An ultraviolet light-curing pipeline repair vehicle

By adopting pull-out cabinets and adjustable main frame structures in UV cured pipeline repair vehicles, the problem of small cabin space is solved, convenient access to equipment and space optimization are achieved, and repair efficiency is improved.

CN119389098BActive Publication Date: 2025-07-25ZHANGZHOU ANYUE ADVANCED MATERIALS TECH CO LTD

Patent Information

Application Number
CN202510000372.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2025-07-25
Estimated Expiration
2045-01-02

AI Technical Summary

Technical Problem

The existing ultraviolet curing pipeline repair vehicles have a small compartment space, which affects staff’s access to light curing repair equipment, especially large equipment, and extends the repair time.

Method used

A UV curing pipeline repair vehicle is designed, which adopts a pull-out cabinet structure in the storage rack. The pull-out cabinet is slidably connected along the length of the car. Combined with an adjustable main frame and support plate frame, it provides a variety of ways to remove and increase the space for movement.

Benefits of technology

It improves the convenience of staff to obtain optical curing and repair equipment, reduces equipment access time, and optimizes the use of internal space of the car.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119389098B_ABST
    Figure CN119389098B_ABST
Patent Text Reader

Abstract

The present application relates to an ultraviolet-curing pipeline repair vehicle, which relates to the technical field of pipeline repair equipment. The ultraviolet-curing pipeline repair vehicle includes a vehicle body, a carriage, a generator set, a control cabinet and a storage rack. The carriage is arranged on the vehicle body, and the generator set, the control cabinet and the storage rack are all arranged in the carriage. A plurality of drawer cabinets are arranged in the storage rack, and the drawer cabinets store ultraviolet-curing repair equipment. The plurality of drawer cabinets are sequentially arranged at intervals in the vertical direction. The drawer cabinets are in plug-in fit with the storage rack, and the drawer cabinets are slidably connected to the storage rack along the length direction of the carriage. In the present application, the drawer cabinets can be pulled out of the storage rack along the length direction of the carriage. Then, after the carriage is opened, the drawer cabinets can be taken out outside the carriage, and thus the corresponding ultraviolet-curing repair equipment can be taken out outside the carriage. This can reduce the requirements for the internal space of the carriage for storing, taking out and loading the ultraviolet-curing repair equipment, and is convenient for the staff to take the ultraviolet-curing repair equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipeline repair equipment, and in particular to an ultraviolet light curing pipeline repair vehicle. Background Art

[0002] An ultraviolet light curing pipeline repair vehicle is a vehicle equipped with an ultraviolet light curing pipeline repair system, mainly used for trenchless repair of pipelines.

[0003] Currently, common ultraviolet light curing pipeline repair vehicles mainly include a vehicle body, a carriage, a light curing repair device, a generator set, and a control cabinet. The carriage is arranged on the vehicle body, and both the generator set and the control cabinet are installed in the carriage. At least a blower, an industrial computer, an industrial display screen, and a cable reel are arranged in the control cabinet. The light curing repair device includes pipeline repair materials, a UV lamp holder, and a plug. The pipeline repair materials, the UV lamp holder, and the plug are all placed in the carriage.

[0004] Since the light curing repair device needs to be placed in the carriage, and in order to ensure the stability of the light curing repair device during the driving of the vehicle, multiple cabinets are often installed in the existing carriage, and various light curing repair devices are placed in the corresponding cabinets.

[0005] After installing the control cabinet and various cabinets in the carriage, the remaining space in the carriage is relatively narrow, which results in a small activity space for the staff. During the process of pipeline repair, the narrow activity space will affect the movement range of the staff, making it inconvenient for the staff to take various light curing repair devices. Especially when the size of the light curing repair device is large, the staff needs to spend a long time carefully taking out the light curing repair device, which will prolong the time required for pipeline repair. Summary of the Invention

[0006] The purpose of the present application is to provide an ultraviolet light curing pipeline repair vehicle, the purpose of which is to improve the carriage structure, increase the activity space of the staff, and facilitate the staff to take the light curing repair device.

[0007] The ultraviolet light curing pipeline repair vehicle provided by the present application adopts the following technical solutions:

[0008] An ultraviolet light curing pipeline repair vehicle includes a vehicle body, a carriage, a generator set, a control cabinet, and a storage rack. The carriage is arranged on the vehicle body, and the generator set, the control cabinet, and the storage rack are all arranged in the carriage. A plurality of drawer cabinets are arranged in the storage rack, and light curing repair devices are stored in the drawer cabinets. The plurality of drawer cabinets are sequentially arranged at intervals in the vertical direction. The drawer cabinets are inserted and matched with the storage rack, and the drawer cabinets are slidably connected with the storage rack along the length direction of the carriage.

[0009] By adopting the above technical solution, the cooperation setting of the vehicle body, the carriage, the generator set, the control cabinet, the storage rack and the light-curing repair equipment stored in the storage rack can perform ultraviolet light-curing pipeline repair operations, thereby meeting the functions of the ultraviolet light-curing pipeline repair vehicle.

[0010] Since a plurality of drawer cabinets are arranged in the storage rack, the light-curing repair equipment is stored in the drawer cabinets, and the drawer cabinets are slidably connected to the storage rack along the length direction of the carriage, the drawer cabinets can be taken out of the storage rack by pulling, and thus the corresponding light-curing repair equipment can be taken out of the storage rack.

[0011] Since the drawer cabinets can be pulled out along the length direction of the carriage, after the carriage is opened, the drawer cabinets can be taken out outside the carriage, and thus the corresponding light-curing repair equipment can be taken out outside the carriage, which can reduce the requirements for the internal space of the carriage for taking out and loading the light-curing repair equipment and facilitate the staff to take the light-curing repair equipment.

[0012] Optionally, the storage rack includes a main rack, the main rack is vertically arranged, the main rack is connected to the carriage, a plurality of support plate racks are arranged in the main rack, the plurality of support plate racks are sequentially spaced along the vertical direction, the support plate racks are slidably connected to the main rack along the length direction of the carriage, the support plate racks are arranged in one-to-one correspondence with the drawer cabinets, and the drawer cabinets are all arranged on the corresponding support plate racks.

