Method and device for determining high-frequency data in building scene and electronic equipment
By determining the high-frequency data of the first energy in the building scenario and using the high-frequency prediction model to predict the high-frequency data of the second energy, the prediction problem of the construction industry when energy data statistics are lacking is solved, and the real-time performance of energy management is improved and accuracy.
Patent Information
- Application Number
- CN202411523067.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-29
- Publication Date
- 2025-02-21
- Estimated Expiration
- 2044-10-29
AI Technical Summary
When energy data statistics are lacking, it is difficult for the construction industry to effectively predict energy data, resulting in increased difficulty in energy management and carbon emission control.
By determining the high frequency data of the first energy source in the building scenario and using the high frequency prediction model, the high frequency data of the second energy source is predicted. The method includes determining the high-frequency data of the first energy source and retrieving a high-frequency prediction model corresponding to the target building scene. The model is constructed based on the low-frequency prediction model, and the low-frequency prediction model is obtained through sample data training.
The purpose of effectively predicting when the second energy energy lacks energy data statistics is achieved, improving the real-time and accuracy of building energy management, and solving the prediction problems caused by the lack of energy data statistics.
Smart Images

Figure CN119494438A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of data processing, and in particular to a method, device and electronic equipment for determining high-frequency data in a building scene. Background Art
[0002] With the acceleration of China's urbanization process, the problem of building carbon emissions has become increasingly prominent. As one of the main sources of energy consumption and greenhouse gas emissions, the construction industry accounts for nearly 40% of total emissions, of which carbon emissions during the building operation stage may account for 60% to 70% of the total building carbon emissions.
[0003] However, since carbon accounting in the building operation phase often relies on estimates and historical data, which has a serious lag, and involves multiple energy types, such as electricity, heat, natural gas, etc., different types of energy have different time scale characteristics, and cannot accurately and timely reflect the actual energy consumption of the building, and lack accurate real-time monitoring methods. Therefore, when energy data statistics are lacking, there is a technical problem that it is difficult to effectively predict energy data.
[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0005] The embodiments of the present invention provide a method, device and electronic device for determining high-frequency data in a building scene, so as to at least solve the technical problem that it is difficult to effectively predict energy data when energy data statistics are lacking.
[0006] According to one aspect of an embodiment of the present invention, a method for determining high-frequency data in a building scene is provided, comprising: determining first high-frequency data corresponding to a first energy source, wherein the first high-frequency data is data having a unit of measurement less than a first threshold and corresponding to the first energy source; retrieving a high-frequency prediction model corresponding to a target building scene, wherein the target building scene is a building scene using the first energy source and a second energy source, the second energy source is an energy source associated with the first energy source, the high-frequency prediction model is constructed based on a low-frequency prediction model, the low-frequency prediction model is obtained by training based on sample data, the sample data includes first sample low-frequency data corresponding to the first energy source and second sample low-frequency data corresponding to the second energy source in the target building scene, the first sample low-frequency data is obtained based on sample high-frequency data, the first sample low-frequency data is data having a unit of measurement greater than or equal to a first threshold and corresponding to the first energy, and the second sample low-frequency data is data having a unit of measurement greater than or equal to a second threshold and corresponding to the second energy; the first high-frequency data is input into the high-frequency prediction model to determine second high-frequency data corresponding to the second energy source.
[0007] Optionally, before calling the high-frequency prediction model corresponding to the target building scene, it also includes: acquiring the sample high-frequency data corresponding to the first energy; accumulating the sample high-frequency data to obtain first sample low-frequency data, wherein the first sample low-frequency data is data with a measurement unit greater than or equal to a first threshold and corresponding to the first energy; training an initial model based on the first sample low-frequency data corresponding to the first energy and the second sample low-frequency data corresponding to the second energy to obtain the low-frequency prediction model; and obtaining the high-frequency prediction model based on the low-frequency prediction model.
[0008] Optionally, the initial model is trained based on the first sample low-frequency data corresponding to the first energy source and the second sample low-frequency data corresponding to the second energy source to obtain the low-frequency prediction model, including: converting the first sample low-frequency data and the second sample low-frequency data into predetermined vectors; determining the query vector, key vector, and value vector corresponding to the predetermined vector based on the query matrix, key matrix, and value matrix; determining the similarity index between the query vector and each key vector; normalizing multiple similarity indices to obtain multiple attention weights, wherein the multiple attention weights correspond one-to-one to the multiple similarity indices; performing weighted summation based on the multiple attention weights and the corresponding value vector to obtain an output vector corresponding to the query vector; inputting the output vector into the initial model for training to obtain the low-frequency prediction model.
[0009] Optionally, the output vector is input into the initial model for training to obtain the low-frequency prediction model, including: when the initial model includes an encoder and a decoder, the output vector is input into the encoder for dimensionality reduction processing to obtain a target vector; based on the target vector, it is input into the decoder to reconstruct it into a reconstructed vector; the loss value between the output vector and the reconstructed vector is determined; and the parameters of the encoder and the decoder are adjusted by a back propagation algorithm until the corresponding loss value is lower than a third threshold value to obtain the low-frequency prediction model.
[0010] Optionally, the high-frequency prediction model is obtained based on the low-frequency prediction model, including: determining initial model parameters of the low-frequency prediction model; determining distinguishing features between low-frequency data and high-frequency data; determining parameter adjustment items corresponding to the distinguishing features from the initial model parameters; adjusting parameters of the parameter adjustment items based on the distinguishing features to obtain the adjusted initial model parameters.
[0011] Optionally, before inputting the first high-frequency data into the high-frequency prediction model to determine the second high-frequency data corresponding to the second energy, it also includes: determining a missing index of the first high-frequency data; when the missing index is greater than a third threshold, determining a data type of the first high-frequency data; and filling the first high-frequency data in a manner corresponding to the data type to obtain the filled first high-frequency data.
[0012] Optionally, after inputting the first high-frequency data into a high-frequency prediction model to determine the second high-frequency data corresponding to the second energy, it also includes: determining the energy supply equipment corresponding to the second high-frequency data; and adjusting the energy supply equipment based on the second high-frequency data to achieve the energy supply target.
