Steel bar connecting device for fabricated prefabricated parts
By designing a steel bar connection device including a sleeve, grouting shell and inner shell, and using a vibrating rod and a ladder distributed circular tube and hole structure, the problem of unstable cement and unstable steel bar connection in the prior art is solved. High density and stable steel bar connection are achieved.
Patent Information
- Application Number
- CN202411530440.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2025-02-18
AI Technical Summary
The existing prefabricated wall steel bar connection devices are prone to cause the cement to be untightened during grouting, and the position of the steel bars is deviated to cause unstable connections, which poses safety hazards.
A steel bar connection device including a sleeve, grouting shell and inner shell is designed to vibrate the sleeve through a vibrating rod to reduce grouting bubbles, and ensure that grouting material is tight through a ladder distributed circular tube and hole structure.
It effectively reduces the bubbles of grouting materials, ensures the compactness of cement, improves the stability of steel bar connections, and reduces safety hazards.
Smart Images

Figure CN119466230A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of assembled prefabricated components, in particular to a steel bar connecting device for assembled prefabricated components. Background Art
[0002] In recent years, the country has proposed the future development direction of the construction industry, namely smart cities, green buildings and building industrialization. Vigorously developing prefabricated buildings is the only way to improve the industrialization of traditional construction methods. The technical level of prefabricated buildings is a direct reflection of the country's construction capabilities and scientific and technological strength. Comprehensively promoting the development of prefabricated buildings has become a top priority for the construction industry. In the construction of prefabricated buildings, the steel bar connection performance of prefabricated prefabricated components is a key factor in the force transmission of steel bars, which plays a decisive role in the effect of steel bar force transmission and the integrity of the structure. The choice of steel bar connection method directly affects the construction speed and structural quality of the building.
[0003] The existing Chinese patent with publication number CN213509229U discloses an assembled wall reinforcement connection device. When it is necessary to pour concrete in the mold 8, the lower opening of the grouting sleeve is aligned with the reserved circular hole in the mold, and the bolt head 6 is driven by an electric wrench to rotate, so that the screw plug 4 is tightened at the lower end of the grouting sleeve, and concrete is poured in the mold 8 to form an upper wall. When it is necessary to assemble the upper wall and the lower wall, the bolt head 6 is driven by an electric wrench to rotate, so that the screw plug 4 is removed, the mold is taken out, and the lower wall reinforcement is extended into the lower chamber 2 through the lower end opening of the grouting sleeve, and grouting is performed into the lower chamber 2 through the grouting hole 21. When the grouting material flows out of the grouting hole 22, the grouting is completed. After the grouting material solidifies, the grouting pipe and the grouting pipe exposed outside the wall are cut off to complete the connection between the upper wall and the lower wall.
[0004] When the device is filled with cement, due to the connection between some parts inside the device, it is easy to cause the cement grouting to be loose, and the density of the slurry after grouting cannot be guaranteed. At the same time, the sleeve grouting connection method requires high precision. If the position of the steel bar deviates slightly, the on-site steel bar will be difficult to penetrate into the sleeve, which may easily cause unnecessary safety hazards.
[0005] Therefore, a steel bar connection device for assembled prefabricated components is needed to solve this problem. Summary of the invention
[0006] In order to solve all or part of the above-mentioned problems, the purpose of the present invention is to provide a steel bar connection device for assembled prefabricated components, so as to solve the problem proposed in the above-mentioned comparative document technology that when the device is filled with cement, due to the connection between some parts inside the device, it is easy to cause the cement grouting to be loose, and the density of the slurry after grouting cannot be guaranteed. At the same time, the sleeve grouting connection method has high precision requirements. If the position of the steel bar deviates slightly, it will be difficult for the on-site steel bar to penetrate into the sleeve, which may easily cause unnecessary safety hazards.
