Intelligent monitoring system and method suitable for aluminum alloy formwork construction
By designing an intelligent monitoring system suitable for aluminum alloy formwork construction, including construction step monitoring modules and secondary analysis modules, the problem of inability to comprehensively and accurately monitor and analyze the construction process in the existing technology has been solved, and the construction quality and safety have been improved Sexual effect.
Patent Information
- Application Number
- CN202411571283.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-06
- Publication Date
- 2025-02-25
AI Technical Summary
The existing intelligent monitoring system is difficult to achieve comprehensive and accurate monitoring and analysis in the construction of aluminum alloy formwork, and cannot have an in-depth understanding of the construction steps and stages, which makes it difficult to detect and deal with potential problems in a timely manner, affecting construction quality and safety.
An intelligent monitoring system including a construction step monitoring module, a construction monitoring primary analysis module and a construction monitoring secondary analysis module are designed. The system generates monitoring records for each construction step, conducts a primary analysis to determine whether to conduct a secondary analysis, and obtains the formwork construction process value through the secondary analysis to determine whether to continue the construction process.
The depth and accurate analysis of the aluminum alloy formwork construction process is achieved, and potential problems can be discovered and dealt with in a timely manner, the construction quality and safety are improved, and management personnel can make better construction decisions.
Smart Images

Figure CN119513692A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction monitoring, and more specifically, to an intelligent monitoring system and method suitable for aluminum alloy formwork construction. Background Art
[0002] In the field of aluminum alloy formwork construction, the traditional construction monitoring method mainly relies on manual monitoring, which is easily affected by human factors, resulting in inaccurate and unreliable monitoring results. Secondly, the results of manual monitoring can only reflect unilateral monitoring data and cannot fully reflect the overall situation of the construction process.
[0003] With the continuous development of science and technology, intelligent monitoring technology has also been applied in the field of aluminum alloy formwork construction. Most of the existing intelligent monitoring systems can only realize basic construction parameter monitoring and data recording functions, and lack the ability to conduct in-depth analysis and comprehensive evaluation of construction steps and stages. Therefore, how to develop an intelligent monitoring system that can comprehensively and accurately monitor and analyze the construction process of aluminum alloy formwork, timely discover and deal with potential problems, and improve construction quality and safety has become a technical problem that needs to be solved urgently. Summary of the invention
[0004] In view of the deficiencies in the prior art, the object of the present invention is to provide an intelligent monitoring system and method suitable for aluminum alloy formwork construction.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] An intelligent monitoring system suitable for aluminum alloy formwork construction, including a construction step monitoring module, a construction monitoring primary analysis module, and a construction monitoring secondary analysis module;
[0007] During the construction of the aluminum alloy formwork, the construction step monitoring module generates a construction step monitoring record of the construction step each time a construction step in a construction stage is completed;
[0008] The construction monitoring primary analysis module is used to obtain the construction step monitoring value of the construction step monitoring record, and determine whether to perform the construction monitoring secondary analysis based on the comparison result between the construction step monitoring value and the construction step monitoring threshold;
[0009] The construction monitoring secondary analysis module obtains the template construction process value after the construction monitoring secondary analysis, and determines whether to continue the construction process of the aluminum alloy template based on the comparison result between the template construction process value and the template construction process boundary value.
[0010] Furthermore, the construction step monitoring record includes the construction step, the construction stage, and the construction step monitoring value.
[0011] Furthermore, the construction step monitoring value of the construction step monitoring record is obtained in the following manner: obtain the construction step in which the construction step monitoring record is located, collect all construction measurement data in the construction step, pre-process all construction measurement data of the construction step and package them into a construction data set, obtain the construction step analysis model corresponding to the construction step, use the construction data set as input data of the construction step analysis model, and the construction step analysis model outputs the construction step monitoring value.
