is:
[0107]
[0108] In the formula, 设计 represents the set of design phase spaces, They are respectively the survey equipment to-and-from site transportation space element in the design phase, the instrument to-and-from site transportation space element, the engineering measurement space element, the geotechnical engineering investigation space element, the geotechnical engineering design and detection and monitoring space element, the hydrogeological survey space element, the engineering hydro-meteorological survey space element and the engineering geophysical exploration space element, and {} represents a set of space elements.
[0109] Furthermore, in step 1, the boundary of the material acquisition stage is divided into a time boundary and a space boundary.
[0110] The time boundary of the material acquisition phase starts from the production of equipment and materials to the transportation of equipment and materials to the construction site. The time boundary model of the material acquisition phase is:
[0111] min{t 生产设备_启 ,t 材料生产制造_启}≤t 物料获取 ≤max{t 运输设备_终 ,t 运输材料_终}
[0112] In the formula, t 生产设备_启 is the starting time point of the production equipment in the material acquisition phase, t 材料生产制造_启 is the starting time of material production in the material acquisition phase, t 运输设备_终 is the end time point of equipment transportation to the construction site during the material acquisition phase, t 运输材料_终is the end time point of material transportation to the construction site in the material acquisition phase, t 物料获取 It is the time point of the material acquisition stage. min{} and max{} represent the minimum and maximum values of the elements in the collection respectively.
[0113] The spatial boundary of the material acquisition stage covers the raw material production, raw material transportation, manufacturing, and transportation of equipment and materials. For a certain batch of material acquisition processes, the spatial boundary model of the material acquisition stage is:
[0114]
[0115] In the formula, 物料获取 Represents the spatial set of material acquisition stages, They are the equipment and raw materials production space elements, material and raw materials production space elements, equipment and raw materials transportation space elements, material and raw materials transportation space elements, production equipment production and manufacturing space elements, material production and manufacturing space elements, production equipment transportation space elements and material transportation space elements in the material acquisition stage.
[0116] Furthermore, in step 1, the construction phase boundary is divided into a time boundary and a space boundary.
[0117] The time boundary of the construction phase is from the start of the project to the completion and acceptance of the project. The time boundary model of the construction phase is:
[0118] t 开工 ≤t 施工 ≤t 竣工
[0119] In the formula, t 开工 is the start time of the project in the construction phase, t 施工 is the time point of the construction phase, t 竣工 It is the time point for completion acceptance of the project during the construction phase.
[0120] The spatial boundary of the construction phase includes the transportation of machinery and equipment, sub-projects, measures and commissioning projects during the construction process. The spatial boundary model of the construction phase is:
[0121]
[0122] In the formula, 施工 Represents the debugging stage space collection, Ω 调试 They are the mechanical equipment transportation space elements, the sub-item engineering space elements, the measures space elements and the debugging engineering space elements in the construction phase.
[0123] Furthermore, in step 1, the boundaries of the operation and maintenance phase are divided into time boundaries and space boundaries.
[0124] The time boundary of the operation and maintenance phase is from the completion acceptance of the project to the demolition of the project. The time boundary model of the operation and maintenance phase is:
[0125] t 竣工 ≤t 运维 ≤t 拆除
[0126] In the formula, t 运维 is the time point of the operation and maintenance phase, t 拆除 This is the time point when the project was demolished.
[0127] The spatial boundary of the operation and maintenance stage includes line loss, sulfur hexafluoride emission (substation engineering), sub-projects and measures in the maintenance process, sub-projects and measures in the technical transformation project, building energy consumption, etc. The spatial boundary model of the operation and maintenance stage is:
[0128]
[0129] In the formula, 运维 represents the space set of operation and maintenance stages, Ω 线损 ,Ω 六氟化硫逸散 , Ω 建筑能耗 They are the line loss operation and maintenance space elements in the operation and maintenance stage, the sulfur hexafluoride emission (substation project) operation and maintenance space elements, the maintenance project sub-item operation and maintenance space elements, the maintenance project measures project operation and maintenance space elements, the technical transformation project sub-item operation and maintenance space elements, the technical transformation project measures project operation and maintenance space elements and the building energy consumption operation and maintenance space elements.
[0130] Furthermore, in step 1, the demolition phase boundary is divided into a time boundary and a space boundary.
[0131] The time boundary of the demolition and disposal phase is from the time the project is demolished to the time when the waste on site is recycled and disposed of. The time boundary model of the demolition phase is:
[0132] t 拆除 ≤t 拆除 ≤t 回收
[0133] In the formula, t 拆除 is the time point of the demolition phase, t 回收 Complete recycling point for on-site waste.
