A building material detection device for building construction
By designing a building material testing device for construction, the problem of manual operation and inability to simply increase the pressure difference between the two sides of the test block in the existing steady-state penetration method is solved. The device realizes automatic sealing and position adjustment of the test block by moving the flip assembly and adjustment assembly. The water tank assembly controls the water pressure through a folding structure and adjustment method to adapt to test block detection of different thicknesses, improving detection efficiency and convenience.
Patent Information
- Application Number
- CN202510042973.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-10
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2045-01-10
AI Technical Summary
The existing steady-state penetration method detection device requires manual operation of the sealing side of the test block, and the pressure difference between the two sides of the test block cannot be simply increased during the experiment, resulting in inconvenience in detection.
A building material inspection device for construction construction is designed, including installation boxes, mobile flip components, adjustment components and water tank components. Through the linkage between the moving flip assembly and the adjustment assembly, the automatic sealing and position adjustment of the test block is achieved. The water tank assembly adopts a folding structure, which controls the water pressure through simple adjustment to adapt to test blocks of different thicknesses.
The automated sealing of the side of the test block is realized, reducing manual participation and improving the efficiency of pre-experiment preparation. Through the design of the water tank assembly, the pressure difference on both sides of the test block can be flexibly controlled, and no additional booster equipment is required to adapt to test block inspection of different thicknesses.
Smart Images

Figure CN119438044B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building material detection, in particular to a building material detection device for building construction. Background Art
[0002] Building materials refer to all materials used in construction projects. In a broad sense, it includes all kinds of materials that constitute the entities of buildings and structures, as well as auxiliary materials required in the construction process.
[0003] In today's construction field, the quality of building materials is directly related to the safety, durability and stability of the entire construction project. With the continuous development of construction technology and the increasing scale of construction, the performance requirements for building materials are becoming more and more stringent, and the requirements for material testing are also getting higher and higher.
[0004] The prior art publication number is CN118258741A, which provides a building material detection device for construction, and relates to the technical field of building material porosity detection. The device comprises a detection box and a test block body. A test cavity is provided inside the detection box, and a lower sealing shell is fixedly connected to the inner wall of the test cavity. A collecting cavity is provided inside the detection box. The device for detecting building materials for construction, when detecting the test block body, can use a heating plate and a pressing plate to press liquid thermoplastic material into the pores of the test block body, and then can drive the upper and lower clamping blocks to clamp the test block body through a second electric push rod, and cooperate with a fan to sequentially deliver strong wind to each side of the test block body, so as to blow out the solid thermoplastic material in the effective pores in the test block body, and then use a weight method to weigh the blown solid thermoplastic material, so as to obtain the effective porosity of the test block body, thereby ensuring the actual effect achieved after the porous concrete construction.
[0005] Although the above-mentioned prior art uses air blowing to detect the effective pores of the test block, the use of solid thermoplastic material blowing is only suitable for the case where the test block has obvious pores. For test blocks with small pores or pores not located on the surface, the penetration method is still used for detection. The penetration method includes the steady-state penetration method and the transient penetration method. Both test methods are to first seal the sides of the test block, and then use water with different water pressures to pass through the upper and lower sides of the test block, record the passing time, the pressure at both ends of the test block, and the thickness of the test block. The permeability can be calculated using the expression of Darcy's law. The difference between the steady-state penetration method and the transient penetration method lies in the use of stable water pressure and variable pressure water pressure. In the experimental process of the steady-state penetration method, the existing equipment uses manual operation to first seal the sides of the test block, and then conduct the experiment. During the experiment, the water tank pressure cannot be changed. If the thickness of the test block is large, it is necessary to increase the pressure on both sides of the test block, which can only be controlled by another pressurizing device, and the device detection test is inconvenient.
[0006] It can be seen that a building material detection device for construction is needed to solve the problem mentioned in the above background technology that the existing steady-state permeability method uses manual operation to first seal the side of the test block during the experiment and cannot simply increase the pressure difference on both sides of the test block during the experiment. Summary of the invention
[0007] The purpose of the present invention is to provide a building material detection device for construction to solve the problem that the existing steady-state permeability method proposed in the above background technology uses manual operation to seal the side of the test block during the experiment and cannot simply increase the pressure difference on both sides of the test block during the experiment.
[0008] In order to solve the above technical problems, the present invention provides the following technical solutions: a building material detection device for construction, comprising an installation box, a movable flip assembly is installed inside the installation box, and an adjustment assembly is arranged on one side of the movable flip assembly, the adjustment assembly clamps the test block in two spaces inside the installation box and flips it back and forth, and the two spaces inside the installation box are separated by a flip door assembly, the movable flip assembly is linked with the flip door assembly, and a water tank assembly is installed inside the installation box above the test block;
[0009] The mobile flip assembly includes a driving motor, a first pulley and a first end gear, and the first pulley is linked to the flip door assembly, a second end gear is meshed above the first end gear, and a retaining frame is arranged on one side of the second end gear, one end of the retaining frame is arranged on the output end of the driving motor, and one side of the second end gear is connected to a rotating frame through a mounting bin;
[0010] The water tank assembly includes a folding box body, and a top plate and a bottom plate are respectively arranged at the upper and lower ends of the inside of the folding box body, a lifting frame is arranged between the top plate and the bottom plate, and a lifting frame is arranged at the middle position of the lifting frame, a limiting threaded shaft is arranged at the bottom end of the lifting frame, and a threaded worm is arranged at the outer side of the limiting threaded shaft, a side turbine is meshed with the threaded worm, a drain pipe passes through the bottom end of the folding box body, and the drain pipe is located at the top of the test block.
