Arrangement method of hydroelectric power generation device for mountain surface runoff and power generation system of hydroelectric power generation device
By generating and processing surface flow and slope data sets, and combining GIS software for terrain analysis and simulation, the problem of arrangement of alpine water conservancy power generation devices in mountainous environments is solved, and the power generation effect of efficiently utilizing mountain surface runoff is achieved.
Patent Information
- Application Number
- CN202411402149.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2025-02-11
AI Technical Summary
The prior art is difficult to effectively utilize flow water such as alpine snow melting and streams for hydropower generation, especially in mountainous environments with complex terrain and unstable runoff, and there is a lack of suitable arrangement methods for terrain slope and runoff.
By generating surface flow and slope data sets, the slope is extracted in segments and converted into vector surface data, the surface runoff data set is processed and the latitude and longitude coordinates are added, the unsuitable areas are bounded, and the relationship between topographic slope, topographic elevation and energy resistance module distribution density function is established. Perform density distribution simulation and generate a distribution simulation map to select the energy resistance module.
It is realized that when factors such as site terrain drops are taken into account, GIS software is used to analyze and pre-read the terrain slope, runoff, etc., and the energy resistance module layout scheme suitable for mountain surface runoff conditions such as melting snow and flood discharge is simulated, thereby improving power generation. Optimization of quantity.
Smart Images

Figure CN119416406A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of high mountain water conservancy power generation, and mainly to a method for arranging a water conservancy power generation device for mountain surface runoff and a power generation system thereof. Background Art
[0002] High-speed water flow contains a large amount of kinetic energy. Because runoff, streams or rivers have a generally constant flow in the drainage channel, it is advantageous to use such water flow to generate electricity. However, slow-flowing water may not have sufficient speed to generate sufficient power. In order to solve the above problems, the prior art, such as the patent document with publication number CN108150336A, discloses a portable generator that generates electricity using water flow and vibration. The above generator can be adapted to an environment with a slower water flow and effectively achieve the purpose of slowing down the water flow.
[0003] For example, the National Alpine Skiing Center, located in the southern foot of Xiaohaituo Mountain in the northern core area of the Yanqing competition area, has the characteristics of large height difference of mountain terrain, vertical drop of nearly 900m, dense contour lines and large slope. In winter, the above-mentioned alpine skiing center needs artificial snowfall to form ski tracks for competitions and mass entertainment. After the snow season ends, the snow with a thickness of at least 40cm melts and forms runoff. How to effectively utilize alpine snowmelt, alpine streams and other flowing water is a technical problem that technicians in this field urgently need to solve.
[0004] In the prior art, a variety of micro-power generation equipment has been designed to achieve mountain surface runoff power generation. Because the site selection of hydropower generation needs to consider multiple factors, including dry and wet areas, river recharge, basin area or catchment area, etc. At the same time, the site selection is also closely related to the degree of terrain drop on the site. However, the prior art lacks a method for analyzing and pre-reading the terrain slope, runoff, etc., and calculating the layout of small hydropower generation resistor modules suitable for snow melting and flood discharge. Summary of the invention
[0005] Therefore, the present invention aims to provide a method for arranging a hydroelectric power generation device for mountain surface runoff and a power generation system thereof, so as to help designers to screen the hydroelectric power generation device for mountain surface runoff by combining factors such as site terrain drop, watershed area, etc. The present application provides a method for arranging a hydroelectric power generation device for mountain surface runoff, comprising the following steps:
[0006] Step S1, generating surface flow and slope data sets: using digital elevation data, generating a surface flow data set; and generating a slope data set;
[0007] Step S2, outputting a slope data set: extracting the slope in sections, dividing it into a low slope area, a medium slope area, and a high slope area, and outputting slope data sets respectively;
[0008] Step S3, vector surface data conversion: processing the three slope area data sets respectively, and converting the raster data sets into vector surface data;
[0009] Step S4, generating a segmented surface runoff data set: processing the surface runoff data set with the vector surface data to generate a segmented surface runoff data set;
[0010] Step S5, processing the segmented surface runoff dataset: processing the segmented surface runoff dataset and adding longitude and latitude coordinate fields to the point dataset;
[0011] Step S6, outputting an attribute table, wherein the output attribute table includes latitude and longitude fields;
[0012] Step S7, delineating unsuitable areas: delineating areas unsuitable for constructing hydropower generation equipment within the overall plan runoff selection area, including urban construction land, agricultural land, and forest land; and picking up the plan curve area within the scope of the hydropower generation construction site;
[0013] Step S8, establishing a functional relationship between terrain slope, terrain elevation and energy resistance module distribution density;
[0014] Step S9, picking up the slope, elevation and coordinate data of the sampling point: picking up the slope, elevation information and coordinate data file of the runoff curve grid sampling point, establishing the point object within the selection area; matching the latitude and longitude coordinates of the entity point with the actual coordinate point;
[0015] Step S10, performing density distribution simulation: establishing a unit grid range with a coordinate interval radius X for each entity point; and performing random point distribution, wherein the number of distribution points is the Y value of each sampling point, and establishing a correlation between the energy resistance module density simulation and the slope and elevation of the sampling point;
[0016] Step S11, generating a distribution simulation diagram: placing random points of simulated distribution within the selected area, forming a distribution diagram on the general plan of the selected area with the density of the dot matrix representing the change of runoff flow, and picking up the X, Y coordinates of the points according to the distribution diagram, that is, selecting the location of the energy resistance module in the area.