[0134] The spatial boundary of the demolition and disposal stage covers the sub-projects of the project demolition process, the transportation of on-site waste to recycling stations or disposal points, sulfur hexafluoride emission (power transformation project), and waste recycling and reuse. The spatial boundary model of the demolition stage is:
[0135]
[0136] In the formula, 拆除 represents the space set of operation and maintenance stages, Ω 回收再利用 They are the spatial elements of the sub-projects in the demolition phase, the spatial elements of transporting on-site waste to the recycling station, the spatial elements of transporting on-site waste to the disposal point, and the spatial elements of waste recycling and reuse.
[0137] Furthermore, in step 3, the priority principle for obtaining data is based on the data quality. The order of data acquisition is:
[0138] 1) Field data, actual measured values, and calculated values;
[0139] 2) Empirical emission data for the same process / equipment;
[0140] 3) Related database data;
[0141] 4) Estimated values from relevant literature and industry expert experience;
[0142] 5) Provincial data;
[0143] 6) Relevant data within the region;
[0144] 7) Domestic related data;
[0145] 8)Related foreign data.
[0146] Furthermore, in step 5, the carbon emission data of each emission source is calculated based on the stage-classified carbon emissions, including carbon emissions in the design stage, material acquisition stage, construction stage, operation and maintenance stage, and demolition and recycling stage.
[0147] Furthermore, in step 5, the carbon emissions in the design phase are the cumulative sum of the carbon emissions from the transportation of the survey equipment to and from the site and the energy consumption of the survey equipment.
[0148] E sj =E yS +E kC
[0149] In the formula, E sj E is the carbon emissions generated during the design phase (kg CO2e); ys Carbon emissions generated by transporting survey equipment during the design phase (kg CO2e); E kc Carbon emissions (kg CO2e) generated by energy consumption of survey equipment during the design phase.
[0150] The transportation methods of survey equipment include road transportation, rail transportation, water transportation, etc.
[0151]
[0152] In the formula, i is the type of transportation mode, j is the type of fuel; AD i,j The amount of fossil fuel type j burned in transport mode i is expressed in tons (t) for solid or liquid fuels and in 10,000 standard cubic meters (10 4 Nm 3 ) is the unit, EF i,j is the carbon emission factor of fossil fuel j.
[0153] On-site carbon emissions investigation includes the accumulation of carbon emissions generated by surveying, exploration, drilling, sampling, experimentation, testing, inspection, and monitoring operations.
[0154]
[0155] Where i is the type of survey project, E i is the consumption of the i-th energy (kg or 10 4 Nm 3 or kWh); EF i is the carbon emission factor of the ith energy source (kg CO2e / unit of measurement).
[0156] Furthermore, in step 5, the carbon emissions in the material acquisition stage are the cumulative sum of the carbon emissions from the production and transportation processes of all equipment, main materials, and building materials.
[0157]
[0158] In the formula, i is the material type, including equipment, main materials, and building materials; M i is the measurement unit of the i-th material (unit or kg or m 3 or other); M i F i is the carbon emission factor of the i-th material (kg CO2e / unit of measurement), the carbon footprint value of the equipment and main materials before leaving the factory; E wl It is the total carbon emissions during the material acquisition stage.
[0159] Carbon emissions from material transportation during the material acquisition phase:
[0160]
[0161] In the formula, AD is the carbon emission of material transportation in the material acquisition stage. i,j The amount of fossil fuel type j burned in transport mode i is expressed in tons (t) for solid or liquid fuels and in 10,000 standard cubic meters (10 4 Nm 3 ) is the unit, EFi,j is the carbon emission factor of fossil fuel j.
[0162] Furthermore, in step 5, the carbon emissions during the construction phase are the cumulative sum of the carbon emissions from the transportation of construction machinery and equipment, construction installation, and commissioning processes.
[0163] Carbon emissions during the construction phase:
[0164]
[0165] In the formula, is the total carbon emissions during the construction phase; Carbon emissions from the transportation of construction machinery and equipment (kg CO2e); E sg Carbon emissions generated by construction and installation (kg CO2e); It is the carbon emission (kg CO2e) generated during the engineering commissioning process.
[0166] Carbon emissions from transportation of construction machinery and equipment during the construction phase:
[0167]
[0168] In the formula, is the carbon emission of construction machinery and equipment transportation during the construction phase, i is the type of transportation mode, and j is the type of fuel; AD i,j The amount of fossil fuel type j burned in transport mode i is expressed in tons (t) for solid or liquid fuels and in 10,000 standard cubic meters (10 4 Nm 3 ) is the unit, EF i,j is the carbon emission factor of fossil fuel j.
[0169] Carbon emissions from construction and installation during the construction phase:
[0170]
[0171] In the formula, i is the type of sub-project or measure project; j is the type of construction machinery and equipment or small machine tools; SQ i CQ is the quantity of the i-th sub-item or measure project. The unit of measurement should be consistent with the bill of quantities. j Unit quantity of construction machinery and equipment or small equipment of the jth type (unit); EQ j EF is the energy consumption per unit shift of the jth type of construction machinery or small machine (kg or kWh); j is the carbon emission factor per unit of energy per shift of the jth type of construction machinery or small equipment (kgCO2e / unit of measurement); E kis the kth energy consumption from other sources at the construction site (kg or 10 4 Nm 3 or kWh); EF k is the carbon emission factor of the kth energy source (kgCO2e / unit of measurement).