[0011] Preferably, the output end of the driving motor is connected to an output shaft, the first pulley is located on the outside of the output shaft, the retaining frame is located above the first pulley and on the outside of the output shaft, and the top of the output shaft is connected to a support column through a bearing, one end of the support column is connected to the first end gear, and the other end of the support column is in contact with the ground, a nozzle is installed on the side of the installation box away from the water tank assembly, and a collecting bin is arranged under the nozzle, and the top of the nozzle is connected to a spraying device through a nozzle.
[0012] Preferably, a motor is installed at one end inside the installation bin, and the output end of the motor passes through the rotating frame and is connected to the center gear, a large turbine is arranged at the middle position inside the rotating frame, and a large worm is meshed above the large turbine, the large worm and the large turbine can both rotate inside the rotating frame, and a rotating coupling is connected to one side of the large turbine, two ends of the rotating coupling are correspondingly connected to two sets of transmission gears, and the two sets of transmission gears are meshed with the center gear, and the other side of the transmission gear is meshed with an external gear, and the number of the external gears is two sets.
[0013] Preferably, one side of the central gear, transmission gear and external gear are all connected to an auxiliary frame, one side of the two groups of external gears are all connected to a first vertical axis, and one end of the first vertical axis is connected to a sleeve ring, one end of the sleeve ring is hinged with a Z-shaped axis, and one side of the sleeve ring is connected to a vertical auxiliary axis, the other end of the Z-shaped axis is hinged with a second vertical axis, and the second vertical axis is located on one side of the vertical auxiliary axis, one end of the second vertical axis is connected to a gasket, and the gasket is located at both ends of the test block.
[0014] Preferably, a water pipe is provided at the top of the folding box body, and the water pipe passes through the top plate and extends to the bottom thereof, a through hole is opened inside the bottom plate, and the through hole is connected to a drain pipe, a control valve is connected to the outside of the drain pipe, and a pressure detection device is installed below the control valve, a collection box is provided inside the installation box below the water tank assembly, and a detection head and a pressure detection device are provided above the collection box.
[0015] Preferably, the lifting frame includes an upper articulated short axis, a first tilting axis and a second tilting axis, the first tilting axis and the second tilting axis are hinged at a middle position, and one end of the first tilting axis and the second tilting axis are hinged to the upper articulated short axis, and the other end is hinged to the lower articulated short axis, one end of the upper articulated short axis is hinged to the top plate, and one end of the lower articulated short axis is hinged to the bottom plate, and the lifting frame is hinged on four sides of the top plate and the bottom plate.
[0016] Preferably, limiting holes are provided on all four sides of the lifting frame, and the limiting holes match the axes at the hinges of the first tilting axis and the second tilting axis, a groove is vertically opened on the limiting threaded axis, and a fixed cylinder matching the groove is installed on the outer side of the limiting threaded axis, the limiting threaded axis passes through the folding box body and extends to the bottom thereof, and a seal is provided at the contact between the folding box body and the limiting threaded axis, the threaded worm rotates at the bottom of the folding box body, and a vertical plate is connected to the bottom of the folding box body, a handle is connected to one side of the side turbine, and the handle passes through the vertical plate and extends to the outside thereof.
[0017] Preferably, the flip door assembly includes a second pulley, and the second pulley is connected to the first pulley by a belt, a worm gear group is arranged above the second pulley, and the worm gear group includes a turbine and a worm gear that mesh with each other, and the worm gear is located above the second pulley, one side of the worm gear group is connected to the pulley group, and the rear side of the pulley group is connected to the driving gear, an outer sleeve shaft is arranged above the driving gear, and a movable rack is arranged inside the outer sleeve shaft, teeth are arranged at both front and rear ends of the movable rack, and the driving gear passes through the outer sleeve shaft and meshes with the teeth at the rear end of the movable rack, and the end of the movable rack is connected to the hinge block.
[0018] Preferably, a half gear is meshed below the front end teeth of the movable rack, and a hinge block is hinged on the rear side of the half gear, the bottom end of the half gear is connected to an extension rod, one side of the extension rod is connected to a flip door, the inner wall of the installation box is connected to a limiting groove, and the hinge block moves inside the limiting groove.
[0019] Compared with the prior art, the beneficial effects achieved by the present invention are:
[0020] First, the present invention provides an installation box, a movable flip assembly, and an adjustment assembly. Before the test block is tested by the steady-state penetration method, the test block can be clamped by the adjustment assembly, and rotated and moved in the installation box, and moved to the paint spraying site. The four sides of the test block are all sprayed with sealing paint and dried and sealed. During this process, the adjustment assembly will drive the test block to rotate, thereby ensuring that the sealing paint can be evenly coated on the four sides of the test block. After that, the test block is rotated to the bottom of the water tank assembly. The entire sealing work is automated, which reduces manual participation and effectively improves the efficiency of pre-experimental preparations.
