Multi-monitoring-data strip mine slope stability analysis method and system
By acquiring and analyzing the influencing factors of multiple monitoring data, comprehensively judging the stability of open-pit mine slopes, the problem that the existing technology cannot effectively integrate and analyze multiple monitoring data, and a more accurate assessment of slope stability is achieved. .
Patent Information
- Application Number
- CN202411478528.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-02-14
Smart Images

Figure CN119443490A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of open-pit mine operations, and in particular to an open-pit mine slope stability analysis method and system with multiple monitoring data. Background Art
[0002] Open-pit mine slope disasters are one of the main mining disasters in open-pit mines and an important factor that plagues open-pit mine safety production. In severe cases, open-pit mines may be forced to stop production and close. At present, most open-pit mines use a variety of online slope stability monitoring devices to collect monitoring data in multiple dimensions, but due to software compatibility and data interpretation limitations, these data are currently used separately. Analyzing a certain type of data alone can only obtain monitoring intelligence for the purpose of monitoring. As for this intelligence, it is obviously insufficient for the comprehensive evaluation of slope stability, and it cannot comprehensively reveal the current degree of danger of slope stability. In addition, the existing monitoring system cannot integrate various detection data and make an overall assessment, and cannot effectively utilize all detection data. Summary of the invention
[0003] The purpose of the present invention is to provide an open-pit mine slope stability analysis method and system based on multiple monitoring data, so as to more accurately judge the stability of the open-pit mine slope.
[0004] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a method for analyzing the stability of an open-pit mine slope with multiple monitoring data, comprising the following steps: obtaining water level data in a slope rock body, a change state of crack expansion in the slope rock body, data on blasting vibration received by the slope rock body, surface deformation data of the slope rock body, displacement data of surface monitoring points of the slope rock body, and internal deformation data of the slope rock body; calculating an influence factor w of the water level in the slope rock body on the slope stability according to the water level data in the slope rock body, calculating an influence factor q of crack expansion on the slope stability according to the change state of crack expansion in the slope rock body, and calculating an influence factor q of crack expansion on the slope stability according to the water level data in the slope rock body. The influence factor b of blasting vibration on slope stability is calculated based on the data of blasting vibration received by the slope rock mass; the influence factor g of surface point displacement on slope stability is calculated based on the displacement data of surface monitoring points of the slope rock mass; the influence factor s of surface deformation on slope stability is calculated based on the surface deformation data of the slope rock mass; the influence factor k of internal deformation of the slope rock mass on slope stability is calculated based on the internal deformation data of the slope rock mass; the stability d of the slope rock mass is judged based on the influence factor w, the influence factor q, the influence factor b, the influence factor g, the influence factor s and the influence factor k.
[0005] Further, the calculation of the influence factor w of the water level in the slope rock body on the slope stability according to the water level data in the slope rock body includes:
[0006] A water level meter is arranged in the slope rock mass;
[0007] Obtain the potential slip surface elevation data h at the location of the measuring hole of the water level meter in the slope rock mass q ;
[0008] The water level in the slope rock mass monitored by the water level meter is obtained as h s ;
[0009] Obtain the time t of the influence of water level in the water level slope rock body on slope stability w ;
[0010] Through the potential sliding surface elevation data h q , the water level in the slope rock mass is h s , impact time t w The impact factor w.
[0011] Furthermore, the calculation of the influence factor q of crack expansion on slope stability according to the change state of crack expansion of the slope rock mass includes:
[0012] A crack meter is provided at the crack of the rock mass of the slope;
[0013] The crack expansion condition is obtained by the crack meter. c , the width of the crack when it is first discovered, l0;
[0014] Get the maximum deformation allowed by the crack I a ;
[0015] By extending the situation c , width l0, maximum deformation I a The impact factor q is calculated.
[0016] Further, the calculation of the influence factor b of the blasting vibration on the slope stability according to the data of the blasting vibration to which the slope rock mass is subjected comprises:
[0017] A blasting vibration meter is arranged on the slope rock mass.