[0013] By adopting the above technical solution, the storage rack can support and install the drawer cabinets through the cooperation setting of the main rack and a plurality of support plate racks. Since the support plate racks are connected to the corresponding drawer cabinets and the support plate racks are slidably connected to the main rack, when the corresponding drawer cabinets are pulled, the corresponding support plates slide out of the main rack, which can improve the stability of the drawer cabinets when sliding.

[0014] Optionally, the main rack includes a first vertical rack and a second vertical rack, the second vertical rack is connected to the inner wall of the carriage, the first vertical rack and the second vertical rack are arranged in parallel at intervals along the width direction of the carriage, and the first vertical rack is slidably connected to the inner wall of the carriage along the width direction of the carriage; the support plate rack includes a first long rod and a second long rod, the length direction of the first long rod is arranged along the length direction of the carriage, the first long rod and the second long rod are arranged in parallel, the first long rod is slidably connected to the first vertical rack along its own length direction, the second long rod is slidably connected to the second vertical rack along its own length direction, the drawer cabinet is arranged on the upper sides of the corresponding first long rod and the second long rod, and the drawer cabinet is connected to the first long rod and the second long rod.

[0015] By adopting the above technical solution, the main frame is arranged through the cooperation of the first vertical frame and the second vertical frame. Since the second vertical frame is connected to the inner wall of the carriage, the first vertical frame is slidably connected to the inner wall of the carriage, and the first vertical frame and the second vertical frame are arranged at intervals in the width direction of the carriage, it is possible to slide the first vertical frame to adjust the distance between the first vertical frame and the second vertical frame, thereby changing the width of the main frame.

[0016] The supporting half-frame is arranged through the cooperation of the first long rod and the second long rod. The first long rod is arranged on the first vertical frame, and the second long rod is arranged on the second vertical frame. This makes the first long rod and the second long rod arranged in parallel at intervals, so that the support plate frame will not affect the sliding adjustment of the first vertical frame. The first long rod is slidably connected to the first vertical frame, and the second long rod is slidably connected to the second vertical frame. This ensures the sliding connection between the support plate frame and the main frame and ensures the normal use of the drawer cabinet.

[0017] Therefore, according to the size of the light-curing repair equipment to be used, a drawer cabinet of the corresponding size is selected, and then the width of the main frame is adjusted so that the width of the main frame meets the installation requirements of the drawer cabinet of the corresponding size. This can also reduce the size of the storage rack as much as possible, and further improve the activity space of the staff in the carriage.

[0018] Optionally, a plurality of sliding wheels are arranged on the lower side of the first vertical frame.

[0019] By adopting the above technical solution, the arrangement of the sliding wheels facilitates manually pushing the first vertical frame, and thus facilitates adjusting the width of the main frame.

[0020] Optionally, the support plate frame is slidably connected to the main frame in the vertical direction, and a lifting locking member is arranged between the support plate frame and the main frame. The lifting locking member is used to lock the support plate frame and the main frame.

[0021] By adopting the above technical solution, since the support plate frame is slidably connected to the main frame in the vertical direction, and a lifting locking member is arranged between the support plate frame and the main frame, it is possible to adjust and fix the position of the support plate frame in the vertical direction, adjust the distance between two adjacent support plate frames, and thus adapt to drawer cabinets of different heights.

[0022] Optionally, the lifting locking member includes a lifting sleeve and a positioning vertical plate. The lifting sleeve is connected to the corresponding support plate frame. The positioning vertical plate is vertically arranged on the main frame. The lifting sleeve is sleeved on the positioning vertical plate and is slidably connected to the positioning vertical plate in the vertical direction. A plurality of positioning holes are formed in the positioning vertical plate, and the plurality of positioning holes are arranged at intervals in the vertical direction. A positioning rod is arranged in the lifting sleeve. One end of the positioning rod is inserted and matched with one of the positioning holes, and the positioning rod is slidably connected to the inner side wall of the corresponding positioning hole along its own length direction. A locking driving member for driving the positioning rod to move along its own length direction is arranged in the lifting sleeve.

[0023] By adopting the above technical solution, the lifting locking member is arranged by the cooperation of the lifting sleeve and the positioning vertical plate. The lifting sleeve is connected to the corresponding support plate frame, the positioning vertical plate is vertically arranged on the main frame, and the lifting sleeve is slidably connected to the positioning vertical plate, so that the support plate frame can be slidably connected to the main frame in the vertical direction.

[0024] On this basis, the positioning rod, the locking driving member in the lifting sleeve and the positioning holes on the positioning vertical plate are arranged. After the lifting sleeve slides on the positioning vertical plate, the locking driving member drives the positioning rod to insert into the corresponding positioning hole. At this time, the positioning rod can lock the positioning vertical plate and the lifting sleeve in the vertical direction, and then can lock the position of the corresponding support plate frame in the vertical direction, which meets the function of the lifting locking member.

[0025] Optionally, an installation plate frame is arranged on the support plate frame. The installation plate frame is slidably connected to the support plate frame along the width direction of the carriage. The drawer is arranged on the corresponding installation plate frame.

[0026] By adopting the above technical solution, an installation plate frame is arranged between the support plate frame and the drawer, and the installation plate frame is slidably connected to the support plate frame along the width direction of the carriage, so that the drawer can be pulled out from the corresponding support plate frame along the width direction of the carriage. This enables the drawer to have two ways of taking out and installing. The first is to pull out from the main frame along the length direction of the carriage, and the second is to pull out from the corresponding support plate frame along the width direction of the carriage, which can improve the convenience of installing and taking out the drawer, and further improve the convenience of taking out and installing the light curing repair device into the corresponding drawer.

