Swimming lane mode-based visual process arrangement method and system
By adopting a visual process orchestration method based on the lane mode in the communication network fault management system, the problem of lack of intuitiveness and flexibility in the traditional orchestration method is solved, and the intuitive orchestration and efficient execution of the process are achieved.
Patent Information
- Application Number
- CN202411408177.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2025-02-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional process orchestration methods lack intuitiveness and flexibility in communication network fault management systems, making it difficult to effectively orchestrate and manage automatic fault handling processes.
The visual process orchestration method based on the lane mode is adopted to realize process orchestration and management by defining the lane type, dividing node tasks to the lane, establishing node task dependencies, configuring node task attributes, and real-time monitoring and adjustment.
Through the lane mode, the process link orchestration results are intuitive and visible, reducing configuration difficulty, improving process configuration efficiency, and optimizing process execution efficiency to ensure the correct execution of tasks and the smooth progress of business processes.
Abstract
Description
Technical Field
[0001] The present invention relates to the field of communication technology, and specifically provides a swimlane mode-based visualized process arrangement method and device. Background Art
[0002] With the development of communication technology, there are more and more communication network devices, and the networking methods between devices are becoming increasingly complex, and the requirements for the intelligent communication network fault management system are also getting higher and higher. The fault management system must not only collect and present equipment faults, but also have the design and management capabilities of the automatic fault handling process, and arrange some node tasks such as fault preprocessing, fault demarcation and positioning, fault handling and recovery provided by the system to complete automatic fault handling. In the communication equipment fault management system, the arrangement of related node tasks in the automatic fault handling process is a key task, which involves the sorting of node tasks, priority division, and dependencies between node tasks.
[0003] Traditional process arrangement methods usually use tables or lists to display, which lacks intuitiveness and flexibility. Therefore, a new process arrangement method is needed to solve these problems. Summary of the invention
[0004] The present invention aims at solving the above-mentioned deficiencies of the prior art and provides a highly practical visual process arrangement method based on the swimlane mode.
[0005] A further technical task of the present invention is to provide a visual process orchestration system based on the lane mode that is reasonably designed, safe and applicable.
[0006] The technical solution adopted by the present invention to solve its technical problem is:
[0007] A visual process orchestration method based on the lane mode first defines the lane type, divides the node tasks into the lanes, establishes the node task dependency, then configures the node task attributes, and finally monitors and adjusts.
[0008] Furthermore, when defining the lane type, first, clarify each link in the automatic fault handling process and assign a lane to each link. The lane appears as a physical dividing line on the flowchart.
[0009] Furthermore, node tasks are divided into lanes, and each node task in the process is divided into corresponding lanes according to the link it belongs to by dragging the node into the lane. In this way, the node tasks in each lane will output the execution results according to the link to which the lane belongs.
[0010] Furthermore, node task dependencies are established, and dependencies between tasks of each node are analyzed to ensure that tasks can be executed in the correct order.
[0011] Further, configure the node task attributes and configure the corresponding attributes for each task;
[0012] In monitoring and adjustment, during the execution of business processes, task scheduling is monitored and adjusted in real time. When problems or abnormal situations arise, task scheduling is adjusted in a timely manner to ensure the smooth progress of business processes.
[0013] A visual process orchestration system based on the lane mode first defines the lane type, divides the node tasks into the lanes, establishes the node task dependency, then configures the node task attributes, and finally monitors and adjusts.
[0014] Furthermore, when defining the lane type, first, clarify each link in the automatic fault handling process and assign a lane to each link. The lane appears as a physical dividing line on the flowchart.
[0015] Furthermore, node tasks are divided into lanes, and each node task in the process is divided into corresponding lanes according to the link it belongs to by dragging the node into the lane. In this way, the node tasks in each lane will output the execution results according to the link to which the lane belongs.
[0016] Furthermore, node task dependencies are established, and dependencies between tasks of each node are analyzed to ensure that tasks can be executed in the correct order.
[0017] Further, configure the node task attributes and configure the corresponding attributes for each task;
[0018] In monitoring and adjustment, during the execution of business processes, task scheduling is monitored and adjusted in real time. When problems or abnormal situations arise, task scheduling is adjusted in a timely manner to ensure the smooth progress of business processes.
[0019] Compared with the prior art, the swimlane-based visualized process arrangement method and system of the present invention have the following outstanding beneficial effects:
[0020] The present invention uses the swimlane mode to make the process link arrangement results intuitive and visible, which is easy to understand and share, and greatly reduces the difficulty of configuration.
[0021] Flexible adjustment: Through simple drag and drop operations, you can quickly adjust the task attribution link, clearly display the allocation and dependency relationship of task nodes between each link, and improve the efficiency of process configuration.
[0022] Optimize process execution efficiency: By analyzing and configuring the dependencies of task nodes, the correct execution of tasks can be ensured, and execution exceptions caused by process confusion can be avoided, thereby improving the execution efficiency of the process. DETAILED DESCRIPTION
[0023] In order to enable those skilled in the art to better understand the solution of the present invention, the present invention is further described in detail below in conjunction with specific implementation methods. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] A best embodiment is given below:
[0025] In this embodiment, a visual process arrangement method based on a lane mode is provided. First, lane types are defined, node tasks are divided into lanes, node task dependencies are established, node task attributes are configured, and finally monitoring and adjustment are performed.
[0026] Among them, the swimlane model is a flowchart representation method that clarifies the responsibilities and collaborative relationships of each node in the business process by dividing different node tasks into different swimlanes.