[0018] The blasting vibration meter is used to obtain the blasting particle vibration velocity v b , blasting vibration frequency f, blasting vibration duration t b ;
[0019] Get the maximum blasting vibration velocity allowed by the slope rock mass as v max ;
[0020] The natural frequency of the slope rock mass is obtained as f0;
[0021] According to the maximum blasting vibration velocity v max and the vibration velocity v of the explosion particleb Calculate the blasting vibration velocity influence factor b1;
[0022] The blasting vibration frequency influencing factor b2 is calculated based on the blasting vibration frequency f and the natural frequency of the slope rock mass f0;
[0023] Through the impact factor b1, impact factor b2, duration t b The impact factor b is calculated.
[0024] Furthermore, the calculation of the influence factor g of the surface point displacement on the slope stability according to the displacement data of the surface monitoring point of the slope rock mass comprises:
[0025] Get the spatial displacement of the monitoring point The spatial displacement of the monitoring point after the n-1th monitoring The spatial displacement of the monitoring point after the nth monitoring
[0026] Get the monitoring interval time t between the displacement monitoring of the nth monitoring point and the displacement monitoring of the n-1th monitoring point n ;
[0027] According to the spatial displacement Spatial displacement and monitoring interval t n Calculate the average displacement velocity v1 of the monitoring point between the nth monitoring and the n-1th monitoring;
[0028] According to the cumulative spatial displacement of the monitoring point and the cumulative monitoring time of the monitoring point, the average displacement velocity v2 of the cumulative spatial displacement of the monitoring point is calculated.
[0029] The influence factor g is calculated by the point displacement average velocity v1 and the point displacement average velocity v2.
[0030] Furthermore, the calculation of the influence factor s of the surface deformation on the slope stability according to the surface deformation data of the slope rock mass includes:
[0031] Arranging a radar on the slope rock mass;
[0032] Obtaining the area m of the deformation region and the deformation speed v of the deformation region through the radar;
[0033] Obtain the maximum allowable deformation area m0 of the slope rock mass and the maximum allowable deformation velocity v0 of the slope rock mass;
[0034] The influence factor s is calculated by the deformation area m, the deformation speed v of the deformation area, the maximum deformation area m0, and the maximum deformation speed v0.
[0035] Further, judging the stability of the slope rock mass according to the influencing factor w, the influencing factor q, the influencing factor b, the influencing factor g, the influencing factor s and the influencing factor k includes:
[0036] Set the stability judgment interval of the slope rock mass;
[0037] Calculate the stability factor d of the slope rock mass by using the influencing factor w, the influencing factor q, the influencing factor b, the influencing factor g and the influencing factor s;
[0038] The stability of the slope rock mass is judged according to the stability determination interval in which the stability factor d is located.
[0039] Furthermore, the calculation formula for calculating the stability factor d of the slope rock mass by using the influencing factor w, the influencing factor q, the influencing factor b, the influencing factor g and the influencing factor s is:
[0040] d=e w·q·b·g·s·k (2).
[0041] Further, the calculation of the influence factor k of the internal deformation of the slope rock mass on the slope stability according to the internal deformation data of the slope rock mass includes:
[0042] The cumulative displacement of the internal deformation of the slope rock mass monitored for the nth time is m n ;
[0043] The cumulative displacement of the internal deformation of the slope rock mass monitored for the n-1th time is m n-1 ;
[0044] Obtain the monitoring interval time t between the nth monitoring of the internal deformation of the slope rock mass and the n-1th monitoring of the internal deformation of the slope rock mass m ;
[0045] Based on the monitoring interval t m , the cumulative displacement is m n , the cumulative displacement is m n-1 , calculate the average displacement velocity v of the internal deformation of the slope rock mass between the nth monitoring and the n-1th monitoring n ;
[0046] The cumulative displacement based on the internal deformation of the slope rock mass is m n-1 The cumulative monitoring interval of the internal deformation of the slope rock mass is used to calculate the average velocity of the cumulative displacement of the internal deformation of the slope rock mass as v k ;
[0047] Based on the average displacement velocity v n , the average velocity of the cumulative displacement is vk The impact factor k is calculated.