[0013] According to one aspect of an embodiment of the present invention, a device for determining high-frequency data in a building scene is provided, comprising: a first determination module, used to determine first high-frequency data corresponding to a first energy source, wherein the first high-frequency data is data having a measurement unit less than a first threshold value and corresponding to the first energy source; a calling module, used to call a high-frequency prediction model corresponding to a target building scene, wherein the target building scene is a building scene using the first energy source and a second energy source, the second energy source is an energy source associated with the first energy source, the high-frequency prediction model is constructed based on a low-frequency prediction model, the low-frequency prediction model is obtained by training based on sample data, the sample data includes first sample low-frequency data corresponding to the first energy source and second sample low-frequency data corresponding to the second energy source in the target building scene, the first sample low-frequency data is obtained based on sample high-frequency data, the first sample low-frequency data is data having a measurement unit greater than or equal to the first threshold value and corresponding to the first energy source, and the second sample low-frequency data is data having a measurement unit greater than or equal to the second threshold value and corresponding to the second energy source; a second determination module, used to input the first high-frequency data into the high-frequency prediction model to determine second high-frequency data corresponding to the second energy source.
[0014] According to one aspect of an embodiment of the present invention, there is provided an electronic device, comprising: a processor; and a memory for storing instructions executable by the processor; wherein the processor is configured to execute the instructions to implement any of the above-described methods for determining high-frequency data in a building scene.
[0015] According to one aspect of an embodiment of the present invention, a computer-readable storage medium is provided. When instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device is enabled to execute any of the above-mentioned methods for determining high-frequency data in a building scene.
[0016] In an embodiment of the present invention, the first high-frequency data corresponding to the first energy is determined, wherein the first high-frequency data is data with a measurement unit less than a first threshold and corresponding to the first energy; the high-frequency prediction model corresponding to the target building scene is retrieved, wherein the target building scene is a building scene using the first energy and the second energy, the second energy is an energy associated with the first energy, the high-frequency prediction model is constructed based on the low-frequency prediction model, the low-frequency prediction model is obtained by training based on sample data, the sample data includes the first sample low-frequency data corresponding to the first energy in the target building scene, the second sample low-frequency data corresponding to the second energy, the first sample low-frequency data is obtained based on the sample high-frequency data; the first high-frequency data is input into the high-frequency prediction model to determine the second high-frequency data corresponding to the second energy. It can be seen that the high-frequency data of one energy in the target building scene can be used to predict the high-frequency data of another energy, so as to achieve the purpose of being able to effectively predict the second energy when there is a lack of energy data statistics, thereby solving the technical problem of being difficult to effectively predict energy data when there is a lack of energy data statistics. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0018] Figure 1 is a flowchart of a method for determining high-frequency data in a building scene according to an embodiment of the present invention;
[0019] Figure 2 is a flow chart of a data determination method provided by an optional embodiment of the present invention;
[0020] Figure 3 4 is a structural block diagram of a device for determining high-frequency data in a building scene according to an embodiment of the present invention. DETAILED DESCRIPTION
[0021] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0022] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0023] Example 1
[0024] According to an embodiment of the present invention, an embodiment of a method for determining high-frequency data in a building scene is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.
[0025] Figure 1 is a flow chart of a method for determining high-frequency data in a building scene according to an embodiment of the present invention. Figure 1 As shown, the method comprises the following steps:
[0026] Step S102, determining first high-frequency data corresponding to the first energy source, wherein the first high-frequency data is data having a measurement unit less than a first threshold and corresponding to the first energy source;
[0027] In step S102 provided in the present application, the first high-frequency data corresponding to the first energy is determined, and the first energy refers to a main energy used in the target building scene, such as electricity. The first high-frequency data refers to high-frequency data corresponding to the first energy, that is, energy consumption data recorded in a shorter time interval (such as every hour). These data can reflect the energy usage in more detail. The first threshold is a threshold used to distinguish the frequency (time resolution) of the data. For example, if the data is lower than the hourly frequency, it is high-frequency data.
[0028] In this step, high-frequency data related to electricity (or any designated “first energy source”) are identified, i.e., data that is recorded with a frequency above a certain threshold (e.g., less than daily). This data is able to provide more detailed information on energy consumption. The use of high-frequency data improves the model’s prediction accuracy because it captures short-term fluctuations in energy use, which is critical when developing real-time energy conservation strategies.
[0029] It should be noted that in this application, high-frequency data refers to data with a measurement unit less than a corresponding threshold and corresponding to the corresponding energy type, such as the hourly level, and low-frequency data refers to data with a measurement unit less than or equal to the corresponding threshold and corresponding to the corresponding energy type, such as the daily level.
[0030] Step S104, calling a high-frequency prediction model corresponding to a target building scene, wherein the target building scene is a building scene using a first energy source and a second energy source, the second energy source is an energy source associated with the first energy source, the high-frequency prediction model is constructed based on a low-frequency prediction model, the low-frequency prediction model is obtained by training based on sample data, the sample data includes first sample low-frequency data corresponding to the first energy source and second sample low-frequency data corresponding to the second energy source in the target building scene, the first sample low-frequency data is obtained based on the sample high-frequency data, the first sample low-frequency data is data having a measurement unit greater than or equal to a first threshold value and corresponding to the first energy source, and the second sample low-frequency data is data having a measurement unit greater than or equal to a second threshold value and corresponding to the second energy source;
[0031] In step S104 provided in the present application, a high-frequency prediction model corresponding to the target building scene is retrieved.
[0032] Among them, the second energy is involved. The second energy is another energy related to the first energy, such as heat or natural gas, which together affect the energy consumption of the target building scene. And the amount of energy consumed has a certain correlation. The second energy can be an energy that is difficult to obtain high-frequency data, such as an acquisition difficulty index higher than a predetermined threshold, or a high-frequency data accumulation higher than a predetermined threshold.
[0033] Among them, high-frequency prediction models are involved. Models obtained based on low-frequency prediction models are used to predict high-frequency data, and machine learning or deep learning techniques are usually used.
[0034] Among them, a low-frequency prediction model is also involved. The model trained according to sample data is used to predict low-frequency data (such as daily or weekly energy consumption), which is the basis of the high-frequency prediction model.
