Assembly method of offshore floating body

By setting up installation platforms on the coast to perform near-shore assembly and rapid transport of offshore floating bodies, the problems of large manpower and material consumption and safety hazards during the assembly and transportation of offshore floating bodies in the existing technology are solved, and efficient and safe assembly of offshore floating bodies is achieved. and transport.

CN119460011APending Publication Date: 2025-02-18CHINA WATER RESOURCES & ELECTRIC POWER MATERIALS GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411819712.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-02-18

AI Technical Summary

Technical Problem

The existing offshore buoy assembly technology requires assembly far away from the coast, resulting in long transportation distances, large manpower and material resources consumption, and safety hazards.

Method used

Using near-shore assembly method, install an installation platform on the coast, position and fix the floating tube and floating box, and after being assembled into a complete offshore floating body, it is quickly transported to the sea entrance through a running vehicle, and transported through a gantry crane or a consignment vessel. To the sea.

Benefits of technology

Inshore assembly and rapid transport of offshore floating bodies has been realized, reducing inconvenience and safety hazards of long-distance transportation, saving manpower and material resources, and improving the safety and reliability of transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119460011A_ABST
    Figure CN119460011A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of offshore floating body installation, and discloses an offshore floating body assembling method which comprises the following steps that an installation platform is arranged on the coast side, and a floating pipe is positioned on the installation platform; the buoyancy tanks are arranged on the two opposite sides of the floating pipe in the axial direction, and positioning of the buoyancy tanks is achieved through the mounting platform; the floating pipes and the floating boxes are fixed, the photovoltaic panels are fixed to the floating pipes, and finally a complete offshore floating body is assembled; the assembled offshore floating body is transferred to a transfer vehicle, and the offshore floating body is conveyed to an estuary through the transfer vehicle; and the offshore floating body on the transfer vehicle is transferred to the sea surface through the estuary and conveyed to an offshore target position. According to the assembling method of the offshore floating body, offshore assembling of the offshore floating body can be achieved, the offshore floating body can be rapidly transferred to the sea surface after being assembled, rapidness and high efficiency are achieved, and manpower and material resources are effectively saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of offshore floating body installation, and in particular to an offshore floating body assembly method. Background Art

[0002] In the development and utilization of renewable clean energy, solar photovoltaic power generation has been vigorously developed due to its advantages of easy installation and low manufacturing cost. Specifically, the offshore floating body used for solar photovoltaic power generation mainly includes a floating tube, a pontoon and a plurality of photovoltaic panels, wherein the floating tube is connected to the pontoon for floating on the sea surface, and the photovoltaic panel is fixed on the floating tube for solar power generation. In the related art, the assembly of the offshore floating body is generally carried out in an assembly workshop far away from the coast. After the assembly is completed, the offshore floating body is transported to the coast by a transport vehicle, and then the offshore floating body is transferred to the sea surface by a crane and other equipment. The above process has the following shortcomings: since the assembly workshop of the offshore floating body is far away from the shore, the transport vehicle needs to transport a long distance to the coast, and due to the large size of the offshore floating body, long-distance transportation is inconvenient, the consumption of manpower and material resources is large, and it will increase safety hazards and other uncertainties. Summary of the invention

[0003] The purpose of the present invention is to provide an assembly method of an offshore floating body, which can realize the near-shore assembly of the offshore floating body and can be quickly transported to the sea surface after the assembly is completed, which is fast and efficient and effectively saves manpower and material resources.

[0004] To achieve this object, the present invention adopts the following technical solutions:

[0005] A method for assembling an offshore floating body, comprising:

[0006] S100, setting up an installation platform on the coast, and positioning the floating pipe on the installation platform;

[0007] S200, placing a buoyancy box on two axially opposite sides of the floating tube, and positioning the buoyancy box through the installation platform;

[0008] S300, fixing the floating tube and the buoyancy box, and fixing the photovoltaic panel on the floating tube, and finally assembling a complete offshore floating body;

[0009] S400, transferring the assembled offshore floating body to a transport vehicle, and transporting the offshore floating body to an estuary by the transport vehicle;

[0010] S500, transferring the offshore floating body on the transport vehicle to the sea surface through the sea inlet, and transporting it to a target location at sea.