[0017] Optionally, in step S1, based on ArcGIS Pro software, using a raster calculator, the slope is extracted in sections, divided into low slope area, medium slope area, and high slope area, and slope datasets are output respectively; and / or,
[0018] In step S2, based on ArcGIS Pro software, using a raster calculator, the slope is extracted in sections, divided into low slope area, medium slope area, and high slope area, and the slope datasets are output respectively; and / or,
[0019] In step S3, based on ArcGIS Pro software, the raster-to-surface tool is used to process the three slope area datasets respectively, and the raster datasets are converted into vector surface data; and / or,
[0020] In step S4, based on ArcGIS Pro software, using a clipping tool, the surface runoff dataset is processed with vector surface data to generate a segmented surface runoff dataset; and / or,
[0021] In step S5, based on ArcGIS Pro software, the Raster to Point tool is used to process the segmented surface runoff dataset and add longitude and latitude coordinate fields to the point dataset;
[0022] In step S7, the three-dimensional modeling analysis software Rhino is used to delineate areas in the overall plan runoff selection area that are not suitable for the construction of hydropower generation equipment, including urban construction land, agricultural land, and forest land; and the Rhino built-in plug-in Grasshopper is used to pick up the plane curve area within the scope of the hydropower generation construction site; and / or,
[0023] Step S9, picking up the slope, elevation and coordinate data of the sampling points: using Grasshopper, a built-in parametric plug-in of Rhino, picking up the slope, elevation information and coordinate data file of the GIS runoff curve grid sampling points, and establishing point objects within the selection area; matching the longitude and latitude coordinates of the entity points with the actual coordinate points, using a unified coordinate system; the unified coordinate system is the 2000 National Geodetic Coordinate System; and / or,
[0024] Step S10, perform density distribution simulation: use the built-in parametric plug-in Grasshopper in Rhino to establish a unit grid range with a coordinate interval radius X for each entity point, use the Grasshopper plug-in populat2D command to perform random point distribution, the number of distribution points is the Y value of each sampling point, and establish the association between the density simulation of the resistance module and the slope and elevation of the sampling point; and / or,
[0025] Step S11, generating a distribution simulation diagram: using Grasshopper, a built-in parametric plug-in of Rhino, the Bake command in Grasshopper is used to place the random points of the simulated distribution within the selected area, forming a distribution diagram on the general plan of the selected area with the density of the dot matrix representing the change of the runoff flow, and picking up the X, Y coordinates of the points according to the distribution diagram, that is, selecting the location of the energy resistance module in the area.
[0026] Optionally, in step S8,
[0027] The functional relationship between the terrain slope S and terrain elevation H and the density value Y of the energy resistance module is established; the density value Y of the energy resistance module is within the radius of the unit sampling point of the runoff selection line; the functional relationship is as follows:
[0028]
[0029] Where S is the slope;
[0030] H is the elevation, m;
[0031] n is the channel roughness coefficient (dimensionless);
[0032] A is the channel cross-sectional area, m2;
[0033] P is the channel wetted perimeter, m;
[0034] N and M are density distribution coefficients, N is (pieces·s) / m 5 , M is (pieces·s) / m 6 .