[0172] The calculation method for commissioning carbon emissions during the construction phase is the same as that for construction and installation carbon emissions.
[0173] Furthermore, in step 5, the carbon emissions in the operation and maintenance stage are the accumulation of indirect carbon emissions corresponding to the operating losses of engineering equipment, sulfur hexafluoride emissions from engineering equipment (sulfur hexafluoride emissions generated during the maintenance of sulfur hexafluoride equipment), engineering maintenance, and engineering technology transformation carbon emissions.
[0174] Carbon emissions during the operation and maintenance phase:
[0175]
[0176] In the formula, E yw is the carbon emissions during the operation and maintenance phase; E ss Indirect carbon emissions corresponding to losses incurred in the operation of engineering equipment (kg CO2e); E is the sulfur hexafluoride emission from engineering equipment, expressed in carbon dioxide equivalent (kg CO2e); jx Carbon emissions generated by engineering maintenance (kg CO2e); E jg is the carbon emission of engineering technology transformation (kg CO2e).
[0177] Indirect carbon emissions corresponding to operating losses:
[0178] E ss =AD ss ×EF
[0179] In the formula, AD ss is the electricity loss during operation (kWh); EF is the national average electricity emission factor (kgCO2e / kWh).
[0180] The amount of electricity lost in transmission:
[0181] AD ss =EL sw +EL in -EL out
[0182] Where WL sw EL is the power plant grid-connected electricity (kWh); in Input electricity for power transmission and transformation projects (kWh); EL out Output electricity (kWh) for power transmission and transformation projects.
[0183] Sulfur hexafluoride emission from engineering equipment:
[0184]
[0185] Where i is the type of maintenance equipment; REP 容量,i is the sulfur hexafluoride capacity of the repaired equipment i, expressed as nameplate data (kg); REP 回收,i is the actual amount of sulfur hexafluoride recovered from the repaired equipment i (kg); is the global warming potential of sulfur hexafluoride.
[0186] Carbon emissions from maintenance during the operation and maintenance phase:
[0187]
[0188] In the formula, i is the type of sub-project or measure project; j is the type of construction machinery and equipment or small machine tools; E jx Carbon emissions from maintenance during the operation and maintenance phase; SQ i CQ is the quantity of the i-th sub-item or measure project. The unit of measurement should be consistent with the bill of quantities. j Unit quantity of construction machinery and equipment or small equipment of the jth type (unit); EQ j EF is the energy consumption per unit shift of the jth type of construction machinery or small machine (kg or kWh); j is the carbon emission factor per unit of energy per shift of the jth type of construction machinery or small equipment (kgCO2e / unit of measurement); E k is the kth energy consumption from other sources at the construction site (kg or 10 4 Nm 3 or kWh); EF k is the carbon emission factor of the kth energy source (kgCO2e / unit of measurement).
[0189] Carbon emissions from technical transformation during the operation and maintenance phase:
[0190]
[0191] In the formula, i is the type of sub-project or measure project; j is the type of construction machinery and equipment or small machine tools; E jg Carbon emissions from technical transformation during the operation and maintenance phase; SQ i CQ is the quantity of the i-th sub-item or measure project. The unit of measurement should be consistent with the bill of quantities. j Unit quantity of construction machinery and equipment or small equipment of the jth type (unit); EQ j EF is the energy consumption per unit shift of the jth type of construction machinery or small machine (kg or kWh); jis the carbon emission factor per unit of energy per shift of the jth type of construction machinery or small equipment (kgCO2e / unit of measurement); E k is the kth energy consumption from other sources at the construction site (kg or 10 4 Nm 3 or kWh); EF k is the carbon emission factor of the kth energy source (kgCO2e / unit of measurement).
[0192] Furthermore, in step 5, the carbon emissions during the demolition phase are the accumulation of engineering demolition, transportation of demolished materials, sulfur hexafluoride emissions, and carbon emission reductions from recycled materials.
[0193] The carbon emissions during the demolition phase are:
[0194]
[0195] In the formula, E cc Carbon emissions from engineering demolition (kg CO2e); E ccy Carbon emissions generated by the transportation of demolished materials (kg CO2e); Carbon emissions from dismantling and recycling sulfur hexafluoride equipment (kg CO2e); E hs is the carbon emission reduction of the recycled material (kg CO2e).