[0012] Furthermore, based on the comparison result between the construction step monitoring value and the construction step monitoring threshold, it is determined whether to perform secondary analysis of construction monitoring, specifically: setting the construction step monitoring threshold, when the construction step monitoring value of the construction step monitoring record is greater than or equal to the construction step monitoring threshold, suspending the construction process of the aluminum alloy formwork, and rectifying the construction of the aluminum alloy formwork; when the construction step monitoring value of the construction step monitoring record is less than the construction step monitoring threshold, obtaining the formwork construction process value.
[0013] Furthermore, the template construction process value is obtained in the following way: obtain all construction step monitoring records in the aluminum alloy template construction process, obtain the construction stage of the construction step monitoring record, mark all construction step monitoring records in the same construction stage as the same-stage monitoring records, and then obtain the stage monitoring value of each construction stage, set the stage monitoring boundary value, when the stage monitoring value of the construction stage is greater than or equal to the stage monitoring boundary value, mark the construction stage as a prominent stage, when the stage monitoring value of the construction stage is less than the stage monitoring boundary value, mark the construction stage as a conventional stage, match all prominent stages into a prominent stage group, when two prominent stages in the prominent stage group are adjacent stages, increase the adjacent prominent impact times by one, when two prominent stages in the prominent stage group are non-adjacent stages, increase the independent prominent impact times by one, mark the adjacent prominent impact times as EKUD, mark the independent prominent impact times as BMHS, mark the total number of conventional stages as BXDT, and use the formula The template construction process value SGGC is obtained, where pa is the adjacent protrusion influence coefficient, pb is the independent protrusion influence coefficient, and pc is the conventional coefficient.
[0014] Furthermore, the stage monitoring value of the construction stage is obtained in the following way: obtain the construction steps of all monitoring records of the same order, sort all monitoring records of the same order in the order of the construction steps, compare the step types of the construction steps of two adjacent monitoring records of the same order after sorting, when the step types are the same, increase the number of stable times of the construction type by one, mark the number of stable times of the construction type as HRSt, sum the monitoring values of the construction steps of two adjacent monitoring records of the same order after sorting, obtain the monitoring value of the connected steps, set the monitoring threshold of the connected steps, when the monitoring value of the connected steps is greater than or equal to the monitoring threshold of the connected steps, increase the number of connected hidden dangers by one, mark the number of connected hidden dangers as TBZy, and use the formula The stage monitoring value FGSP of the construction stage is obtained, where ja is the stability coefficient of the construction type and jb is the connected hidden danger coefficient.
[0015] Furthermore, the step type of the construction step in which the same-order monitoring record is located is obtained in the following manner: obtain the construction step monitoring value of the same-order monitoring record, set the construction step monitoring high value and the construction step monitoring low value, when the construction step monitoring value of the same-order monitoring record is greater than or equal to the construction step monitoring high value, mark the step type of the construction step in which the same-order monitoring record is located as a one-stage step type, when the construction step monitoring value of the same-order monitoring record is less than or equal to the construction step monitoring low value, mark the step type of the construction step in which the same-order monitoring record is located as a three-stage step type, and when the construction step monitoring value of the same-order monitoring record is between the construction step monitoring high value and the construction step monitoring low value, mark the step type of the construction step in which the same-order monitoring record is located as a two-stage step type.
[0016] Furthermore, based on the comparison result between the template construction process value and the template construction process boundary value, determine whether to continue the construction process of the aluminum alloy template, specifically: set the template construction process boundary value, when the template construction process value is greater than or equal to the template construction process boundary value, suspend the construction process of the aluminum alloy template, and rectify the construction of the aluminum alloy template; when the template construction process value is less than the template construction process boundary value, continue the construction process of the aluminum alloy template.