[0035] A high mountain hydroelectric power generation system, applied to the above-mentioned hydroelectric power generation device arrangement method, comprises:
[0036] Small generators;
[0037] The energy resistance module comprises: a drainage main cavity and a drainage pipeline arranged on the drainage main cavity; a turbine blade is arranged in the drainage pipeline and is connected to the small generator to drive the rotor to rotate; when the rotor rotates relative to the permanent magnet structure in the stator housing and the magnetic flux in the permanent magnet structure changes, an electromotive force is generated in the coil, and the induced electromotive force causes the charge to move in the conductor coil, forming a current flow;
[0038] The energy resistance module is connected to the battery through a wire to supply power to the battery.
[0039] Optionally, there are multiple drainage pipelines, which are symmetrically arranged on the drainage main cavity to form a polygonal energy resistance module.
[0040] Optionally, a plurality of the energy resistance modules are engaged and snap-fitted in the drainage channel to limit and fix each of the energy resistance modules.
[0041] Optionally, there are six drainage pipelines, which are symmetrically arranged on the drainage main cavity to form a hexagonal energy resistance module.
[0042] Optionally, a pressing component is further provided on the drainage pipeline; the pressing component has an outward convex state protruding from the outer peripheral surface of the drainage pipeline, and an inward convex state protruding from the inner peripheral surface of the drainage pipeline by being driven to press;
[0043] In the inwardly convex state, the inner diameter of the drainage pipeline is reduced to accelerate the flow of water passing through the drainage pipeline.
[0044] The technical solution of the present invention has the following advantages:
[0045] 1. The method for arranging a hydroelectric power generation device for mountain surface runoff provided by the present invention comprises the following steps:
[0046] Step S1, generating surface flow and slope data sets: using digital elevation data, generating a surface flow data set; and generating a slope data set;
[0047] Step S2, outputting a slope data set: extracting the slope in sections, dividing it into a low slope area, a medium slope area, and a high slope area, and outputting slope data sets respectively;
[0048] Step S3, vector surface data conversion: processing the three slope area data sets respectively, and converting the raster data sets into vector surface data;
[0049] Step S4, generating a segmented surface runoff data set: processing the surface runoff data set with the vector surface data to generate a segmented surface runoff data set;
[0050] Step S5, processing the segmented surface runoff dataset: processing the segmented surface runoff dataset and adding longitude and latitude coordinate fields to the point dataset;
[0051] Step S6, outputting an attribute table, wherein the output attribute table includes latitude and longitude fields;
[0052] Step S7, delineating unsuitable areas: delineating areas unsuitable for constructing hydropower generation equipment within the overall plan runoff selection area, including urban construction land, agricultural land, and forest land; and picking up the plan curve area within the scope of the hydropower generation construction site;
[0053] Step S8, establishing a functional relationship between terrain slope, terrain elevation and energy resistance module distribution density;
[0054] Step S9, picking up the slope, elevation and coordinate data of the sampling point: picking up the slope, elevation information and coordinate data file of the runoff curve grid sampling point, establishing the point object within the selection area; matching the latitude and longitude coordinates of the entity point with the actual coordinate point;
[0055] Step S10, performing density distribution simulation: establishing a unit grid range with a coordinate interval radius X for each entity point; and performing random point distribution, wherein the number of distribution points is the Y value of each sampling point, and establishing a correlation between the energy resistance module density simulation and the slope and elevation of the sampling point;
[0056] Step S11, generating a distribution simulation diagram: placing random points of simulated distribution within the selected area, forming a distribution diagram on the general plan of the selected area with the density of the dot matrix representing the change of runoff flow, and picking up the X, Y coordinates of the points according to the distribution diagram, that is, selecting the location of the energy resistance module in the area.
[0057] In the present invention, through the above-mentioned method for arranging the hydropower generation device, it is possible to effectively consider factors such as the site terrain drop, comprehensively utilize the geographic information system, i.e., GIS software, to analyze and pre-read the terrain slope, runoff and other aspects, and simulate the energy-resistance module arrangement plan suitable for mountain surface runoff conditions such as snowmelt and flood discharge, thereby achieving optimal power generation.