[0196] Carbon emissions from engineering demolition:
[0197]
[0198] In the formula, i is the type of sub-project or measure project; j is the type of construction machinery and equipment or small machine tools; E cc Carbon emissions from technical transformation during the operation and maintenance phase; SQ i CQ is the quantity of the i-th sub-item or measure project. The unit of measurement should be consistent with the bill of quantities. j Unit quantity of construction machinery and equipment or small equipment of the jth type (unit); EQ j EF is the energy consumption per unit shift of the jth type of construction machinery or small machine (kg or kWh); j is the carbon emission factor per unit of energy per shift of the jth type of construction machinery or small equipment (kgCO2e / unit of measurement); E k is the kth energy consumption from other sources at the construction site (kg or 10 4 Nm 3 or kWh); EF k is the carbon emission factor of the kth energy source (kgCO2e / unit of measurement).
[0199] Carbon emissions from transport of demolished materials:
[0200]
[0201] Where i is the type of demolition material, which can be divided into direct recycling materials, recyclable materials and waste; M cc,i Q i is the weight of the i-th demolition object (t); D 1,i is the transportation distance of the i-th type of demolition material, which is determined according to the location of the demolition site, the garbage sorting and processing plant, the recycling material production plant, and the waste disposal site (km); TF i is the carbon emission factor of the transport mode [kg CO2e / (t·km)].
[0202] The carbon reduction from recycling is the sum of the carbon reduction from directly recycled materials and the carbon reduction from renewable materials.
[0203] Carbon reduction from direct recycling:
[0204]
[0205] In the formula, is the carbon emission reduction of direct recycling; i is the type of direct recycled material; M hs,i , Q i is the weight of the ith type of directly recycled material (kg); M i F i is the carbon emission factor of the ith directly recycled material (kg CO2e / unit of measurement).
[0206] Carbon reduction from renewable materials:
[0207]
[0208] In the formula, is the carbon emission reduction of renewable materials; j is the type of renewable materials; M zs,j Q j is the weight of the jth renewable material (kg); hs,j is the recycling rate of the jth renewable material; hf,j is the recovery rate of the jth renewable material; M j F j is the carbon emission factor of the jth raw material (kg CO2e / unit of measurement).
[0209] Carbon emissions from waste disposal:
[0210]
[0211] Where i is the type of waste disposal; W i is the weight of waste disposed by the i-th waste disposal method (t); WF iis the carbon emission factor of the ith waste disposal method (kg CO2e / kg).
[0212] Furthermore, in step 6, the total carbon emissions of the project are summarized and calculated as the sum of the carbon emissions of the design stage, material acquisition stage, construction stage, operation and maintenance stage, and demolition and recycling stage.
[0213]
[0214] In the formula, E gc The total carbon emissions generated during the entire life cycle of the power transmission and transformation project (kg CO2e); E sj is the carbon emission in the investigation and design stage of power transmission and transformation engineering (kg CO2e); E wl Carbon emissions during the material acquisition phase for power transmission and transformation projects (kg CO2e); is the carbon emission during the construction phase of the power transmission and transformation project (kg CO2e); E yw E is the carbon emission during the operation and maintenance phase of the power transmission and transformation project (kgCO2e); cz Carbon emissions during the dismantling and recovery phase of power transmission and transformation projects (kg CO2e).
[0215] The beneficial effects described in the present invention are: 1) The present invention proposes a carbon emission accounting process for the life cycle of power system transmission and transformation projects; 2) The present invention proposes the accounting objects and accounting boundaries for the life cycle of power system transmission and transformation projects; 3) The present invention proposes the principle of the order of obtaining carbon emission data for the life cycle of power system transmission and transformation projects; 4) The present invention proposes a method for dividing the carbon emission accounting stages for the life cycle of power system transmission and transformation projects and summarizing the carbon emissions of the projects, which provides a reference for the carbon emission accounting of power system transmission and transformation projects under the current "dual carbon" goals.
[0216] Therefore, the present invention proposes a carbon emission accounting process for the life cycle of power system transmission and transformation projects; proposes the carbon emission accounting objects and accounting boundary requirements for the life cycle of power system transmission and transformation projects, and defines the carbon emission accounting boundaries from the time boundary and the space boundary; proposes the order principle for obtaining carbon emission data for the life cycle of power system transmission and transformation projects, and gives priority to collecting high-quality data to reduce uncertainty and improve the authority of data collection; proposes a carbon emission accounting stage division for the life cycle of power system transmission and transformation projects and a method for summarizing the carbon emissions of the projects, which provides a new method for selecting carbon emission sources for power system transmission and transformation projects, calculating carbon emissions at each stage, and summarizing the carbon emissions of the projects.
[0217] Exemplary Devices
[0218] Figure 3 Schematic diagram of a device for calculating carbon emissions during the life cycle of a power transmission and transformation project provided by an exemplary embodiment of the present invention. Figure 3As shown, the device 300 includes:
[0219] The first determination module 310 is used to specify the carbon emission accounting objects in the life cycle stage of the power transmission and transformation project, and determine the accounting boundary model of each carbon emission accounting object;
[0220] The second determination module 320 is used to determine the emission source and greenhouse gas type of each carbon emission accounting object according to the accounting boundary model;
[0221] A collection module 330 is used to collect activity data of each carbon emission accounting object according to emission sources and greenhouse gases;
[0222] The calculation module 340 is used to calculate the carbon emission data of each carbon emission accounting object according to the activity data of each carbon emission accounting object and the corresponding carbon emission factor;
[0223] The summarizing module 350 is used to summarize the total carbon emissions of the power transmission and transformation project according to the carbon emission data of each carbon emission accounting object.