[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a steel bar connection device for assembled prefabricated components, comprising a sleeve, a steel bar 1 is installed through the upper end of the sleeve, a steel bar 2 is installed through the lower end of the sleeve, a grouting port is installed on the outer side of the sleeve, a slurry outlet is installed on the outer side of the sleeve, a vibrating rod is arranged on the inner side of the slurry outlet, the sleeve comprises a grouting outer shell, a grouting inner shell is fixedly installed on the inner side of the grouting outer shell, a plurality of holes 1 are opened on the grouting inner shell, and a circular grouting inner shell is fixedly installed between the grouting outer shell and the grouting inner shell. The round tube passes through the grouting inner shell and is fixedly connected with it. The end of the round tube away from the grouting inner shell is fixedly connected with the grouting outer shell. The round tube is distributed in stages on the grouting inner shell. A plurality of holes five are provided on the round tube. When we put the steel bar two and the steel bar one into the sleeve for grouting, we start the vibrating rod to vibrate the sleeve to reduce the bubbles of the grouting material in the sleeve. The grouting material enters the grouting inner shell through the grouting port. When the grouting material begins to fill the inside of the grouting inner shell under the action of pressure, the grouting material falls to the lower end of the grouting inner shell. The grouting material flows into the space between the grouting outer shell and the grouting inner shell through hole one, reducing the situation that the grouting outer shell is not filled when the grouting inner shell is filled under the action of pressure. At the same time, when the grouting material passes through hole one, the grouting material falling through the upper grouting port hits the grouting material already injected into the grouting inner shell through the action of gravity, and discharges a small amount of air inside. When the grouting material submerges the round tube, the grouting material is discharged between the grouting outer shell and the grouting inner shell through hole five. The slurry hits the grouting material between the grouting outer shell and the grouting inner shell to expel the internal air. When the grouting material submerges all the round tubes, the holes in the round tubes continue to be discharged. By squeezing the grouting material on the outside, the bubbles inside are expelled to make it more compact. When the grouting inner shell and the part between the grouting outer shell and the grouting inner shell are all filled, the overflowing grouting material is discharged through the slurry outlet. At the same time, we close the input of the grouting material and pull out the vibrating rod to seal the grouting port and the slurry outlet to complete the connection between steel bar one and steel bar two.
[0008] Furthermore, a fixed connecting rod is installed between the grouting outer shell and the grouting inner shell, the fixed connecting rod is located between the steel bar one and the steel bar two, and the fixed connecting rod is fixedly connected to both the grouting outer shell and the grouting inner shell. The grouting outer shell and the grouting inner shell are reinforced by the fixed connecting rod to prevent the grouting inner shell from being separated from the grouting inner shell under high-pressure grouting, and also to fix the casting of the steel bar one and the steel bar two.
[0009] Furthermore, multiple sets of fixed ring assemblies are fixedly installed on the inner side of the grouting inner shell, and the positions of the fixed ring assemblies correspond to steel bar 1. When we insert steel bar 1 and steel bar 2 into the sleeve, steel bar 1 is first stabilized by the fixed ring assembly, and then steel bar 2 is inserted into the sleeve.
[0010] Furthermore, a second hole is provided at the upper end of the grouting outer shell, a hole groove is provided at the lower end of the grouting outer shell, a gap is reserved between the grouting outer shell and the grouting inner shell, a round tube is arranged between the gap, and a steel bar 1 is positioned through the second hole so that the steel bar 1 is reinforced by the fixed circular ring assembly, and the grouting material is retained between the grouting outer shell and the grouting inner shell through the gap.
[0011] Furthermore, the fixed ring assembly includes a connecting block 1, a fixed ring 2 is fixedly installed on the end of the connecting block 1 away from the grouting inner shell, a bonding sheet is fixedly installed on the inner side of the fixed ring 2, the fixed ring 2 matches the steel bar 1, and after the position of the steel bar 1 is determined by the hole 2, it is fixed by the fixed ring 2, and the steel bar 1 is bonded to prevent slipping by the bonding sheet.
[0012] Furthermore, a connecting plate is slidably installed in the hole groove, an elastic part is fixedly installed on the outer side of the connecting plate, and the other end of the elastic part is fixedly connected to the grouting shell. After we determine and fix the position of steel bar 1 through hole 2, the position of steel bar 2 may not be matched due to inaccurate manual measurement, so we slide the connecting plate in the hole groove to position steel bar 2 through the connecting plate, and the connecting plate remains relatively stable through the action of each group of elastic parts.
[0013] Furthermore, a hole three is opened at the upper end of the connecting plate, and a fixing ring is fixedly installed at the upper end of the hole three. The hole three matches the size of the fixing ring, and the fixing ring matches the steel bar two. The steel bar two passes through the connecting plate through the hole three, and its position is fixed by the fixing ring. The position of the two groups of steel bars is matched, and pouring begins.