[0048] On the other hand, a multi-monitoring data open-pit mine slope stability analysis system is provided, comprising: a data acquisition mechanism, which acquires water level data in the slope rock body, a change state of crack expansion in the slope rock body, data of blasting vibration received by the slope rock body, surface deformation data of the slope rock body, displacement data of surface monitoring points of the slope rock body, and dynamic data of slope rock body deformation; an influence factor calculation mechanism, which calculates an influence factor w of the water level in the slope rock body on the slope stability according to the water level data in the slope rock body, calculates an influence factor q of crack expansion on the slope stability according to the change state of crack expansion in the slope rock body, calculates an influence factor b of blasting vibration on the slope stability according to the data of blasting vibration received by the slope rock body, calculates an influence factor g of surface point displacement on the slope stability according to the displacement data of surface monitoring points of the slope rock body, and calculates an influence factor s of surface deformation on the slope stability according to the surface deformation data of the slope rock body; and a stability calculation mechanism, which judges the stability d of the slope rock body according to the influence factor w, the influence factor q, the influence factor b, the influence factor g, and the influence factor s.
[0049] It can be seen from the analysis that the present invention discloses a method and system for analyzing the stability of an open-pit mine slope with multiple monitoring data. The present invention realizes the collaborative analysis of multi-dimensional monitoring data and more accurately judges the stability of the open-pit mine slope. In addition, the calculation process of this method is simple, which is conducive to the rapid mastery of mine safety technicians; at the same time, it reduces the capital investment of mining enterprises in purchasing joint monitoring equipment and analysis software. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. Among them:
[0051] Figure 1 Flowchart of an embodiment of the present invention. DETAILED DESCRIPTION
[0052] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments. Each example is provided by way of explanation of the present invention and does not limit the present invention. In fact, it will be clear to those skilled in the art that modifications and variations may be made in the present invention without departing from the scope or spirit of the present invention. For example, a feature shown or described as a part of one embodiment may be used in another embodiment to produce yet another embodiment. Therefore, it is desired that the present invention encompasses such modifications and variations within the scope of the appended claims and their equivalents.
[0053] One or more examples of the present invention are shown in the accompanying drawings. The detailed description uses numbers and letter labels to refer to features in the drawings. Like or similar labels in the drawings and description have been used to refer to like or similar parts of the present invention. As used herein, the terms "first", "second", "third", and "fourth", etc. are used interchangeably to distinguish one component from another and are not intended to indicate the location or importance of individual components.
[0054] like Figure 1 As shown, according to an embodiment of the present invention, a method for analyzing the stability of an open-pit mine slope based on multiple monitoring data is provided, comprising the following steps:
[0055] Step S101, obtaining water level data in the slope rock mass, change status of crack expansion in the slope rock mass, data of blasting vibration on the slope rock mass, surface deformation data of the slope rock mass, displacement data of surface monitoring points of the slope rock mass and dynamic data of slope rock mass deformation.
[0056] Step S102, calculating the impact factor w, the impact factor q, the impact factor b, the impact factor g, the impact factor s and the impact factor k.
[0057] Specifically, the influence factor w of the water level in the slope rock body on the slope stability is calculated according to the water level data in the slope rock body, the influence factor q of crack extension on the slope stability is calculated according to the changing state of crack extension in the slope rock body, the influence factor b of blasting vibration on the slope stability is calculated according to the data of blasting vibration received by the slope rock body, the influence factor g of surface point displacement on the slope stability is calculated according to the displacement data of surface monitoring points of the slope rock body, the influence factor s of surface deformation on the slope stability is calculated according to the surface deformation data of the slope rock body, and the influence factor k of the internal deformation of the slope rock body on the slope stability is calculated according to the internal deformation data of the slope rock body.
[0058] Step S103, judging the stability d of the slope rock mass according to the influencing factor w, the influencing factor q, the influencing factor b, the influencing factor g, the influencing factor s and the influencing factor k.
[0059] The above-mentioned method of judging the stability of the slope rock mass based on the influencing factor w, influencing factor q, influencing factor b, influencing factor g, influencing factor s and influencing factor k includes: setting the stability judgment interval of the slope rock mass; calculating the stability factor d of the slope rock mass through the influencing factor w, influencing factor q, influencing factor b, influencing factor g and influencing factor s; judging the stability of the slope rock mass based on the stability judgment interval in which the stability factor d is located.
[0060] The calculation formula for calculating the stability factor d of the slope rock mass through the influence factor w, influence factor q, influence factor b, influence factor g and influence factor s is:
[0061] d=e w·q·b·g·s·k (3).