[0027] Optionally, auxiliary slide rails are arranged at the bottom of the installation plate frame. The length direction of the auxiliary slide rails is arranged along the width direction of the carriage. A plurality of auxiliary slide platforms are arranged on the support plate frame. The auxiliary slide platforms are slidably connected to the auxiliary slide rails.

[0028] By adopting the above technical scheme, the cooperation between the auxiliary slide rail and the auxiliary slide table can improve the sliding stability between the mounting plate frame and the corresponding supporting plate frame, while ensuring that when the pull-out cabinet is pulled out along the length direction of the carriage, the pull-out cabinet, the mounting plate frame and the supporting plate frame can be pulled out synchronously, thereby improving the stability of the pull-out cabinet.

[0029] Optionally, outlets are provided on one side and the upper side in the length direction of the pull-out cabinet, and a closing cover is provided on the pull-out cabinet. The closing cover is provided in one-to-one correspondence with the outlets, and the closing cover closes the corresponding outlets, and the closing cover is rotatably connected to the pull-out cabinet.

[0030] By adopting the above technical solution, the outlet on the drawer cabinet cooperates with the closing cover, which ensures that the light-curing repair equipment can be taken out of or loaded into the corresponding drawer cabinet. Since the outlet can be opened on one side or / and the upper side of the drawer cabinet in the length direction according to actual needs, the drawer cabinet corresponding to the outlet position can be selected according to actual needs, thereby facilitating the loading and unloading of the light-curing repair equipment.

[0031] Optionally, a plurality of separation partitions are arranged in the pull-out cabinet, and the plurality of separation partitions are arranged in sequence and spaced apart along the length direction of the pull-out cabinet, and the separation partitions are detachably connected to the pull-out cabinet.

[0032] By adopting the above technical solution and setting up separation partitions, the pull-out cabinet is divided into several independent spaces. Therefore, when multiple photocuring repair devices are loaded in the same pull-out cabinet, the separation partitions can separate two photocuring repair devices, which can prevent the two photocuring repair devices from being damaged by collision during transportation.

[0033] In summary, the present application includes at least one of the following beneficial technical effects:

[0034] 1. The present application adopts the coordinated arrangement of a pull-out cabinet and a storage rack, so that the pull-out cabinet can be pulled out from the storage rack along the length direction of the carriage, and then after the carriage is opened, the pull-out cabinet can be taken out outside the carriage, and the corresponding light-curing repair equipment can also be taken out outside the carriage, which can reduce the requirements for the internal space of the carriage for taking out and loading the light-curing repair equipment, making it easier for staff to take the light-curing repair equipment.

[0035] 2. The present application makes the width of the storage rack adjustable through the structural setting of the main frame in the storage rack, which can adjust the size of the storage rack so that the storage rack can be installed with pull-out cabinets of different sizes. This can reduce the waste of space in the storage rack, reduce the size of the storage rack as much as possible, and increase the activity space for the staff in the car.

[0036] 3. Through the structural arrangement of the inner support plate rack and the main rack of the storage rack in this application, the support plate rack can be freely adjusted in the vertical direction, and thus can be adapted to pull-out cabinets of different heights.

[0037] 4. Through the structural arrangement of the installation plate rack inside the storage rack in this application, the pull-out cabinet can be pulled out from the storage rack along the width direction of the carriage. Furthermore, the pull-out cabinet has two different pulling methods, which can improve the convenience of installing and removing the pull-out cabinet, and thus improve the convenience of taking out and installing the light-curing repair equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 is the overall structural schematic diagram of the ultraviolet light-curing pipeline repair vehicle according to Embodiment 1 of this application.

[0039] Figure 2 is the sectional structural schematic diagram of the carriage according to Embodiment 1 of this application.

[0040] Figure 3 is the internal structural schematic diagram of the carriage according to Embodiment 1 of this application.

[0041] Figure 4 is the overall structural schematic diagram of the storage rack and the pull-out cabinet according to Embodiment 1 of this application.

[0042] Figure 5 is Figure 4 the partial enlarged structural schematic diagram of Part A in

[0043] Figure 6 is the overall structural schematic diagram of the support plate rack and the lifting rack according to Embodiment 1 of this application.

[0044] Figure 7 is the overall structural schematic diagram of the lifting sleeve tube according to Embodiment 1 of this application.

[0045] Figure 8 is the sectional structural schematic diagram of the lifting sleeve tube according to Embodiment 1 of this application.

[0046] Figure 9 is the sectional structural schematic diagram of the lifting sleeve tube at another position according to Embodiment 1 of this application.

[0047] Figure 10 is the overall structural schematic diagram of the support plate rack, the lifting rack, the installation plate rack and the pull-out cabinet according to Embodiment 1 of this application.

[0048] Figure 11 is the overall structural schematic diagram of the pull-out cabinet according to Embodiment 2 of this application.

[0049] Figure 12 is the internal structural schematic diagram of the pull-out cabinet according to Embodiment 2 of this application.

[0050] In the figure, 1 is the vehicle body; 11 is the vehicle head; 12 is the chassis; 2 is the carriage; 21 is the tail gate; 22 is the space partition; 23 is the power generation space; 24 is the working space; 25 is the side door; 26 is the electric control box; 27 is the folding table; 3 is the generator set; 4 is the control cabinet; 5 is the storage rack; 51 is the main rack; 511 is the first vertical rack; 5111 is the vertical rod; 5112 is the cross rod; 512 is the second vertical rack; 513 is the connecting rod group; 5131 is the first rod; 5132 is the second rod; 514 is the first sliding guide; 5141 is the support slide rail; 5142 is the support slide table; 515 is the sliding wheel; 52 is the support plate rack; 521 is the first long rod; 522 is the second long rod; 523 is the middle rod group; 5231 is the third rod; 5232 is the fourth rod; 524 is the second sliding guide; 53 is the installation space; 54 is the lifting rack; 541 is the first sliding rod; 542 is the second sliding rod; 543 is the third sliding guide; 55 is the lifting locking part; 551 is the lifting sleeve; 5511 is the installation cavity; 5512 is the sliding hole; 5513 is the bayonet; 552 is the positioning vertical plate; 5521 is the positioning hole; 553 is the positioning rod; 554 is the locking driving part; 5541 is the lever; 5542 is the driving gear; 5543 is the driving rack; 56 is the installation plate rack; 561 is the bottom plate; 5611 is the auxiliary slide rail; 5612 is the auxiliary slide table; 562 is the long side plate; 563 is the wide side plate; 564 is the first limiting plate; 565 is the second limiting plate; 6 is the pull-out cabinet; 61 is the closed cover; 62 is the slot; 63 is the separation partition. Detailed implementation mode

[0051] The following will further describe the present application in detail with reference to the attached Figure 1 - attached Figure 12 drawings.