[0017] Furthermore, an intelligent monitoring method applicable to aluminum alloy formwork construction includes the following steps:
[0018] Step 1: During the construction of the aluminum alloy formwork, each time a construction step in a construction stage is completed, a construction step monitoring record of the construction step is generated;
[0019] Step 2: Obtain the construction step monitoring value of the construction step monitoring record, and determine whether to perform secondary analysis of construction monitoring based on the comparison result between the construction step monitoring value and the construction step monitoring threshold;
[0020] Step 3: After the secondary analysis of construction monitoring, the formwork construction process value is obtained, and based on the comparison result between the formwork construction process value and the formwork construction process boundary value, it is determined whether to continue the construction process of the aluminum alloy formwork.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] 1. The method of the present invention analyzes in depth and accurately whether the construction of the aluminum alloy formwork needs to be rectified through independent analysis of the construction steps and comprehensive analysis of the construction steps and construction stages;
[0023] 2. Set up a construction step monitoring module to carry out detailed monitoring of the construction steps of each construction stage in the aluminum alloy formwork construction, accurately feedback the situation of each construction step, set up a construction monitoring first-level analysis module and a construction monitoring second-level analysis module, and complete the two-level monitoring and analysis of the aluminum alloy formwork construction, which will help managers make better construction decisions. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 A method flow chart of an intelligent monitoring method applicable to aluminum alloy formwork construction;
[0025] Figure 2 A flow chart of a method for determining whether to continue the construction process of the aluminum alloy formwork;
[0026] Figure 3 This is the system module diagram of the intelligent monitoring system suitable for aluminum alloy formwork construction. DETAILED DESCRIPTION
[0027] Example 1: Reference Figure 1 , an intelligent monitoring method applicable to aluminum alloy formwork construction includes the following steps:
[0028] Step 1: During the construction of the aluminum alloy formwork, each time a construction step in a construction stage is completed, a construction step monitoring record of the construction step is generated;
[0029] Step 2: Obtain the construction step monitoring value of the construction step monitoring record, and determine whether to perform secondary analysis of construction monitoring based on the comparison result between the construction step monitoring value and the construction step monitoring threshold;
[0030] Step 3: After the secondary analysis of construction monitoring, the formwork construction process value is obtained, and based on the comparison result between the formwork construction process value and the formwork construction process boundary value, it is determined whether to continue the construction process of the aluminum alloy formwork.
[0031] Example 2: Reference Figure 2-Figure 3 , an intelligent monitoring system suitable for aluminum alloy formwork construction, including a construction step monitoring module, a construction monitoring first-level analysis module, and a construction monitoring second-level analysis module.
[0032] Construction step monitoring module: During the construction of aluminum alloy formwork, when a construction step in a construction stage is completed (the construction process of aluminum alloy formwork includes multiple construction stages, each construction stage includes multiple construction steps, all construction stages must be strictly carried out in stage order, and the construction steps in the construction stage must be strictly carried out in step order. The construction stages include the following: 1. Construction preparation stage; 2. Wall and column formwork installation stage; 3. Beam and slab formwork installation stage; 4. Formwork correction and reinforcement stage; 5. Rebar binding stage. The construction steps in the construction preparation stage include the following: 1. Measurement and layout steps; 2. Ground leveling and chiseling steps; 3. Installation of positioning bars and embedded parts steps; The construction steps in the wall and column formwork installation stage include the following: 1. Wall and column steel bar binding and acceptance steps; 2. Brushing release agent steps; 3. Wall and column formwork assembly and correction steps), a construction step monitoring record of the construction step is generated. The construction step monitoring record includes the construction step, the construction stage, and the construction step monitoring value.
[0033] The construction step monitoring value of the construction step monitoring record is obtained in the following manner: obtain the construction step in which the construction step monitoring record is located, collect all construction measurement data in the construction step (taking the measurement and layout step as an example, the collected data includes but is not limited to layout position data, layout accuracy data, and layout efficiency data), pre-process all construction measurement data of the construction step and package them into a construction data set (data preprocessing methods include but are not limited to data cleaning and data formatting), obtain the construction step analysis model corresponding to the construction step, use the construction data set as input data of the construction step analysis model, and the construction step analysis model outputs the construction step monitoring value.