[0035] In this step, a high-frequency prediction model is selected based on the type of energy used in the building (such as electricity and heat). This model is built based on the previously trained low-frequency prediction model and is used to improve the temporal resolution, that is, to predict hourly data from daily data. By expanding from a low-frequency prediction model to a high-frequency prediction model, more detailed data can be predicted using a smaller amount of data (low-frequency data is often easy to obtain), which is crucial for the real-time and accuracy of energy management and energy conservation and emission reduction decisions.
[0036] Step S106: input the first high-frequency data into a high-frequency prediction model to determine second high-frequency data corresponding to the second energy source.
[0037] In step S106, the known high-frequency power data is input into the high-frequency prediction model, and the model predicts the high-frequency data of heat (or other energy) associated with power usage. This method can infer the mutual influence and pattern between different energy sources, so as to evaluate the energy data of the building more comprehensively and accurately.
[0038] Through the above steps S102-S106, the first high-frequency data corresponding to the first energy is determined, wherein the first high-frequency data is data with a measurement unit less than the first threshold and corresponding to the first energy; the high-frequency prediction model corresponding to the target building scene is retrieved, wherein the target building scene is a building scene using the first energy and the second energy, the second energy is an energy associated with the first energy, the high-frequency prediction model is constructed based on the low-frequency prediction model, the low-frequency prediction model is obtained by training based on sample data, the sample data includes the first sample low-frequency data corresponding to the first energy in the target building scene, the second sample low-frequency data corresponding to the second energy, and the first sample low-frequency data is obtained based on the sample high-frequency data; the first high-frequency data is input into the high-frequency prediction model to determine the second high-frequency data corresponding to the second energy. It can be seen that it can predict the high-frequency data of another energy through the high-frequency data of one energy in the target building scene, so as to achieve the purpose of being able to effectively predict the second energy when there is a lack of energy data statistics, thereby solving the technical problem of being difficult to effectively predict energy data when there is a lack of energy data statistics.
[0039] It should be noted that in practical applications, the fusion of high-frequency and low-frequency data can further improve the prediction performance of the model. For example, by fusing high-frequency power data with low-frequency thermal data, the temporal details of high-frequency data can be used to supplement the deficiencies of low-frequency data and improve the model's ability to capture energy consumption patterns.
[0040] As an optional embodiment, before calling the high-frequency prediction model corresponding to the target building scene, it also includes: obtaining sample high-frequency data corresponding to the first energy; accumulating the sample high-frequency data to obtain first sample low-frequency data, wherein the first sample low-frequency data is data with a measurement unit greater than or equal to a first threshold and corresponding to the first energy; based on the first sample low-frequency data corresponding to the first energy and the second sample low-frequency data corresponding to the second energy, training the initial model to obtain a low-frequency prediction model; based on the low-frequency prediction model, obtaining a high-frequency prediction model.
[0041] In this embodiment, sample high-frequency data corresponding to the first energy source is obtained. That is, at this stage, the goal is to collect samples of high-frequency data related to the first energy source (e.g., electricity). High-frequency data refers to data recorded at shorter time intervals (such as every hour or every minute), which can more accurately reflect the patterns and changes in energy use. High-frequency data provides more detailed time series information, which is critical for training predictive models that can accurately capture short-term fluctuations. This step ensures that the input data of the model has enough details to learn the complex patterns of energy consumption.
[0042] By accumulating the sample high-frequency data, the first sample low-frequency data is obtained. That is, by accumulating or averaging the high-frequency data, it can be converted into low-frequency data (such as daily or weekly data). This conversion is to be consistent with the low-frequency data of the second energy source (such as daily data of thermal power) to facilitate subsequent analysis and model training. The generation of low-frequency data helps to reduce the amount of data, simplify the model training process, and to some extent can reduce data noise and improve the stability and prediction accuracy of the model.
[0043] Then, based on the first sample low-frequency data corresponding to the first energy source and the second sample low-frequency data corresponding to the second energy source, the initial model is trained to obtain a low-frequency prediction model, that is, an initial model is trained using the low-frequency data generated above, including the data of the first energy source (such as electricity) and the second energy source (such as heat). This model is designed to predict low-frequency energy consumption and will serve as the basis for the high-frequency prediction model. By training the low-frequency prediction model, the basic pattern of energy consumption can be learned with fewer data points and computing resources, and then expanded to high-frequency prediction through the model, which saves computing costs and improves prediction accuracy.
[0044] Finally, the high-frequency prediction model is obtained based on the low-frequency prediction model. After the low-frequency prediction model is successfully trained, the model needs to be further expanded to predict high-frequency data. This usually involves adjusting the model structure (such as adding an attention mechanism) and fine-tuning the parameters to adapt to the prediction needs of higher-frequency data. The high-frequency prediction model can provide real-time or near real-time energy consumption forecasts, which is essential for immediate response, optimizing energy management, and reducing carbon emissions.
[0045] This series of pre-steps ensures that the construction and training of the high-frequency prediction model are based on sufficient data preparation and model optimization. By starting with high-frequency data, gradually converting to low-frequency data and training the low-frequency prediction model, and then expanding the low-frequency model to high-frequency prediction, the prediction accuracy and practicality of the model can be effectively improved, while reducing the complexity of data processing and model training. This method ensures that even with limited resources, a high-quality prediction model can be built, which significantly improves the real-time and accuracy of building energy management.
[0046] As an optional embodiment, the initial model is trained based on the first sample low-frequency data corresponding to the first energy source and the second sample low-frequency data corresponding to the second energy source to obtain a low-frequency prediction model, including: converting the first sample low-frequency data and the second sample low-frequency data into a predetermined vector; determining the query vector, key vector, and value vector corresponding to the predetermined vector based on the query matrix, key matrix, and value matrix; determining the similarity index between the query vector and each key vector; normalizing multiple similarity indices to obtain multiple attention weights, wherein the multiple attention weights correspond one-to-one to the multiple similarity indices; performing weighted summation based on the multiple attention weights and the corresponding value vector to obtain an output vector corresponding to the query vector; inputting the output vector into the initial model for training to obtain a low-frequency prediction model.