[0011] Preferably, the mounting platform is provided with a first positioning portion and a second positioning portion;

[0012] In step S100, the floating tube is limited in radial direction by the first positioning portion, and the floating tube is limited in axial direction by the second positioning portion.

[0013] Preferably, the first positioning portion includes a first positioning member, the first positioning member includes a positioning seat, a first limiting plate and a second limiting plate, the first limiting plate and the second limiting plate are respectively obliquely arranged at two ends of the positioning seat, and the first limiting plate and the second limiting plate are both in contact with the outer wall of the floating tube.

[0014] Preferably, the second positioning portion includes a second positioning member and a third positioning member, the end of the floating tube is arranged on the second positioning member, the third positioning member is arranged on the second positioning member, and the third positioning member is used to abut against the end surface of the floating tube to limit the axial direction of the floating tube.

[0015] Preferably, a third positioning portion is provided on the mounting platform;

[0016] In step S200, the buoyancy chamber is limited in the radial direction of the buoyancy tube by the third positioning portion.

[0017] Preferably, the third positioning portion comprises a triangular positioning plate, one side of which can abut against one end of the buoyancy box.

[0018] Preferably, in step S300, a first gantry crane is arranged at the coast, the photovoltaic panel is hoisted by the first gantry crane, and the photovoltaic panel is transported to an installation position relative to the floating pipe.

[0019] Preferably, in step S400, a first gantry crane is arranged at the coast, the assembled offshore floating body is hoisted by the first gantry crane, and the offshore floating body is transported to the transport vehicle, so that the floating pipe is placed in a receiving groove provided on the transport vehicle.

[0020] Preferably, in step S500, a second gantry crane is provided on one side of the estuary, and the offshore floating body on the transport vehicle is hoisted by the second gantry crane, and the offshore floating body is transported to the sea surface through the estuary.

[0021] Preferably, in step S500, the offshore floating body is transported to the offshore target location by a shipping vessel.

[0022] Beneficial effects:

[0023] The assembly method of the offshore floating body provided by the present invention first sets up an installation platform on the coast, and positions the floating tube on the installation platform. Subsequently, pontoons are placed on both sides of the floating tube that are opposite to each other in the axial direction, and the pontoons are positioned by the installation platform to fix the pontoons in the installation position relative to the floating tube. Next, the floating tube and the pontoon are fixed, and the photovoltaic panel is fixed on the floating tube, so that the floating tube, the pontoon and the photovoltaic panel are connected as a whole, and finally assembled into a complete offshore floating body. After the assembly of the offshore floating body is completed, the offshore floating body is transferred to the operating vehicle, and the offshore floating body is transported to the estuary on the coast by the operating vehicle, that is, the offshore floating body below the estuary. The offshore floating body on the operating vehicle is transported to the sea surface through the estuary, and finally transported to the target position at sea. The above method can enable the offshore floating body to realize near-shore assembly, and can be quickly transported to the sea surface after the assembly is completed, which can avoid the problem of long-distance transportation of the offshore floating body on land, reduce the consumption of manpower and material resources, and the safety and reliability of short-distance transportation are more guaranteed on the way. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a structural schematic diagram of the method for assembling an offshore floating body provided by the present invention;

[0025] Figure 2 It is a schematic diagram of components required to be arranged on the coast in the method for assembling an offshore floating body provided by the present invention;

[0026] Figure 3 It is a structural schematic diagram of the operating vehicle provided by the present invention;

[0027] Figure 4 It is a structural schematic diagram of the installation platform provided by the present invention;

[0028] Figure 5 The present invention Figure 4 A local enlarged schematic diagram of the middle A;

[0029] Figure 6 It is a schematic diagram of the installation platform positioning floating pipe provided by the present invention;

[0030] Figure 7 The present invention Figure 6 A partial enlarged schematic diagram of point B in the middle;

[0031] Figure 8 It is a schematic diagram of positioning the installation platform provided by the present invention and further positioning the pontoon;

[0032] Fig. 9 The present invention Figure 8 A partial enlarged schematic diagram of point C in the middle;

[0033] Fig.10 It is a schematic diagram showing that the offshore floating body is assembled on the installation platform provided by the present invention.