[0224] Optionally, the carbon emission accounting objects in the declaration period of the power transmission and transformation project specified in the first determination module 310 include:
[0225] Divide different activities within each phase of the power transmission and transformation project life cycle;
[0226] The carbon emission accounting objects are determined based on the impact of different activities on the carbon emissions of power transmission and transformation projects and the independence of the activities.
[0227] Optionally, the carbon emission accounting objects include the design stage, material stage, construction stage, operation and maintenance stage, and demolition and recycling stage.
[0228] Optionally, the accounting boundary models of each carbon emission accounting object include: design phase time boundary model, design phase space boundary model, material acquisition phase time boundary model, material acquisition phase space boundary model, construction phase time boundary model, construction phase space boundary model, operation and maintenance phase time boundary model, operation and maintenance phase space boundary model, demolition phase time boundary model, demolition phase space boundary model.
[0229] Optionally, the design phase time boundary model is:
[0230] t 研究_启 ≤t 设计 ≤t 施工图_终
[0231] In the formula, t 研究_启 is the starting time point of the feasibility study in the design phase, t 设计 is the time point of the design phase, t 施工图_终 It is the end time point of construction drawing design in the design phase;
[0232] The spatial boundary model in the design phase is:
[0233]
[0234] In the formula, 设计 represents the set of design phase spaces, They are respectively the survey equipment to-and-from site transportation space element in the design phase, the instrument to-and-from site transportation space element, the engineering measurement space element, the geotechnical engineering investigation space element, the geotechnical engineering design and detection and monitoring space element, the hydrogeological survey space element, the engineering hydro-meteorological survey space element and the engineering geophysical exploration space element, and {} represents a set of space elements.
[0235] Optionally, the time boundary model of the material acquisition stage is:
[0236] min{t 生产设备_启 ,t 材料生产制造_启}≤t 物料获取 ≤max{t 运输设备_终 ,t 运输材料_终}
[0237] In the formula, t 生产设备_启 is the starting time point of the production equipment in the material acquisition phase, t 材料生产制造_启 is the starting time of material production in the material acquisition phase, t 运输设备_终 is the end time point of equipment transportation to the construction site during the material acquisition phase, t 运输材料_终 is the end time point of material transportation to the construction site in the material acquisition phase, t 物料获取 is the time point of the material acquisition stage, min{} and max{} represent the minimum and maximum values of the elements in the collection respectively;
[0238] The spatial boundary model of the material acquisition stage is:
[0239]
[0240] In the formula, 物料获取 Represents the spatial set of material acquisition stages, They are the equipment and raw materials production space elements, material and raw materials production space elements, equipment and raw materials transportation space elements, material and raw materials transportation space elements, production equipment production and manufacturing space elements, material production and manufacturing space elements, production equipment transportation space elements and material transportation space elements in the material acquisition stage.
[0241] Optionally, the construction phase time boundary model is:
[0242] t 开工 ≤t施工 ≤t 竣工
[0243] In the formula, t 开工 is the start time of the project in the construction phase, t 施工 is the time point of the construction phase, t 竣工 The time point for project completion acceptance during the construction phase;
[0244] The spatial boundary model during the construction phase is:
[0245]
[0246] In the formula, 施工 Represents the debugging stage space collection, Ω 调试 They are the mechanical equipment transportation space elements, the sub-item engineering space elements, the measures space elements and the debugging engineering space elements in the construction phase.
[0247] Optionally, the time boundary model of the operation and maintenance phase is:
[0248] t 竣工 ≤t 运维 ≤t 拆除
[0249] In the formula, t 运维 is the time point of the operation and maintenance phase, t 拆除 The time when the project was demolished;
[0250] The spatial boundary model in the operation and maintenance phase is:
[0251]
[0252] In the formula, 运维 represents the space set of operation and maintenance stages, Ω 线损 ,Ω 六氟化硫逸散 , Ω 建筑能耗 They are the line loss operation and maintenance space elements in the operation and maintenance stage, the sulfur hexafluoride emission (substation project) operation and maintenance space elements, the maintenance project sub-item operation and maintenance space elements, the maintenance project measures project operation and maintenance space elements, the technical transformation project sub-item operation and maintenance space elements, the technical transformation project measures project operation and maintenance space elements and the building energy consumption operation and maintenance space elements.