[0058] 2. The method for arranging a hydroelectric power generation device for mountain surface runoff provided by the present invention,
[0059] In step S1, based on ArcGIS Pro software, using a raster calculator, the slope is extracted in sections, divided into low slope area, medium slope area, and high slope area, and the slope datasets are output respectively; and / or,
[0060] In step S2, based on ArcGIS Pro software, using a raster calculator, the slope is extracted in sections, divided into low slope area, medium slope area, and high slope area, and the slope datasets are output respectively; and / or,
[0061] In step S3, based on ArcGIS Pro software, the raster-to-surface tool is used to process the three slope area datasets respectively, and the raster datasets are converted into vector surface data; and / or,
[0062] In step S4, based on ArcGIS Pro software, using a clipping tool, the surface runoff dataset is processed with vector surface data to generate a segmented surface runoff dataset; and / or,
[0063] In step S5, based on ArcGIS Pro software, the Raster to Point tool is used to process the segmented surface runoff dataset and add longitude and latitude coordinate fields to the point dataset;
[0064] In step S7, the 3D modeling and analysis software Rhino is used to delineate areas in the overall plan runoff selection area that are not suitable for the construction of hydropower generation equipment, including urban construction land, agricultural land, and forest land; and the Rhino built-in plug-in Grasshopper is used to pick up the plane curve area within the scope of the hydropower generation construction site; and / or,
[0065] Step S9, picking up the slope, elevation and coordinate data of the sampling points: using Grasshopper, a built-in parametric plug-in of Rhino, picking up the slope, elevation information and coordinate data file of the GIS runoff curve grid sampling points, and establishing point objects within the selection area; matching the longitude and latitude coordinates of the entity points with the actual coordinate points, using a unified coordinate system; the unified coordinate system is the 2000 National Geodetic Coordinate System; and / or,
[0066] Step S10, perform density distribution simulation: use the built-in parametric plug-in Grasshopper in Rhino to establish a unit grid range with a coordinate interval radius X for each entity point, use the Grasshopper plug-in populat2D command to perform random point distribution, the number of distribution points is the Y value of each sampling point, and establish the association between the density simulation of the resistance module and the slope and elevation of the sampling point; and / or,
[0067] Step S11, generating a distribution simulation diagram: using Grasshopper, a built-in parametric plug-in of Rhino, the Bake command in Grasshopper is used to place the random points of the simulated distribution within the selected area, forming a distribution diagram on the general plan of the selected area with the density of the dot matrix representing the change of the runoff flow, and picking up the X, Y coordinates of the points according to the distribution diagram, that is, selecting the location of the energy resistance module in the area.
[0068] In the present invention, ArcGIS Pro software and 3D modeling and analysis software Rhino can effectively assist designers in generating internal resistance module distribution simulation diagrams, thereby simulating resistance module layout schemes suitable for mountain surface runoff conditions such as snowmelt and flood discharge, thereby achieving optimal power generation. The above software effectively reduces the difficulty of arranging hydropower generation devices.
[0069] 3. The method for arranging a hydroelectric power generation device for mountain surface runoff provided by the present invention, in step S8, establishes a functional relationship between the terrain slope S, the terrain elevation H, and the density value Y of the energy resistance module; wherein the density value Y of the energy resistance module is within the radius of the unit sampling point of the runoff selection line; the functional relationship is as follows:
[0070]
[0071] In the present invention, the above functional relationship can be used to calculate the energy resistance module density value Y through parameters such as terrain slope S and terrain elevation H. The energy resistance module distribution map is generated according to the above energy resistance module density value.
[0072] 4. The high mountain hydroelectric power generation system provided by the present invention is applied to the above-mentioned hydroelectric power generation device arrangement method, comprising:
[0073] Small generators;
[0074] The energy resistance module comprises: a drainage main cavity and a drainage pipeline arranged on the drainage main cavity; a turbine blade is arranged in the drainage pipeline and is connected to the small generator to drive the rotor to rotate; when the rotor rotates relative to the permanent magnet structure in the stator housing and the magnetic flux in the permanent magnet structure changes, an electromotive force is generated in the coil, and the induced electromotive force causes the charge to move in the conductor coil, forming a current flow;
[0075] The energy resistance module is connected to the battery through a wire to supply power to the battery.