[0047] In this embodiment, the first sample low-frequency data and the second sample low-frequency data are converted into predetermined vectors. That is, at this stage, data preprocessing converts low-frequency data (such as daily electricity consumption, daily heat energy consumption, etc.) into vector representations suitable for input into the self-attention Transformer model. This usually involves standardization, encoding, and possible feature extraction of data. Vectorized data helps the model understand and process information, especially for deep learning models. Converting data into numerical vectors is a necessary preprocessing step, which can improve the training efficiency and prediction accuracy of the model.
[0048] Afterwards, the query vector, key vector, and value vector corresponding to the predetermined vector are determined based on the query matrix, key matrix, and value matrix. That is, first, the predetermined vector is linearly transformed to generate a query vector (Q), a key vector (K), and a value vector (V). The query vector is used to find information, the key vector indicates the location of the information, and the value vector contains the information that needs attention. The attention mechanism allows the model to focus on the most relevant information when processing sequence data, rather than blindly averaging all inputs. This is particularly useful for processing long sequence data and capturing long-term dependencies in the sequence, which can significantly improve the prediction accuracy of the model.
[0049] Then, the similarity index between the query vector and each key vector is determined. The degree of match between each key vector and the query vector, i.e., the similarity index, is obtained by calculating the dot product between the query vector and all key vectors or using other similarity metrics (such as cosine similarity). The similarity index is used to measure the relevance of different data points to the current query and is the basis for calculating the attention weight. Data points with higher similarity will be given greater weights, thus playing a more important role in model prediction.
[0050] Thus, multiple similarity indexes are normalized to obtain multiple attention weights. That is, the similarity index is normalized, such as using the normalized Softmax function, to obtain the attention weights. The sum of these weights is equal to 1, which indicates the distribution of the model's attention to different parts of the input data. The normalized attention weights ensure that the model's attention is more reasonably distributed. Through different weights, the model can learn which parts of the data sequence are more important, which is crucial to improving the accuracy of predictions.
[0051] Based on multiple attention weights, the corresponding value vectors are weighted and summed to obtain the output vector corresponding to the query vector. The calculated attention weights are weighted and summed with the corresponding value vectors to generate the output vector, which is the output result of the attention mechanism and contains the information that the query vector cares about most. The weighted summed output vector can more accurately reflect the characteristics of the key information in the sequence, which helps the model make more accurate predictions, especially when dealing with complex and nonlinear energy consumption patterns.
[0052] Finally, the output vector is input into the initial model for training to obtain a low-frequency prediction model. The output vector generated by the attention mechanism is input into the initial model as part of the training data to optimize the model parameters, and finally a model that can accurately predict low-frequency energy consumption is obtained. By integrating the attention mechanism, the model can process input data more intelligently and learn more complex energy consumption patterns. This not only improves the accuracy of the prediction, but also enhances the generalization ability of the model, enabling it to better adapt to different building scenarios and energy consumption patterns.
[0053] The above steps together realize the training of low-frequency prediction models, in which the integration of attention mechanism improves the model's focus on key information, enhances the model's prediction ability and understanding of complex energy consumption patterns. This helps to more accurately predict the energy demand of buildings at different time points, thereby providing support for building energy efficiency management and carbon emission control.
[0054] It should be noted that when converting low-frequency data into predetermined vectors, dynamic feature engineering can be further performed, such as calculating the average consumption of the past few days as an additional feature through a sliding window, which helps the model learn seasonal and cyclical patterns.
[0055] In addition to power and thermal energy data, other types of low-frequency data, such as humidity, temperature and other environmental data, can also be considered to improve the prediction performance of the model. These additional data can increase the input dimension of the model and make the prediction more refined.
[0056] As an optional embodiment, the output vector is input into the initial model for training to obtain a low-frequency prediction model, including: when the initial model includes an encoder and a decoder, the output vector is input into the encoder for dimensionality reduction processing to obtain a target vector; based on the target vector, it is input into the decoder to reconstruct it into a reconstructed vector; the loss value between the output vector and the reconstructed vector is determined; and the parameters of the encoder and the decoder are adjusted by a back propagation algorithm until the corresponding loss value is lower than a third threshold value to obtain a low-frequency prediction model.
[0057] In this embodiment, when the initial model includes an encoder and a decoder, the output vector is input into the encoder for dimensionality reduction processing to obtain a target vector. The encoder performs dimensionality reduction processing on the output vector generated by the attention mechanism, which is achieved through the forward propagation of the neural network. The goal of the encoder is to extract the most core features of the output vector and convert it into a more compact representation (target vector) for easy model understanding and processing. Dimensionality reduction processing helps to reduce data redundancy and improve the computational efficiency of the model. It can also enhance the model's understanding of the characteristics of the input data, which is particularly effective for processing high-dimensional data.
[0058] The target vector is then input into the decoder and reconstructed into a reconstructed vector. The decoder receives the target vector generated by the encoder and tries to "reconstruct" it back to the format of the original data, that is, to generate a new sequence (reconstructed vector), which should be as close as possible to the input low-frequency data sequence. The reconstruction process verifies whether the features extracted by the encoder are sufficient to express the information of the original data, and also provides a goal for model training, that is, the decoder output should be similar to the input data.
[0059] Determine the loss value between the output vector and the reconstructed vector. The loss value is a measure of the difference between the model prediction result (reconstructed vector) and the actual data (output vector or low-frequency data), usually using mean square error (MSE), root mean square error (RMSE) or other loss functions suitable for sequence data. The calculation of the loss value provides a quantitative target for model training, enabling the model to optimize its prediction accuracy by minimizing the loss, thereby improving the training effect and practicality of the model.
[0060] The parameters of the encoder and decoder are adjusted through the back propagation algorithm until the corresponding loss value is lower than the third threshold, and a low-frequency prediction model is obtained. Among them, the back propagation algorithm is a common method for training neural networks. It adjusts the parameters by calculating the gradient of the loss function relative to the network parameters to minimize the loss value. During the training process, the model training is considered complete until the loss value is lower than the preset second threshold (an acceptable error level). The back propagation algorithm can continuously optimize the model parameters and improve the accuracy of the model prediction. By setting the second threshold, it can be ensured that the model stops training after reaching a certain accuracy standard, avoiding overfitting and improving the generalization ability of the model on unknown data.