[0014] Furthermore, a plurality of holes four are provided on the grouting inner shell, and the holes four are distributed in stages, and the holes four match the circular tubes. The hole one is located at the lower end of the holes four, and the grouting material in the grouting inner shell is discharged into the circular tube through the holes four on the grouting inner shell, and the grouting material is discharged into the gap through the holes five on the circular tube. Through the circular tubes distributed in stages, the grouting material hits the grouting material at the lower end of the gap under the action of gravity, so that the air inside it is discharged.
[0015] Furthermore, a connecting rod is fixedly installed on the upper side of one end of the fixed connecting rod close to the slurry outlet, and a fixed ring is fixedly installed on the upper end of the connecting rod. The fixed ring matches the vibrating rod, and the end of the vibrating rod close to the fixed connecting rod is slidably connected to the grouting inner shell. The vibrating rod penetrates into the fixed ring to transmit the vibration into the interior of the sleeve, thereby shaking out the bubbles in the grouting inner shell.
[0016] Furthermore, a fixed ring three is fixedly installed inside the slurry outlet, a connecting block two is fixedly installed outside the fixed ring three, the other end of the connecting block two is fixedly connected to the outer shell of the slurry outlet, the fixed ring three matches the vibrating rod, and the diameter of the slurry outlet is larger than the diameter of the vibrating rod. The vibrating rod transmits the vibration to the grouting outer shell through the fixed ring three, discharges the gas in the grouting material in the gap, and enhances its compactness.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] The present invention proposes a steel bar connection device for assembled prefabricated components. When we put steel bar 2 and steel bar 1 into the sleeve for grouting, we start the vibrating rod to vibrate the sleeve to reduce the bubbles of the grouting material in the sleeve. The grouting material enters the interior of the grouting inner shell through the grouting port. When the grouting material begins to fill the interior of the grouting inner shell under the action of pressure, the grouting material falls to the lower end of the grouting inner shell, and a part of the grouting material flows into the space between the grouting outer shell and the grouting inner shell through the hole 1, thereby reducing the situation that the grouting outer shell is not filled when the grouting inner shell is full under the action of pressure. At the same time, when the grouting material passes through the hole 1, the grouting material falling through the upper end grouting port is used to press the grouting material already injected into the grouting inner shell through the action of gravity. The grouting material is tapped to expel a small amount of air inside. When the grouting material covers the circular tube, the grouting material is discharged through hole five to between the grouting outer shell and the grouting inner shell. The grouting material falling from the vibrating and stepped circular tubes taps the grouting material between the grouting outer shell and the grouting inner shell to expel the internal air. When the grouting material covers all the circular tubes, the holes in the circular tubes continue to discharge. By squeezing the grouting material on the outside, the bubbles inside are expelled to make it more compact. When the grouting inner shell and the part between the grouting outer shell and the grouting inner shell are filled, the overflowed grouting material is discharged through the slurry outlet. At the same time, we close the input of the grouting material and pull out the vibrating rod to seal the grouting port and the slurry outlet to complete the connection between steel bar one and steel bar two. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0020] Figure 2 It is a schematic diagram of the internal structure of the sleeve of the present invention;
[0021] Figure 3 It is a schematic diagram of the top view structure of the sleeve of the present invention;
[0022] Figure 4 It is a schematic diagram of the planar structure of the sleeve of the present invention;
[0023] Figure 5 It is a schematic diagram of the external structure of the sleeve of the present invention;
[0024] Figure 6 It is a schematic diagram of the grouting inner shell structure of the present invention;
[0025] Figure 7 It is a schematic diagram of the fixed connecting rod structure of the present invention;
[0026] Figure 8 It is a schematic diagram of the pulp outlet structure of the present invention.
[0027] In the figure: 1. sleeve; 11. grouting outer shell; 111. hole groove; 112. gap; 113. hole two; 12. grouting inner shell; 121. hole four; 122. hole one; 13. fixed connecting rod; 131. connecting rod; 132. fixed ring one; 14. fixed ring assembly; 141. connecting block one; 142. fixed ring two; 143. bonding sheet; 15. fixed ring; 16. connecting plate; 161. hole three; 17. elastic member; 18. round tube; 181. hole five; 2. steel bar one; 3. steel bar two; 4. grouting port; 5. slurry outlet; 51. fixed ring three; 52. connecting block two; 6. vibrating rod. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with the accompanying drawings.