[0076] In the present invention, by placing the energy resistance module in the drainage channel, the turbine blades in the energy resistance module can effectively drive the small generator to generate electricity. Moreover, more importantly, in the present invention, the turbine blades are placed in the drainage pipeline. No matter how the energy resistance module is placed, the water flow will enter the drainage pipeline and flow out under the guidance of the drainage pipeline, thereby realizing power generation by utilizing the terrain slope.
[0077] 5. In the high mountain hydropower generation system provided by the present invention, there are multiple drainage pipelines, which are symmetrically arranged on the drainage main cavity to form a polygonal energy resistance module.
[0078] In the present invention, multiple drainage pipelines are symmetrically arranged at various positions of the drainage main cavity, thereby ensuring that no matter how the energy resistance modules are stacked, water can smoothly enter the drainage pipeline and drive the turbine blades to rotate.
[0079] 6. In the high mountain hydroelectric power generation system provided by the present invention, a plurality of said energy resistance modules are matched and snapped together in the drainage channel to limit and fix each said energy resistance module. In addition, there are 6 said drainage pipelines, which are symmetrically arranged on the said drainage main cavity to form a hexagonal structure of energy resistance modules.
[0080] In the present invention, the energy resistance modules with hexagonal structures are easier to be stably and reliably matched and connected, so that the energy resistance modules are mutually connected in the drainage channel, so that the energy resistance modules will not be washed away by the flowing water in the drainage channel.
[0081] 7. In the high mountain hydropower generation system provided by the present invention, a pressing component is also provided on the drainage pipeline; the pressing component has an outward convex state protruding from the outer peripheral surface of the drainage pipeline, and an inward convex state being driven to press and protrude from the inner peripheral surface of the drainage pipeline; in the inward convex state, the inner diameter of the drainage pipeline is reduced to accelerate the water flow passing through the drainage pipeline.
[0082] In the present invention, the inner diameter of the drainage pipeline can be adjusted quickly and simply by the pressing component arranged on the drainage pipeline, so as to adapt to different terrain requirements. Moreover, it has the advantages of simple structure and low manufacturing cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0083] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0084] Figure 1 A schematic diagram of the location of the energy resistance module provided by the present invention;
[0085] Figure 2 A schematic diagram of segmented analysis of surface runoff provided by the present invention;
[0086] Figure 3 A schematic diagram of the arrangement of multiple energy resistance modules arranged in a drainage channel provided by the present invention;
[0087] Figure 4 A schematic diagram of the three-dimensional structure of the energy resistance module provided by the present invention;
[0088] Figure 5 A schematic diagram of the three-dimensional structure of a drainage pipeline provided with turbine blades provided by the present invention;
[0089] Figure 6 A schematic diagram of the three-dimensional structure of a drainage pipeline with a pressing component provided by the present invention.
[0090] Description of reference numerals:
[0091] 1-energy resistance module; 2-drainage main cavity; 3-drainage pipeline; 4-turbine blade; 5-drainage channel; 6-pressing component. DETAILED DESCRIPTION
[0092] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0093] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0094] Example 1
[0095] See also Figure 2 and Figure 1 , Figure 2 A schematic diagram of segmented analysis of surface runoff in an embodiment of the present invention is shown. Figure 1 A schematic diagram of the location of the energy resistance module in an embodiment of the present invention is shown.