[0061] This series of training steps ensures that the encoder-decoder architecture can effectively learn the features of low-frequency energy data, and the validity of the learned features is verified through the reconstruction process. Through the parameter adjustment of the back-propagation algorithm, the model can achieve high prediction accuracy and good generalization performance, which is crucial for predicting the low-frequency energy consumption of buildings at different time points.
[0062] As an optional embodiment, a high-frequency prediction model is obtained based on a low-frequency prediction model, including: determining initial model parameters of the low-frequency prediction model; determining distinguishing features between low-frequency data and high-frequency data; determining parameter adjustment items corresponding to the distinguishing features from the initial model parameters; adjusting the parameters of the parameter adjustment items based on the distinguishing features to obtain the adjusted initial model parameters.
[0063] In this embodiment, the initial model parameters of the low-frequency prediction model are determined. This step mainly obtains the weights and bias parameters of all neural network layers in the low-frequency prediction model. These parameters are learned during the model training process and are used to predict low-frequency energy consumption. The initial model parameters provide a starting point for the high-frequency prediction model, avoiding the large amount of time and computing resources consumed by training the model from scratch, and avoiding the inability to train an accurate model due to insufficient data.
[0064] Then determine the distinguishing features of low-frequency data from high-frequency data. Compare the characteristics of low-frequency data and high-frequency data, such as time resolution, data volatility, periodic patterns, etc., to identify significant differences between the two. High-frequency data usually has higher time resolution and more complex short-term fluctuations. Understanding the different characteristics of the two is key to adjusting the model to adapt to high-frequency data. This helps the model to optimize the model structure and parameters in a targeted manner to improve the predictive ability of high-frequency data.
[0065] From the initial model parameters, determine the parameter adjustments that correspond to the distinguishing features. Based on the distinguishing features, determine which model parameters need to be adjusted. For example, if high-frequency data is more volatile, it may be necessary to increase the complexity of the model or adjust the weights of the attention mechanism. Targeted parameter adjustments can optimize the model more efficiently and avoid wasting resources and extending training time caused by blind adjustments.
[0066] The parameters of the parameter adjustment items are adjusted according to the distinguishing features to obtain the initial model parameters after parameter adjustment. The specific information of the distinguishing features is used to adjust the selected parameter adjustment items, such as changing the learning rate, increasing or decreasing the number of model layers, adjusting the regularization parameters, etc., to generate model parameters suitable for high-frequency data prediction. The adjusted model parameters can better capture the characteristics of high-frequency data, improve the model's prediction accuracy and stability for high-frequency data, and thus more accurately estimate energy consumption in real time or in a short period.
[0067] This series of steps, by utilizing the learned parameters of the low-frequency prediction model and combining the characteristics of high-frequency data to make targeted adjustments to the model parameters, can quickly generate a model suitable for high-frequency data prediction, greatly reducing the time and resource consumption of model training, while improving the model's predictive ability on high-frequency data, which helps to monitor and optimize building energy management in real time.
[0068] As an optional embodiment, before inputting the first high-frequency data into the high-frequency prediction model and determining the second high-frequency data corresponding to the second energy, it also includes: determining the missing index of the first high-frequency data; when the missing index is greater than a third threshold, determining the data type of the first high-frequency data; and filling the first high-frequency data in a manner corresponding to the data type to obtain the filled first high-frequency data.
[0069] In this embodiment, the missing index of the first high-frequency data is determined. The missing index refers to the proportion of missing values in the data. For high-frequency data (such as hourly electricity consumption data), due to the large number of data points, the calculation of the missing index is a necessary preprocessing step, which can help identify the integrity of the data set. Clarifying the missing data helps to take targeted measures and avoid directly using data with a large number of missing values for prediction, thereby improving the prediction accuracy and reliability of the model.
[0070] When the missing index is greater than the third threshold, the data type of the first high-frequency data is determined. If the missing index exceeds the preset third threshold (an acceptable missing ratio), the data type needs to be further determined, such as continuous data (power consumption) or discrete data (such as device status). Different data types will affect the method of data filling, so this step is crucial to choosing the correct filling strategy.
[0071] The first high-frequency data is filled in a manner corresponding to the data type to obtain the filled first high-frequency data. An appropriate filling method is selected according to the data type, such as using time series prediction filling (such as moving average method or using prediction model filling) for continuous data, and using state-based filling (such as nearest neighbor filling) for discrete data.
[0072] By filling in missing data, we can avoid the problem of incomplete data in model training. At the same time, choosing the appropriate data type filling method can preserve the original characteristics of the data and the coherence of the time series as much as possible, thereby improving the performance of the prediction model.
[0073] Dealing with missing values in high-frequency data is a key step to ensure the accuracy of model prediction. By calculating the missing index and selecting an appropriate data filling strategy, we can effectively make up for the incompleteness of the data and avoid prediction bias caused by missing data, thereby improving the model's prediction ability and robustness for high-frequency data.
[0074] It should be noted that in addition to using prediction models or time series analysis for filling, you can also try to integrate external data sources (such as meteorological data, holiday information, etc.) for data filling to improve the accuracy of filling and the completeness of the data.
[0075] It should also be noted that the output results of the low-frequency prediction model can also be used as a reference for filling in high-frequency data, especially during periods of missing data, by using the low-frequency prediction results for reasonable speculation and filling in, further improving the prediction accuracy of high-frequency data.
[0076] Through these extensions, not only can high-frequency data be preprocessed more effectively to ensure the accuracy and reliability of model training and prediction, but it can also be flexibly adjusted and optimized according to specific scenarios and data characteristics to provide a more comprehensive and accurate data foundation. At the same time, model-based filling strategies and multi-source data fusion filling can improve the overall performance of data prediction and reduce prediction errors caused by incomplete data, thereby better supporting real-time monitoring and decision-making.
[0077] As an optional embodiment, after inputting the first high-frequency data into the high-frequency prediction model and determining the second high-frequency data corresponding to the second energy, it also includes: determining the energy supply equipment corresponding to the second high-frequency data; and adjusting the energy supply equipment based on the second high-frequency data to achieve the energy supply target.