[0034] In the figure:

[0035] 01. Floating tube; 011. Fixed block; 02. Floating tank; 03. Photovoltaic panel; 04. Connecting frame;

[0036] 1. Mounting platform; 11. First positioning portion; 111. First positioning member; 1111. Positioning seat; 1112. First limiting plate; 1113. Second limiting plate; 1114. Reinforcing plate; 112. Positioning assembly; 1121. First positioning block; 1122. Second positioning block; 12. Second positioning portion; 121. Second positioning member; 1211. Positioning base plate; 1212. Positioning connecting block; 1213. First limiting groove; 1214. Second limiting groove; 122. Third positioning member; 1221. Abutting plate; 1222. Connecting plate; 13. Third positioning portion; 14. Cushion block;

[0037] 2. Operation vehicle; 21. Support block; 211. Accommodation tank;

[0038] 3. First gantry crane; 31. First slide rail; 32. Second slide rail;

[0039] 4. The second gantry crane. DETAILED DESCRIPTION

[0040] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0041] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0042] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0043] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0044] This embodiment provides a method for assembling an offshore floating body. Figures 1 to 10 As shown, the method for assembling an offshore floating body comprises the following steps:

[0045] S100, setting up an installation platform 1 on the coast, and positioning the floating pipe 01 on the installation platform 1;

[0046] S200, placing pontoons 02 on both sides of the floating tube 01 that are axially opposite to each other, and positioning the pontoons 02 by installing the platform 1;

[0047] S300, fixing the floating tube 01 and the pontoon 02, and fixing the photovoltaic panel 03 on the floating tube 01, and finally assembling a complete offshore floating body;

[0048] S400, transferring the assembled offshore floating body to the transport vehicle 2, and transporting the offshore floating body to the estuary by the transport vehicle 2;

[0049] S500, the offshore floating body on the transport vehicle 2 is transferred to the sea surface through the sea estuary, and transported to the target location at sea.

[0050] In this embodiment, first, an installation platform 1 is set up on the coast, and the floating tube 01 is positioned on the installation platform 1. Subsequently, pontoons 02 are placed on both sides of the floating tube 01 that are axially opposite to each other, and the pontoons 02 are positioned by the installation platform 1 to fix the pontoons 02 in the installation position relative to the floating tube 01. Next, the floating tube 01 and the pontoons 02 are fixed, and the photovoltaic panel 03 is fixed on the floating tube 01, so that the floating tube 01, the pontoons 02 and the photovoltaic panel 03 are connected as a whole, and finally assembled into a complete offshore floating body. After the offshore floating body is assembled, the offshore floating body is transferred to the operating vehicle 2, and the offshore floating body is transported to the estuary on the coast by the operating vehicle 2, that is, the offshore floating body from below the estuary. The offshore floating body on the operating vehicle 2 is transported to the sea surface through the estuary, and finally transported to the target position at sea. The above method enables offshore floating bodies to be assembled near the shore and quickly transported to the sea surface after assembly. This can avoid the problem of long-distance land transportation of offshore floating bodies, reduce the consumption of manpower and material resources, and ensure the safety and reliability of short-distance transportation.

[0051] In this embodiment, the installation platform 1 is provided with a first positioning portion 11 and a second positioning portion 12; in step S100, the first positioning portion 11 limits the radial direction of the floating tube 01, and the second positioning portion 12 limits the axial direction of the floating tube 01. The cooperation of the first positioning portion 11 and the second positioning portion 12 can limit the axial direction and radial direction of the floating tube 01, thereby ensuring reliable fixation of the floating tube 01.