[0062] According to the calculated slope stability comprehensive evaluation factor d, a more comprehensive evaluation of the slope stability can be made. In order to facilitate a more intuitive evaluation of the slope stability, a four-color judgment interval of the slope stability danger level can be set, that is, Among them, a1, a2, a3, and a4 are adjustment parameters of the comprehensive evaluation factor of slope stability. The specific parameter values need to be selected in combination with the actual conditions of each mine slope. For example, the slope stability danger level can be explained as follows: blue means that the slope is stable and not dangerous; yellow means that the slope is in a critically stable state and generally dangerous; orange means that the slope is unstable and relatively dangerous; red means that the slope is extremely unstable and particularly dangerous.
[0063] In actual application, when the monitoring data of a certain monitoring means is missing, that is to say, one or more of the influencing factors w, q, b, g and s, the missing influencing factors can be replaced by the number 1; when a certain monitoring means is added to obtain data of other dimensions, a stability influencing factor can be determined according to the impact of the monitoring data on stability, and added to the formula of this method to participate in the calculation.
[0064] The calculation of the above-mentioned influencing factors is specifically as follows: calculating the influencing factor w of the water level in the slope rock body on the slope stability according to the water level data in the slope rock body includes: setting a water level meter in the slope rock body; obtaining the potential slip surface elevation data h at the location of the measuring hole of the water level meter in the slope rock body; q ; Get the water level in the slope rock mass monitored by the water level meter as h s ; Obtain the time t of the influence of water level in the water level slope rock body on slope stability w ; Through the potential slip surface elevation data h q , the water level in the slope rock mass is h s , impact time t w Impact factor w.
[0065] The calculation formula of impact factor w is:
[0066]
[0067] The influence factor q of crack expansion on slope stability is calculated based on the change of crack expansion in the slope rock mass, including: setting a crack meter at the crack of the slope rock mass; obtaining the crack expansion condition l through the crack meter c , the width of the crack when it is initially discovered l0; obtain the maximum allowable deformation of the crack I a ; By extending the case lc , width l0, maximum deformation I a Calculate the impact factor q.
[0068] The above-mentioned crack meter is an instrument used to record the width of crack opening in the area where cracks have appeared. The size of the crack opening represents the degree to which the landslide body has left the parent rock.
[0069] The above impact factor q calculation formula is:
[0070]
[0071] The influence factor b of blasting vibration on slope stability is calculated based on the data of blasting vibration on the slope rock mass, including: setting a blasting vibration meter on the slope rock mass; obtaining the vibration velocity v of the blasting particle through the blasting vibration meter b , blasting vibration frequency f, blasting vibration duration t b ; Get the maximum blasting vibration velocity allowed by the slope rock mass as v max ; Get the natural frequency of the slope rock mass as f0; According to the maximum blasting vibration velocity v max and the vibration velocity v of the explosion particle b Calculate the blasting vibration velocity influence factor b1; calculate the blasting vibration frequency influence factor b2 according to the blasting vibration frequency f and the natural frequency of the slope rock mass f0; through the influence factor b1, influence factor b2, duration t b Calculate the impact factor b.
[0072] Explosion particle vibration velocity v b It can represent the amount of energy carried by the blasting vibration when it propagates to the monitoring point; the blasting vibration frequency f represents the frequency of the vibration wave when the seismic wave reaches the monitoring position. When the frequency is consistent with the natural frequency of the rock mass, it is easy to cause the same frequency resonance and aggravate the damage of the rock mass; the blasting vibration duration t b It indicates the continuous effect of blasting vibration on the rock mass. Long-term continuous vibration may cause fatigue damage and stress superposition to the rock mass.
[0073] The above impact factor b1 calculation formula is:
[0074]
[0075] The calculation formula of impact factor b2 is:
[0076]
[0077] The calculation formula of impact factor b is:
[0078] b=b1·b2·t b (8).
[0079] Calculating the influence factor g of surface point displacement on slope stability based on the displacement data of the surface monitoring point of the slope rock mass includes: obtaining the spatial displacement of the monitoring point The spatial displacement of the monitoring point after the n-1th monitoring The spatial displacement of the monitoring point after the nth monitoring Get the monitoring interval time t between the displacement monitoring of the nth monitoring point and the displacement monitoring of the n-1th monitoring point n ; According to the spatial displacement Spatial displacement and monitoring interval t n Calculate the average displacement speed of the monitoring point between the nth monitoring and the n-1th monitoring as v1; according to the spatial displacement and the cumulative monitoring time of the monitoring point, calculate the cumulative point displacement average velocity v2 of the monitoring point,
[0080] in, a0 refers to the initial spatial displacement of the detection point, t i is the monitoring interval between the ith monitoring and the i-1th monitoring. The impact factor g is calculated by the point displacement average velocity v1 and the point displacement average velocity v2.