[0021] Second, the present invention realizes the steady-state penetration method of the test block using the water stored in the water tank assembly through the water tank assembly. The folding box is a folding structure, and the folding box can be controlled to unfold by shaking the handle, thereby expanding the internal volume of the folding box, so that the pressure at the water outlet end of the folding box increases, thereby increasing the differential pressure between the upper and lower surfaces of the test block. Without the need for additional pressurizing equipment, the water pressure in the folding box can be controlled by a simple adjustment method, and test blocks of different thicknesses can be flexibly tested.
[0022] Thirdly, the present invention provides a flip door assembly, so that when the mobile flip assembly drives the adjustment assembly and the test block to flip and move to the other side of the installation box, the middle flip door will drop to separate the internal space of the installation box, thereby avoiding mutual influence between the experimental operations in the two spaces and making the device more user-friendly. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the structure of the present invention;
[0024] Figure 2 It is a cross-sectional view of the present invention;
[0025] Figure 3 This is a schematic diagram of the internal structure of the installation box of the present invention;
[0026] Figure 4 This is a schematic diagram of the structure of the mobile flip assembly and the adjustment assembly of the present invention;
[0027] Figure 5 This is a schematic diagram of the separation of the mobile flip assembly and the adjustment assembly of the present invention;
[0028] Figure 6 This is a schematic diagram of splitting the first vertical axis and the second vertical axis of the present invention;
[0029] Figure 7 This is a schematic diagram of the connection structure of the water tank assembly of the present invention;
[0030] Figure 8 This is a schematic diagram of the disassembly of the water tank assembly of the present invention;
[0031] Fig. 9 This is a schematic diagram of the lifting frame connection structure of the present invention;
[0032] Fig.10 This is a schematic diagram of the connection structure of the flip door assembly of the present invention;
[0033] Fig.11 This is a schematic diagram of the disassembly of the flip door assembly of the present invention.
[0034] Among them: 1. Installation box; 2. Mobile flip assembly; 201. Drive motor; 202. First pulley; 203. First end gear; 204. Cage; 205. Second end gear; 206. Installation bin; 3. Adjustment assembly; 301. Rotating frame; 302. Large turbine; 303. Large worm; 304. Rotating shaft; 305. Center gear; 306. Transmission gear; 307. External gear; 308. Auxiliary frame; 309. First vertical axis; 310. Socket ring; 311. Z-shaped axis; 312. Vertical auxiliary axis; 313. Second vertical axis; 4. Flip door assembly; 401. Second pulley; 402 , worm gear group; 403, pulley group; 404, driving gear; 405, moving rack; 406, outer sleeve shaft; 407, half gear; 408, hinge block; 409, extension rod; 410, flip door; 411, limiting groove; 5, water tank assembly; 501, folding box body; 502, top plate; 503, bottom plate; 504, lifting frame; 5041, upper hinged short axis; 5042, first tilting axis; 5043, second tilting axis; 5044, lower hinged short axis; 505, lifting frame; 506, limiting threaded axis; 507, threaded worm; 508, side turbine; 509, handle; 510, drain pipe. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] See also Figure 1-Figure 6 A building material detection device for construction includes an installation box 1, a mobile flip assembly 2 is installed inside the installation box 1, and an adjustment assembly 3 is arranged on one side of the mobile flip assembly 2, the adjustment assembly 3 clamps the test block in two spaces inside the installation box 1 and flips it back and forth, the mobile flip assembly 2 includes a driving motor 201, a first pulley 202 and a first end gear 203, and the first pulley 202 is linked with a flip door assembly 4, a second end gear 205 is meshed above the first end gear 203, and a retaining frame 204 is arranged on one side of the second end gear 205, one end of the retaining frame 204 is arranged at the output end of the driving motor 201, and one side of the second end gear 205 is connected to a rotating frame 301 through an installation bin 206.
[0037] In this embodiment, the steady-state permeability method is based on Darcy's law. Under a stable fluid flow state, the permeability of porous materials is measured. It is necessary to measure the volume flow rate of the fluid, the cross-sectional area perpendicular to the fluid flow direction, the head difference of the fluid at both ends of the material, that is, the pressure difference, and the thickness of the material. When other parameters are kept unchanged in the experiment, the permeability can be calculated by measuring the flow rate and the pressure difference. The existing equipment generally mainly includes a liquid supply system such as a constant pressure water tank, a test specimen porous material sample, which is usually cylindrical or rectangular in shape, and the side is sealed to only allow the fluid to pass through the upper and lower surfaces, a pressure measurement system for measuring the pressure difference at both ends of the specimen, such as a pressure sensor and a collection system for collecting the fluid passing through the specimen. For example, in the side sealing of the measuring cylinder, manual operation is required. In this embodiment, the side of the test block is sealed by spraying sealing paint. In fact, it can also be wrapped with a sealing strip. In this embodiment, the sealing material can be changed according to actual needs. A controller is installed in the device, and the operation of the device experiment can be controlled by the controller.