[0096] This embodiment provides a method for arranging a hydroelectric power generation device for mountain surface runoff, comprising the following steps:
[0097] Step S1, generating surface flow and slope datasets: Based on ArcGIS Pro software, using a raster calculator, extract the slope in sections, divide it into low slope area, medium slope area, and high slope area, and output the slope datasets respectively;
[0098] Step S2, outputting the slope dataset: Based on ArcGIS Pro software, using the raster calculator, extracting the slope in sections, dividing it into low slope area, medium slope area, and high slope area, and outputting the slope datasets respectively;
[0099] Step S3, vector surface data conversion: based on ArcGIS Pro software, use the raster to surface tool to process the three slope area datasets respectively, and convert the raster datasets into vector surface data;
[0100] Step S4, generating a segmented surface runoff dataset: based on ArcGIS Pro software, using a clipping tool, processing the surface runoff dataset with vector surface data to generate a segmented surface runoff dataset;
[0101] Step S5, processing the segmented surface runoff dataset: based on ArcGIS Pro software, using the raster to point tool, processing the segmented surface runoff dataset, and adding longitude and latitude coordinate fields to the point dataset;
[0102] Step S6, outputting an attribute table, wherein the output attribute table includes latitude and longitude fields;
[0103] Step S7, delineating unsuitable areas: using the 3D modeling and analysis software Rhino, delineating areas unsuitable for the construction of hydropower generation equipment within the general plan runoff selection area, including urban construction land, agricultural land, and forest land; and using the Rhino built-in plug-in Grasshopper to pick up the plane curve area of the hydropower generation construction site range;
[0104] Step S8, establishing a functional relationship between terrain slope, terrain elevation and energy resistance module distribution density;
[0105] Step S9, picking up the slope, elevation and coordinate data of the sampling points: using Grasshopper, a parameterized plug-in built into Rhino, picking up the slope, elevation information and coordinate data file of the GIS runoff curve grid sampling points, and establishing point objects within the selection area; matching the longitude and latitude coordinates of the entity points with the actual coordinate points, using a unified coordinate system; the unified coordinate system is the 2000 National Geodetic Coordinate System;
[0106] Step S10, density distribution simulation: using Grasshopper, a built-in parametric plug-in of Rhino, a unit grid range with a coordinate interval radius X is established for each entity point, and the Grasshopper plug-in populat2D command is used to perform random point distribution. The number of distribution points is the Y value of each sampling point, and the relationship between the density simulation of the energy resistance module and the slope and elevation of the sampling point is established;
[0107] Step S11, generating a distribution simulation diagram: using Grasshopper, a built-in parametric plug-in of Rhino, the Bake command in Grasshopper is used to place the random points of the simulated distribution within the selected area, forming a distribution diagram on the general plan of the selected area with the density of the dot matrix representing the change of the runoff flow, and picking up the X, Y coordinates of the points according to the distribution diagram, that is, selecting the location of the energy resistance module in the area.
[0108] In this embodiment, in the specific step S8, a functional relationship between terrain slope, terrain elevation and energy resistance module distribution density is established in the following manner:
[0109] The functional relationship between the terrain slope S and terrain elevation H and the density value Y of the energy resistance module is established; the density value Y of the energy resistance module is within the radius of the unit sampling point of the runoff selection line; the functional relationship is as follows:
[0110]
[0111] Where S is the slope;
[0112] H is the elevation, m;
[0113] n is the channel roughness coefficient (dimensionless);
[0114] A is the channel cross-sectional area, m2;
[0115] P is the channel wetted perimeter, m;
[0116] N and M are density distribution coefficients, N is (pieces·s) / m 5 , M is (pieces·s) / m 6 .
[0117] Of course, the present invention does not impose any specific restrictions on the software used to generate surface flow and slope datasets, output slope datasets, convert vector surface data, generate segmented surface runoff datasets, and process segmented surface runoff datasets. In other embodiments, data processing and analysis can also be achieved through software other than ArcGIS Pro software.
[0118] Of course, the present invention does not impose any specific restrictions on the software used to delineate unsuitable areas, or to pick up the slope, elevation and coordinate data of sampling points, or to perform density distribution simulation and generate distribution simulation maps. In other embodiments, data processing and analysis can also be achieved through other software besides Rhino.
[0119] Example 2
[0120] See also Figure 3 and Figure 4 , Figure 3 A schematic diagram of the arrangement of multiple energy resistance modules arranged in a drainage channel in an embodiment of the present invention is shown. Figure 4 A schematic diagram of the three-dimensional structure of the energy resistance module in an embodiment of the present invention is shown.
[0121] This embodiment provides a high mountain water conservancy power generation system, which is applied to the method for arranging a water conservancy power generation device for mountain surface runoff in Embodiment 1, comprising:
[0122] Small generators;
[0123] The energy resistance module 1 comprises: a drainage main cavity 2 and a drainage pipeline 3 arranged on the drainage main cavity 2; Figure 5 As shown, the drainage pipeline 3 is provided with turbine blades 4 connected to the small generator to drive the rotor to rotate. When the rotor rotates relative to the permanent magnet structure in the stator housing and the magnetic flux in the permanent magnet structure changes, an electromotive force is generated in the coil. The induced electromotive force causes the charge to move in the conductor coil, forming a current flow.