[0081] The calculation formula of the above impact factor g is: The influence factor g of surface point displacement on slope stability can well reveal the deformation and stability characteristics of the slope in the area where the point is currently located.
[0082] GNSS (Global Navigation Satellite System) or monitoring piles can usually be used to monitor the displacement of slope surface points.
[0083] Calculating the influence factor s of the surface deformation on the slope stability according to the surface deformation data of the slope rock mass includes: setting a radar on the slope rock mass; obtaining the deformation area m and the deformation speed v of the deformation area through the radar; obtaining the maximum allowable deformation area m0 of the slope rock mass and the maximum allowable deformation speed v0 of the slope rock mass; calculating the influence factor s through the deformation area m, the deformation speed v of the deformation area, the maximum deformation area m0 and the maximum deformation speed v0.
[0084] Usually, the internal displacement of the rock mass on the slope of an open-pit mine is monitored by an inclinometer. The core data of the monitoring is the change in the inclination angle, but the final performance data is the horizontal displacement.
[0085] Generally, the equipment used for surface displacement monitoring in open-pit mines is slope radar. Slope radar monitoring technology is a surface monitoring technology. Compared with other point monitoring, it has the characteristics of wider area coverage and overall deformation monitoring.
[0086] The calculation formula of impact factor s is:
[0087]
[0088] Calculating the influence factor k of the internal deformation of the slope rock mass on the slope stability based on the internal deformation data of the slope rock mass includes: obtaining the cumulative displacement of the internal deformation of the slope rock mass monitored for the nth time as m n ; The cumulative displacement of the internal deformation of the slope rock mass monitored for the n-1th time is m n-1 ; Obtain the monitoring interval time t between the nth monitoring of the internal deformation of the slope rock mass and the n-1th monitoring of the internal deformation of the slope rock mass m ; Based on the monitoring interval t m , the cumulative displacement is m n , the cumulative displacement is m n-1 , calculate the average displacement velocity v of the internal deformation of the slope rock mass between the nth monitoring and the n-1th monitoring n , The cumulative displacement based on the internal deformation of the slope rock mass is m n-1 The cumulative monitoring interval of the internal deformation of the slope rock mass is used to calculate the average velocity of the cumulative displacement of the internal deformation of the slope rock mass as v k , t i is the monitoring interval between the i-th monitoring and the i-1-th monitoring; the average displacement speed is v n , the average velocity of the cumulative displacement is v k Calculate the impact factor k:
[0089]
[0090] The present invention also discloses an open-pit mine slope stability analysis system with multiple monitoring data, comprising: a data acquisition mechanism, which acquires water level data in the slope rock body, a change state of crack expansion in the slope rock body, data of blasting vibration received by the slope rock body, surface deformation data of the slope rock body, displacement data of surface monitoring points of the slope rock body and dynamic data of slope rock body deformation; an influence factor calculation mechanism, which calculates an influence factor w of the water level in the slope rock body on the slope stability according to the water level data in the slope rock body, calculates an influence factor q of the crack expansion on the slope stability according to the change state of crack expansion in the slope rock body, calculates an influence factor b of the blasting vibration on the slope stability according to the data of blasting vibration received by the slope rock body, calculates an influence factor g of the surface point displacement on the slope stability according to the displacement data of the surface monitoring points of the slope rock body, and calculates an influence factor s of the surface deformation on the slope stability according to the surface deformation data of the slope rock body; and a stability calculation mechanism, which judges the stability d of the slope rock body according to the influence factor w, the influence factor q, the influence factor b, the influence factor g and the influence factor s.
[0091] The present invention also discloses an electronic device, which includes: a processor and a memory for storing executable instructions of the processor; wherein the processor is configured to execute the above-mentioned analysis method.
[0092] From the above description, it can be seen that the above-mentioned embodiments of the present invention achieve the following technical effects: the present invention performs mathematical regression analysis on a large amount of data monitored in normal times, and inversely calculates the reasonable value range of each parameter in the formula when the slope does not collapse; through the inversion of the collapse case, the monitoring data before the slope collapse is used to obtain the limit data of each parameter in the formula.