[0038] Specifically, the output end of the driving motor 201 is connected to the output shaft, the first pulley 202 is located on the outside of the output shaft, the retaining frame 204 is located above the first pulley 202 and on the outside of the output shaft, and the top of the output shaft is connected to a support column through a bearing, one end of the support column is connected to the first end gear 203, and the other end of the support column is in contact with the ground, a nozzle is installed on the side of the installation box 1 away from the water tank assembly 5, and a collecting bin is arranged under the nozzle, and the top of the nozzle is connected to the spraying equipment through a nozzle.
[0039] In this embodiment, a sealed door is provided on the outside of the installation box 1. After closing, the experimental environment can be free from external factors. After opening, some equipment can be manually adjusted, such as a handle 509. An opening is provided at the top of the installation box 1. The setting of the opening facilitates the folding of the box body 501 for telescopic operation. The interior of the installation box 1 includes two spaces, which are located on both sides of the movable flip assembly 2. One group is the space where the water tank assembly 5 is located, which is used for penetration experiments, and the other group is the space where the paint spray head is located, which is used for sealing the test block. A partition can be provided in the middle, and the flip door 410 is flipped and located on one side of the partition. The flip door 410 itself is provided with an opening, which can bypass the position of the movable flip assembly 2, so that the two spaces are not completely sealed, but can be divided to a certain extent. When the drive motor 201 is started, the flip door assembly 4 will be linked, so the flip door assembly 4 can be closed when the movable flip assembly 2 drives the test block to rotate to the side of the paint spray head, and the flip door assembly 4 can also be closed when the penetration experiment is performed. The user can adjust according to the actual usage. A drying device can be installed on one side of the paint spray head to accelerate the drying of the sealing paint and shorten the waiting time.
[0040] Specifically, a motor is installed at one end inside the installation bin 206, and the output end of the motor passes through the rotating frame 301 and is connected to the central gear 305. A large turbine 302 is arranged at the middle position inside the rotating frame 301, and a large worm 303 is meshed above the large turbine 302. Both the large worm 303 and the large turbine 302 can rotate inside the rotating frame 301, and a rotating coupling 304 is connected to one side of the large turbine 302. Two ends of the rotating coupling 304 are correspondingly connected to two sets of transmission gears 306, and the two sets of transmission gears 306 are meshed with the central gear 305. The other side of the transmission gear 306 is meshed with an external gear 307, and the number of external gears 307 is two sets.
[0041] In this embodiment, the driving motor 201 can be a forward and reverse motor. After starting, it drives the adjusting component 3 to rotate from the bottom of the water tank component 5 to the bottom of the paint spray head, and can also rotate back, from the bottom of the paint spray head to the bottom of the water tank component 5. In the adjusting component 3, there are no partitions on both sides of the rotating frame 301, and the interior is hollow. A partition is provided on the front side, and a vertical groove is opened on the partition. Two groups of first vertical shafts 309 pass through the vertical groove and extend to the outside thereof. A fixing plate is provided inside the rotating frame 301 to fix the large worm 303. A handle can be installed at one end of the large worm 303 for easy rotation. The rotation of the large worm 303 drives the large turbine 302 to rotate, which can prevent reversal. A through hole is provided in the middle of the large turbine 302, which is located at the rotating The motor output shaft on the rear side of the frame 301 passes through the through hole and is connected to the central gear 305. The two ends of the rotating shaft 304 are connected to the two sets of transmission gears 306 through bearings and shafts. When the central gear 305 is driven by the motor to rotate, it will drive the transmission gear 306 to rotate and also drive the outer gear 307 to rotate. The rotation of the outer gear 307 will drive the first vertical shaft 309 to rotate. The second vertical shaft 313 is rotated through the rotation of the sleeve ring 310, the Z-shaped shaft 311 and the vertical auxiliary shaft 312, thereby rotating the test block clamped in the middle. Therefore, the test block can be rotated when being sprayed, so that the outer side of the test block can be evenly sprayed by the paint spray head. The test block can be a rectangular structure or a cylindrical structure.
[0042] Specifically, one side of the central gear 305, the transmission gear 306 and the external gear 307 are all connected to the auxiliary frame 308, one side of the two sets of external gears 307 are all connected to the first vertical axis 309, and one end of the first vertical axis 309 is connected to the sleeve ring 310, one end of the sleeve ring 310 is hinged with a Z-shaped axis 311, and one side of the sleeve ring 310 is connected to a vertical auxiliary axis 312, the other end of the Z-shaped axis 311 is hinged with a second vertical axis 313, and the second vertical axis 313 is located on one side of the vertical auxiliary axis 312, one end of the second vertical axis 313 is connected to a gasket, and the gasket is located at both ends of the test block.
[0043] In this embodiment, the rotating large worm 303 is separated from the rotating center gear 305. The center gear 305 is driven by a motor on the rear side of the rotating frame 301, and the large worm 303 is manually driven. The large worm 303 drives the large turbine 302 to rotate. The rotation of the large turbine 302 drives the rotating connecting shaft 304 to rotate, thereby changing the position of the transmission gears 306 located on both sides of the center gear 305. With the assistance of the front auxiliary frame 308, the positions of the outer gear 307 and the transmission gear 306 are changed. The attached figure shows the situation where the five groups of gears are located on the same vertical line, and the two groups of first vertical axes 309 are the farthest apart. By rotating the large worm 303, the positions of the five groups of gears can be changed. Although they are always in a meshing state, they are no longer located on the same vertical line.