[0052] Embodiment 1: An ultraviolet light-curing pipeline repair vehicle, referring to Figure 1 and Figure 2 drawings, includes a vehicle body 1, a carriage 2, a generator set 3, a control cabinet 4 and a light-curing repair device. The carriage 2 is arranged on the vehicle body 1, and the generator set 3, the control cabinet 4 and the light-curing repair device are all arranged in the carriage 2.

[0053] In this embodiment, the control cabinet 4 at least includes a fan or an air compressor, an industrial computer, a power supply, a frequency converter, a cable reel, a radiator and an industrial display screen. The light-curing repair device at least includes a ferrule, a UV lamp holder and pipeline repair materials.

[0054] Referring to Figure 1 drawings, the vehicle body 1 includes a vehicle head 11 and a chassis 12. The vehicle head 11 is located on one side of the length direction of the chassis 12. The carriage 2 is arranged on the chassis 12. The opening of the carriage 2 is located on the side of the carriage 2 away from the vehicle head 11. A tail gate 21 is arranged on the side of the carriage 2 away from the vehicle head 11. The tail gate 21 is rotatably connected to the carriage 2, and the tail gate 21 closes the opening of the carriage 2.

[0055] Referring to Figure 2 , a space partition 22 is provided inside the carriage 2. The thickness direction of the space partition 22 is arranged along the length direction of the carriage 2. The space partition 22 divides the internal space of the carriage 2 into a power generation space 23 and a working space 24. And the power generation space 23 is located on the side of the space partition 22 facing the vehicle head 11, and the working space 24 is located on the side of the space partition 22 facing the tailgate 21. The generator set 3 is located inside the power generation space 23, and the control cabinet 4 and the light curing repair equipment are located inside the working space 24.

[0056] Referring to Figure 2 , a side opening is formed on the side wall of the carriage 2. The side opening is communicated with the power generation space 23. And a side door 25 is provided on the side wall of the carriage 2. The side door 25 closes the side opening. The setting of the side door 25 enables the power generation space 23 to be independently opened, which is convenient for the maintenance and installation of the generator set 3.

[0057] Referring to Figure 2 , an electric control box 26 and a plurality of sockets are provided inside the carriage 2. The electric control box 26 is located inside the power generation space 23, and the plurality of sockets are located inside the working space 24. And the plurality of sockets are connected to the electric control box 26 through electric wires. The electric control box 26 is connected to the generator set 3 through electric wires. With the cooperation of the sockets, the electric control box 26 and the generator set 3, the internal equipment of the carriage 2 can be powered.

[0058] Referring to Figure 3 , a folding table 27 is further provided inside the carriage 2. The folding table 27 is arranged on the space partition 22 and is located inside the working space 24. The setting of the folding table 27 can provide an office position for the staff.

[0059] Referring to Figure 3 , a storage rack 5 is provided inside the carriage 2. The storage rack 5 is located inside the working space 24. The storage rack 5 and the control cabinet 4 are arranged at intervals along the width direction of the carriage 2. And a working passage for the staff to pass through is formed between the storage rack 5 and the control cabinet 4. And the light curing repair equipment is stored inside the storage rack 5.

[0060] Referring to Figure 4 , the storage rack 5 includes a main rack 51 and a support plate rack 52. The main rack 51 is vertically arranged and connected to the inner wall of the carriage 2. A plurality of support plate racks 52 are all arranged inside the main rack 51. The support plate racks 52 are horizontally arranged. And the plurality of support plate racks 52 are arranged at intervals in sequence along the vertical direction. In the vertical direction, installation spaces 53 are formed between the top of the main rack 51 and the adjacent support plate rack 52 and between the adjacent two support plate racks 52. A plurality of drawer cabinets 6 are provided inside the storage rack 5. The drawer cabinets 6 are arranged in one-to-one correspondence with the installation spaces 53. The drawer cabinets 6 are all installed inside the corresponding installation spaces 53.

[0061] The light-curing repair devices are respectively stored in the corresponding drawer cabinets 6, and the drawer cabinets 6 are inserted into the corresponding installation spaces 53, so that the storage function of the light-curing repair devices can be realized.

[0062] Referring to Figure 3 and Figure 4 , the main frame 51 includes a first vertical frame 511 and a second vertical frame 512. Both the first vertical frame 511 and the second vertical frame 512 are arranged in the vertical direction. The second vertical frame 512 is connected to an inner side wall in the width direction of the carriage 2. The first vertical frame 511 is located between the second vertical frame 512 and the control cabinet 4, and the first vertical frame 511 and the second vertical frame 512 are arranged in parallel at intervals in the width direction of the carriage 2. A plurality of connecting rod groups 513 are arranged between the upper sides of the first vertical frame 511 and the second vertical frame 512 and between the lower sides of the first vertical frame 511 and the second vertical frame 512. The connecting rod groups 513 connect the first vertical frame 511 and the second vertical frame 512, and the plurality of connecting rod groups 513 are arranged at intervals in the length direction of the carriage 2 in sequence.

[0063] Referring to Figure 4 and Figure 5 , the connecting rod group 513 includes a first rod 5131 and a second rod 5132. The length directions of the first rod 5131 and the second rod 5132 are both arranged along the interval direction of the first vertical frame 511 and the second vertical frame 512. One end of the first rod 5131 is connected to the first vertical frame 511, one end of the second rod 5132 is connected to the second vertical frame 512, and the first rod 5131 is slidably connected to the corresponding second rod 5132 along its own length direction.