[0052] Specifically, the first positioning portion 11 includes a first positioning member 111, and the first positioning member 111 includes a positioning seat 1111, a first limiting plate 1112, and a second limiting plate 1113. The first limiting plate 1112 and the second limiting plate 1113 are respectively arranged at two ends of the positioning seat 1111, and the first limiting plate 1112 and the second limiting plate 1113 are both in contact with the outer wall of the floating tube 01. Specifically, the floating tube 01 is supported on the first limiting plate 1112 and the second limiting plate 1113 at the same time, so that the floating tube 01 can be provided with reliable radial limiting.

[0053] Furthermore, the first positioning member 111 also includes a reinforcing plate, the reinforcing plate 1114 is located between the first limiting plate 1112 and the second limiting plate 1113, the first end of the reinforcing plate 1114 is fixedly connected to the first limiting plate 1112, and the second end of the reinforcing plate 1114 is fixedly connected to the second limiting plate 1113. The provision of the reinforcing plate 1114 can enhance the overall strength of the first positioning member 111.

[0054] In this embodiment, in the radial direction of the floating tube 01, the position of the first positioning part 11 relative to the mounting platform 1 is set to be adjustable. Specifically, the first positioning part 11 also includes a positioning assembly 112. The positioning assembly 112 includes a first positioning block 1121 and a second positioning block 1122, and the first positioning block 1121 and the second positioning block 1122 are arranged at intervals along the axial direction of the floating tube 01, and a positioning groove can be formed between the first positioning block 1121 and the second positioning block 1122. Specifically, the positioning seat 1111 of the first positioning member 111 is placed in the positioning groove, and the positioning seat 1111 can be displaced in the positioning groove along the radial direction of the floating tube 01, so as to adjust the position.

[0055] In this embodiment, the second positioning part 12 includes a second positioning member 121 and a third positioning member 122. The end of the floating tube 01 is arranged on the second positioning member 121, and the third positioning member 122 is arranged on the second positioning member 121. The third positioning member 122 is used to abut against the end surface of the floating tube 01 to limit the axial direction of the floating tube 01. Specifically, the second positioning member 121 includes a positioning base plate 1211 and a positioning connection block 1212 arranged on the positioning base plate 1211. The positioning base plate 1211 has a first limiting groove 1213, and the positioning connection block 1212 has a second limiting groove 1214. The first limiting groove 1213 is connected to the first limiting groove 1213. The two sides of the third positioning member 122 are respectively inserted into the first limiting groove 1213 and the second limiting groove 1214, so that the third positioning member 122 is fixed.

[0056] In this embodiment, the positioning base plate 1211 and the positioning connection block 1212 are vertically arranged.

[0057] Specifically, the third positioning member 122 includes an abutment plate 1221 and a connection plate 1222 that are connected to each other. The two sides of the connection plate 1222 are respectively inserted into the first limiting groove 1213 and the second limiting groove 1214, so that the connection plate 1222 is reliably fixed on the second positioning member 121. When the floating tube 01 is placed on the second positioning member 121, the end of the floating tube 01 is supported on the positioning bottom plate 1211, and the end of the floating tube 01 is abutted against the abutment plate 1221, so as to achieve axial positioning of the floating tube 01.

[0058] Specifically, after the axial positioning of the floating tube 01 is completed by using the third positioning member 122 , the third positioning member 122 is removed, and the buoyancy box 02 is installed between the positioning base plate 1211 and the positioning connection block 1212 , so as to be positioned and installed with the end of the floating tube 01 .

[0059] In this embodiment, the installation platform 1 is provided with a third positioning portion 13. In step S200, the buoyancy box 02 is limited in the radial direction of the floating tube 01 by the third positioning portion 13. Specifically, the third positioning portion 13 is configured as a triangular positioning plate, one side of which can abut against one end of the buoyancy box 02 to limit the buoyancy box 02 in the radial direction of the floating tube 01. In this way, the stability of the third positioning portion 13 can be ensured.

[0060] Specifically, the end of the floating tube 01 is fixedly connected to the buoyancy box 02 at the corresponding end by connecting members such as bolts.