[0124] The energy resistance module 1 is connected to the battery through a wire to supply power to the battery.
[0125] In this embodiment, if Figure 4 As shown, there are six drainage pipelines 3, which are symmetrically arranged on the drainage main cavity 2 to form a hexagonal energy resistance module 1. A plurality of energy resistance modules 1 are matched and snapped in the drainage channel 5 to limit and fix each energy resistance module 1.
[0126] In this embodiment, if Figure 6 As shown, the drainage pipeline 3 is also provided with a pressing component 6; the pressing component 6 has an outer convex state protruding from the outer circumference of the drainage pipeline 3, and an inner convex state protruding from the inner circumference of the drainage pipeline 3 by being driven to press; in the inner convex state, the inner diameter of the drainage pipeline 3 is reduced to accelerate the water flow through the drainage pipeline 3. The above-mentioned pressing component 6 can quickly and easily adjust the inner diameter of the drainage pipeline 3, so as to adapt to different terrain requirements. Moreover, it also has the advantages of simple structure and low production cost.
[0127] Of course, this embodiment does not specifically limit the number and arrangement position of the drainage pipelines 3 located on the drainage main cavity 2. In other embodiments, the drainage pipelines 3 can also be 4 or other numbers. Multiple drainage pipelines 3 can be asymmetrically arranged on the drainage main cavity 2 as needed.
[0128] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A method for arranging a hydroelectric power generation device for mountain surface runoff, characterized in that: The following steps are involved: Step S1, generating surface flow and slope data sets: using digital elevation data, generating a surface flow data set; And generate slope data set; Step S2, outputting a slope data set: extracting the slope in sections, dividing it into a low slope area, a medium slope area, and a high slope area, and outputting slope data sets respectively; Step S3, vector surface data conversion: processing the three slope area data sets respectively, and converting the raster data sets into vector surface data; Step S4, generating a segmented surface runoff data set: processing the surface runoff data set with the vector surface data to generate a segmented surface runoff data set; Step S5, processing the segmented surface runoff dataset: processing the segmented surface runoff dataset and adding longitude and latitude coordinate fields to the point dataset; Step S6, outputting an attribute table, wherein the output attribute table includes latitude and longitude fields; Step S7, delineating unsuitable areas: delineating areas unsuitable for constructing hydropower generation equipment within the overall plan runoff selection area, including urban construction land, agricultural land, and forest land; and picking up the plan curve area within the scope of the hydropower generation construction site; Step S8, establishing a functional relationship between terrain slope, terrain elevation and energy resistance module distribution density; Step S9, picking up the slope, elevation and coordinate data of the sampling point: picking up the slope, elevation information and coordinate data file of the runoff curve grid sampling point, establishing the point object within the selection area; matching the latitude and longitude coordinates of the entity point with the actual coordinate point; Step S10, performing density distribution simulation: establishing a unit grid range with a coordinate interval radius X for each entity point; And perform random point distribution, where the number of distribution points is the Y value of each sampling point, and establish the association between the density simulation of the resistance module and the slope and elevation of the sampling point; Step S11, generating a distribution simulation diagram: placing random points of simulated distribution within the selected area, forming a distribution diagram on the general plan of the selected area with the density of the dot matrix representing the change of runoff flow, and picking up the X, Y coordinates of the points according to the distribution diagram, that is, selecting the location of the energy resistance module in the area.