[0064] In this embodiment, referring to Figure 4 and Figure 5 , a first sliding guide member 514 is arranged between the first rod 5131 and the second rod 5132. The first sliding guide member 514 includes a support slide rail 5141 and a support slide table 5142. There are two support slide rails 5141, and the two support slide rails 5141 are respectively arranged on the first rod 5131 and the second rod 5132, and the length direction of the support slide rail 5141 is arranged along the length direction of the first rod 5131. There are also two support slide tables 5142, and the two support slide tables 5142 are respectively arranged on the first rod 5131 and the second rod 5132. The support slide table 5142 on the first rod 5131 is slidably connected to the support slide rail 5141 on the second rod 5132; similarly, the support slide table 5142 on the second rod 5132 is slidably connected to the support slide rail 5141 on the first rod 5131.

[0065] Referring to Figure 4 , through the structural settings of the first vertical frame 511, the second vertical frame 512, the connecting rod group 513 and the first sliding guide member 514, the first vertical frame 511 and the second vertical frame 512 can be pushed to approach or move away from each other, and thus the width of the main frame 51 can be adjusted.

[0066] In this embodiment, in order to ensure the structural stability of the main frame 51 and reduce the possibility of deformation of the main frame 51, through holes are opened on the first rod 5131 and the corresponding second rod 5132 according to actual needs. Then, after the width adjustment of the main frame 51 is completed, bolts are installed through the corresponding through holes to realize the connection reinforcement between the first rod 5131 and the corresponding second rod 5132, thereby improving the stability of the entire main frame 51; when the width of the main frame 51 needs to be readjusted, the bolts are removed again, and then the width of the main frame 51 is adjusted.

[0067] In this embodiment, referring to Figure 4 , a plurality of sliding wheels 515 are installed at the bottom of the first vertical frame 511. The arrangement of the sliding wheels 515 facilitates the pushing of the first vertical frame 511.

[0068] Referring to Figure 4 and Figure 6 , the support plate frame 52 includes a first long rod 521, a second long rod 522, and a plurality of intermediate rod groups 523. The length directions of the first long rod 521 and the second long rod 522 are both arranged along the length direction of the main frame 51. The first long rod 521 is connected to the first vertical frame 511, and the second long rod 522 is connected to the second vertical frame 512. A plurality of intermediate rod groups 523 are located between the first long rod 521 and the second long rod 522, and the plurality of intermediate rod groups 523 are arranged at intervals in sequence along the length direction of the first long rod 521. Both the first long rod 521 and the second long rod 522 are connected to the intermediate rod groups 523.

[0069] Referring to Figure 4 and Figure 6 , the intermediate rod group 523 includes a third rod 5231 and a fourth rod 5232. The length directions of the third rod 5231 and the fourth rod 5232 are both arranged along the interval direction between the first long rod 521 and the second long rod 522. One end of the third rod 5231 is connected to the first long rod 521, one end of the fourth rod 5232 is connected to the second long rod 522, and the third rod 5231 is slidably connected to the fourth rod 5232 along its own length direction.

[0070] In this embodiment, referring to Figure 4 and Figure 6 , a second sliding guide 524 is provided between the third rod 5231 and the corresponding fourth rod 5232, and the first sliding guide 514 and the second sliding guide 524 have the same structure.

[0071] When adjusting the width of the main frame 51, the cooperation of the first long rod 521, the second long rod 522, the intermediate rod group 523, and the second sliding guide 524 can adjust the distance between the first long rod 521 and the second long rod 522, and thus can synchronously adjust the width of the support plate frame 52.

[0072] Referring to Figure 4 andFigure 5 A lifting frame 54 is provided between the support plate frame 52 and the main frame 51. The lifting frame 54 includes a first sliding rod 541 and a second sliding rod 542. The lengths of the first sliding rod 541 and the second sliding rod 542 are both arranged along the length direction of the main frame 51. The first sliding rod 541 is connected to the first vertical frame 511, and the second sliding rod 542 is connected to the second vertical frame 512. And the support plate frame 52 is located between the corresponding first sliding rod 541 and the second sliding rod 542. The support plate frame 52 is slidably connected to the first sliding rod 541 and the second sliding rod 542 along the length direction of the main frame 51.

[0073] In this embodiment, referring to Figure 5 , third sliding guides 543 are provided between the first long rod 521 and the first sliding rod 541 and between the second long rod 522 and the second sliding rod 542. The first sliding guide 514 and the third sliding guide 543 have the same structure. This enables the first long rod 521 to slide relative to the first sliding rod 541 and the second long rod 522 to slide relative to the second sliding rod 542. This can achieve the sliding connection between the support plate frame 52 and the lifting frame 54, and further achieve the sliding connection between the support plate frame 52 and the main frame 51.

[0074] Referring to Figure 4 and Figure 6 , both ends of the first sliding rod 541 are slidably connected to the first vertical frame 511 in the vertical direction, and both ends of the second rod 5132 are slidably connected to the second vertical frame 512 in the vertical direction. And lifting locking members 55 are provided between both ends of the first sliding rod 541 and the first vertical frame 511 and between both ends of the second sliding rod 542 and the second vertical frame 512.

[0075] In this embodiment, referring to Figure 4 and Figure 6 , the first vertical frame 511 and the second vertical frame 512 have the same structure, and the first sliding rod 541 and the second sliding rod 542 have the same structure. Furthermore, the structure of the lifting locking member 55 between the first sliding rod 541 and the first vertical frame 511 is the same as the structure of the lifting locking member 55 between the second sliding rod 542 and the second vertical frame 512. The following takes the structure of the lifting locking member 55 between the first sliding rod 541 and the first vertical frame 511 as an example for illustration.