[0093] The present invention realizes the collaborative analysis of multi-dimensional monitoring data and more accurately judges the stability of open-pit mine slopes. In addition, the method has a simple calculation process, which is conducive to the rapid mastery of mine safety technicians; at the same time, it reduces the capital investment of mining enterprises in purchasing joint monitoring equipment and analysis software.
[0094] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for analyzing slope stability of an open-pit mine based on multiple monitoring data, characterized in that: The following steps are involved: Obtain water level data in the slope rock mass, the changing state of crack expansion in the slope rock mass, data on blasting vibrations in the slope rock mass, surface deformation data of the slope rock mass, displacement data of surface monitoring points of the slope rock mass, and internal deformation data of the slope rock mass; Calculate the influence factor w of the water level in the slope rock body on the slope stability according to the water level data in the slope rock body, calculate the influence factor q of crack extension on the slope stability according to the change state of crack extension in the slope rock body, calculate the influence factor b of blasting vibration on the slope stability according to the data of blasting vibration received by the slope rock body, calculate the influence factor g of surface point displacement on the slope stability according to the displacement data of the surface monitoring points of the slope rock body, calculate the influence factor s of surface deformation on the slope stability according to the surface deformation data of the slope rock body, and calculate the influence factor k of the internal deformation of the slope rock body on the slope stability according to the internal deformation data of the slope rock body; The stability d of the slope rock mass is determined according to the influencing factor w, the influencing factor q, the influencing factor b, the influencing factor g, the influencing factor s and the influencing factor k.
2. The method for analyzing slope stability of an open-pit mine based on multiple monitoring data according to claim 1, characterized in that: The calculation of the influence factor w of the water level in the slope rock body on the slope stability according to the water level data in the slope rock body comprises: A water level meter is arranged in the slope rock mass; Obtain the potential slip surface elevation data h at the location of the measuring hole of the water level meter in the slope rock mass q ; The water level in the slope rock mass monitored by the water level meter is obtained as h s ; Obtain the time t of the influence of water level in the water level slope rock body on slope stability w ; Through the potential sliding surface elevation data h q , the water level in the slope rock mass is h s , impact time t w The impact factor w.
3. The method for analyzing slope stability of an open-pit mine based on multiple monitoring data according to claim 1, characterized in that: The calculation of the influence factor q of crack expansion on slope stability according to the change state of crack expansion in the slope rock mass comprises: A crack meter is provided at the crack of the rock mass of the slope; The crack expansion condition is obtained by the crack meter. c , the width of the crack when it is first discovered, l0; Get the maximum deformation allowed by the crack I a ; By extending the situation c , width l0, maximum deformation I a The impact factor q is calculated.
4. The method for analyzing slope stability of an open-pit mine based on multiple monitoring data according to claim 1, characterized in that: The calculation of the influence factor b of the blasting vibration on the slope stability according to the data of the blasting vibration to which the slope rock mass is subjected comprises: A blasting vibration meter is arranged on the slope rock mass. The blasting vibration meter is used to obtain the blasting particle vibration velocity v b , blasting vibration frequency f, blasting vibration duration t b ; Get the maximum blasting vibration velocity allowed by the slope rock mass as v max ; The natural frequency of the slope rock mass is obtained as f0; According to the maximum blasting vibration velocity v max and the vibration velocity v of the explosion particle b Calculate the blasting vibration velocity influence factor b1; The blasting vibration frequency influencing factor b2 is calculated based on the blasting vibration frequency f and the natural frequency of the slope rock mass f0; By impact factor b1, impact factor b2, duration t b The impact factor b is calculated.
5. The method for analyzing slope stability of an open-pit mine based on multiple monitoring data according to claim 1, characterized in that: The calculation of the influence factor g of the surface point displacement on the slope stability according to the displacement data of the surface monitoring point of the slope rock mass comprises: Get the spatial displacement of the monitoring point The spatial displacement of the monitoring point after the n-1th monitoring The spatial displacement of the monitoring point after the nth monitoring Get the monitoring interval time t between the displacement monitoring of the nth monitoring point and the displacement monitoring of the n-1th monitoring point n ; According to the spatial displacement Spatial displacement and monitoring interval t n Calculate the average displacement velocity v1 of the monitoring point between the nth monitoring and the n-1th monitoring; According to the cumulative spatial displacement of the monitoring point and the cumulative monitoring time of the monitoring point, the average displacement velocity v2 of the cumulative spatial displacement of the monitoring point is calculated. The influence factor g is calculated by the point displacement average velocity v1 and the point displacement average velocity v2.