[0034] Each construction step corresponds to an independent construction step analysis model. The only difference between each construction step analysis model is the replacement of training data. This embodiment discloses a method for constructing a construction step analysis model for the measurement and layout steps: collecting multiple groups of construction data sets of the measurement and layout steps (the collected construction data sets have been preprocessed), constructing a deep learning model, using each group of construction data sets as training data for the deep learning model, assigning a construction step monitoring value to each training data, and the value range of the construction step monitoring value is (0.5~1.5). The larger the value of the construction step monitoring value, the less it meets the construction standard of the measurement and layout steps. The smaller the value of the construction step monitoring value, the more it meets the construction standard of the measurement and layout steps. The training data is divided into 70% of the training set and 30% of the validation set, and the training set and the validation set are trained. After the training is completed, the construction step analysis model is obtained.
[0035] Construction monitoring first-level analysis module: obtain the construction step monitoring value of the construction step monitoring record, set the construction step monitoring threshold (the construction step monitoring threshold is a preset value, and the system can modify the size by itself); when the construction step monitoring value of the construction step monitoring record is greater than or equal to the construction step monitoring threshold, suspend the construction process of the aluminum alloy formwork and rectify the construction of the aluminum alloy formwork; when the construction step monitoring value of the construction step monitoring record is less than the construction step monitoring threshold, obtain the formwork construction process value.
[0036] The template construction process value is obtained in the following way: obtain all the construction step monitoring records in the aluminum alloy template construction process, obtain the construction stage of the construction step monitoring record, mark all the construction step monitoring records in the same construction stage as the same stage monitoring records, and then obtain the stage monitoring value of each construction stage, set the stage monitoring boundary value (the stage monitoring boundary value is a preset value, and the system can modify the size by itself), when the stage monitoring value of the construction stage is greater than or equal to the stage monitoring boundary value, mark the construction stage as a prominent stage, when the stage monitoring value of the construction stage is less than the stage monitoring boundary value, mark the construction stage as a regular stage, match all the prominent stages into a prominent stage group, when two prominent stages in the prominent stage group are adjacent stages (such as the two prominent stages in the prominent stage group are the construction preparation stage and the wall column template installation stage, indicating that the two prominent stages are adjacent stages), increase the adjacent prominent impact times by one, when the two prominent stages in the prominent stage group are non-adjacent stages, increase the independent prominent impact times by one, mark the adjacent prominent impact times as EKUD, mark the independent prominent impact times as BMHS, mark the total number of regular stages as BXDT, and use the formula The template construction process value SGGC is obtained, where pa is the adjacent protrusion influence coefficient, pb is the independent protrusion influence coefficient, pc is the conventional coefficient, the value of pa is 0.92, the value of pb is 0.65, and the value of pc is 0.74.
[0037] The stage monitoring value of the construction stage is obtained in the following way: obtain the construction steps of all monitoring records of the same order, sort all monitoring records of the same order in the order of the construction steps, compare the step types of the construction steps of the two adjacent monitoring records of the same order after sorting, when the step types are the same, increase the number of stable times of the construction type by one, when the step types are different, do not process, mark the number of stable times of the construction type as HRSt, sum the construction step monitoring values of the two adjacent monitoring records of the same order after sorting, obtain the monitoring value of the connected steps, set the monitoring threshold of the connected steps (the monitoring threshold of the connected steps is a preset value, and the system can modify the size by itself), when the monitoring value of the connected steps is greater than or equal to the monitoring threshold of the connected steps, increase the number of connected hidden dangers by one, when the monitoring value of the connected steps is less than the monitoring threshold of the connected steps, do not process, mark the number of connected hidden dangers as TBZy, and use the formula The stage monitoring value FGSP of the construction stage is obtained, where ja is the stability coefficient of the construction type, jb is the connected hidden danger coefficient, the value of ja is 1.26, and the value of jb is 1.08.
[0038] The step type of the construction step where the same-order monitoring record is located is obtained in the following way: obtain the construction step monitoring value of the same-order monitoring record, set the construction step monitoring high value and the construction step monitoring low value (the construction step monitoring high value is greater than the construction step monitoring low value, and the construction step monitoring threshold is greater than the construction step monitoring high value, the construction step monitoring high value and the construction step monitoring low value are both preset values, and the system can modify the size by itself), when the construction step monitoring value of the same-order monitoring record is greater than or equal to the construction step monitoring high value, the step type of the construction step where the same-order monitoring record is located is marked as a one-stage step type, when the construction step monitoring value of the same-order monitoring record is less than or equal to the construction step monitoring low value, the step type of the construction step where the same-order monitoring record is located is marked as a three-stage step type, and when the construction step monitoring value of the same-order monitoring record is between the construction step monitoring high value and the construction step monitoring low value, the step type of the construction step where the same-order monitoring record is located is marked as a two-stage step type.