[0078] In this embodiment, the energy supply equipment corresponding to the second high-frequency data is determined. After obtaining the second high-frequency data (such as high-frequency thermal energy consumption data), it is first necessary to clarify which energy supply equipment (such as boilers and heat pumps in the thermal energy supply system) are directly related to these data, because different energy types may involve different equipment. This step ensures that the prediction results can be accurately applied to actual energy management, avoids improper operations caused by confusion of equipment categories, and improves the effectiveness and pertinence of energy adjustments.
[0079] Adjust the energy supply equipment according to the second high-frequency data. Based on the second high-frequency data predicted by the high-frequency prediction model, dynamically adjust the operating parameters of the relevant energy supply equipment to achieve energy supply goals, such as reducing energy waste, reducing carbon emissions, or optimizing energy costs while meeting energy demand. This equipment adjustment strategy based on real-time prediction results can significantly improve the efficiency of energy use and reduce unnecessary energy consumption. It also helps building managers respond to fluctuations in energy demand in real time and achieve more accurate energy management.
[0080] Directly applying the output of the high-frequency prediction model to the adjustment of energy supply equipment can not only optimize energy supply in real time, but also improve the response speed and flexibility of the building energy system, providing strong technical support and management means for achieving energy conservation, emission reduction and green building goals.
[0081] It should be noted that a prediction-adjustment closed-loop control system can be constructed, that is, the prediction results of the high-frequency prediction model are used to adjust the energy supply equipment in real time, and the actual operating data of the equipment after adjustment is input into the model again for prediction, forming a continuously optimized closed-loop control process, thereby improving the adaptability and stability of the energy system.
[0082] Based on the above embodiments and optional embodiments, an optional implementation is provided, which is described in detail below.
[0083] An optional implementation of the present invention provides a method for determining high-frequency data in a building scene. Figure 2 is a flow chart of a data determination method provided by an optional embodiment of the present invention, such as Figure 2 As shown, it involves a building energy and carbon data downscaling method based on the optimized sparse attention mechanism Sparse Transformer target tracking algorithm. For multiple categories of low-frequency energy such as building cooling, heating, and gas, the long-term, coarse-grained time series data is downscaled to shorter-period or higher-frequency hourly dimension data, and the refined hourly electricity data is collected to obtain high-frequency energy data of all categories of buildings. The carbon emission factor is used to calculate the real-time carbon emissions during the building operation stage, evaluate the dynamic changes of carbon emissions, and formulate precise emission reduction measures.
[0084] To achieve the purpose of the present invention, the technical solution is: a building energy and carbon data downscaling method based on the optimized Sparse Transformer target tracking algorithm. It includes the following steps:
[0085] Step 1: Collect high-frequency data α and low-frequency data β and perform data preprocessing;
[0086] Step 2: Reduce the high-frequency data α to low-frequency data α1;
[0087] Step 3: Establish a tracking model A1 of the low-frequency data α1 and the original low-frequency data β;
[0088] Step 4: Extend the low-frequency data tracking model A1 to high-frequency data, establish the high-frequency data tracking model A2, and obtain the high-frequency energy data β1;
[0089] Step 5: Gather high-frequency data α and β1 to perform high-frequency carbon emission calculations during the building operation phase.
[0090] Specifically:
[0091] Step 1: Collect high-frequency energy data α and low-frequency energy data β and perform data preprocessing:
[0092] 1.1 Clean the original energy data (e.g., high frequency: electricity data in hourly dimension, etc.; low frequency: cooling, heating, and gas data in daily dimension, etc.) to ensure data quality, including processing outliers and missing values.
[0093] Outliers: Determine whether there are outliers based on the box plot and each quantile, delete the outliers and convert them into missing values.
[0094] Missing values: Detect the missing ratio of variables and consider deleting or filling. If the missing rate of the variable is high (greater than 50%), the coverage is low, and the importance is low, the variable can be deleted directly. If the variable to be filled is continuous, the mean method and random difference are generally used for filling. If the variable is discrete, the median or dummy variable is usually used for filling.
[0095] 1.2 Normalize the data so that it can be compared and converted between different scales. Use maximum-minimum normalization to map the data to the [0, 1] interval. The calculation formula is as follows.
[0096]
[0097] x is the eigenvalue before transformation, xnew is the eigenvalue after transformation, xmax is the maximum eigenvalue, and xmin is the minimum eigenvalue.
[0098] Step 2: Reduce the high-frequency energy data α to low-frequency energy data α1:
[0099] 2.1 Taking the high-frequency hourly electricity data as an example, by simple summation, its time dimension is reduced to be consistent with the low-frequency energy data. The time dimension of the low-frequency data in this article takes days as an example to calculate the total daily electricity consumption of the building.
[0100] Step 3: Establish a tracking model A1 for the low-frequency energy data α1 and the original low-frequency energy data β:
[0101] Based on the Sparse Transformer target tracking algorithm, the attention mechanism is introduced to establish a low-frequency energy data tracking model. The specific steps are as follows:
[0102] 3.1 Collect low-frequency energy data α1 and β, and convert the data at time i into vector zi, the expression is as follows.
[0103] z i =[α1,β]
[0104] 3.2 For the vector zi, multiply it by three matrices WQ, WK, and WV respectively to obtain three features, namely query: Qi = WQzi, key: Ki = WKzi, value: Vi = WVzi.
[0105] 3.3 Calculate the global attention weight, first calculate it with the query Qi of zi and the key Ki of all other vectors.
[0106]
[0107]
[0108] Where dk represents the dimension of the vector; e1i is the calculation weight; a1i is the global attention weight.
[0109] 3.4 Multiply the corresponding a1i and Vi and add them together to calculate the output vector h1 of z1.
[0110]
[0111] Perform the above steps for each zi to obtain the corresponding output vector. After aggregation and flattening, a new vector h will be obtained. The above is the introduction of the attention mechanism module, which enhances the feature representation of the model, improves the model prediction performance and adaptability, and optimizes the Sparse Transformer target tracking algorithm.
[0112] 3.5 uses the unconstrained positional encoding to perform positional encoding on the SparseTransformer module.