[0030] Combination Figure 1-4 , Figure 6A steel bar connection device for an assembled prefabricated component includes a sleeve 1, a steel bar 2 is installed through the upper end of the sleeve 1, a steel bar 3 is installed through the lower end of the sleeve 1, a grouting port 4 is installed on the outer side of the sleeve 1, a grouting outlet 5 is installed on the outer side of the sleeve 1, a vibrating rod 6 is arranged on the inner side of the grouting outlet 5, the sleeve 1 includes a grouting outer shell 11, a grouting inner shell 12 is fixedly installed on the inner side of the grouting outer shell 11, a plurality of holes 122 are opened on the grouting inner shell 12, a round tube 18 is fixedly installed between the grouting outer shell 11 and the grouting inner shell 12, and the round tube 18 penetrates the grouting inner shell 12. And it is fixedly connected thereto, one end of the round tube 18 away from the grouting inner shell 12 is fixedly connected to the grouting outer shell 11, the round tube 18 is distributed in stages on the grouting inner shell 12, and a plurality of holes 181 are provided on the round tube 18. When we put the steel bars 2 3 and the steel bars 1 2 into the sleeve 1 for grouting, we start the vibrating rod 6 to vibrate the sleeve 1 to reduce the bubbles of the grouting material in the sleeve 1, and the grouting material enters the interior of the grouting inner shell 12 through the grouting port 4. When the grouting material begins to fill the interior of the grouting inner shell 12 under the action of pressure, the grouting material falls to the lower end of the grouting inner shell 12, and a part of the grouting The grouting material flows into the space between the grouting outer shell 11 and the grouting inner shell 12 through the hole 122, reducing the situation that the grouting outer shell 11 is not filled when the grouting inner shell 12 is filled under the action of pressure. At the same time, when the grouting material passes through the hole 122, the grouting material falling through the upper grouting port 4 hits the grouting material already injected into the grouting inner shell 12 through the action of gravity, and discharges a small amount of air inside. When the grouting material submerges the circular tube 18, the grouting material is discharged to the space between the grouting outer shell 11 and the grouting inner shell 12 through the hole 5 181. The grouting material below hits the grouting material between the grouting outer shell 11 and the grouting inner shell 12 to expel the internal air. When the grouting material submerges all the circular tubes 18, the holes in the circular tubes continue to be discharged. By squeezing the grouting material on the outside, the bubbles inside are expelled to make it more compact. When the grouting inner shell 12 and the part between the grouting outer shell 11 and the grouting inner shell 12 are all filled, the overflowing grouting material is discharged through the slurry outlet 5. At the same time, we close the input of the grouting material and pull out the vibrating rod 6 to seal the grouting port 4 and the slurry outlet 5 to complete the connection between the steel bar 1 2 and the steel bar 2 3.
[0031] Combination Figure 1 and Figure 2 A steel bar connection device for assembled prefabricated components, a fixed connecting rod 13 is installed between a grouting outer shell 11 and a grouting inner shell 12, the fixed connecting rod 13 is located between the steel bar 1 2 and the steel bar 2 3, and the fixed connecting rod 13 is fixedly connected to the grouting outer shell 11 and the grouting inner shell 12, the grouting outer shell 11 and the grouting inner shell 12 are reinforced by the fixed connecting rod 13 to prevent the grouting inner shell 12 from being separated from the grouting outer shell 11 and the grouting inner shell 12 under high-pressure grouting, and at the same time, the casting of the steel bar 1 2 and the steel bar 2 3 is also fixed.
[0032] Combination Figure 2-3 A steel bar connection device for assembled prefabricated components, multiple sets of fixed ring components 14 are fixedly installed on the inner side of the grouting inner shell 12, and the position of the fixed ring components 14 corresponds to the steel bar 1 2. When we insert the steel bar 1 2 and the steel bar 2 3 into the sleeve 1, the steel bar 1 2 is first stabilized by the fixed ring components 14, and then the steel bar 2 3 is inserted into the sleeve 1.