[0044] See also Figure 10-11 A building material detection device for construction, wherein two spaces inside an installation box 1 are separated by a flip door assembly 4, and a movable flip assembly 2 is linked with the flip door assembly 4.
[0045] In this embodiment, the flip door 410 moves back and forth with the movement of the worm gear set 402, and its states are divided into horizontal and vertical states. When the flip door 410 is in the vertical state, it is located in the middle position of the internal space of the installation box 1, and the internal space of the installation box 1 is blocked as a whole. A groove is opened inside the flip door 410, and the shape of the groove matches the outer contour of the driving motor 201 and other related parts to avoid mutual interference. Because the flip door 410 itself is fixedly installed in the middle position inside the installation box 1, the movement of the flip door 410 does not interfere with the setting of the flip door 410 itself, and the belt between the first pulley 202 and the second pulley 401 can also pass through the groove. Sealing pads can be set on the four sides of the flip door 410, and the two sides can also be assisted by limit blocks matching the inner wall of the installation box 1. The material itself can be a lighter plate material, which is convenient for flipping back and forth.
[0046] Specifically, the flip door assembly 4 includes a second pulley 401, and the second pulley 401 is connected to the first pulley 202 by a belt, a worm gear group 402 is arranged above the second pulley 401, and the worm gear group 402 includes a turbine and a worm that mesh with each other, and the worm is located above the second pulley 401, a pulley group 403 is connected to one side of the worm gear group 402, and the rear side of the pulley group 403 is connected to a driving gear 404, an outer sleeve shaft 406 is arranged above the driving gear 404, and a moving rack 405 is arranged inside the outer sleeve shaft 406, teeth are arranged at both front and rear ends of the moving rack 405, and the driving gear 404 passes through the outer sleeve shaft 406 and meshes with the teeth at the rear end of the moving rack 405, and the end of the moving rack 405 is connected to the hinge block 408.
[0047] In this embodiment, the worm gear set 402 can prevent reversal to a certain extent. In this embodiment, the worm gear set 402, the pulley set 403, the driving gear 404 and the outer sleeve shaft 406 are all arranged on a mounting plate extending from the inside of the mounting box 1, and the mounting plate is used as a support to meet the operation of the flip door assembly 4. When the motor starts to drive the second pulley 401 to rotate, the second pulley 401 drives the worm gear set 402 to rotate. The turbine in the worm gear set 402 is coaxial with a group of pulleys in the pulley set 403, so it will drive the entire pulley set 403 to rotate. Another group of pulleys in the pulley set 403 is coaxial with the driving gear 404, so it will drive the driving gear 404 to rotate. The rear side of the driving gear 404 is connected to the mounting box 1 through a shaft and a bearing. The outer sleeve shaft 406 is connected to the mounting plate extending from the inner wall. The rotation of the driving gear 404 will drive the movable rack 405 to extend or retract from the inside of the outer sleeve shaft 406. Because the lower end of the movable rack 405 is provided with teeth meshing with the driving gear 404, the outer sleeve shaft 406 is a hollow structure, one end of which is fixed to the inner wall of the mounting box 1. Matching limit blocks and limit grooves can be provided between the outer sleeve shaft 406 and the movable rack 405 to assist the movement of the movable rack 405.
[0048] Specifically, a half gear 407 is meshed below the front end teeth of the movable rack 405, and a hinge block 408 is hinged on the rear side of the half gear 407, the bottom end of the half gear 407 is connected to an extension rod 409, one side of the extension rod 409 is connected to a flip door 410, the inner wall of the installation box 1 is connected to a limiting groove 411, and the hinge block 408 moves inside the limiting groove 411.
[0049] In this embodiment, the forward and backward movement of the movable rack 405 will also drive the hinge block 408 forward and backward, and the half gear 407 hingedly connected on one side of the hinge block 408 will also move together. However, due to the hinged connection, when the hinge block 408 moves to the turning point of the limiting groove 411, the half gear 407 will rotate due to the engagement with the front end teeth of the movable rack 405, thereby causing the horizontally arranged flip door 410 to rotate and flip from a horizontal state to a vertical state. The limiting groove 411 includes a vertical portion and a horizontal portion, and the vertical portion and the horizontal portion are connected at the end. The extension rod 409 is connected to the flip door 410, and the extension rod 409 and the flip door 410 will both rotate with the rotation of the half gear 407.
[0050] Please refer to 7- Fig. 9A building material testing device for construction, wherein a water tank assembly 5 is installed inside an installation box 1 above a test block, the water tank assembly 5 comprises a folding box body 501, and a top plate 502 and a bottom plate 503 are respectively arranged at the upper and lower ends of the folding box body 501, a lifting frame 504 is arranged between the top plate 502 and the bottom plate 503, and a lifting frame 505 is arranged at the middle position of the lifting frame 504, a limiting threaded shaft 506 is arranged at the bottom end of the lifting frame 505, and a threaded worm 507 is arranged on the outer side of the limiting threaded shaft 506, a side turbine 508 is meshed with the threaded worm 507, a drain pipe 510 is passed through the bottom end of the folding box body 501, and the drain pipe 510 is located at the top of the test block.