2. The method for arranging a hydroelectric power generation device for mountain surface runoff according to claim 1, characterized in that: In step S1, based on ArcGIS Pro software, using a raster calculator, the slope is extracted in sections, divided into low slope area, medium slope area, and high slope area, and the slope datasets are output respectively; and / or, In step S2, based on ArcGIS Pro software, using a raster calculator, the slope is extracted in sections, divided into low slope area, medium slope area, and high slope area, and the slope datasets are output respectively; and / or, In step S3, based on ArcGIS Pro software, the raster-to-surface tool is used to process the three slope area datasets respectively, and the raster datasets are converted into vector surface data; and / or, In step S4, based on ArcGIS Pro software, using the clipping tool, the surface runoff dataset is processed with the vector surface data to generate a segmented surface runoff dataset; and / or, In step S5, based on ArcGIS Pro software, the Raster to Point tool is used to process the segmented surface runoff dataset and add longitude and latitude coordinate fields to the point dataset; In step S7, the 3D modeling and analysis software Rhino is used to delineate areas in the overall plan runoff selection area that are not suitable for the construction of hydropower generation equipment, including urban construction land, agricultural land, and forest land; and the Rhino built-in plug-in Grasshopper is used to pick up the plane curve area within the scope of the hydropower generation construction site; and / or, In step S9, the built-in parametric plug-in Grasshopper of Rhino is used to pick up the slope, elevation information and coordinate data file of the GIS runoff curve grid sampling point, and establish the point object within the selection area; the longitude and latitude coordinates of the entity point are matched with the actual coordinate point, and a unified coordinate system is used; the unified coordinate system is the 2000 National Geodetic Coordinate System; and / or, In step S10, the built-in parametric plug-in Grasshopper of Rhino is used to establish a unit grid range of coordinate interval radius X for each entity point, and the Grasshopper plug-in populat2D command is used to perform random point distribution. The number of distribution points is the Y value of each sampling point, and the relationship between the density simulation of the resistance module and the slope and elevation of the sampling point is established; and / or, In step S11, Grasshopper, a built-in parametric plug-in of Rhino, is used to place the simulated random points within the selected area through the Bake command in Grasshopper, forming a distribution map on the general plan of the selected area with the density of the dot matrix representing the change of runoff flow. The X, Y coordinates of the points are picked up according to the distribution map, which is the location of the energy resistance module in the area.
3. The method for arranging a hydroelectric power generation device for mountain surface runoff according to claim 1, characterized in that: In step S8, The functional relationship between the terrain slope S and terrain elevation H and the density value Y of the energy resistance module is established; the density value Y of the energy resistance module is within the radius of the unit sampling point of the runoff selection line; the functional relationship is as follows: Where S is the slope; H is the elevation, m; n is the channel roughness coefficient (dimensionless); A is the channel cross-sectional area, m2; P is the channel wetted perimeter, m; N and M are density distribution coefficients, N is (pieces·s) / m 5 , M is (pieces·s) / m 6 .
4. A high mountain hydroelectric power generation system, applied to the method for arranging a hydroelectric power generation device for mountain surface runoff according to any one of claims 1 to 3, characterized in that: include: Small generators; The energy resistance module (1) comprises: a drainage main cavity (2) and a drainage pipeline (3) arranged on the drainage main cavity (2); a turbine blade (4) is arranged in the drainage pipeline (3) and is connected to the small generator to drive the rotor to rotate; when the rotor rotates relative to the permanent magnet structure in the stator housing and the magnetic flux in the permanent magnet structure changes, an electromotive force is generated in the coil, and the induced electromotive force causes the charge to move in the conductor coil, forming a current flow; A storage battery, wherein the energy resistance module (1) is connected to the storage battery via a wire to supply power to the storage battery.
5. The high mountain hydroelectric power generation system according to claim 4, characterized in that: The drainage pipelines (3) are multiple and symmetrically arranged on the drainage main cavity (2) to form an energy resistance module (1) with a polygonal structure.
6. The high mountain hydroelectric power generation system according to claim 5, characterized in that: The plurality of energy resistance modules (1) are engaged and snap-fitted in the drainage channel (5) so as to limit and fix each of the energy resistance modules (1).
7. The high mountain hydroelectric power generation system according to claim 6, characterized in that: There are six drainage pipelines (3) which are symmetrically arranged on the drainage main cavity (2) to form a hexagonal energy resistance module (1).
8. The high mountain hydroelectric power generation system according to claim 4, characterized in that: The drainage pipeline (3) is also provided with a pressing component (6); the pressing component (6) has an outward convex state protruding from the outer peripheral surface of the drainage pipeline (3), and an inward convex state protruding from the inner peripheral surface of the drainage pipeline (3) by being driven to press; In the inwardly convex state, the inner diameter of the drainage pipeline (3) is reduced so as to accelerate the flow of water passing through the drainage pipeline (3).