[0076] Referring to Figure 4 , the first vertical frame 511 includes two vertical rods 5111 and two cross rods 5112. The two vertical rods 5111 are arranged at intervals along the length direction of the carriage 2, and the two cross rods 5112 are arranged at intervals in the vertical direction. And the two vertical rods 5111 and the two cross rods 5112 are connected to each other to form a rectangular frame.

[0077] Referring to Figure 4 and Figure 6, the lifting and locking member 55 includes a lifting sleeve 551. The lifting sleeve 551 is sleeved outside the corresponding vertical rod 5111. The lifting sleeve 551 is slidably connected to the vertical rod 5111 in the vertical direction, and one end of the first sliding rod 541 is detachably connected to the corresponding lifting sleeve 551. In this embodiment, the first sliding rod 541 is connected to the lifting sleeve 551 by bolts.

[0078] Refer to Figure 4 , positioning vertical plates 552 are provided on both opposite sides of the vertical rod 5111. The two positioning vertical plates 552 are spaced apart along the length direction of the cross bar 5112. A plurality of positioning holes 5521 are formed in the positioning vertical plates 552, and the plurality of positioning holes 5521 are sequentially spaced apart in the vertical direction.

[0079] Refer to Figure 4 and Figure 6 , positioning rods 553 are provided on both opposite inner side walls of the lifting sleeve 551. The length direction of the positioning rods 553 is parallel to the axial direction of the positioning holes 5521, and the positioning rods 553 are inserted and matched with a positioning hole 5521 along their own length directions.

[0080] Refer to Figure 6 and Figure 7 , the positioning rods 553 are slidably connected to the lifting sleeve 551 along their own length directions. A locking driving member 554 is provided on the lifting sleeve 551, and both positioning rods 553 are connected to the locking driving member 554.

[0081] Refer to Figure 7 and Figure 8 , an installation cavity 5511 is formed in the lifting sleeve 551. Slide holes 5512 are formed in both opposite inner side walls of the lifting sleeve 551. The slide holes 5512 communicate with the installation cavity 5511. The slide holes 5512 are arranged in one-to-one correspondence with the positioning rods 553, and the positioning rods 553 are inserted and matched with the slide holes 5512. The positioning rods 553 are slidably connected to the inner side walls of the corresponding slide holes 5512 along their own length directions. This enables the positioning rods 553 to slide along their own length directions, and then to be inserted into or withdrawn from the corresponding positioning holes 5521.

[0082] Refer to Figure 8 and Figure 9, the locking drive member 554 is located between the two positioning rods 553, the locking drive member 554 includes a driving gear 5542 and two driving racks 5543, the driving gear 5542 and the two driving racks 5543 are both located in the mounting cavity 5511, the driving gear 5542 is rotatably connected to the lifting sleeve 551, the two driving racks 5543 are both arranged along the length of the positioning rod 553, the two driving racks 5543 are arranged at intervals in the vertical direction, the driving gear 5542 is located between the two driving racks 5543, the two driving racks 5543 are both meshed with the driving gear 5542, the driving racks 5543 and the positioning rods 553 are arranged one by one, the driving racks 5543 are connected to the corresponding positioning rods 553, the driving racks 5543 are slidably connected to the lifting sleeve 551 along their own length direction, and the driving gear 5542 is rotatably connected to the lifting sleeve 551.

[0083] Through the cooperation between the driving gear 5542 and the two driving racks 5543, when the driving gear 5542 rotates clockwise, the two driving racks 5543 drive the two positioning rods 553 to move toward each other; on the contrary, when the driving gear 5542 rotates counterclockwise, the two driving racks 5543 drive the two positioning rods 553 to move away from each other.

[0084] Reference Figure 7 and Figure 9 The locking drive member 554 also includes a bend lever 5541, which is located outside the lifting sleeve 551, one end of the bend lever 5541 is rotatably connected to the lifting sleeve 551, and the bend lever 5541 is coaxially rotatably connected to the driving gear 5542.

[0085] When the shift lever 5541 is rotated to a horizontal state, the two positioning rods 553 are pulled out from the corresponding positioning holes 5521, thereby releasing the lock of the lifting sleeve 551 and the positioning vertical plate 552, and the first slide bar 541 can be lifted and lowered in the vertical direction; and when the shift lever 5541 is rotated to a vertical state, the two positioning rods 553 are reinserted into the corresponding positioning holes 5521, thereby restoring the lock of the lifting sleeve 551 and the positioning vertical plate 552.

[0086] Reference Figure 4 and Figure 7 A bayonet 5513 is provided on the side of the lifting sleeve 551 away from the corresponding support plate frame 52 , and the bayonet 5513 is plugged into and matched with the corresponding vertical rod 5111 .

[0087] By opening the bayonet 5513 on the lifting sleeve 551, it is convenient to install the lifting sleeve 551 on the corresponding vertical rod 5111, and it is also convenient to remove the lifting sleeve 551 from the corresponding vertical rod 5111, which facilitates the removal and installation of the first sliding rod 541 and the second sliding rod 542.

[0088] Reference Figure 4 and Figure 10 ,Between the pull-out cabinet 6 and the corresponding support plate frame 52, there is an installation plate frame 56. The installation plate frame 56 includes a bottom plate 561, a long side plate 562 and a wide side plate 563. The bottom plate 561 is arranged on the corresponding support plate frame 52, and the bottom plate 561 is slidably connected to the support plate frame 52 along the width direction of the main frame 51. The long side plate 562 and the wide side plate 563 are both vertically arranged on the upper side of the bottom plate 561, and the long side plate 562 and the wide side plate 563 are both fixedly connected to the bottom plate 561. The long side plate 562 is located on the side of the bottom plate 561 facing the second vertical frame 512, and the wide side plate 563 is located on the side of the bottom plate 561 facing the space partition 22. The pull-out cabinet 6 is arranged on the corresponding bottom plate 561, and the bottom plate 561 is detachably connected to the pull-out cabinet 6. The long side plate 562 and the wide side plate 563 both abut against the corresponding pull-out cabinet 6. In this embodiment, the bottom plate 561 and the pull-out cabinet 6 are connected by bolts.