[0061] Optionally, a cushion block 14 is further provided on the installation platform 1, and the cushion block 14 is installed below the floating tube 01. The cushion block 14 is located at the center of the floating tube 01. Since the floating tube 01 is long and heavy, the cushion block 14 is installed below the floating tube 01 to fill the gap between the middle of the floating tube 01 and the installation platform 1, which can prevent the floating tube 01 from being deformed after being placed for a long time.

[0062] In this embodiment, in step S300, a first gantry crane 3 is set at the coast, and the photovoltaic panel 03 is hoisted by the first gantry crane 3, and the photovoltaic panel 03 is transported to the installation position relative to the floating tube 01. Specifically, a first slide rail 31 extending along a first direction is provided on the installation platform 1, and the first gantry crane 3 can slide relative to the installation platform 1 along the first direction. A first hook is provided on the first gantry crane 3, and the first hook can adjust the position along the second direction. Exemplarily, in this embodiment, there are two first slide rails 31, and the two first slide rails 31 are arranged at intervals along the second direction. A plurality of installation platforms 1 are arranged between the two first slide rails 31. Such an arrangement can further enhance the installation efficiency of the offshore floating body on the coast.

[0063] Specifically, the photovoltaic panel 03 is connected to the connecting frame 04, and the floating tube 01 is correspondingly provided with a fixing block 011. After the photovoltaic panel 03 is hoisted by the first gantry crane 3, the first hook is moved to move the photovoltaic panel 03 to the top of the floating tube 01 to be installed. Then, with the assistance of the on-site operator, the connecting frame 04 is docked to the target position of the fixing block 011, and then fixedly connected by bolts and other connectors. The offshore floating body after final assembly presents Fig.10 The structure shown in .

[0064] In this embodiment, in step S400, the assembled offshore floating body is hoisted by the first gantry crane 3, and the offshore floating body is transported to the transport vehicle 2, so that the floating tube 01 is placed in the receiving groove 211 provided on the transport vehicle 2. Specifically, when the offshore floating body needs to be transported, the transport vehicle 2 is moved to the lifting area of ​​the first gantry crane 3, the first gantry crane 3 hoists and moves the offshore floating body, and finally places the offshore floating body on the transport vehicle 2. Specifically, a support block 21 is provided on the transport vehicle 2, and the support block 21 is provided with a receiving groove 211. The receiving groove 211 fits with the outer peripheral wall of the floating tube 01 of the offshore floating body, the first gantry crane 3 hoists the offshore floating body, and finally places the floating tube 01 in the corresponding receiving groove 211, thereby realizing the reliable accommodation of the offshore floating body and preventing the offshore floating body from moving randomly relative to the transport vehicle 2.

[0065] Optionally, the transfer vehicle can be configured as an automated guided vehicle (AGV) to achieve reliable transportation of offshore floating bodies during short-distance transportation.

[0066] In this embodiment, in step S500, a second gantry crane 4 is provided on one side of the estuary, and the offshore floating body on the transport vehicle 2 is hoisted by the second gantry crane 4, and the offshore floating body is transferred to the sea surface through the estuary. Specifically, a second slide rail 32 extending along the second direction is provided on the installation platform 1, and the second gantry crane 4 can slide relative to the installation platform 1 along the second direction. A second hook is provided on the second gantry crane 4, and the second hook can adjust the position along the first direction. Exemplarily, in this embodiment, there are two second slide rails 32, and the two second slide rails 32 are arranged at intervals along the second direction. Specifically, the estuary is located between the two second slide rails 32, and the position below the second hook corresponds to the position of the estuary. Specifically, the transport vehicle 2 carries the offshore floating body and moves it to the lifting area of ​​the second gantry crane 4, the second gantry crane 4 hoists and moves the offshore floating body, and finally drops the offshore floating body from the transport vehicle 2 through the estuary and transfers it to the sea surface.

[0067] In this embodiment, the arrangement of the first gantry crane 3 and the second gantry crane 4 can meet the requirements of offshore lifting of offshore floating bodies without the need for additional construction machinery such as cranes, thereby reducing the cost of manpower and material resources to a certain extent.