[0039] Construction monitoring secondary analysis module: Set the template construction process boundary value (the template construction process boundary value is a preset value, and the system can modify the size by itself). When the template construction process value is greater than or equal to the template construction process boundary value, suspend the construction process of the aluminum alloy template and rectify the construction of the aluminum alloy template (the rectification method is not the research and development focus of this application, so it will not be elaborated). When the template construction process value is less than the template construction process boundary value, continue the construction process of the aluminum alloy template.
[0040] A construction step monitoring module is set up to carry out detailed monitoring of the construction steps of each construction stage in the aluminum alloy formwork construction, and accurate feedback is given on the situation of each construction step. A first-level construction monitoring analysis module and a second-level construction monitoring analysis module are set up to complete the two-level monitoring and analysis of the aluminum alloy formwork construction through independent analysis of the construction steps and comprehensive analysis of the construction steps and construction stages. In-depth and accurate analysis of whether the construction of the aluminum alloy formwork needs to be rectified will help managers make better construction decisions.
[0041] The above formulas are all dimensionless and numerical calculations are performed, and the preset parameters in the formulas are set by technicians in this field according to actual conditions.
[0042] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.
[0043] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0044] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0045] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0046] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0047] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in the various embodiments of the present application. The aforementioned storage media include: various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.
[0048] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. Intelligent monitoring system suitable for aluminum alloy formwork construction, characterized by: It includes construction step monitoring module, construction monitoring primary analysis module and construction monitoring secondary analysis module; During the construction of the aluminum alloy formwork, the construction step monitoring module generates a construction step monitoring record of the construction step each time a construction step in a construction stage is completed; The construction monitoring primary analysis module is used to obtain the construction step monitoring value of the construction step monitoring record, and determine whether to perform the construction monitoring secondary analysis based on the comparison result between the construction step monitoring value and the construction step monitoring threshold; The construction monitoring secondary analysis module obtains the template construction process value after the construction monitoring secondary analysis, and determines whether to continue the construction process of the aluminum alloy template based on the comparison result between the template construction process value and the template construction process boundary value.
2. The intelligent monitoring system for aluminum alloy formwork construction according to claim 1 is characterized in that: The construction step monitoring record includes the construction step, construction stage, and construction step monitoring value.
3. The intelligent monitoring system for aluminum alloy formwork construction according to claim 1 is characterized in that: The construction step monitoring value of the construction step monitoring record is obtained in the following manner: obtain the construction step in which the construction step monitoring record is located, collect all construction measurement data in the construction step, preprocess all construction measurement data of the construction step and package them into a construction data set, obtain the construction step analysis model corresponding to the construction step, use the construction data set as input data of the construction step analysis model, and the construction step analysis model outputs the construction step monitoring value.
4. The intelligent monitoring system for aluminum alloy formwork construction according to claim 1 is characterized in that: Based on the comparison result between the construction step monitoring value and the construction step monitoring threshold, determine whether to conduct secondary analysis of construction monitoring, specifically: set the construction step monitoring threshold, when the construction step monitoring value recorded in the construction step monitoring record is greater than or equal to the construction step monitoring threshold, suspend the construction process of the aluminum alloy formwork, and rectify the construction of the aluminum alloy formwork; when the construction step monitoring value recorded in the construction step monitoring record is less than the construction step monitoring threshold, obtain the formwork construction process value.