[0113] The 3.6 encoder consists of N encoder layers, each of which takes the output of the previous encoder layer as input and inputs the spatial position encoding into the encoder. Therefore, the first encoder layer takes the target template features with spatial position encoding as input. The specific calculation is expressed as:
[0114]
[0115] Where Z∈RHtWt×C represents the characteristics of the target template; Penc∈RHtWt×C represents the spatial position encoding, represents the i-th encoder layer, represents the output of the (i-1)th encoder layer.
[0116] 3.7 The decoder consists of M decoding layers, each of which not only inputs the search area features with spatial position encoding or the output of its previous decoder layer, but also inputs the encoded features of the target template output by the encoder. The specific calculation is expressed as:
[0117]
[0118] Where X∈RHsWs×C represents the search area feature, Pdec∈RHsWs×C represents the spatial position encoding, represents the target template encoding features output by the encoder, represents the i-th decoding layer, Represents the output of the (i-1)th decoding layer, and establishes a tracking model A1 of the low-frequency energy data α1 and the original low-frequency energy data β.
[0119] Step 4: Extend the low-frequency energy data tracking model A1 to high-frequency energy data and establish the high-frequency energy data tracking model A2.
[0120] 4.1 Extend the low-frequency energy data tracking model A1 to high-frequency energy data.
[0121] 4.2 Accumulate the hourly data of other energy categories, compare and verify with the daily or monthly data, and correct the intelligent model parameters.
[0122] 4.3 The mean absolute error (MAE) and root mean square error (RMSE) are used to evaluate the model and establish the high-frequency energy data tracking model A2.
[0123] MAE, the full name is Mean Absolute Error, which represents the average value of the absolute error between the predicted value and the observed value. Its calculation formula is as follows.
[0124]
[0125] RMSE, the full name is Root Mean Square Error, which represents the sample standard deviation of the difference between the predicted value and the observed value (called residual). The root mean square error is used to illustrate the degree of dispersion of the sample. When doing nonlinear fitting, the smaller the RMSE, the better. Its calculation formula is as follows.
[0126]
[0127] Step 5: Gather high-frequency energy data and perform high-frequency carbon emission calculations during the building operation phase.
[0128] 5.1 Based on the high-frequency energy data tracking model A2, the input is the low-frequency energy data of building cooling, heating, gas, etc., and the output is the high-frequency energy data of building cooling, heating, gas, etc.
[0129] 5.2 Collect high-frequency electricity, cooling, heating, gas and other energy data of all categories, combine them with the carbon emission factors of the corresponding energy categories, and use the carbon emission factor method to calculate the high-frequency carbon emission data C. The calculation expression is as follows.
[0130]
[0131] Among them, Ei is the energy consumption of the i-th type of building; EFi is the (dynamic) carbon emission factor of the i-th type of energy, and i is the number of energy categories.
[0132] It is worth noting that the optional implementation methods of the present invention are described using the main energy forms of buildings, such as cold, heat, electricity and gas, as examples, but the optional implementation methods of the present invention include but are not limited to the above energy categories.
[0133] Through the above optional implementation, at least the following beneficial effects can be achieved:
[0134] (1) Enhanced real-time performance:
[0135] By downscaling long-term, coarse-grained time series data into shorter-period or higher-frequency data, the model can provide a more detailed analysis of the dynamic changes in carbon emissions. This downscaling process helps to more accurately evaluate and formulate emission reduction measures, which is of great significance for real-time monitoring and response to building carbon emissions. For building managers, energy use strategies can be adjusted immediately to optimize building operation efficiency; real-time data helps to quickly respond to market changes and adjust energy policies and emission reduction measures in a timely manner.
[0136] (2) Improve accuracy:
[0137] The method proposed in the optional implementation mode of the present invention is based on the Sparse Transformer target tracking algorithm, which is an advanced deep learning architecture that can effectively process sequence data and introduce an attention mechanism so that the model can focus on key information and ignore irrelevant or redundant data. Through this optimization algorithm, the model can better capture the time series characteristics of building energy consumption and improve the accuracy of carbon emission accounting.
[0138] (3) Improving green and low-carbon development in the construction industry:
[0139] Based on the present invention, an efficient and accurate carbon emission accounting model is provided for the construction industry, which helps to promote the construction industry to develop in a green and low-carbon direction. Through accurate carbon emission accounting, building owners and operators can better understand the impact of their operations on the environment and take effective measures to reduce carbon footprint. In addition, it also provides data-assisted support for building owners to participate in the carbon trading market, which helps to quantify and manage carbon assets and promote the development of green buildings and low-carbon economy.
[0140] It should be noted that, for the above-mentioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should know that the present invention is not limited by the described action sequence, because according to the present invention, certain steps can be performed in other sequences or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present invention.
[0141] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods of various embodiments of the present invention.
[0142] Example 2
[0143] According to an embodiment of the present invention, a device for implementing the above-mentioned method for determining high-frequency data in a building scene is also provided. Figure 3 is a structural block diagram of a device for determining high-frequency data in a building scene according to an embodiment of the present invention. Figure 3As shown, the device includes: a first determination module 302, a calling module 304 and a second determination module 306. The device is described in detail below.
[0144] A first determination module 302 is used to determine first high-frequency data corresponding to a first energy source, wherein the first high-frequency data is data having a measurement unit less than a first threshold and corresponding to the first energy source; a retrieval module 304 is connected to the first determination module 302 and is used to retrieve a high-frequency prediction model corresponding to a target building scene, wherein the target building scene is a building scene using a first energy source and a second energy source, the second energy source is an energy source associated with the first energy source, and the high-frequency prediction model is constructed based on a low-frequency prediction model, and the low-frequency prediction model is obtained by training based on sample data, the sample data includes first sample low-frequency data corresponding to the first energy source and second sample low-frequency data corresponding to the second energy source in the target building scene, and the first sample low-frequency data is obtained based on the sample high-frequency data; a second determination module 306 is connected to the retrieval module 304 and is used to input the first high-frequency data into the high-frequency prediction model to determine second high-frequency data corresponding to the second energy source.
[0145] It should be noted here that the above-mentioned first determination module 302, calling module 304 and second determination module 306 correspond to steps S102 to S106 in implementing the high-frequency data determination method in the building scene, and the instances and application scenarios implemented by the multiple modules are the same as the corresponding steps, but are not limited to the contents disclosed in the above-mentioned embodiment 1.