[0068] In this embodiment, in step S500, the offshore floating body is transported to the offshore target location by the shipping ship. Specifically, the shipping ship is on standby at the estuary. When the second gantry crane 4 drops the offshore floating body from the transport vehicle 2 through the estuary and transfers it to the sea surface, the shipping ship connects the offshore floating body through a structure such as a chain, and finally tows the offshore floating body to the offshore target location.

[0069] In summary, the assembly method of the offshore floating body provided in this embodiment enables the offshore floating body to be assembled near the shore, and can be quickly transported to the sea surface after the assembly is completed, which can avoid the problem of long-distance land transportation of the offshore floating body, reduce the consumption of manpower and material resources, and ensure the safety and reliability of short-distance transportation.

[0070] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A method for assembling an offshore floating body, characterized in that: The following steps are involved: S100, setting up an installation platform (1) on the coast, and positioning a floating pipe (01) on the installation platform (1); S200, placing buoyancy boxes (02) on both sides of the floating tube (01) that are axially opposite to each other, and positioning the buoyancy boxes (02) through the installation platform (1); S300, fixing the floating tube (01) and the buoyancy box (02), and fixing the photovoltaic panel (03) on the floating tube (01), and finally assembling a complete offshore floating body; S400, transferring the assembled offshore floating body to a transport vehicle (2), and transporting the offshore floating body to an estuary by means of the transport vehicle (2); S500, transferring the offshore floating body on the transport vehicle (2) to the sea surface via the sea estuary, and transporting it to a target location at sea.

2. The method for assembling an offshore floating body according to claim 1, characterized in that: The installation platform (1) is provided with a first positioning portion (11) and a second positioning portion (12); In step S100, the first positioning portion (11) is used to limit the position of the floating tube (01) in the radial direction, and the second positioning portion (12) is used to limit the position of the floating tube (01) in the axial direction.

3. The method for assembling an offshore floating body according to claim 2, characterized in that: The first positioning portion (11) comprises a first positioning member (111), the first positioning member (111) comprises a positioning seat (1111), a first limiting plate (1112) and a second limiting plate (1113), the first limiting plate (1112) and the second limiting plate (1113) are respectively arranged obliquely at two ends of the positioning seat (1111), and the first limiting plate (1112) and the second limiting plate (1113) are both in contact with the outer wall of the floating tube (01).

4. The method for assembling an offshore floating body according to claim 2, characterized in that: The second positioning portion (12) comprises a second positioning member (121) and a third positioning member (122), the end of the floating tube (01) is arranged on the second positioning member (121), the third positioning member (122) is arranged on the second positioning member (121), and the third positioning member (122) is used to abut against the end surface of the floating tube (01) to limit the axial direction of the floating tube (01).

5. The method for assembling an offshore floating body according to claim 1, characterized in that: The installation platform (1) is provided with a third positioning portion (13); In step S200, the buoyancy box (02) is positioned in the radial direction of the buoyancy tube (01) by the third positioning portion (13).

6. The method for assembling an offshore floating body according to claim 5, characterized in that: The third positioning portion (13) comprises a triangular positioning plate, one side of which can abut against one end of the buoyancy box (02).

7. The method for assembling an offshore floating body according to claim 1, characterized in that: In step S300, a first gantry crane (3) is arranged at the coast, the photovoltaic panel (03) is hoisted by the first gantry crane (3), and the photovoltaic panel (03) is transported to an installation position relative to the floating pipe (01).

8. The method for assembling an offshore floating body according to claim 1, characterized in that: In step S400, a first gantry crane (3) is arranged at the coast, the assembled offshore floating body is hoisted by the first gantry crane (3), and the offshore floating body is transported to the transport vehicle (2), so that the floating pipe (01) is placed in a receiving groove (21) opened on the transport vehicle (2).

9. The method for assembling an offshore floating body according to claim 1, characterized in that: In step S500, a second gantry crane (4) is provided on one side of the estuary, and the offshore floating body on the transport vehicle (2) is hoisted by the second gantry crane (4), and the offshore floating body is transported to the sea surface through the estuary.

10. The method for assembling an offshore floating body according to claim 1, characterized in that: In step S500, the offshore floating body is transported to the offshore target location by a shipping ship.