[0033] Combination Figure 2 , Figure 4 and Figure 5 A steel bar connection device for assembled prefabricated components, a hole 113 is opened at the upper end of the grouting outer shell 11, a hole groove 111 is opened at the lower end of the grouting outer shell 11, a gap 112 is reserved between the grouting outer shell 11 and the grouting inner shell 12, a round tube 18 is arranged between the gap 112, a steel bar 2 is positioned through the hole 113, the steel bar 2 is reinforced through the fixed ring assembly 14, and the grouting material is retained between the grouting outer shell 11 and the grouting inner shell 12 through the gap 112.
[0034] Combination Figure 3 and Figure 4 A steel bar connection device for an assembled prefabricated component, a fixed ring assembly 14 includes a connection block 141, a fixed ring 142 is fixedly installed at one end of the connection block 141 away from the grouting inner shell 12, a bonding sheet 143 is fixedly installed on the inner side of the fixed ring 142, the fixed ring 142 matches the steel bar 2, after the steel bar 2 determines its position through the hole 113, it is fixed by the fixed ring 142, and the steel bar 2 is bonded and prevented from slipping by the bonding sheet 143.
[0035] Combination Figure 4 A steel bar connection device for assembled prefabricated components, a connecting plate 16 is slidably installed in a hole groove 111, an elastic member 17 is fixedly installed on the outer side of the connecting plate 16, and the other end of the elastic member 17 is fixedly connected to the grouting shell 11. When we determine and fix the position of the steel bar 2 through the hole 2 113, the position of the steel bar 2 3 may not be matched due to inaccurate manual measurement, so we slide the connecting plate 16 in the hole groove 111 to position the steel bar 2 3 through the connecting plate 16, and at the same time, the connecting plate 16 remains relatively stable through the action of each group of elastic members 17.
[0036] Combination Figure 2-4 , Figure 6A steel bar connection device for assembled prefabricated components, a hole three 161 is opened at the upper end of the connecting plate 16, a fixing ring 15 is fixedly installed at the upper end of the hole three 161, the hole three 161 matches the size of the fixing ring 15, the fixing ring 15 matches the steel bar two 3, the steel bar two 3 passes through the connecting plate 16 through the hole three 161, and its position is fixed by the fixing ring 15, the position of the two groups of steel bars is matched, and pouring begins.
[0037] Combination Figure 2 and Figure 6 A steel bar connection device for assembled prefabricated components, a plurality of holes 121 are provided on a grouting inner shell 12, the holes 121 are distributed in stages, the holes 121 match the round tube 18, the hole 122 is located at the lower end of the hole 121, the grouting material in the grouting inner shell 12 is discharged into the round tube 18 through the holes 121 on the grouting inner shell 12, the grouting material is discharged into the gap 112 through the holes 181 on the round tube 18, and the grouting material is hit by gravity at the lower end of the gap 112 through the staged round tubes 18, so that the air inside is discharged.
[0038] Combination Figure 2 and Figure 7 A steel bar connection device for assembled prefabricated components, a connecting rod 131 is fixedly installed on the upper side of one end of the fixed connecting rod 13 close to the slurry outlet 5, a fixed ring 132 is fixedly installed on the upper end of the connecting rod 131, the fixed ring 132 is matched with a vibrating rod 6, and the end of the vibrating rod 6 close to the fixed connecting rod 13 is slidably connected to the grouting inner shell 12, the vibrating rod 6 penetrates into the fixed ring 132, transmits the vibration to the inside of the sleeve 1, and shakes out the bubbles in the grouting inner shell 12.
[0039] Combination Figure 1 and Figure 8 A steel bar connection device for assembled prefabricated components, a fixed ring three 51 is fixedly installed inside the slurry outlet 5, a connecting block two 52 is fixedly installed outside the fixed ring three 51, the other end of the connecting block two 52 is fixedly connected to the outer shell of the slurry outlet 5, the fixed ring three 51 matches the vibrating rod 6, and the diameter of the slurry outlet 5 is larger than the diameter of the vibrating rod 6, the vibrating rod 6 transmits the vibration to the grouting shell 11 through the fixed ring three 51, discharges the gas in the grouting material in the gap 112, and enhances its compactness.
[0040] It should be noted that, in the description of the present application, it should be understood that the terms "length", "thickness", "inside", "outside", "axial", "radial", etc., indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0041] In addition, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises", or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article, or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article, or apparatus.