[0146] Example 3
[0147] According to another aspect of an embodiment of the present invention, there is also provided an electronic device, comprising: a processor; and a memory for storing instructions executable by the processor, wherein the processor is configured to execute instructions to implement any of the above-mentioned methods for determining high-frequency data in a building scene.
[0148] Example 4
[0149] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided. When instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device can execute any of the above-mentioned methods for determining high-frequency data in a building scene.
[0150] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0151] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0152] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0153] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0154] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0155] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0156] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for determining high-frequency data in a building scene, characterized in that: include: Determine first high-frequency data corresponding to a first energy source, wherein the first high-frequency data is data having a measurement unit less than a first threshold and corresponding to the first energy source; Retrieve a high-frequency prediction model corresponding to a target building scene, wherein the target building scene is a building scene using the first energy and the second energy, the second energy is an energy associated with the first energy, the high-frequency prediction model is constructed based on a low-frequency prediction model, the low-frequency prediction model is obtained by training based on sample data, the sample data includes first sample low-frequency data corresponding to the first energy and second sample low-frequency data corresponding to the second energy in the target building scene, the first sample low-frequency data is obtained based on sample high-frequency data, the first sample low-frequency data is data having a measurement unit greater than or equal to the first threshold and corresponding to the first energy, and the second sample low-frequency data is data having a measurement unit greater than or equal to the second threshold and corresponding to the second energy; The first high-frequency data is input into a high-frequency prediction model to determine second high-frequency data corresponding to the second energy.
2. The method according to claim 1, characterized in that Before calling the high-frequency prediction model corresponding to the target building scene, it also includes: Acquire the sample high-frequency data corresponding to the first energy source; Accumulating the sample high-frequency data to obtain the first sample low-frequency data; Training an initial model based on the first sample low-frequency data corresponding to the first energy source and the second sample low-frequency data corresponding to the second energy source to obtain the low-frequency prediction model; The high-frequency prediction model is obtained according to the low-frequency prediction model.
3. The method according to claim 2, characterized in that Training the initial model according to the first sample low-frequency data corresponding to the first energy source and the second sample low-frequency data corresponding to the second energy source to obtain the low-frequency prediction model includes: Converting the first sample low-frequency data and the second sample low-frequency data into a predetermined vector; Determine a query vector, a key vector, and a value vector corresponding to the predetermined vector according to the query matrix, the key matrix, and the value matrix; determining a similarity index between the query vector and each key vector; Normalizing the multiple similarity indexes to obtain multiple attention weights, wherein the multiple attention weights correspond to the multiple similarity indexes one by one; According to the multiple attention weights, weighted sum is performed with the corresponding value vector to obtain an output vector corresponding to the query vector; The output vector is input into the initial model for training to obtain the low-frequency prediction model.
4. The method according to claim 3, characterized in that: Inputting the output vector into the initial model for training to obtain the low-frequency prediction model includes: In the case where the initial model includes an encoder and a decoder, the output vector is input into the encoder for dimensionality reduction processing to obtain a target vector; Inputting the target vector into the decoder to reconstruct a reconstructed vector; determining a loss value between the output vector and the reconstructed vector; The parameters of the encoder and the decoder are adjusted by a back propagation algorithm until the corresponding loss value is lower than a third threshold, thereby obtaining the low-frequency prediction model.
5. The method according to claim 2, characterized in that: The high-frequency prediction model is obtained according to the low-frequency prediction model, including: Determining initial model parameters of the low-frequency prediction model; Identify the distinguishing features of low-frequency data from high-frequency data; Determining, from the initial model parameters, parameter adjustment items corresponding to the distinguishing features; The parameters of the parameter adjustment items are adjusted according to the distinguishing features to obtain the adjusted initial model parameters.
6. The method according to claim 1, characterized in that Before inputting the first high-frequency data into a high-frequency prediction model to determine the second high-frequency data corresponding to the second energy source, the method further includes: determining a missing index of the first high-frequency data; When the missing index is greater than a third threshold, determining a data type of the first high-frequency data; The first high-frequency data is filled in a manner corresponding to the data type to obtain the filled first high-frequency data.
7. The method according to any one of claims 1 to 6, characterized in that After inputting the first high-frequency data into a high-frequency prediction model to determine the second high-frequency data corresponding to the second energy source, the method further includes: determining an energy supply device corresponding to the second high-frequency data; The energy supply equipment is adjusted according to the second high-frequency data to achieve an energy supply target.
8. A device for determining high-frequency data in a building scene, characterized in that: include: A first determination module, configured to determine first high-frequency data corresponding to a first energy source, wherein the first high-frequency data is data having a measurement unit less than a first threshold and corresponding to the first energy source; A calling module, used for calling a high-frequency prediction model corresponding to a target building scene, wherein the target building scene is a building scene using the first energy and the second energy, the second energy is an energy associated with the first energy, the high-frequency prediction model is constructed based on a low-frequency prediction model, the low-frequency prediction model is obtained by training based on sample data, the sample data includes first sample low-frequency data corresponding to the first energy and second sample low-frequency data corresponding to the second energy in the target building scene, the first sample low-frequency data is obtained based on sample high-frequency data, the first sample low-frequency data is data having a measurement unit greater than or equal to the first threshold and corresponding to the first energy, and the second sample low-frequency data is data having a measurement unit greater than or equal to the second threshold and corresponding to the second energy; The second determination module is used to input the first high-frequency data into a high-frequency prediction model to determine second high-frequency data corresponding to the second energy.
9. An electronic device, characterized in that: include: processor; a memory for storing instructions executable by the processor; The processor is configured to execute the instructions to implement the method for determining high-frequency data in a building scene as described in any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: When the instructions in the computer-readable storage medium are executed by a processor of an electronic device, the electronic device is enabled to execute the method for determining high-frequency data in a building scene as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Akeptus smart building technology: system and procedure for development of smart energy sensors
CA3082653A1
Scene template library construction method, object prediction method and device, and electronic equipment
CN116662411A
Short-term economic prediction model training method and device and readable storage medium