[0027] Define lane types: First, clarify each link in the automatic fault handling process and assign a lane to each link. The lane can be represented as a physical dividing line on the flowchart.
[0028] Divide node tasks into lanes: Divide each node task in the process into corresponding lanes according to the link to which it belongs by dragging the node into the lane. In this way, the node tasks in each lane will output the execution results according to the link to which the lane belongs.
[0029] Establish node task dependencies: Analyze the dependencies between tasks at each node to ensure that tasks can be executed in the correct order, including predecessor tasks, successor tasks, and parallel methods between tasks (sequential, exclusive, parallel), etc.
[0030] Configure node task properties: Configure corresponding properties for each task, such as task name, task description, task input parameters, task output parameters, etc. These properties help participants better understand and execute tasks.
[0031] Monitoring and adjustment: During the execution of business processes, real-time monitoring and adjustment of task scheduling are carried out. When problems or abnormal situations occur, task scheduling can be adjusted in time to ensure the smooth progress of business processes.
[0032] Based on the above method, a visual process orchestration system based on the lane mode in this embodiment first defines the lane type, divides the node tasks into lanes, establishes node task dependencies, then configures the node task attributes, and finally monitors and adjusts.
[0033] When defining the lane type, first, clarify each link in the automatic fault handling process and assign a lane to each link. The lane appears as a physical dividing line on the flowchart.
[0034] Divide node tasks into lanes, and divide each node task in the process into corresponding lanes according to the link they belong to by dragging the nodes into the lanes. In this way, the node tasks in each lane will output the execution results according to the link to which the lane belongs.
[0035] Establish node task dependencies, analyze the dependencies between each node task, and ensure that tasks can be executed in the correct order.
[0036] Configure node task attributes and configure corresponding attributes for each task;
[0037] In monitoring and adjustment, during the execution of business processes, task scheduling is monitored and adjusted in real time. When problems or abnormal situations arise, task scheduling is adjusted in a timely manner to ensure the smooth progress of business processes.
[0038] The present invention can be intuitively visualized: through the swimlane mode, the process link arrangement results are intuitively visible, easy to understand and share, and the difficulty of configuration is greatly reduced.
[0039] Flexible adjustment: Through simple drag and drop operations, you can quickly adjust the task attribution link, clearly display the allocation and dependency relationship of task nodes between each link, and improve the efficiency of process configuration.
[0040] Optimize process execution efficiency: By analyzing and configuring the dependencies of task nodes, the correct execution of tasks can be ensured, and execution exceptions caused by process confusion can be avoided, thereby improving the execution efficiency of the process.
[0041] The above-mentioned specific implementations are only specific cases of the present invention. The patent protection scope of the present invention includes but is not limited to the above-mentioned specific implementations. Any technical solutions that conform to the above-mentioned specific implementations of the present invention and any appropriate changes or substitutions made by ordinary technicians in the relevant technical field shall fall within the patent protection scope of the present invention.
[0042] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A visual process arrangement method based on swimlane mode, characterized in that: First, define the lane type, divide the node tasks into lanes, establish node task dependencies, then configure the node task properties, and finally monitor and adjust.
2. A method for visual process arrangement based on swimlane mode according to claim 1, characterized in that: When defining the lane type, first, clarify each link in the automatic fault handling process and assign a lane to each link. The lane appears as a physical dividing line on the flowchart.
3. A method for visual process arrangement based on swimlane mode according to claim 2, characterized in that: Divide node tasks into lanes, and divide each node task in the process into corresponding lanes according to the link they belong to by dragging the nodes into the lanes. In this way, the node tasks in each lane will output the execution results according to the link to which the lane belongs.
4. A method for visual process arrangement based on swimlane mode according to claim 3, characterized in that: Establish node task dependencies, analyze the dependencies between each node task, and ensure that tasks can be executed in the correct order.
5. A method for visual process arrangement based on swimlane mode according to claim 4, characterized in that: Configure node task attributes and configure corresponding attributes for each task; In monitoring and adjustment, during the execution of business processes, task scheduling is monitored and adjusted in real time. When problems or abnormal situations arise, task scheduling is adjusted in a timely manner to ensure the smooth progress of business processes.
6. A visual process orchestration system based on swimlane mode, characterized in that: First, define the lane type, divide the node tasks into lanes, establish node task dependencies, then configure the node task properties, and finally monitor and adjust.
7. A visual process arrangement system based on swimlane mode according to claim 6, characterized in that: When defining the lane type, first, clarify each link in the automatic fault handling process and assign a lane to each link. The lane appears as a physical dividing line on the flowchart.
8. A visual process arrangement system based on swimlane mode according to claim 7, characterized in that: Divide node tasks into lanes, and divide each node task in the process into corresponding lanes according to the link they belong to by dragging the nodes into the lanes. In this way, the node tasks in each lane will output the execution results according to the link to which the lane belongs.
9. A visual process arrangement system based on swimlane mode according to claim 8, characterized in that: Establish node task dependencies, analyze the dependencies between each node task, and ensure that tasks can be executed in the correct order.
10. A visual process arrangement system based on swimlane mode according to claim 8, characterized in that: Configure node task attributes and configure corresponding attributes for each task; In monitoring and adjustment, during the execution of business processes, task scheduling is monitored and adjusted in real time. When problems or abnormal situations arise, task scheduling is adjusted in a timely manner to ensure the smooth progress of business processes.
Citation Information
Patent Citations
Business data processing method, device and equipment and computer storage medium
CN114610383A
Cited By
Method for graphically designing time behavior of system model
CN120745046A