[0253] Optionally, the demolition phase time boundary model is:
[0254] t 拆除 ≤t 拆除 ≤t 回收
[0255] In the formula, t 拆除is the time point of the demolition phase, t 回收 completion point for recycling of on-site waste;
[0256] The spatial boundary model of the demolition stage is:
[0257]
[0258] In the formula, 拆除 represents the space set of operation and maintenance stages, They are the spatial elements of the sub-projects in the demolition phase, the spatial elements of transporting on-site waste to the recycling station, the spatial elements of transporting on-site waste to the disposal point, and the spatial elements of waste recycling and reuse.
[0259] Optionally, the collection module 330 includes:
[0260] According to the emission sources and greenhouse gases, the activity data of each carbon emission accounting object are collected according to the preset priority principle, where the priority principle is: field data, actual measurement values, calculated values; empirical emission data of the same process / equipment; relevant database data; relevant literature, estimated values from the experience of experts in the industry; relevant data within the province; relevant data within the region; domestic relevant data; and foreign relevant data.
[0261] Optionally, the carbon emission data of each carbon emission accounting object includes:
[0262] Carbon emissions during the design phase include the cumulative carbon emissions from the transportation of survey equipment to and from the site and the energy consumption of survey equipment during on-site exploration. The transportation of survey equipment to and from the site includes road transportation, rail transportation, and water transportation. On-site exploration carbon emissions include the cumulative carbon emissions generated by mapping, exploration, drilling, sampling, experimentation, testing, inspection, and monitoring operations:
[0263] Carbon emissions during the material acquisition phase include the cumulative carbon emissions from the production and transportation of all equipment, main materials, and building materials;
[0264] Carbon emissions during the construction phase include the cumulative carbon emissions from the transportation of construction machinery and equipment, construction installation, and commissioning;
[0265] Carbon emissions during the operation and maintenance phase include indirect carbon emissions corresponding to the operation loss of engineering equipment, sulfur hexafluoride emissions from engineering equipment, engineering maintenance, and the accumulation of carbon emissions from engineering technology transformation;
[0266] Carbon emissions during the demolition phase include the accumulation of engineering demolition, transportation of demolished materials, sulfur hexafluoride emissions, and carbon emission reductions from recycled materials.
[0267] Exemplary Electronic Devices
[0268] Figure 4This is a structure of an electronic device provided by an exemplary embodiment of the present invention. Figure 4 As shown, the electronic device 40 includes one or more processors 41 and a memory 42 .
[0269] The processor 41 may be a central processing unit (CPU) or other forms of processing units having data processing capabilities and / or instruction execution capabilities, and may control other components in the electronic device to perform desired functions.
[0270] The memory 42 may include one or more computer program products, which may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 41 may run the program instructions to implement the methods of the software programs of the various embodiments of the present invention described above and / or other desired functions. In one example, the electronic device may also include: an input device 43 and an output device 44, which are interconnected via a bus system and / or other forms of connection mechanisms (not shown).
[0271] In addition, the input device 43 may also include, for example, a keyboard, a mouse, etc.
[0272] The output device 44 can output various information to the outside, and can include, for example, a display, a speaker, a printer, a communication network and a remote output device connected thereto.
[0273] Of course, to simplify, Figure 4 Only some of the components related to the present invention in the electronic device are shown, and components such as a bus, an input / output interface, etc. are omitted. In addition, the electronic device may further include any other appropriate components according to specific application conditions.
[0274] Exemplary computer program products and computer-readable storage media
[0275] In addition to the above-mentioned methods and devices, an embodiment of the present invention may also be a computer program product, which includes computer program instructions, which, when executed by a processor, enable the processor to execute the steps of the method according to various embodiments of the present invention described in the above-mentioned "Exemplary Method" section of this specification.
[0276] The computer program product may be written in any combination of one or more programming languages to write program code for performing the operations of the embodiments of the present invention, including object-oriented programming languages such as Java, C++, etc., and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.
[0277] In addition, an embodiment of the present invention may also be a computer-readable storage medium having computer program instructions stored thereon, which, when executed by a processor, enable the processor to execute the steps of the method according to various embodiments of the present invention described in the above “Exemplary Method” section of this specification.
[0278] The computer readable storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, system or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0279] The basic principle of the present invention is described above in conjunction with specific embodiments. However, it should be pointed out that the advantages, strengths, effects, etc. mentioned in the present invention are only examples and not limitations, and it cannot be considered that these advantages, strengths, effects, etc. must be possessed by each embodiment of the present invention. In addition, the specific details disclosed above are only for the purpose of illustration and facilitation of understanding, rather than limitation, and the above details do not limit the present invention to being implemented by adopting the above specific details.
[0280] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the system embodiment, since it basically corresponds to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.
[0281] The block diagrams of the devices, systems, equipment, and systems involved in the present invention are only illustrative examples and are not intended to require or imply that they must be connected, arranged, and configured in the manner shown in the block diagram. As will be appreciated by those skilled in the art, these devices, systems, equipment, and systems can be connected, arranged, and configured in any manner. Words such as "including", "comprising", "having", etc. are open words, referring to "including but not limited to", and can be used interchangeably with them. The words "or" and "and" used here refer to the words "and / or" and can be used interchangeably with them, unless the context clearly indicates otherwise. The word "such as" used here refers to the phrase "such as but not limited to", and can be used interchangeably with it.