5. The intelligent monitoring system for aluminum alloy formwork construction according to claim 4 is characterized in that: The template construction process value is obtained in the following way: obtain all the construction step monitoring records in the aluminum alloy template construction process, obtain the construction stage of the construction step monitoring record, mark all the construction step monitoring records in the same construction stage as the same stage monitoring records, and then obtain the stage monitoring value of each construction stage, set the stage monitoring boundary value, when the stage monitoring value of the construction stage is greater than or equal to the stage monitoring boundary value, mark the construction stage as a prominent stage, when the stage monitoring value of the construction stage is less than the stage monitoring boundary value, mark the construction stage as a regular stage, match all the prominent stages into a prominent stage group, when two prominent stages in the prominent stage group are adjacent stages, increase the number of adjacent prominent impacts by one, when two prominent stages in the prominent stage group are non-adjacent stages, increase the number of independent prominent impacts by one, mark the number of adjacent prominent impacts as EKUD, mark the number of independent prominent impacts as BMHS, mark the total number of regular stages as BXDT, and use the formula The template construction process value SGGC is obtained, where pa is the adjacent protrusion influence coefficient, pb is the independent protrusion influence coefficient, and pc is the conventional coefficient.
6. The intelligent monitoring system for aluminum alloy formwork construction according to claim 5 is characterized in that: The stage monitoring value of the construction stage is obtained in the following way: obtain the construction steps of all monitoring records of the same order, sort all monitoring records of the same order in the order of the construction steps, compare the step types of the construction steps of two adjacent monitoring records of the same order after sorting, when the step types are the same, increase the number of stable times of the construction type by one, mark the number of stable times of the construction type as HRSt, sum the monitoring values of the construction steps of two adjacent monitoring records of the same order after sorting, obtain the monitoring value of the connected steps, set the monitoring threshold of the connected steps, when the monitoring value of the connected steps is greater than or equal to the monitoring threshold of the connected steps, increase the number of connected hidden dangers by one, mark the number of connected hidden dangers as TBZy, and use the formula The stage monitoring value FGSP of the construction stage is obtained, where ja is the stability coefficient of the construction type and jb is the connected hidden danger coefficient.
7. The intelligent monitoring system for aluminum alloy formwork construction according to claim 6 is characterized in that: The step type of the construction step where the same-order monitoring record is located is obtained in the following manner: obtain the construction step monitoring value of the same-order monitoring record, set the construction step monitoring high value and the construction step monitoring low value, when the construction step monitoring value of the same-order monitoring record is greater than or equal to the construction step monitoring high value, mark the step type of the construction step where the same-order monitoring record is located as a one-stage step type, when the construction step monitoring value of the same-order monitoring record is less than or equal to the construction step monitoring low value, mark the step type of the construction step where the same-order monitoring record is located as a three-stage step type, when the construction step monitoring value of the same-order monitoring record is between the construction step monitoring high value and the construction step monitoring low value, mark the step type of the construction step where the same-order monitoring record is located as a two-stage step type.
8. The intelligent monitoring system for aluminum alloy formwork construction according to claim 1 is characterized in that: Based on the comparison result between the template construction process value and the template construction process boundary value, determine whether to continue the construction process of the aluminum alloy template. Specifically, set the template construction process boundary value. When the template construction process value is greater than or equal to the template construction process boundary value, suspend the construction process of the aluminum alloy template and rectify the construction of the aluminum alloy template. When the template construction process value is less than the template construction process boundary value, continue the construction process of the aluminum alloy template.
9. An intelligent monitoring method for aluminum alloy formwork construction, applied to the intelligent monitoring system for aluminum alloy formwork construction according to claim 1, characterized in that: The steps include: Step 1: During the construction of the aluminum alloy formwork, each time a construction step in a construction stage is completed, a construction step monitoring record of the construction step is generated; Step 2: Obtain the construction step monitoring value of the construction step monitoring record, and determine whether to perform secondary analysis of construction monitoring based on the comparison result between the construction step monitoring value and the construction step monitoring threshold; Step 3: After the secondary analysis of construction monitoring, the formwork construction process value is obtained, and based on the comparison result between the formwork construction process value and the formwork construction process boundary value, it is determined whether to continue the construction process of the aluminum alloy formwork.