[0042] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A steel bar connection device for an assembled prefabricated component, comprising a sleeve (1), a steel bar 1 (2) is installed through the upper end of the sleeve (1), a steel bar 2 (3) is installed through the lower end of the sleeve (1), a grouting port (4) is installed on the outer side of the sleeve (1), a slurry outlet (5) is installed on the outer side of the sleeve (1), and a vibrating rod (6) is arranged on the inner side of the slurry outlet (5), characterized in that: The sleeve (1) comprises a grouting outer shell (11), a grouting inner shell (12) is fixedly mounted on the inner side of the grouting outer shell (11), a plurality of holes (122) are provided on the grouting inner shell (12), a round tube (18) is fixedly mounted between the grouting outer shell (11) and the grouting inner shell (12), the round tube (18) passes through the grouting inner shell (12) and is fixedly connected thereto, one end of the round tube (18) away from the grouting inner shell (12) is fixedly connected to the grouting outer shell (11), the round tube (18) is distributed in a stepped manner on the grouting inner shell (12), and a plurality of holes (181) are provided on the round tube (18).
2. The steel bar connection device for prefabricated components according to claim 1, characterized in that: A fixed connecting rod (13) is installed between the grouting outer shell (11) and the grouting inner shell (12); the fixed connecting rod (13) is located between the first steel bar (2) and the second steel bar (3); and the fixed connecting rod (13) is fixedly connected to both the grouting outer shell (11) and the grouting inner shell (12).
3. The steel bar connection device for prefabricated components according to claim 1, characterized in that: A plurality of groups of fixed circular ring components (14) are fixedly installed on the inner side of the grouting inner shell (12), and the positions of the fixed circular ring components (14) correspond to the steel bar one (2).
4. The steel bar connection device for prefabricated components according to claim 1, characterized in that: The upper end of the grouting outer shell (11) is provided with a second hole (113), the lower end of the grouting outer shell (11) is provided with a hole groove (111), a gap (112) is reserved between the grouting outer shell (11) and the grouting inner shell (12), and the round tube (18) is arranged between the gap (112).
5. The steel bar connection device for prefabricated components according to claim 1, characterized in that: The fixed circular ring assembly (14) comprises a connecting block 1 (141), a fixed circular ring 2 (142) being fixedly mounted on one end of the connecting block 1 (141) away from the grouting inner shell (12), a fitting sheet (143) being fixedly mounted on the inner side of the fixed circular ring 2 (142), and the fixed circular ring 2 (142) matches the steel bar 1 (2).
6. The steel bar connection device for prefabricated components according to claim 1, characterized in that: A connecting plate (16) is slidably mounted in the hole groove (111), an elastic member (17) is fixedly mounted on the outer side of the connecting plate (16), and the other end of the elastic member (17) is fixedly connected to the grouting shell (11).
7. The steel bar connection device for prefabricated components according to claim 1, characterized in that: The upper end of the connecting plate (16) is provided with a third hole (161), the upper end of the third hole (161) is fixedly mounted with a fixing ring (15), the size of the third hole (161) matches that of the fixing ring (15), and the fixing ring (15) matches that of the second steel bar (3).
8. The steel bar connection device for prefabricated components according to claim 1, characterized in that: The grouting inner shell (12) is provided with a plurality of four holes (121), the four holes (121) are distributed in a stepped manner, the four holes (121) match the circular tube (18), and the one hole (122) is located at the lower end of the four holes (121).
9. The steel bar connection device for prefabricated components according to claim 1, characterized in that: A connecting rod (131) is fixedly installed on the upper side of one end of the fixed connecting rod (13) close to the slurry outlet (5), and a fixed circular ring (132) is fixedly installed on the upper end of the connecting rod (131). The fixed circular ring (132) matches the vibrating rod (6), and the end of the vibrating rod (6) close to the fixed connecting rod (13) is slidably connected to the grouting inner shell (12).
10. The steel bar connection device for prefabricated components according to claim 1, characterized in that: A fixed circular ring three (51) is fixedly installed inside the slurry outlet (5), a connecting block two (52) is fixedly installed outside the fixed circular ring three (51), the other end of the connecting block two (52) is fixedly connected to the outer shell of the slurry outlet (5), the fixed circular ring three (51) matches the vibrating rod (6), and the diameter of the slurry outlet (5) is greater than the diameter of the vibrating rod (6).
Citation Information
Patent Citations
Fabricated wall steel bar connecting device
CN213509229U