[0051] In this embodiment, the material of the folding box 501 is a foldable material. The box is foldable, and its internal volume will change when it is compressed and expanded. Parts such as the top plate 502, the bottom plate 503 and the lifting frame 504 are located in the water, so they can be made of materials that are not easy to corrode. In this embodiment, water enters the interior of the folding box 501 from the through water pipe at the top, and then is discharged from the drain pipe at the bottom. After the pressure at both ends of the test block is determined, the folding degree of the folding box 501 will not change in the experiment, and the pressure in the experiment will not change.
[0052] Specifically, a water pipe is provided at the top of the folding box body 501, and the water pipe passes through the top plate 502 and extends to the bottom thereof, a through hole is opened inside the bottom plate 503, and the through hole is connected to the drain pipe 510, a control valve is connected to the outside of the drain pipe 510, and a pressure detection device is installed below the control valve, a collection box is provided inside the installation box 1 below the water tank assembly 5, and a detection head and a pressure detection device are provided above the collection box.
[0053] In this embodiment, rotating the handle 509 will drive the side turbine 508 to rotate, and the side turbine 508 will drive the threaded worm 507 to rotate. The side turbine 508 cooperates with the threaded worm 507 to have a certain anti-reversal function. When the handle 509 is released, the hinge angle of the lifting frame 504 will not change. Even if there is a certain amount of water inside the folding box 501, it will not interfere with the experiment. A water level sensor can be installed at the top of the folding box 501. When the water level drops, the water supply pump will pump water into the folding box 501 to maintain a certain water level and keep the drainage water pressure normal.
[0054] Specifically, the lifting frame 504 includes an upper hinged short axis 5041, a first tilting axis 5042 and a second tilting axis 5043. The first tilting axis 5042 and the second tilting axis 5043 are hinged at a middle position, and one end of the first tilting axis 5042 and the second tilting axis 5043 is hinged to the upper hinged short axis 5041, and the other end is hinged to the lower hinged short axis 5044. One end of the upper hinged short axis 5041 is hinged to the top plate 502, and one end of the lower hinged short axis 5044 is hinged to the bottom plate 503. The lifting frame 504 is hinged on four sides of the top plate 502 and the bottom plate 503.
[0055] In this embodiment, when the handle 509 is shaken, the rotation of the side turbine 508 will drive the threaded worm 507 to rotate. The rotation of the threaded worm 507 in conjunction with the limit of the fixed cylinder will drive the limit threaded shaft 506 to rise and fall, thereby driving the lifting frame 505 to rise and fall. The lifting and lowering of the lifting frame 505 will drive the lifting frame 504 to expand or compress, thereby expanding or shrinking the distance between the top plate 502 and the bottom plate 503, and then drive the outer folding box 501 to fold or unfold, thereby changing the volume.
[0056] Specifically, limiting holes are provided on all four sides of the lifting frame 505, and the limiting holes match the axes at the hinges of the first tilting axis 5042 and the second tilting axis 5043. A groove is vertically opened on the limiting threaded axis 506, and a fixed cylinder matching the groove is installed on the outer side of the limiting threaded axis 506. The limiting threaded axis 506 penetrates the folding box body 501 and extends to the bottom thereof, and a seal is provided at the contact between the folding box body 501 and the limiting threaded axis 506. The threaded worm 507 rotates at the bottom of the folding box body 501, and a vertical plate is connected to the bottom of the folding box body 501. A handle 509 is connected to one side of the side turbine 508, and the handle 509 penetrates the vertical plate and extends to the outside thereof.
[0057] In this embodiment, the position where the limiting threaded shaft 506 contacts the folding box body 501 is sealed, so that even if the limiting threaded shaft 506 is raised or lowered and passes through the folding box body 501, water leakage will not occur. In this embodiment, the handle 509 can be rotated by a motor to improve the degree of automation of the device, or it can be manually controlled. As for whether to use manual rotation or electric drive, it can be selected according to actual conditions.