[0089] Reference Figure 6 and Figure 10 ,On the bottom plate 561, there are a number of auxiliary slide rails 5611. The length direction of the auxiliary slide rails 5611 is arranged along the width direction of the main frame 51, and a number of auxiliary slide rails 5611 are arranged at intervals in sequence along the length direction of the main frame 51. On the support plate frame 52, there are a number of auxiliary slide platforms 5612. The auxiliary slide platforms 5612 are inserted and matched with the corresponding auxiliary slide rails 5611, and the auxiliary slide platforms 5612 are slidably connected to the corresponding auxiliary slide rails 5611 along the length direction of the auxiliary slide rails 5611.

[0090] Reference Figure 6 and Figure 10 ,On the lower side of the bottom plate 561, there are a number of first limiting plates 564. The first limiting plates 564 are arranged vertically opposite to the long side plate 562. A number of first limiting plates 564 are arranged at intervals in sequence along the length direction of the carriage 2, and the auxiliary slide rails 5611 and the first limiting plates 564 are arranged alternately in sequence along the length direction of the support plate frame 52. A number of second limiting plates 565 are installed on the first slide rod 541. The second limiting plates 565 are arranged in one-to-one correspondence with the first limiting plates 564, and the first limiting plates 564 and the corresponding second limiting plates 565 are arranged vertically opposite to each other along the width direction of the carriage 2. The cooperation of the first limiting plates 564 and the second limiting plates 565 can limit the movement of the installation plate frame 56, and further can limit the movement of the pull-out cabinet 6.

[0091] Reference Figure 2 and Figure 10 ,On the side of the pull-out cabinet 6 away from the space partition 22 along its own length direction, there is an outlet, and a closing cover 61 is rotatably connected to the pull-out cabinet 6. The closing cover 61 closes the outlet.

[0092] The implementation principle of the embodiment of this application is as follows: When it is necessary to use an ultraviolet light-curing pipeline repair vehicle for pipeline repair, select the specifications of the light-curing pipeline repair equipment to be carried according to the parameters of the pipeline to be repaired, and then select a pull-out cabinet 6 of the corresponding size according to the specifications of the equipment to be carried, and install each piece of equipment into the corresponding pull-out cabinet 6.

[0093] Then, according to the size of the selected pull-out cabinet 6, select to add or subtract the support plate frames 52 to ensure that the number of installation spaces 53 can accommodate all the pull-out cabinets 6. After that, adjust the positions of the support plate frames 52 in the vertical direction to ensure that the height of each installation space 53 meets the requirements of the corresponding pull-out cabinet 6, and adjust the width of the main frame 51 along the width direction of the carriage 2 to ensure that the width of the installation space 53 meets the requirements of the corresponding pull-out cabinet 6. Finally, push several pull-out cabinets 6 into the corresponding installation spaces 53 in sequence, which can realize the installation of the pull-out cabinets 6. Since the actual size of the storage rack 5 is adjusted according to the pull-out cabinet 6 used, the size of the storage rack 5 can be reduced as much as possible, thereby improving the activity space of the staff in the carriage 2.

[0094] When it is necessary to use the equipment in the corresponding pull-out cabinet 6, open the tailgate 21 of the carriage 2, and then pull out the corresponding pull-out cabinet 6 from the storage rack 5, or directly pull out the equipment in the pull-out cabinet 6 from the corresponding pull-out cabinet 6. Since there is no obstruction when the tailgate 21 is opened and the pull-out cabinet 6 is pulled out, it is convenient to take out the corresponding equipment in the pull-out cabinet 6, and it can also reduce the requirements for the space of the carriage 2 when loading or unloading equipment.

[0095] Embodiment 2: An ultraviolet light-curing pipeline repair vehicle, referring to Figure 3 and Figure 11 , the difference between this embodiment and Embodiment 1 is that: on the side of the pull-out cabinet 6 away from the space partition 22 along its own length direction, the upper side of the pull-out cabinet 6, and the side of the pull-out cabinet 6 facing the control cabinet 4, there are outlets, and a number of closing covers 61 are provided on the pull-out cabinet 6, and the closing covers 61 are arranged in one-to-one correspondence with the outlets, and the closing covers 61 close the corresponding outlets.

[0096] Referring to Figure 11 , a number of slots 62 are provided in the pull-out cabinet 6, and the a number of slots 62 are arranged at intervals in sequence along the length direction of the pull-out cabinet 6. A number of separation partitions 63 are arranged in the pull-out cabinet 6, and the separation partitions 63 are arranged in one-to-one correspondence with the slots 62, and the separation partitions 63 are inserted and matched with the corresponding slots 62.

[0097] The implementation principle of the embodiment of this application is as follows: Since the drawer cabinet 6 is provided with outlets on three sides, it is possible to select different outlets according to the actual size of the equipment and the space size inside the carriage 2 to take out the equipment in the drawer cabinet 6, which can improve the convenience of taking out and putting in the equipment in the drawer cabinet 6. The setting of the separation partition 63 in the drawer cabinet 6 can, when multiple devices are loaded in the same drawer cabinet 6, be installed between two devices, which can prevent the two devices from being damaged by collision during transportation.

[0098] The embodiments of this specific implementation manner are all preferred embodiments of this application, and do not limit the protection scope of this application accordingly. The same components are denoted by the same reference numerals. Therefore, all equivalent changes made according to the structure, shape, and principle of this application should be covered within the protection scope of this application.