[0282] The method and system of the present invention may be implemented in many ways. For example, the method and system of the present invention may be implemented by software, hardware, firmware or any combination of software, hardware, firmware. The above order of steps for the method is only for illustration, and the steps of the method of the present invention are not limited to the order specifically described above, unless otherwise specifically stated. In addition, in some embodiments, the present invention may also be implemented as a program recorded in a recording medium, which includes machine-readable instructions for implementing the method according to the present invention. Thus, the present invention also covers a recording medium storing a program for executing the method according to the present invention.
[0283] It should also be noted that in the system, device and method of the present invention, each component or each step can be decomposed and / or recombined. These decompositions and / or recombinations should be regarded as equivalent schemes of the present invention. The above description of the disclosed aspects is provided to enable any technician in the field to make or use the present invention. Various modifications to these aspects are very obvious to those skilled in the art, and the general principles defined here can be applied to other aspects without departing from the scope of the present invention. Therefore, the present invention is not intended to be limited to the aspects shown here, but in accordance with the widest range consistent with the principles and novel features disclosed here.
[0284] The above description has been given for the purpose of illustration and description. In addition, this description is not intended to limit the embodiments of the present invention to the forms disclosed herein. Although a number of example aspects and embodiments have been discussed above, those skilled in the art will recognize certain variations, modifications, changes, additions and sub-combinations thereof.
Claims
1. A method for calculating carbon emissions during the life cycle of a power transmission and transformation project, characterized in that: include: Specify the carbon emission accounting objects in the life cycle of power transmission and transformation projects, and determine the accounting boundary model for each carbon emission accounting object; Determine the emission sources and greenhouse gas types of each carbon emission accounting object according to the accounting boundary model; Collecting activity data of each carbon emission accounting object according to the emission source and the greenhouse gas; Calculate the carbon emission data of each carbon emission accounting object according to the activity data of each carbon emission accounting object and the corresponding carbon emission factor; The total carbon emissions of the power transmission and transformation project are summarized according to the carbon emission data of each carbon emission accounting object.
2. The method according to claim 1, characterized in that The carbon emission accounting objects in the declaration cycle of the designated power transmission and transformation project include: Divide different activities within each phase of the power transmission and transformation project life cycle; The carbon emission accounting object is determined based on the impact of different activities on the carbon emissions of power transmission and transformation projects and the independence between the activities.
3. The method according to claim 2, characterized in that The carbon emission accounting objects include the design stage, material stage, construction stage, operation and maintenance stage, and demolition and recycling stage.
4. The method according to claim 3, characterized in that: The accounting boundary models of each carbon emission accounting object include: time boundary model of the design stage, space boundary model of the design stage, time boundary model of the material acquisition stage, space boundary model of the material acquisition stage, time boundary model of the construction stage, space boundary model of the construction stage, time boundary model of the operation and maintenance stage, space boundary model of the operation and maintenance stage, time boundary model of the demolition stage, and space boundary model of the demolition stage.
5. The method according to claim 4, characterized in that The time boundary model of the design phase is: t 研究_启 ≤t 设计 ≤t 施工图_终 Where, t 研究_启 is the starting time point of the feasibility study in the design phase, t 设计 is the time point of the design phase, t 施工图_终 It is the end time point of construction drawing design in the design phase; The spatial boundary model in the design phase is: In the formula, 设计 represents the set of design phase spaces, They are respectively the survey equipment to-and-from site transportation space element in the design phase, the instrument to-and-from site transportation space element, the engineering measurement space element, the geotechnical engineering investigation space element, the geotechnical engineering design and detection and monitoring space element, the hydrogeological survey space element, the engineering hydro-meteorological survey space element and the engineering geophysical exploration space element, and {} represents a set of space elements.
6. The method according to claim 4, characterized in that The time boundary model of the material acquisition stage is: min{t 生产设备_启 ,t 材料生产制造_启 }≤t 物料获取 ≤max{t 运输设备_终 ,t 运输材料_终 } Where, t 生产设备_启 is the starting time point of the production equipment in the material acquisition phase, t 材料生产制造_启 is the starting time of material production in the material acquisition phase, t 运输设备_终 is the end time point of equipment transportation to the construction site during the material acquisition phase, t 运输材料_终 is the end time point of material transportation to the construction site in the material acquisition phase, t 物料获取 is the time point of the material acquisition stage, min{} and max{} represent the minimum and maximum values of the elements in the collection respectively; The spatial boundary model of the material acquisition stage is: In the formula, 物料获取 Represents the spatial set of material acquisition stages, They are the equipment and raw materials production space elements, material and raw materials production space elements, equipment and raw materials transportation space elements, material and raw materials transportation space elements, production equipment production and manufacturing space elements, material production and manufacturing space elements, production equipment transportation space elements and material transportation space elements in the material acquisition stage.