[0058] When in use, it is necessary to connect an external power supply, which provides electrical energy for the device so that the device can operate normally. First, the large worm 303 is shaken, so that the large worm 303 drives the large turbine 302 to rotate, and the large turbine 302 drives the rotating shaft 304 to rotate, so that the position of the transmission gear 306 on both sides of the central gear 305 changes. With the cooperation of the auxiliary frame 308, the position of the external gears 307 on both sides will also change, and the position of the first vertical axis 309 output from one side of the external gear 307 will change, so that the distance between the two groups of first vertical axes 309 is extended or shortened, so that the clamping piece can better adapt to the size of the test block, and the test block is clamped in the middle, and the drive motor 201 is started, so that the drive motor 201 drives the first pulley 202 and the retaining frame 204 to rotate, and the retaining frame 204 drives the second end gear 205 to rotate around the first end gear 203 The second end gear 205 meshes with the first end gear 203 so that it also rotates. The second end gear 205 rotates while revolving, thereby driving the rotating frame 301 to revolve and rotate as a whole, so that the rotating frame 301 moves to the side of the installation box 1 away from the water tank assembly 5, and at the same time rotates from the original vertical state to the horizontal state, located below the paint spray head. When the paint spray head is spraying paint, the motor on the rear side of the rotating frame 301 can be started to rotate the central gear 305, and the central gear 305 drives the transmission gear 306 to rotate, thereby driving the outer gear 307 to rotate, and the outer gear 307 drives the first vertical shaft 309 to rotate. The first vertical shaft 309 is driven by the sleeve ring 310 and the vertical auxiliary shaft 312 to rotate the second vertical shaft 313, thereby rotating the test block clamped in the middle. The paint spray head rotates downwardly so that the paint is evenly distributed on the outside of the test block, ensuring that the side of the test block is evenly sprayed and sealed, and the rotation of the first pulley 202 drives the second pulley 401 to rotate, so that the second pulley 401 drives the worm gear set 402 to rotate, and the worm gear set 402 drives the pulley set 403 to rotate, thereby driving the driving gear 404 to rotate, and the rotation of the driving gear 404 drives the moving rack 405 to move inside the outer sleeve shaft 406, so that the moving rack 405 moves out from the inside of the outer sleeve shaft 406, and the movement of the moving rack 405 drives the hinge block 408 to move together, so that the hinge block 408 moves inside the limiting groove 411, and the movement of the hinge block 408 drives the half gear 407 and the extension rod 409 to move together, and because the end of the moving rack 405 is meshed with the half gear 407 and the hinge block 408 Due to the hinged connection with the half gear 407, when the extension rod 409 reaches the turning position of the limit groove 411, the flip door 410 will also turn, thereby dividing the two spaces inside the installation box 1, so that the test block can be sealed by the paint spraying under the paint spraying head while reducing the impact on the water tank assembly 5. When the paint spraying surface of the test block is dry, it can be rotated back.When the test block is flipped, it is in a vertical state and located at the bottom of the drain pipe 510, and the penetration test can be carried out. Whether the differential pressure on both sides of the test block needs to be increased is determined according to the thickness of the test block. If necessary, the handle 509 is shaken to make the handle 509 drive the side turbine 508 to rotate, and the side turbine 508 drives the threaded worm 507 to rotate, so that the limit threaded shaft 506 is lifted and lowered, and the lifting and lowering of the limit threaded shaft 506 drives the lifting frame 505 to lift and lower, so that the folded lifting frame 504 is unfolded, and the outer folding box body 501 is a folding structure, which will also unfold with the internal unfolding structure. The foldable box 501 is unfolded, thereby expanding the height of the foldable box 501 and increasing the internal volume. At this time, the water inside the foldable box 501 is filled, and the water level height is maintained during the experiment using a water level sensor. The control valve outside the drain pipe 510 is opened to conduct a permeation experiment. In the experiment, since the sides are sealed, the test block can only penetrate from top to bottom. The detection equipment below contacts the water to obtain the permeation time. The permeability of the test block can be calculated by cooperating with the pressure detection equipment installed at both ends of the test block and the thickness of the test block, thereby obtaining the permeability of the porous material in the building material.
[0059] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present application. The scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A building material detection device for construction, comprising an installation box (1), characterized in that: A movable flip assembly (2) is installed inside the installation box (1), and an adjustment assembly (3) is arranged on one side of the movable flip assembly (2). The adjustment assembly (3) clamps the test block in two spaces inside the installation box (1) and flips it back and forth. The two spaces inside the installation box (1) are separated by a flip door assembly (4). The movable flip assembly (2) and the flip door assembly (4) are linked. A water tank assembly (5) is installed inside the installation box (1) above the test block. The movable flip assembly (2) comprises a driving motor (201), a first belt pulley (202) and a first end gear (203), and the first belt pulley (202) is linked to the flip door assembly (4), a second end gear (205) is meshed above the first end gear (203), and a retaining frame (204) is provided on one side of the second end gear (205), one end of the retaining frame (204) is provided at the output end of the driving motor (201), and one side of the second end gear (205) is connected to a rotating frame (301) via a mounting bin (206); The water tank assembly (5) comprises a foldable box body (501), wherein a top plate (502) and a bottom plate (503) are respectively arranged at the upper and lower ends of the foldable box body (501), a lifting frame (504) is arranged between the top plate (502) and the bottom plate (503), and a lifting frame (505) is arranged at the middle position of the lifting frame (504), a limiting threaded shaft (506) is arranged at the bottom end of the lifting frame (505), and a threaded worm (507) is arranged on the outer side of the limiting threaded shaft (506), and a side turbine (508) is meshed on one side of the threaded worm (507), and a drainage pipe (510) passes through the bottom end of the foldable box body (501), and the drainage pipe (510) is located at the top end of the test block.
2. A building material detection device for construction according to claim 1, characterized in that: The output end of the driving motor (201) is connected to an output shaft, the first pulley (202) is located outside the output shaft, the retaining frame (204) is located above the first pulley (202) and outside the output shaft, and the top end of the output shaft is connected to a support column via a bearing, one end of the support column is connected to the first end gear (203), and the other end of the support column is in contact with the ground, a nozzle is installed on a side of the installation box (1) away from the water tank assembly (5), and a collection bin is provided below the nozzle, and the top end of the nozzle is connected to a spraying device via a nozzle.