6. The method for analyzing slope stability of an open-pit mine based on multiple monitoring data according to claim 1, characterized in that: The calculation of the influence factor s of the surface deformation on the slope stability according to the surface deformation data of the slope rock mass comprises: Arranging a radar on the slope rock mass; Obtaining the area m of the deformation region and the deformation speed v of the deformation region through the radar; Obtain the maximum allowable deformation area m0 of the slope rock mass and the maximum allowable deformation velocity v0 of the slope rock mass; The influence factor s is calculated by the deformation area m, the deformation speed v of the deformation area, the maximum deformation area m0, and the maximum deformation speed v0.
7. The method for analyzing slope stability of an open-pit mine based on multiple monitoring data according to claim 1, characterized in that: The determining of the stability of the slope rock mass according to the influencing factor w, the influencing factor q, the influencing factor b, the influencing factor g, the influencing factor s and the influencing factor k comprises: Set the stability judgment interval of the slope rock mass; Calculate the stability factor d of the slope rock mass by using the influencing factor w, the influencing factor q, the influencing factor b, the influencing factor g and the influencing factor s; The stability of the slope rock mass is judged according to the stability determination interval in which the stability factor d is located.
8. The method for analyzing slope stability of an open-pit mine based on multiple monitoring data according to claim 6, characterized in that: The calculation formula for calculating the stability factor d of the slope rock mass by using the influencing factor w, the influencing factor q, the influencing factor b, the influencing factor g and the influencing factor s is: d=e w·q·b·g·s·k (1)。 9. The method for analyzing slope stability of an open-pit mine based on multiple monitoring data according to claim 2, characterized in that: The calculation of the influence factor k of the internal deformation of the slope rock mass on the slope stability according to the internal deformation data of the slope rock mass comprises: The cumulative displacement of the internal deformation of the slope rock mass monitored for the nth time is m n ; The cumulative displacement of the internal deformation of the slope rock mass monitored for the n-1th time is m n-1 ; Obtain the monitoring interval time t between the nth monitoring of the internal deformation of the slope rock mass and the n-1th monitoring of the internal deformation of the slope rock mass m ; Based on the monitoring interval t m , the cumulative displacement is m n , the cumulative displacement is m n-1 , calculate the average displacement velocity v of the internal deformation of the slope rock mass between the nth monitoring and the n-1th monitoring n ; The cumulative displacement based on the internal deformation of the slope rock mass is m n-1 The cumulative monitoring interval of the internal deformation of the slope rock mass is used to calculate the average velocity of the cumulative displacement of the internal deformation of the slope rock mass as v k ; Based on the average displacement velocity v n , the average velocity of the cumulative displacement is v k The impact factor k is calculated.
10. An open-pit mine slope stability analysis system with multiple monitoring data, characterized in that: include: A data acquisition mechanism is used to acquire water level data in the slope rock mass, the changing state of crack expansion in the slope rock mass, data on blasting vibrations received by the slope rock mass, surface deformation data of the slope rock mass, displacement data of surface monitoring points of the slope rock mass, and dynamic data on deformation of the slope rock mass; An influence factor calculation mechanism calculates an influence factor w of the water level in the slope rock body on the slope stability according to the water level data in the slope rock body, calculates an influence factor q of crack extension on the slope stability according to the change state of crack extension in the slope rock body, calculates an influence factor b of blasting vibration on the slope stability according to the data of blasting vibration received by the slope rock body, calculates an influence factor g of surface point displacement on the slope stability according to the displacement data of the surface monitoring points of the slope rock body, and calculates an influence factor s of surface deformation on the slope stability according to the surface deformation data of the slope rock body; The stability calculation mechanism determines the stability d of the slope rock mass according to the influencing factor w, the influencing factor q, the influencing factor b, the influencing factor g and the influencing factor s.
Citation Information
Cited By
Dangerous rock mass real-time instability early warning method and system based on multi-source monitoring data
CN121436663A
A dangerous rock mass real-time instability early warning method and system based on multi-source monitoring data
CN121436663B