7. The method according to claim 4, characterized in that The time boundary model of the construction phase is: t 开工 ≤t 施工 ≤t 竣工 Where, t 开工 is the start time of the project in the construction phase, t 施 工 is the time point of the construction phase, t 竣 工 The time point for project completion acceptance during the construction phase; The spatial boundary model of the construction phase is: In the formula, 施工 Represents the debugging stage space collection, Ω 调试 They are the mechanical equipment transportation space elements, the sub-item engineering space elements, the measures space elements and the debugging engineering space elements in the construction phase.
8. The method according to claim 4, characterized in that The time boundary model of the operation and maintenance phase is: t 竣工 ≤t 运维 ≤t 拆除 Where, t 运 维 is the time point of the operation and maintenance phase, t 拆除 The time when the project was demolished; The spatial boundary model of the operation and maintenance stage is: In the formula, 运维 represents the space set of operation and maintenance stages, Ω 线损 ,Ω 六氟化硫逸散 , Ω 建筑能耗 They are the line loss operation and maintenance space elements in the operation and maintenance stage, the sulfur hexafluoride emission (substation project) operation and maintenance space elements, the maintenance project sub-item operation and maintenance space elements, the maintenance project measures project operation and maintenance space elements, the technical transformation project sub-item operation and maintenance space elements, the technical transformation project measures project operation and maintenance space elements and the building energy consumption operation and maintenance space elements.
9. The method according to claim 4, characterized in that The time boundary model of the demolition phase is: t 拆除 ≤t 拆除 ≤t 回收 Where, t 拆除 is the time point of the demolition phase, t 回收 Complete recycling time points for on-site waste; The spatial boundary model of the demolition stage is: In the formula, 拆除 represents the space set of operation and maintenance stages, Ω 回收再利用 They are the spatial elements of the sub-projects in the demolition phase, the spatial elements of transporting on-site waste to the recycling station, the spatial elements of transporting on-site waste to the disposal point, and the spatial elements of waste recycling and reuse.
10. The method according to claim 1, characterized in that According to the emission sources and the greenhouse gases, activity data of each carbon emission accounting object is collected, including: According to the emission sources and the greenhouse gases, the activity data of each carbon emission accounting object is collected according to the preset priority principle, wherein the priority principle is: field data, actual measurement values, calculated values; empirical emission data of the same process / equipment; relevant database data; relevant literature, estimated values of industry expert experience; relevant data within the province; relevant data within the region; domestic relevant data; foreign relevant data.
11. The method according to claim 3, characterized in that The carbon emission data of each carbon emission accounting object includes: Carbon emissions during the design phase include the cumulative carbon emissions from the transportation of survey equipment to and from the site and the energy consumption of survey equipment during on-site surveys. The transportation of survey equipment to and from the site includes road transportation, rail transportation, and water transportation. On-site survey carbon emissions include the cumulative carbon emissions generated by surveying, exploration, drilling, sampling, experimentation, testing, inspection, and monitoring operations: Carbon emissions during the material acquisition phase include the cumulative carbon emissions from the production and transportation of all equipment, main materials, and building materials; Carbon emissions during the construction phase include the cumulative carbon emissions from the transportation of construction machinery and equipment, construction installation, and commissioning; Carbon emissions during the operation and maintenance phase include indirect carbon emissions corresponding to the operation loss of engineering equipment, sulfur hexafluoride emissions from engineering equipment, engineering maintenance, and the accumulation of carbon emissions from engineering technology transformation; Carbon emissions during the demolition phase include the accumulation of engineering demolition, transportation of demolished materials, sulfur hexafluoride emissions, and carbon emission reductions from recycled materials.
12. A device for calculating carbon emissions during the life cycle of a power transmission and transformation project, characterized in that: include: The first determination module is used to specify the carbon emission accounting objects in the life cycle stage of the power transmission and transformation project and determine the accounting boundary model of each carbon emission accounting object; A second determination module is used to determine the emission source and greenhouse gas type of each carbon emission accounting object according to the accounting boundary model; A collection module, used to collect activity data of each carbon emission accounting object according to the emission source and the greenhouse gas; An accounting module, used to calculate the carbon emission data of each carbon emission accounting object according to the activity data of each carbon emission accounting object and the corresponding carbon emission factor; The summary module is used to summarize the total carbon emissions of the power transmission and transformation project according to the carbon emission data of each carbon emission accounting object.
13. A computer-readable storage medium, characterized in that: The storage medium stores a computer program, and the computer program is used to execute the method according to any one of claims 1 to 11.
14. An electronic device, characterized in that: The electronic device comprises: processor; a memory for storing instructions executable by the processor; The processor is used to read the executable instructions from the memory and execute the instructions to implement the method described in any one of claims 1-11.