3. A building material detection device for construction according to claim 1, characterized in that: A motor is installed at one end inside the installation bin (206), and the output end of the motor passes through the rotating frame (301) and is connected to a central gear (305). A large turbine (302) is provided at a middle position inside the rotating frame (301), and a large worm (303) is meshed above the large turbine (302). Both the large worm (303) and the large turbine (302) can rotate inside the rotating frame (301), and a rotating shaft (304) is connected to one side of the large turbine (302). Two sets of transmission gears (306) are connected to two ends of the rotating shaft (304), and both sets of the transmission gears (306) are meshed with the central gear (305). The other side of the transmission gear (306) is meshed with an external gear (307), and the number of the external gears (307) is two sets.
4. A building material detection device for construction according to claim 3, characterized in that: One side of the central gear (305), the transmission gear (306) and the external gear (307) are all connected to an auxiliary frame (308), one side of the two groups of external gears (307) are all connected to a first vertical shaft (309), and one end of the first vertical shaft (309) is connected to a sleeve ring (310), one end of the sleeve ring (310) is hinged to a Z-shaped shaft (311), and one side of the sleeve ring (310) is connected to a vertical auxiliary shaft (312), the other end of the Z-shaped shaft (311) is hinged to a second vertical shaft (313), and the second vertical shaft (313) is located on one side of the vertical auxiliary shaft (312), one end of the second vertical shaft (313) is connected to a gasket, and the gasket is located at both ends of the test block.
5. The building material detection device for construction according to claim 1, characterized in that: A through-water pipe is provided at the top of the folding box body (501), and the through-water pipe penetrates the top plate (502) and extends to below it; a through hole is provided inside the bottom plate (503), and the through hole is connected to a drain pipe (510); a control valve is connected to the outside of the drain pipe (510), and a pressure detection device is installed below the control valve; a collection box is provided inside the installation box (1) below the water tank assembly (5), and a detection head and a pressure detection device are provided above the collection box.
6. A building material detection device for construction according to claim 1, characterized in that: The lifting frame (504) comprises an upper hinged short axis (5041), a first tilting axis (5042) and a second tilting axis (5043); the first tilting axis (5042) and the second tilting axis (5043) are hinged at a middle position; one end of the first tilting axis (5042) and the second tilting axis (5043) are hinged to the upper hinged short axis (5041), and the other end is hinged to the lower hinged short axis (5044); one end of the upper hinged short axis (5041) is hinged to the top plate (502), and one end of the lower hinged short axis (5044) is hinged to the bottom plate (503); and the lifting frame (504) is hinged on four sides of the top plate (502) and the bottom plate (503).
7. A building material detection device for construction according to claim 6, characterized in that: Limiting holes are arranged on all four sides of the lifting frame (505), and the limiting holes match the axes at the hinges of the first tilting axis (5042) and the second tilting axis (5043). A groove is vertically opened on the limiting threaded axis (506), and a fixed cylinder matching the groove is installed on the outer side of the limiting threaded axis (506). The limiting threaded axis (506) penetrates the folding box (501) and extends to the bottom thereof, and a seal is arranged at the contact point between the folding box (501) and the limiting threaded axis (506). The threaded worm (507) rotates below the folding box (501), and a vertical plate is connected to the bottom of the folding box (501). A handle (509) is connected to one side of the side turbine (508), and the handle (509) penetrates the vertical plate and extends to the outside thereof.
8. The building material detection device for construction according to claim 1, characterized in that: The flip door assembly (4) comprises a second pulley (401), and the second pulley (401) is connected to the first pulley (202) via a belt, a worm gear group (402) is arranged above the second pulley (401), and the worm gear group (402) comprises a turbine and a worm that mesh with each other, the worm being located above the second pulley (401), and a pulley group (403) is connected to one side of the worm gear group (402), and the pulley group The rear side of (403) is connected to a driving gear (404), an outer sleeve shaft (406) is arranged above the driving gear (404), and a moving rack (405) is arranged inside the outer sleeve shaft (406), the front and rear ends of the moving rack (405) are both provided with teeth, and the driving gear (404) passes through the outer sleeve shaft (406) and meshes with the teeth at the rear end of the moving rack (405), and the end of the moving rack (405) is connected to the hinge block (408).
9. A building material detection device for construction according to claim 8, characterized in that: A half gear (407) is meshed below the front teeth of the movable rack (405), and a hinge block (408) is hinged on the rear side of the half gear (407). The bottom end of the half gear (407) is connected to an extension rod (409), and one side of the extension rod (409) is connected to a flip door (410). The inner wall of the installation box (1) is connected to a limiting groove (411), and the hinge block (408) moves inside the limiting groove (411).
Citation Information
Patent Citations
Building material detection device for building construction
CN118258741A
Circulating experiment device capable of simultaneously determining porosity degree, specific yield and permeability coefficients
CN108344677A
Concrete permeability testing device
CN117388148A