Claims

1. An ultraviolet light-curing pipeline repair vehicle, characterized in that, Including: A vehicle body (1), a carriage (2), a generator set (3), a control cabinet (4) and a storage rack (5). The carriage (2) is arranged on the vehicle body (1), and the generator set (3), the control cabinet (4) and the storage rack (5) are all arranged in the carriage (2); A plurality of drawer cabinets (6) are arranged in the storage rack (5), and a light-curing repair device is stored in the drawer cabinet (6). The plurality of drawer cabinets (6) are arranged at intervals in the vertical direction in sequence. The drawer cabinet (6) is in plug-in fit with the storage rack (5), and the drawer cabinet (6) is slidably connected with the storage rack (5) along the length direction of the carriage (2); The storage rack (5) includes a main rack (51). The main rack (51) is arranged vertically and is connected with the carriage (2). A plurality of support plate racks (52) are arranged in the main rack (51). The plurality of support plate racks (52) are arranged at intervals in the vertical direction in sequence. The support plate rack (52) is slidably connected with the main rack (51) along the length direction of the carriage (2). The support plate rack (52) is arranged corresponding to the drawer cabinet (6) one by one, and the drawer cabinet (6) is arranged on the corresponding support plate rack (52); The main rack (51) includes a first vertical rack (511) and a second vertical rack (512). The second vertical rack (512) is connected with the inner wall of the carriage (2). The first vertical rack (511) and the second vertical rack (512) are arranged in parallel at intervals along the width direction of the carriage (2). The first vertical rack (511) is slidably connected with the inner wall of the carriage (2) along the width direction of the carriage (2); The support plate rack (52) includes a first long rod (521) and a second long rod (522). The length direction of the first long rod (521) is arranged along the length direction of the carriage (2). The first long rod (521) is arranged in parallel with the second long rod (522). The first long rod (521) is slidably connected with the first vertical rack (511) along its own length direction. The second long rod (522) is slidably connected with the second vertical rack (512) along its own length direction. The drawer cabinet (6) is arranged on the upper sides of the corresponding first long rod (521) and the second long rod (522), and the drawer cabinet (6) is connected with the first long rod (521) and the second long rod (522); The support plate rack (52) is slidably connected with the main rack (51) in the vertical direction, and a lifting locking member (55) is arranged between the support plate rack (52) and the main rack (51). The lifting locking member (55) is used for locking the support plate rack (52) and the main rack (51); The lifting locking member (55) comprises a lifting sleeve (551) and a positioning vertical plate (552), the lifting sleeve (551) is connected to the corresponding support plate frame (52), the positioning vertical plate (552) is vertically arranged on the main frame (51), the lifting sleeve (551) is sleeved on the positioning vertical plate (552), and the lifting sleeve (551) is slidably connected to the positioning vertical plate (552) along the vertical direction; The positioning vertical plate (552) is provided with a plurality of positioning holes (5521), and the plurality of positioning holes (5521) are arranged in sequence at intervals along the vertical direction. A positioning rod (553) is arranged in the lifting sleeve (551), and one end of the positioning rod (553) is plugged into and matched with one of the positioning holes (5521). The positioning rod (553) is slidably connected with the inner side wall of the corresponding positioning hole (5521) along its own length direction. A locking driving member (554) is arranged in the lifting sleeve (551) for driving the positioning rod (553) to move along its own length direction. The locking drive member (554) includes a shift lever (5541), a driving gear (5542) and two driving racks (5543). The driving gear (5542) and the two driving racks (5543) are arranged on the lifting sleeve (551). The two driving racks (5543) are arranged along the length direction of the positioning rod (553). The two driving racks (5543) are meshed with the driving gear (5542). ) are arranged one by one with the positioning rods (553), the driving rack (5543) is connected to the corresponding positioning rod (553), the driving rack (5543) is slidably connected to the lifting sleeve (551) along its own length direction, and the driving gear (5542) is rotationally connected to the lifting sleeve (551); the bend lever (5541) is located outside the lifting sleeve (551), and the bend lever (5541) is coaxially rotationally connected to the driving gear (5542); A bayonet (5513) is provided on a side of the lifting sleeve (551) facing away from the corresponding support plate frame (52), and the bayonet (5513) is plug-fitted with the corresponding vertical rod (5111).

2. The ultraviolet light-curing pipeline repair vehicle according to claim 1, characterized in that, A plurality of sliding wheels (515) are arranged on the lower side of the first vertical frame (511).

3. An ultraviolet light-curing pipeline repair vehicle according to claim 1, characterized in that, A mounting plate frame (56) is provided on the support plate frame (52); the mounting plate frame (56) is slidably connected to the support plate frame (52) along the width direction of the carriage (2); and the drawer cabinet (6) is provided on a corresponding mounting plate frame (56).

4. The ultraviolet light-curing pipeline repair vehicle according to claim 3, characterized in that, An auxiliary slide rail (5611) is arranged at the bottom of the mounting plate frame (56), and the length direction of the auxiliary slide rail (5611) is arranged along the width direction of the carriage (2). A plurality of auxiliary slide platforms (5612) are arranged on the supporting plate frame (52), and the auxiliary slide platforms (5612) are slidably connected to the auxiliary slide rail (5611).

5. An ultraviolet light-curing pipeline repair vehicle according to claim 1, characterized in that, One side and the upper side in the length direction of the drawer cabinet (6) are both provided with outlets, a closing cover (61) is arranged on the drawer cabinet (6), the closing cover (61) is arranged in one-to-one correspondence with the outlets, and the closing cover (61) closes the corresponding outlet, and the closing cover (61) is rotatably connected to the drawer cabinet (6).

6. The ultraviolet light-curing pipeline repair vehicle according to claim 5, wherein A plurality of separation partitions (63) are arranged in the drawer cabinet (6), the plurality of separation partitions (63) are arranged at intervals in sequence along the length direction of the drawer cabinet (6), and the separation partitions (63) are detachably connected to the drawer cabinet (6).

Citation Information

Patent Citations

  • Photo-curing vehicle

    CN117584836A

  • Safety electric power emergency repair tool vehicle

    CN203211168U

  • High-precision sound-light alarm aging rack convenient to install

    CN210108913U

  • Multi-surface storage cabinet

    CN219088723U

  • Expandable rack assembly with telescoping tube sections adapted to facilitate connection to side supports

    US20030209509A1

Cited By

  • Self-cleaning pipeline repairing and curing equipment and method thereof

    CN121672280A